Attachment SECTION J.pdf
PDF 1012 KB Posted
- Attached to
- Integrated Solid Waste Management Services (ISWM) Federal contract opportunity
- Solicitation number
- N6945024R0090
About this file
This document appears to be a solicitation for Integrated Solid Waste Management (ISWM) services at Naval Air Station Meridian, MS. The solicitation number is N6945024R0090 and it is a 100% set-aside for SBA certified HUBZone small business concerns. The solicitation covers requirements for solid waste collection, transportation, and disposal services for various facilities at the installation. Key details include the specific buildings, container sizes, and collection frequencies. The document also includes attachments with definitions, references, and technical documents related to solid waste management. Overall, this appears to be a commercial purchase procurement for ISWM services issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2- SECTION J.pdf | ||
| Attachment 5 - J-0200000-06.xlsx | XLSX spreadsheet | |
| Amendment 0002 SF30_N6945024R0090.pdf | ||
| Attachment 1- SECTION C.pdf | ||
| Attachment 3 - J-0200000-02.pdf | ||
| Attachment 4 - J-0200000-05.pdf | ||
| SF1449.pdf | ||
| Amendment 0001 SF30_N6945024R0090.pdf | ||
| Attachment J-0200000-06.xlsx | XLSX spreadsheet | |
| Solicitation SF1449 N6945024R0090_Conformed.pdf | ||
| N6945024R0090_Solicitation.pdf | ||
| Attachment J-0200000-06.xlsx | XLSX spreadsheet | |
| Attachment J-0200000-02.pdf | ||
| Attachment SECTION C.pdf | ||
| Attachment J-0200000-05.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J – 0200000 Management and Administration
Section J – 0200000 Management and Administration
Attachment Number Attachment Title J-0200000-01 Definitions and Acronyms J-0200000-02 Wage Determinations J-0200000-03 Directives, Instructions, and References J-0200000-04 Forms J-0200000-05 Installation Spill Prevention, Control, and Countermeasure Plan J-0200000-06 Exhibit Line Item Numbers (ELINs)
N69450-24-R-0090 SECTION J
Attachment J-0200000-01 Definitions and Acronyms
Definition Description Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.
Contracting Officer (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the Facility Support Contract Manager (FSCM) or PAR.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative That individual appointed by the Contractor, in writing, who has been assigned responsibility for executing the requirements of this contract.
Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Bimonthly (BM). Services performed 6 times during each 12-month period of the contract at intervals of 60 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
Partnering The terms “partnering” and “partnership” used herein shall mean a relationship of open communication and close cooperation that involves both Government and Contractor personnel working together for the purpose of establishing a mutually beneficial, proactive, cooperative environment within which to achieve contract objectives and resolve issues and implementing actions as required.
Definition Description Performance Assessment A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Quality Assurance (QA) The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
Spill Prevention Control and Countermeasure (SPCC) Plan
The SPCC Plan establishes engineering controls including procedures, methods, equipment and other requirements to prevent the discharge of oil into or upon navigable waters. The Plan includes procedures for oil spill prevention, measures to contain spills and an established spill drill exercises to ensure effective countermeasures in the event of oil spill.
Acronym Title ACO Administrative Contracting Officer AFFF Aqueous Film Forming Foam BFR Basic Facility Requirements BW Biweekly CBMM Condition Based Maintenance Management Program CDR Contract Discrepancy Report CIA Controlled Industrial Area CIMU Component Inventory Management Unit CMMS Computerized Maintenance Management System CNSSI Committee on National Security Systems Instruction COR Contracting Officer Representative COR Condition of Readiness DBH Diameter at Breast Height DCR Direct Condition Rating DoD Department of Defense DoDI Department of Defense Instruction DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract FSCM Facility Support Contract Manager GIS Geospatial Information System GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials HCA Head Contracting Agency ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MAP Maintenance Action Plan MDI Mission Dependency Index MEP Mechanical, Electrical and Plumbing MILCON Military Construction MPAS Monthly Performance Assessment Summary MRI Mission Readiness Index MSDS Material Safety Data Sheets NAVFAC Naval Facilities Engineering Command NIST National Institute of Standards and Technology NIST SP National Institute of Standards and Technology Special Publication NMCI Navy Marine Corps Intranet
Acronym Title NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative PAW Performance Assessment Worksheet PEO Program Executive Officer PM Project Manager POAM Plan of Action and Milestones PRCSP Permit Required Confined Space Program PWS Performance Work Statement PWO Public Works Officer Q Quarterly QC Quality Control RSL Remaining Service Life SC Security Clearances SM Semimonthly SPAR Senior Performance Assessment Representative TE Technical Exhibit VIQ Variation in Quantity WBS Work Breakdown Structure
Attachment J-0200000-02 Wage Determinations
Attachment J-0200000-02 Wage Determinations is provided as a separate attachment.
Attachment J-0200000-03 Directives, Instructions, and References
Reference Title EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements P.L. 91-596 Occupational Safety and Health Act
Attachment J-0200000-04 Forms
Contractor Significant Incident Report (CSIR)
Initial Report Follow-up Report Final Report
1. General Information Contracting Activity:
Accident Classification:
Injury Fatality Environment Procedural Issues
Lessons Learned
Illness Property Damage
Other_______________________________
Involving:
Confined Space Equip/Mrt Ver/Mat Handling (Heavy Construction Equip.)
Hazardous Material
Crane and Rigging Equip/Mrt Ver/Mat Handling (Material Handling)
Trenching/Excavation
Diving Equip/Mrt Ver/Mat Handling (Man-Lift/Elevated Platform)
Waterfront/Marine Operations
Demolition/Renovation Fall from Ladder Fall from Scaffold
Other___________________
Electrical Fall from Roof Fire
2. Personal Information Name (Last, First, MI):
Age: Sex:
Job Title/Description:
Employed By:
Supervisor Name (Last, First, MI) & Title:
Was the person trained to perform this activity/task?
Yes No
What type of training was received (OJT, classroom, etc)?
Date of the most recent formal training and topics discussed?
3. Witness Information
Witness #1: Name (Last, First, MI):
Supervisor Name (Last, First, MI):
Witness #2: Name (Last, First, MI):
Supervisor Name (Last, First, MI):
Additional Witnesses:
Yes
No
4. Contract Information Type of Contract:
A/E BOS CLEAN Construction Design Build FSCC
FSSC
JOC RAC Service
Other_______________________________
Contract Number & Title:
Industrial Group & Industrial Type:
Prime Contractor Name/Address/Phone & Fax No:
Safety Manager (Last, First, MI):
Insurance Carrier:
Sub Contractor Name/Address/Phone & FAX No:
Safety Manager (Last, First, MI):
Insurance Carrier:
5. Accident Description Date of Accident:
Time of Accident:
Exact Location of Accident:
Describe the accident in detail in your words: (Use the back of page if you need additional space)
(List any additional witnesses on a separate sheet and attach.)
Direct Cause(s) of Accident:
Indirect Cause(s) of Accident:
Action(s) taken to prevent re-occurrence or provide on-going corrective actions:
Corrective Action Beginning Date:
Anticipated Completion Date:
Personal Protective Equipment:
Available and used Available and not used Not Required
Not related to Mishap Wrong PPE for job
List PPE Used:
Type of Construction Equipment (Make, Model, Serial #, VIN#) Involved:
Was Hazardous Material Spilled/Released?
Please List Hazardous Material(s) Involved:
Who provided first aid or cleanup of mishap site?
Any blood-borne pathogen exposure, other than EMTs?
Yes
No
Who?
List OSHA and EM-385-1-1 standards that were violated:
Was site secured and witness statements taken immediately?
By Whom?
6. Injury Illness/Fatality Information Severity of Injury/Illness:
Fatality Lost Workday Case Involving Days Away From Work
Temporary Disabillity Recordable Workday Case Involving Restricted Duty
Permanent Total Disability Other Recordable Case
Recordable First Aid Case
Permanent Partial Disability Non-Recordable Case No Injury
Estimated Days Lost:
Estimated Days Hospitalized:
Estimated Days Restricted Duty:
Contractor Significant Incident Report (CSIR)
List Primary Body Part Affected:
List Other Body Part(s) Affected:
Nature of Injury/Illness for Primary Body Part (Examples: Amputation, Burn, Hernia):
Type of Accident (Examples: Fall same level, Lifting, Bitten, Exerted):
Source of Accident (Examples: Crane, Carbon Monoxide, Ladder, Welding Equipment):
7. Causal Factors (Explain answers on supplementary sheet) Design – Design of facility, workplace, or equipment was a factor?
Inspection/Maintenance – Inspection & Maintenance procedures were a factor?
Persons Physical Condition – In your opinion, the physical condition of the person was a factor?
Operation Procedures – Operating procedures were a factor?
Job Practices – One or more job safety/health practices not being followed when the accident occurred contributed to the accident?
Human Factors – One or more human factors, such as a person’s size or strength contributed to the accident?
Environmental Factors – Heat, cold, dust, sun, glare, etc., contributed to the accident?
Chemical and Physical Agent Factors – Exposure to chemical agents, such as dust, fumes, mist, vapors, or physical agents such as noise, radiation, etc., Office Factors – Office setting such as lifting office furniture, carrying, stooping, contributed to the accident?
Support Factors – Inappropriate tools/resources were provided to perform the task?
PPE – Improper selection, use or maintenance of PPE
Contractor Significant Incident Report (CSIR)
Drugs/Alcohol – In your opinion, were drugs or alcohol a factor?
Job Hazard Analysis – The lack of an adequate (IAW- EM-385-1-1 Sec 01.A) activity hazard analysis was a contributing factor.
Job Hazard Analysis – JHA was not site specific and/or did not address the type of work/operations performed when the mishap occurred.
Management – A lack of adequate supervision contributed to the accident.
Management – Inadequate information was provided at pre con meeting.
CONTRACTOR SIGNIFICANT INCIDENT REPORT (CSIR) INSTRUCTIONS
Complete Sections Appropriate to Incident (Rev. 06/02).
NOTE: THE ATTACHED CSIR FORM IS TO BE USED BY CONTRACTORS TO RECORD THE RESULTS
OF THEIR ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED TO THE
CONTRACTING OFFICER WITHIN THE REQUIRED TIMEFRAMES.
GENERAL. Complete a separate report for each person who was injured in the accident. A report needs to be completed for all OSHA recordable accidents, property damage in excess of $2000.00 (This amount is for record purposes only. GOV is not required to enter property damage reports into FAIR database if it is less than $10,000.00.), WHE accidents, or near miss/high visibility mishaps. Please type or print legibly. Appropriate items shall be marked with an “X” in box(es), non-applicable sections shall be marked “N/A”. If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.
Mark the report:
INITIAL – If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.
FOLLOW-UP – If you are providing additional information on a report previously submitted.
FINAL – If you are providing a completed report and expect no changes.
SECTION 1 – GENERAL INFORMATION
CONTRACTING ACTIVITY/ROICC OFFICE - Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).
ACCIDENT CLASSIFICATION - INJURY/ILLNESS/FATALITY/PROPERTY DAMAGE/-PROCEDURAL
ISSUES/-ENVIRONMENTAL/LESSONS LEARNED/OTHER – Mark the appropriate block(s) if the incident resulted in any of these conditions.
INVOLVING - If the mishap involved any of the conditions listed under “Involving” mark the appropriate box(es).
Specific questions associated with each of these conditions are available from the Contracting Officer to assist you in your investigation. When these questions are used they shall be attached as part of this report.
Contractor Significant Incident Report (CSIR)
SECTION 2 - PERSONAL INFORMATION
NAME - Enter last name, first name, middle initial of person involved.
AGE - Enter age.
SEX - Enter M for Male and F for Female.
JOB TITLE/DESCRIPTION - Enter the job title/description assigned to the injured person (e.g. carpenter, laborer, surveyor, etc.).
EMPLOYED BY - Enter employment company name of the person involved.
SUPERVISOR’S NAME & TITLE - Enter name and title of the immediate supervisor.
WAS PERSON TRAINED TO PERFORM ACTIVITY/TASK? - For the purpose of this section “trained” means the person has been provided the necessary information (either formal and/or on-the-job (OJT) training) to competently perform the activity/task in a safe and healthful manner.
TYPE OF TRAINING - Indicate the specific type of training (classroom or on-the-job) that the injured person received before the accident happened.
DATE OF MOST RECENT FORMAL TRAINING/TOPICS DISCUSSED - Enter the month, day, and year of the last formal training completed that covered the activity/task being performed at the time of the accident. List topics that were discussed at the training identified above.
SECTION 3 - WITNESS INFORMATION
The following applies to Witness #1 and Witness #2:
WITNESS NAME - Enter last name, first name, middle initial of the witness.
JOB DESCRIPTION/TITLE - Enter the job title/description assigned to the witness (e.g. carpenter, laborer, surveyor, etc.).
EMPLOYED BY - Enter the name of the employment company of the witness.
SUPERVISORS NAME - Enter name of immediate supervisor of the witness.
ADDITIONAL WITNESSES - Provide same information, as above, for each witnesses. Use additional pages if necessary.
SECTION 4 - CONTRACTOR INFORMATION
TYPE OF CONTRACT - Mark appropriate box. A/E means architect/engineer. If “OTHER” is marked, specify type of contract on line provided.
CONTRACT NUMBER/TITLE - Enter complete contract number and tile of prime contract (e.g. N62477-85-C- 0100, 184 Pearl City Hsg. Revitalization).
CONSTRUCTION INDUSTRIAL GROUP AND INDUSTRIAL TYPE – This is the type of construction that will be done at this project.
1. First, you must choose the Industrial Group. You have 4 choices to choose from: (NOTE! Review of the Industrial Types below and knowing what the projects scope of work is will assist you in deciding what the Industrial Group should be.)
a. Buildings
b. Heavy Industrial
c. Infrastructure
d. Light Industrial
2. Once you have chosen the Industrial Group, you now select the Industrial Type. You have multiple choices under each Group, chose the one you feel fits the project most closely because on most projects there won’t be an exact match:
a. Buildings:
(1) Communications Ctr.
(2) Dormitory/Hotel
(3) High-rise Office
(4) Hospital
Contractor Significant Incident Report (CSIR)
(5) Housing
(6) Laboratory
(7) Low-rise Office
(8) Maintenance Facility
(9) Parking Garage
(10) Physical Fitness Ctr.
(11) Restaurant/Nightclub
(12) School
(13) Warehouse
b. Heavy Industrial:
(1) Chemical Mfg.
(2) Electrical (Generating)
(3) Environmental
(4) Metals Refining/Processing
(5) Mining
(6) Natural Gas Processing
(7) Oil Exploration/Production
(8) Oil Refining
(9) Pulp and Paper
c. Infrastructure:
(1) Airport
(2) Electrical Distribution
(3) Flood Control
(4) Highway
(5) Marine Facilities
(6) Navigation
(7) Rail
(8) Tunneling
(9) Water/Wastewater
d. Light Industrial:
(1) Automotive Assembly/Mfg.
(2) Consumer Products Mfg.
(3) Foods
(4) Microelectronics Mfg.
(5) Office Products Mfg.
(6) Pharmaceuticals Mfg.
CONTRACTOR’S NAME/ADDRESS/PHONE NUMBER
(1) PRIME - Enter the exact name (title of firm), address, phone and fax numbers of the prime contractor.
(2) SUBCONTRACTOR - Enter the exact name, address, phone and fax numbers of any subcontractor involved in the accident.
SAFETY MANAGER’S NAME
(1) PRIME - Enter the name of the prime contractor safety manager.
(2) SUBCONTRACTOR - Enter the name of the subcontractors safety manager.
INSURANCE CARRIER
(1) PRIME - Enter the exact name/title of the prime’s insurance company. Policy number not required.
(2) SUBCONTRACTOR - Enter the exact name of the subcontractor’s insurance company. Policy number not required.
SECTION 5 - ACCIDENT DESCRIPTION
DATE OF ACCIDENT - Enter the month, day, and year of accident.
TIME OF ACCIDENT - Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).
Contractor Significant Incident Report (CSIR) EXACT LOCATION OF ACCIDENT - Enter facts needed to locate the accident scene (installation/project name, building/room number, street, direction and distance from closest landmark, etc.).
DESCRIBE THE ACCIDENT IN DETAIL. Fully describe the accident in the space provided. If property damage involved, give estimated dollar amount of damage and/or repair costs involved. If additional space is needed continue on a separate sheet and attach to this report. Give the sequence of events that describe what happened leading up to and including the accident. Fully identify personnel and equipment involved and their role(s) in the accident. Ensure that relationships between personnel and equipment are clearly specified. Ensure questions below regarding direct cause(s), indirect cause(s), and actions taken are answered. NOTE! Review questions in Section 7 below before completing.
DIRECT CAUSE(S) - The direct cause is that single factor which most directly leads to the accident. See examples below.
INDIRECT CAUSE(S) - Indirect cause are those factors, which contributed to, but did not directly initiate the occurrence of the accident.
Examples for Direct and Indirect Cause:
1. Employee was dismantling scaffold and fell 12 feet from unguarded opening.
Direct cause: Failure to provide fall protection at elevation Indirect causes: Failure to enforce safety requirements: improper training/motivation of employee (possibility that employee was not knowledgeable of fall protection requirements or was lax in his attitude toward safety); failure to ensure provision of positive fall protection whenever elevated; failure to address fall protection during scaffold dismantling in phase hazard analysis.
2. Private citizen had stopped his vehicle at intersection for red light when vehicle was struck in rear by contractor vehicle. (note contractor vehicles was in proper safe working condition.)
Direct cause: Failure of contractor driver to maintain control of and stop contractor vehicle within safe distance.
Indirect cause: Failure of employee to pay attention to driving (defensive driving).
ACTION(S) TAKEN TO PREVENT RE-OCCURRENCE OR PROVIDE ON-GOING CORRECTIVE ACTIONS.
Fully describe all the actions taken, anticipated, and recommended to eliminate the cause(s) and prevent reoccurrence of similar accidents/illnesses. Continue on back or additional sheets of paper if necessary to fully explain and attach to the complete report form.
CORRECTIVE ACTION DATES -
(1) Beginning - Enter the date when the corrective action(s) identified above will begin.
(2) Anticipated Completion - Enter the date when the corrective action(s) identified above will be completed.
PERSONAL PROTECTIVE EQUIPMENT (PPE) - Mark appropriate box(es) and list PPE which was being used by the injured person at the time of the accident (e.g. protective clothing, shoes, glasses, goggles, respirator, safety belt, harness, etc.)
TYPE OF CONTRACTOR EQUIPMENT - Enter the Serial Number, Model Number and specific type of equipment involved in the mishap (e.g. dump truck (off highway), crane (rubber tire), pump truck (concrete), etc.).
WAS HAZARDOUS MATERIAL SPILLED/RELEASED? - Mark appropriate block and list name(s) of any reportable quantities of hazardous materials spilled/released during the mishap.
WHO PROVIDED FIRST AID OR CLEAN-UP OF MISHAP SITE? - List name(s) of individual(s) and employer, if known.
ANY BLOOD-BORNE PATHOGEN EXPOSURE, OTHER THAN EMT? - Mark appropriate block and list name(s) of individual(s) and employer, if known.
LIST OSHA AND/OR EM 385-1-1 STANDARDS THAT WERE VIOLATED. - Self explanatory.
WAS SITE SECURED AND WITNESS STATEMENT TAKEN IMMEDIATELY? - Mark appropriate block and list by whom.
SECTION 6 - INJURY/ILLNESS/FATALITY INFORMATION
SERVERITY OF INJURY/ILLNESS – Mark appropriate box.
Contractor Significant Incident Report (CSIR) ESTIMATED DAYS LOST - Enter the estimated number of workdays the person will lose from work. Update when final data is known.
ESTIMATED DAYS HOSPITALIZED - Enter the estimated number of workdays the person will be hospitalized.
Update when final data is known.
ESTIMATED DAYS RESTRICTED DUTY - Enter the estimated number of workdays the person, as a result of the accident, will not be able to perform all of their regular duties. Update when final data is known.
BODY PART(S) AFFECTED - Enter the most appropriate primary and when applicable, secondary, etc. body part(s) affected (e.g. arm: wrist: abdomen: single eye; jaw : both elbows: second finger: great toe: collar bone:
kidney, etc.).
NATURE OF INJURY/ILLNESS FOR PRIMARY BODY PART - Enter the most appropriate nature of injury/illness (e.g. amputation, back strain, dislocation, laceration, strain, asbestosis, food poisoning, heart conditions, etc.).
TYPE AND SOURCE OF INJURY/ILLNESS - Type and Source Codes are used to describe what caused the incident.
(1) TYPE Code stands for an “Action” (Example: Worker, installing conduit, lost his balance and fell five feet from a ladder. Type Code: Fell different levels”.) Select the most appropriate Type of injury from the list below:
TYPE OF INJURY/ILLNESS
STRUCK
BY/AGAINST
CONTACTED
CONTACTED WITH (INJURED PERSON
MOVING)
CONTACTED BY (OBJECT WAS MOVING)
FELL, SLIPPED, TRIPPED
SAME LEVEL/DIFFERENT LEVEL/NO
FALL
EXERTED
LIFTED, STRAINED BY (SINGLE ACTION)
STRESSED BY (REPEATED ACTION)
CAUGHT
ON/IN/BETWEEN
EXPOSED
INHALED/INGESTED/ABSORBED/EXPOSED
TO
PUNCTURED, LACERATED
PUNCTURED BY/CUT BY/STUNG
BY/BITTEN BY
TRAVELING IN
(2) SOURCE Code stands for an “object or substance.” (Example: Worker, installing conduit, lost his balance and fell five feet from a ladder. Source Code: “Ladder”.) Select the most appropriate Source of injury from the list below:
SOURCE OF INJURY/ILLNESS
Building or Working Area Walking/Working Area Stairs/Steps Ladder Furniture Boiler/Pressure Vessel Equipment Layout Windows/Doors Electricity
Dust, Vapor, Etc.
Dust (Silica, Coat, Etc.)
Fibers Asbestos Gases Carbon Monoxide Mist, Steam, Vapor, Fume Welding Fumes Particles (Unidentified)
Contractor Significant Incident Report (CSIR) Environment Condition Temperature Extreme (Indoor) Weather (Ice, Rain, Heat, etc.)
Fire, Flame, Smoke (Not Tobacco) Noise Radiation Light Ventilation Tobacco Smoke Stress (Emotional) Confined Space
Chemical, Plastic, etc.
Dry Chemical - Corrosive Dry Chemical - Toxic Dry Chemical - Explosive Dry Chemical - Flammable Liquid Chemical - Corrosive Liquid Chemical - Toxic Liquid Chemical - Explosive Liquid Chemical - Flammable Plastic Water Medicine
Machine or Tool Hand Tool (Powered: Saw, Grinder, etc.)
Hand Tool (Non Powered) Mechanical Power Transmission Apparatus Guard, Shield (Fixed, Moveable, Interlock) Video Display Terminal Pump, Compressor, Air Pressure Tool Heating Equipment Welding Equipment
Inanimate Object Box, Barrel, etc.
Paper Metal Item, Mineral Needle Glass Scrap, Trash, Wood Food Clothing, Apparel, Shoes
Machine or Tool Hand Tool (Powered: Saw, Grinder, etc.)
Hand Tool (Non Powered) Mechanical Power Transmission Apparatus Guard, Shield (Fixed, Moveable, Interlock) Video Display Terminal Pump, Compressor, Air Pressure Tool Heating Equipment Welding Equipment
Inanimate Object Box, Barrel, etc.
Paper Metal Item, Mineral Needle Glass Scrap, Trash, Wood Food Clothing, Apparel, Shoes
Vehicle As Driver of Privately Owned, Rental Vehicle.
As Passenger of Privately Owned, Rental Vehicle.
Driver of Government Vehicle Passenger of Government Vehicle Common Carrier (Airline, Bus, etc.)
Aircraft (Not Commercial) Boat, Ship, Barge
Animate Object Dog Other Animal Plant Insect Human (Violence) Human (Communicable Disease) Bacteria, Virus (Not Human Contact)
Material Handling Equipment Earthmover (Tractor, Backhoe, etc.)
Conveyor (For Material and Equipment) Elevator, Escalator, Personnel Hoist Hoist, Sling Chain, Jack Crane Forklift Hand truck , Dolly
Personal Protective Equipment Protective Clothing, Shoes, Glasses, Goggles Respirator, Mask Diving Equipment Safety Belt, Harness Parachute
SECTION 7 - CAUSAL FACTORS
Review thoroughly. Answer each question by marking the appropriate block. NOTE! If any answer is yes, explain in section 5 above.
Contractor Significant Incident Report (CSIR)
(1) DESIGN - Did inadequacies associated with the building or work site play a role? Would an improved design or layout of the equipment or facilities reduce the likelihood of similar accidents? Were the tools or other equipment designed and intended for the task at hand?
(2) INSPECTION/MAINTENANCE - Did inadequately or improperly maintained equipment, tools, workplace, etc., create or worsen any hazards that contributed to the accident? Would better equipment, facility, work site or work activity inspections have helped avoid the accident?
(3) PERSONS PHYSICAL CONDITION - Do you feel that the accident would probably not have occurred if the employee was in “good” physical condition? If the person involved in the accident had been in better physical condition, would the accident have been less severe or avoided altogether? Was overexertion a factor?
(4) OPERATION PROCEDURES - Did lack of or inadequacy within established operating procedures contribute to the accident? Did any aspect of the procedures introduce any hazard to, or increase the risk associated with the work process? Would establishment or improvement of operating procedures reduce the likelihood of similar accidents?
(5) JOB PRACTICES - Were any of the provision of the Safety and Health Requirements Manual (EM 385-1-1) violated? Was the task being accomplished in a manner which was not in compliance with an established job hazard analysis or activity hazard analysis? Did any established job practice (including EM 385-1-1) fail to adequately address the task or work process? Would better job practices improve the safety of the task?
(6) HUMAN FACTORS - Was the person under undue stress (either internal or external to the job)? Did the task tend toward overloading the capabilities of the person: i.e., did the job require tracking and reacting to many external inputs such as displays, alarms, or signals? Did the arrangement of the workplace tend to interfere with efficient task performance? Did the task require reach strengths, endurance, agility, etc., at or beyond the capabilities of the employee? Was the work environment ill-adapted to the person? Did the person need more training, experience, or practice in doing the task? Was the person inadequately rested to perform safely?
(7) ENVIRONMENTAL FACTORS - Did any factors such as moisture, humidity, rain, snow, sleet, hail, ice, fog, cold, heat, sun temperature changes, wind, tides, floods, currents, terrain; dust, mud, glare, pressure changes, lighting, etc., play a part in the accident?
(8) CHEMICAL AND PHYSICAL AGENT FACTORS - Did exposure to chemical agents (either single shift exposure or long-term exposure such as dusts, fibers, (asbestos, etc.), silica, gases (carbon, monoxide, chlorine, etc.), mists, steam, vapors, fumes, smoke, other particulates, liquid or dry chemicals that are corrosive, toxic, explosive or flammable, by-products of combustion or physical agents such as noise, ionizing radiation, non-ionizing radiation (UV radiation created during welding, etc.) contribute to the accident/incident?
(9) OFFICE FACTORS - Did the fact that the accident occurred in an office setting or to an office worker have a bearing on its cause? For example, office workers tend to have less experience and training in performing tasks such as lifting office furniture. Did physical hazards within the office environment contribute to the hazard?
(10) SUPPORT FACTORS - Was the person using an improper tool for the job? Was inadequate time available or utilized to safely accomplish the task? Were less than adequate personnel resources (in terms of employee skills, number of workers, and adequate supervision) available to get the job done properly? Was funding available, utilized and adequate to provide proper tools, equipment, personnel, site preparation, etc.
(11) PERSONAL PROTECTIVE EQUIPMENT - Did the person fail to use appropriate personal protective equipment (gloves, eye protection, hard-toed shoes, respirator, etc) for the task or environment? Did protective equipment provided or worn fail to provide adequate protection from the hazard(s)? Did lack of or inadequate maintenance of protective gear contribute to the accident?
(12) DRUGS/ALCOHOL - Is there any reason to believe the person’s mental or physical capabilities, judgment, etc., were impaired or altered by the use of drugs or alcohol? Consider the effects of prescription medicine and over the counter medications as well as illicit drug use. Consider the effect of drug or alcohol induced “hangovers”.
(13) JOB/ACTIVITY HAZARD ANALYSIS - Was a written Job/Activity Analysis completed for the task being performed at the time of the accident? If one was made, did it address the hazard adequately or does it need to be updated? If none made, will one be made? These may also need to be addressed in the Corrective Actions Taken section. Mark the appropriate box. If one was made, attach a copy of the analysis to the report.
(14) MANAGEMENT - Did the lack of supervisor or management support play a part in the mishap?
Mark the appropriate box.
Contractor Significant Incident Report (CSIR)
SECTION - 8 OSHA INFORMATION - Complete this section if applicable
SECTION 9 - REPORT PREPARER
Providing a completed CSIR to the Contracting Officer is the PRIME CONTRACTOR’S RESPONSIBILITY.
Enter the name, date of report, title, employer, phone number and signature of person completing the accident report and provide it to the Contracting Officer, or his representative, responsible for oversight of that contractor activity. NOTE! If prepared by other than the Prime Contractor, a person employed by the Prime Contractor must sign that they have reviewed and concur with the report and its findings (e.g. company owner, project supervisor/foreman, Safety Officer, etc.).
Attachment J-0200000-05 Installation Spill Prevention, Control, and Countermeasure Plan
Attachment J-0200000-05 Installation Spill Prevention, Control, and Countermeasure Plan provided as a separate attachment (Provided as file name: J-0200000-05 SPCC.pdf)
Attachment J-0200000-06 Exhibit Line Item Numbers (ELINs)
Attachment J-0200000-06 Exhibit Line Item Numbers provided as a separate attachment (Provided as file name:
J-0200000-06 ELINs.xls)
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT NUMBER ATTACHMENT TITLE
J-1503030-01 Definitions and Acronyms
J-1503030-02 References and Technical Documents
J-1503030-03 Locations and Frequency
ATTACHMENT J-1503030-01
DEFINITIONS AND ACRONYMS
DEFINITION/ACRONYM DESCRIPTION
Ashes The residue from burned wood, coal, coke, and other combustible material.
Container A receptacle designed for holding and transporting various types of solid waste.
CY Cubic Yard Debris Grass cuttings, tree trimmings, leaves, pine straw, limbs, stumps, street sweepings, roofing and construction wastes, and similar waste material.
Garbage Animal and vegetable waste (and containers thereof) resulting from the handling, preparation, cooking, and consumption of foods. Edible or hog food garbage is that portion of waste food which has been segregated for salvage.
Hazardous Waste A solid waste or combination of solid wastes, which because of its quantity, concentration, or physical, chemical, or infectious characteristics may: (1) cause, or significantly contribute to, an increase in mortality or an increase in serious irreversible, or incapacitating reversible, illness; or (2) pose a substantial present or potential hazard to human health or the environment when improperly treated, stored, transported, disposed of, or otherwise managed.
Recyclable Waste Waste material which can be transformed into new products in such a manner that the original product may lose its identity.
Refuse All garbage, ashes, debris, rubbish, and other similar waste materials. Not included are explosive and incendiary waste and contaminated waste from medical and radiological processes.
Rubbish A variety of unsalvageable waste materials such as metal, glass, crockery, floor sweepings, paper, wrapping, containers, cartons, and similar articles not used in preparing or dispensing food.
Sanitary Free of microorganisms.
Solid Waste Refuse and other discarded solid materials resulting from commercial, industrial, residential, and community activities. It does not include hazardous wastes, infectious/medical wastes, solids or dissolved materials in domestic sewage, or other significant pollutants in water resources such as silt, dissolved or suspended solids in industrial waste, water effluents, dissolved materials in irrigation return flow, or other common water pollutants.
Spillage Any refuse dislodged from containers and/or solid waste collecting equipment in the course of collection and disposal.
Waste Deposit Area Designated points where solid wastes will be placed for collection by the Contractor. May also be referred to as collection station, collection point, pick-up stations, or collection site.
ATTACHMENT J-1503010-02
REFERENCES AND TECHNICAL DOCUMENTS
Title Reference Solid Waste Management 40 CFR parts 243, 260 through 267, 270, 271 and 280 OPNAVINST 5090.1 Environmental and Natural Resources Protection Manual
ATTACHMENT J-1503030-03
LOCATIONS AND FREQUENCY
Customer Bldg. # Location 8CY 6CY Frequency Pickup
Schedule CNIC 1 Operations 2 - 3W M/W/F
CNIC 2 Hangar 2 - 4W M/T/W/F
CNIC 51 Fire Station #1 - 1 2W T/F
CNIC 52 Sportsman Lodge - 1 W T
CNIC 150 Simulator Building 1 - 4W M/T/W/F
CNIC 174
Ground Support
Equipment (GSE) 1 - 3W M/W/F
CNIC 189 Corrosion Control 1 - 3W M/W/F
CNIC 208
Unaccompanied Housing (BEQ)
1 - 3W M/W/F
CNIC 211 Chapel - 1 W M
CNIC 218 CBQ/NGIS - 1 W W
CNIC 220 Library 1 - 2W T/F
CNIC 221
Main Gate Pass &
Tag Office
- 1 2W T/F
CNIC 224
Supply Warehouse
(NAVSUP)
1 - 3W M/W/F
CNIC 229 Public Works 1 - 2W M/W
CNIC 231 Transportation 1 - 2W M/W
CNIC 255 NAS Admin 1 - 4W M/T/W/F
CNIC 256 CDC 1 - 2W T/F
CNIC 257
Dinning Facility
(Galley) 3 - 4W M/T/W/F
CNIC 275 Dog Kennel - 1 W T
CNIC 313 MWR Bowling Alley 1 - 4W M/T/W/F
CNIC 315 Joe Williams Field - 1 BM W
CNIC 330 NTTC Schools 1 - 4W M/T/W/F
CNIC 334 MWR Horse Stables 1 - W T
CNIC 356 NTTC BEQ 3 - 4W M/T/W/F
CNIC 362 NTTC Admin - 1 2W T/F
CNIC 369 Gym - 1 2W T/F
CNIC 379 Fire Station #2 - 1 2W T/F
CNIC 388 MWR Rudders 1 - 3W M/W/F
CNIC 405
Family Support
Center
- 1 2W M/W
CNIC 423 Police Station 1 - 2W M/F
CNIC 434
Navy Reserve Center
(NOSC)
1 - W W
CNIC
Fletcher
Road Lake Martha - 1 W T
Customer Bldg. # Location 8CY 6CY Frequency Pickup
Schedule
CNIC
Fuller Road
Adjacent to
BLDG
#224
40 CY Bulk Waste Container (qty. 1)
- - On Call* F
DECA 431 Commissary (DECA) 1 - 4W M/T/W/F
DHA 367 DHA 1 - 3W M/W/F
NEX 212 Package Store (NEX) 2 - 2W T/F
NEX 214 Retail Store (NEX) 1 - 2W T/F
RCTA 219 RCTA - 1 W W
* The Government will notify Contractor when to collect and dispose of roll-off container. The Government requires six (6) services annually.
| 0200000 J Management and Administration_rEVIEW |
| 1503030 J Integrated Solid Waste Management_FINAL |
File details come from the government source that posted it. Updated .