Attachment- Site Visit Attendees 03-17-2025.pdf
PDF 150 KB Posted
- Solicitation number
- 36C26125R0009
About this file
This document is a Meeting Sign-In Sheet for two separate meetings related to the VA Medical Center ICU Renovation Project 662-23-101. The first sign-in sheet, dated 3/7/2025 at 1100, was facilitated by David Wolf and held at Flag Pole, Bldg 3203, 3B, with attendees from organizations including SFVAME, WTC Wolf Inc., ASG Performs, and various other companies. Participants included engineers, project managers, and representatives from security and construction-related firms.
The second sign-in sheet, dated 1st March 2025, was also facilitated by David Wolf and located at Flag Pole, Bldg 302, 3B Wing, focusing on the Intensive Care Unit Building project. Attendees represented organizations such as HTZ, FOS Electric, NXL, HCCI, Talton, Unigren, Overwatch Airwalk LLC, and Baxter Netgain Network. The meeting participants held various titles including Super, Project Manager, Project Executive, P.M., and Sales roles, suggesting a collaborative discussion about the ICU renovation project details and potential implementation strategies.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA’.
U.S. Department of Veterans Affairs
Veterans Health AdmIn3tratIon
PROJECT: &&Z -2-3 - I°I N6tI icO I MEETING DATE: 3,/,i/ç @//&?
FACILITATOR: LOCATION: FLA4 po —2ojAJib wolf
NAME TITLE ORGANIZATION PHONE EMAIL
woL.f, Ai b SiZ v,fr’C._ o 6W isgz. ., .i
EiiL (.&c (€-Jcj,1 LL ,t-c .L.QWrc-4t z c /Acc °‘-s-9 P€ 37€,4,J P( C /;-Li c 16 L1i1 t4’/‘p!cL .
f?)
Vw-1rb&1ELL1 GAJWA 8fm b-’ll.s, ç Qi (\)L.. S
69 3 7 kr
J’-
NETWORK CONTRACT OFFICE 21: MEETING SIGN - IN SHEET
C 4’
*1
Page lof 1
IJOIae
-I7 c-uoUjs!uwpv 4aHSUEi2f
SJ!eIiVUJJO iueuniedeacn
),f4pJ1,Od
2W
NOLLVZINVDHO
e°cYrf& :J/3yJ ijjj.NVN
PLAO1VII’1I3V{
:jjij‘>“dI53M J31OJd
HSNI-NDIS9NII33L’:[z3I.4OI3VUINO3)IUOMI3N
VA
| S04 Site Visit ICU.pdf |
| ICU 17th of March 2025 sign in sheet two.pdf |
File details come from the government source that posted it. Updated .