Attachment Price Breakdown.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 36C26125R0009
About this file
The file is a Price Breakdown attachment for a VA Medical Center ICU Renovation project (Solicitation 36C26125R0009). The spreadsheet provides a detailed cost breakdown by construction division, including material and labor costs for various categories such as General Requirements, Concrete, Metals, Wood and Plastic, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, Communications, and Electronic Safety and Security.
The related solicitation details a comprehensive renovation of the Intensive Care Unit at the San Francisco VA Medical Center, involving the construction of 10 patient rooms with surge capacity to 12, including 4 dedicated and 2 configurable Airborne Infection Isolation rooms. The project is located on the 3rd floor B-Wing of Building 203, with significant infrastructure work and special considerations for clinical area impacts. The contractor should anticipate approximately 30% of labor occurring outside normal business hours, with strict management of noise, vibration, and dust control during the renovation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Base Design PRICE BREAKDOWN | |||
| ICU Renovation VA San Francisco Health Care System | |||
| RFP 36C26125R0009 | |||
| DESCRIPTION | MATERIAL | LABOR | TOTAL |
| Division 01. General Requirements | |||
| General Conditions/Requirements | $ | $ | $ |
| Concrete | $ | $ | $ |
| Division 05. Metals | |||
| Metals | $ | $ | $ |
| Division 06. Wood and Plastic | |||
| Woods and Plastic | $ | $ | $ |
| Division 07. Thermal and Moisture Protection | |||
| Thermal and Moisture Protection | $ | $ | $ |
| Division 08. Openings | |||
| Openings | $ | $ | $ |
| Division 09. Finishes | |||
| Finishes | $ | $ | $ |
| Division 10. Specailities | |||
| Specialities | $ | $ | $ |
| Division 11. Equipment | |||
| Equipment | $ | $ | $ |
| Division 12. Furnishings | |||
| Furnishings | $ | $ | $ |
| Division 13. Special Construction | |||
| Special Construction | $ | $ | $ |
| Division 21. Fire Suppression | |||
| Fire Suppression | $ | $ | $ |
| Division 22. Plumbing | |||
| Plumbing | $ | $ | $ |
| Division 23. Heating, Ventilating, Air Conditioning (HVAC) | |||
| HVAC | $ | $ | $ |
| Division 26. Electrical | |||
| Electrical | $ | $ | $ |
| Division 27. Communications | |||
| Communications | $ | $ | $ |
| Division 28. Electronic Safety and Security | |||
| Electronic Safety and Security | $ | $ | $ |
| Subtotal All Divisions | $ | $ | $ |
| Overhead | $ | $ | $ |
| Profit | $ | $ | $ |
| Bonds and Insurance | $ | $ | $ |
| Total | $ | $ | $ |
| TOTAL OFFER (ALL Sections) | $ | $ | $ |
File details come from the government source that posted it. Updated .