Section C – 0100000 General Information 0100000 – General Information
| 1.3 |
| Acquisition of Additional Work |
| 1.4 |
| Background Information |
| 1.5 |
| Verification of Workload and Conditions |
| 1.8 |
| Navy Approach to Service Contracting |
| 1.8.1 |
| Partnering Philosophy |
| 1.8.2 |
| Contractor's Knowledge |
| 1.8.3 |
| Industry Best Practices |
| 1.11 |
| Technical Proposal Certification |
0100000 – General Information
| Spec Item |
| Title |
| Description |
| 1.1 |
| Outline of Services |
| Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Naval Weapons Station Earle, Colts Neck, New Jersey 07722.and outlying areas supported by this installation performance-based contract that is comprised of both Recurring Work and Non-Recurring Work Items. |
The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff Annex 4 Public Safety Annex 5 Air Operations Annex 6 Port Operations Annex 7 Ordnance Annex 8 Range Operations Annex 9 Health Care Support Annex 10 Supply Annex 11 Personnel Support Annex 12 Morale, Welfare and Recreation Support Annex 13 Galley Annex 14 Housing Annex 15 Facilities Support Annex 16 Utilities Annex 17 Base Support Vehicles and Equipment Annex 18 Environmental
| 1.2 |
| Project Location |
| The work sites are located on the main Station in Colts Neck, New Jersey on State Highway Route 34, the Pier Complex located in Leonardo, New Jersey on State Highway Route 36 and the government highway known as Normandy Road which interconnects the two activities and runs approximately 18 miles. Normandy Road is a Government property with restricted access limited to Station personnel and Contractors working with NWS Earle. |
The work shall be performed at various locations and could vary from location to location. The following is an example of the dispersion of work at the various locations.
(1) Pest Control: Naval Weapons Station Earle, Colts Neck, Leonardo and the interconnecting Normandy Road.
| 1.3 |
| Acquisition of Additional Work |
| The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract. |
| 1.4 |
| Background Information |
| Naval Weapons Station (NWS) Earle is located approximately 50 statute miles south of New York City in the township of Colts Neck, in beautiful rural Monmouth County, New Jersey. Some areas of public interest near by to this Naval activity are Continental Arena, beautiful Monmouth Park and always exciting Atlantic City. NWS Earle encompasses 11,851 acres. The main Station area occupies 10,218 acres. Another 670 acres are occupied in the vicinity of the Waterfront area in Leonardo, New Jersey, adjacent to Sandy Hook Bay. The remaining acreage abuts the road, which connects the two areas. NWS Earle’s mission is to receive, issue, maintain, store ammunition, explosives, and perform additional Mission requirements as directed by Department of the Navy. In addition, NWS Earle presently provides real estate, facilities, administrative and logistical support to other DOD Commands including Navy and Civilian ships. |
The railroad connects the two sections of the base. Approximately 20 miles apart on double track mainline, ending three miles in the bay on trestles and three working piers. The rail system has multiple storage yards with multiple tracks. The mainline crosses bridges underpasses and major highways. Each intersection has signals and traffic lights. The track maintenance will require working in isolated areas where getting equipment in and out will be a challenge. The mainline is adjacent to houses the entire length.
| 1.5 |
| Verification of Workload and Conditions |
| Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided. |
As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
| 1.6 |
| Standard Template |
| Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. |
The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification Item 3 will always contain the Recurring Work requirements. Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.
| 1.7 |
| Related Information |
| There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows: |
Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
| 1.8 |
| Navy Approach to Service Contracting |
| The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations. The Navy also supports the following principles: |
| 1.8.1 |
| Partnering Philosophy |
| The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners. |
| 1.8.2 |
| Contractor's Knowledge |
| The Navy expects to receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level. |
| 1.8.3 |
| Industry Best Practices |
| The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. To that end, the Navy's emphasis will be in evaluating performance objectives (end results). |
| 1.9 |
| Standard Template |
| Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations. |
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the management and administrative requirements. Specification Item 3 will always contain the Recurring Work requirements. Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.
| 1.10 |
| Navy PBSA Approach |
| The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan. |
| 1.11 |
| Technical Proposal Certification |
| The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract. |