Attachment J-0200000-05.pdf
PDF 2 MB Posted
- Attached to
- Integrated Solid Waste Management Services (ISWM) Federal contract opportunity
- Solicitation number
- N6945024R0090
About this file
This document is an Installation Spill Prevention, Control, and Countermeasure (SPCC) Plan for a federal contract opportunity. The plan outlines the procedures and requirements for handling hazardous substances, including spill prevention, response, and reporting. Key details include:
The plan covers general requirements for labeling, storage, and use of hazardous substances, as well as facility-specific spill containment and response procedures. It designates primary and secondary spill response contacts, specifies spill kit locations, and provides instructions for responding to small and large spills. The plan also includes requirements for routine inspections, spill tracking, training of personnel, and plan management and updating. Appendices provide inspection logs, spill logs, and a training log.
The related federal contract opportunity is a solicitation (N6945024R0090) for Integrated Solid Waste Management (ISWM) services at Naval Air Station Meridian, MS. It is a 100% set-aside for SBA certified HUBZone small businesses. The procurement is for commercial services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 SF30_N6945024R0090.pdf | ||
| Attachment 1- SECTION C.pdf | ||
| Attachment 3 - J-0200000-02.pdf | ||
| Attachment 4 - J-0200000-05.pdf | ||
| SF1449.pdf | ||
| Attachment 2- SECTION J.pdf | ||
| Attachment 5 - J-0200000-06.xlsx | XLSX spreadsheet | |
| Attachment J-0200000-06.xlsx | XLSX spreadsheet | |
| Solicitation SF1449 N6945024R0090_Conformed.pdf | ||
| Amendment 0001 SF30_N6945024R0090.pdf | ||
| N6945024R0090_Solicitation.pdf | ||
| Attachment J-0200000-06.xlsx | XLSX spreadsheet | |
| Attachment J-0200000-02.pdf | ||
| Attachment SECTION J.pdf | ||
| Attachment SECTION C.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor: ______________________________________________________________
Address: ________________________________________________________________
Telephone: ( ) ____-_____
Types of Work or Hazardous Substances Used: ________________________________________
This spill plan is designed to handle the requirements for this system and associated hazardous substances.
The spill plan should be updated if the hazardous substance inventory changes.
Spill Prevention The following are general requirements for any hazardous substances stored or used at this facility.
General Requirements:
• Ensure all hazardous substances are properly labeled.
• Store, dispense, and/or use hazardous substances in a way that prevents releases.
• Provide secondary containment when storing hazardous substances in bulk quantities (-55 g).
• Maintain good housekeeping practices for all chemical materials at the facility.
• Routine/Daily checks in the hazardous substance storage area to be performed by:
• Monthly inspections of the hazardous substance storage area, secondary containment, and annular space (interior cavity of double wall tank) on any Above-ground Storage Tanks (AST) or Underground Storage Tanks (UST) need to be logged in this plan. See Appendix A- Inspection Log.
Facility Specific Requirements
Spill Containment The general spill response procedure at this facility is to stop the source of the spill, contain any spilled material and clean up the spill in a timely manner to prevent accidental injury or other damage. Small spills will be contained by site personnel if they are able to do so without risking injury. Spill kits are located at the following location(s). See attached site map:
Emergency Procedures:
• Immediately call 911 in the event of injury, fire or potential fire, or spill of a hazardous substance that gives rise to an emergency situation.
• If a spill has occurred, contact the following persons immediately:
Name: _______________________________ (Primary) Telephone Number: (___)_____-_______
Attachment J-0200000-05 Installation Spill Prevention, Control, and Countermeasure Plan
SPCC
____________________________ (After Hours Emergency Contact) (____)_____-________
• In the event of a large spill, a properly trained employee should...
• Assess the area for any immediate dangers to health or safety (i.e. a wrecked car on fire). If any dangers are present, move away from the area, call 911.
• Notify the primary and/or secondary contact from the list above and then continue your spill response. The primary contact should assess additional notification requirements.
• Retrieve the spill kit from the closest location.
• Assess the size of the leak and any immediate threat of the spill reaching the floor/storm drains or permeable surfaces in the area. If there is an immediate threat and there are no safety concerns, then attempt to block the spill from coming in contact with the floor/storm drain or permeable surface. If no drain covers are available, then try to use absorbent (cat litter) and/or sock booms or rags to stop the spill from getting into the drains or to any permeable surfaces.
• If the spill can be contained with absorbent booms, deploy them around the spill. Use the booms to direct the spill away from any immediate hazards (i.e. a wrecked car).
• If there is no immediate threat to the floor/storm drains or permeable surfaces, or after controlling the spill, try to plug or stop the leak, if possible. If applicable, put on protective gear (gloves, goggles, protective clothing, etc.) and plug the leak.
• Once the spill has been contained and any immediate threat to storm drains or permeable surfaces has been minimized, contact the spill cleanup contractor and dispatch them to clean up the spill or commence spill cleanup procedures.
Spill Reporting
If a hazardous substance spill exceeds 25 gallons or if any amount has been released to soil, surface water, or storm drains, notify the following agencies:
• National Response Center (NRC) 1-800-424-8802
• Mississippi Emergency Management Agency (MEMA) 1-800-222-6362
Government POC:Jerome Clemons NAVFAC SE Performance Assessment Rep (PAR) (601) 679-2960
Spill Cleanup
• Small spills will be handled by __________________________________________. The telephone number of the designated small spill response entity is (_____)______-__________
• Large spills will be handled by __________________________________________. The telephone number for the spill cleanup contractor is (_____) ______-_________
Attachment J-0200000-05
Hazardous Substance Inventory
Plan Management The primary contact shall administer this plan and will be responsible for updating and including any required documentation.
Training All personnel who may respond to any spill, need to be trained on the contents and procedures in this plan. Trained personnel will add their names and dates of training to the Training Log (see Appendix D}. Only persons trained on this plan shall respond to a spill. If you are not trained and witness a spill, call or notify the primary and secondary contacts listed on Page 2 of this plan.
Spill Tracking Any spills must be entered into the Spill Log (see Appendix C). If a large catastrophic spill occurs, attach additional pages to describe the event. Include known or possible causes, areas affected, and effectiveness of the cleanup. Include a review of the cleanup contractor and their procedures.
For small spills, it is sufficient to fill out the Spill Log, and to take measures to prevent a repeat occurrence.
Facility Inspections Routine inspections will be conducted daily during regular business hours. Daily inspections will include, at a minimum, a visual inspection of the hazardous substances containers and the area immediately adjacent to it for signs of a spill or leak. These inspections do not need to be logged unless a spill or leak is detected. Ideally, these inspections will be conducted by a manager or by regular employees.
Full site inspections will be conducted monthly by the primary contact or designee and, at a minimum, will include those items on the inspection form in Appendix B. If any item on the inspection form is found unacceptable, the inspection form will be attached to this plan. If all items are deemed acceptable; it is sufficient for the inspector to log only the inspection and the results in the Inspection Log (Appendix A).
Disclaimer This spill plan is designed to be applicable to a broad number of business types and hazardous substance handling and storage situations. Modifying this plan to reflect your site specific hazards and business practices is highly recommended.
Your facility assumes all responsibility for the contents of this Spill Management Plan and the use of this plan within the business.
Appendix A - Inspection Log
Jul
October
November
December
Januar
March
June
Jul
October
November
December
Januar
Februa
March
June
Jul
October
November
December
Acceptable Unacceptable
Lids and Labels?
Have all lids and caps been returned to their proper place?
Do all the containers still have labels?
Evidence of Spills?
Is there any indication that a spill might have occurred? If so, was the spill properly cleaned up? Was there any spill kit materials used? Was the Spill Log filled out for that incident? Any housekeeping issues?
For Tanks with alarm systems only Any Alarms or Sensor issues?
Have there been any alarm conditions in the past month? If alarms have occurred, has the monitoring system been serviced by the manufacturer or an authorized service company? Is the system up and working at this time? Is the sensor working? Did you conduct a test of the alarm and the sensor? When was the last time the sensor was serviced?
New Hazardous Substances?
Have any new chemical products been purchased? Do you have the MSDS for new products? Have you assessed how to store and handle this new product safely? Have you added the new hazardous substance to the inventory sheet in this plan? Is the container properly labeled?
Spill Kit Complete?
Have any items been used from the spill kit? If items are missing, is there an associated entry in the Spill Log? Are there any items missing that are currently on order? Is the spill kit stored where it is supposed to be stored?
Is there a sufficient supply of daily cleanup materials?
Storm Drains?
Is there a buildup of sediment in the drain traps? Is there any evidence of drain clogging? Are the drain filters still intact? Any need replacing? Have they been replaced?
Items Fixed?
Have all deficiencies previously noted been fixed or made acceptable?
List any issues, deficiencies, or failures in detail:
Attachment J-0200000-05
Appendix B - Inspection Form
Appendix D - Spill Log
Appendix E - Training Log
Site Map Note locations of spill kits, inside floor drains, storm drains, and hazardous substance storage areas.
File details come from the government source that posted it. Updated .