Attachment_O-Community_Benefit_Agreement_Information_Sheet_-_Final.pdf

PDF 201 KB Posted

Attached to
Redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area (RE-BID)
Solicitation number
25-P-00399
Issued by
Hillsborough County, Florida

About this file

This is a Community Benefit Agreement Information Sheet issued by the City of Tampa, Florida, outlining mandatory requirements for developers undertaking projects that receive city participation. The document establishes a tiered framework applicable to the redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area. Projects are categorized into three tiers based on construction value and city participation amounts, with increasingly stringent requirements. Tier 1 applies to projects exceeding $5 million in construction cost with city participation of at least 20% or any project with city participation of $10 million or greater. Tier 2 mandates requirements for projects exceeding $10 million in construction cost with 20% city participation or $20 million in city participation. Tier 3 applies to projects exceeding $25 million in construction cost with 20% city participation or $30 million in city participation. The framework requires developers to hold two public meetings in the impacted community—one prior to drafting the Term Sheet and one before approval of the negotiated Community Benefit Agreement.

All tiers mandate compliance with existing city land development regulations, submission of a Construction Planning Worksheet, achievement of minimum Small Business Enterprise and Minority Business Enterprise (SBE/MBE) participation requirements ranging from 15% to 30% depending on tier level, and creation of a Community Impact Report addressing fiscal, housing, employment, utility, traffic, small business, environmental, social, health, and sustainability impacts. LEED certification requirements escalate by tier, with Tier 2 and Tier 3 projects requiring LEED Silver certification. Tier 1 and Tier 2 projects must include streetscape and public realm improvements aligned with community master plans. Tier 2 projects require selection of at least one additional community benefit from a prescribed list including affordable and workforce housing construction, historic building renovation, public parking, complete streets improvements, technological public improvements, sustainability and resiliency efforts, vacant structure demolition, and public space development. Tier 3 projects must provide items from both the Tier 2 list and select from additional options including responsible wage requirements with benefits and housing subsidies for employees earning under 100% of average state wage, with all Tier 3 items commensurate with the city's contribution.

View the file

Other files

File Type Posted
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID)_(Addendum_#1_Revision).pdf PDF
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID).pdf PDF
Attachment_Q_-_ARMY_NAVY_PROJECT_SUMMARY_TABLE-Final.xlsx XLSX spreadsheet
Attachment_P-FinancialSubmissionWorkbook-Final.xlsx XLSX spreadsheet
Attachment_O-Community_Benefit_Agreement_Information_Sheet_-_Final.pdf PDF
Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf PDF
Attachment_M_-UNITE_Ashley_Grant_-_City_of_Tampa_-_Narrative.pdf PDF
Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf PDF
Attachment_K-Section_5_ROW_Impacts_Scott_St_Exit_Ramp.pdf PDF
Attachment_J-Excerpts-from-Mayors-Institute-2022.pdf PDF
Attachment_I-Phase_I_and_Limited_Phase-II-Executive-Summary-Report-2020-11-19.pdf PDF
Attachment_H-Archelogical-Report-Desktop-for-13121N-Tampa-St-2020-11-17_(1).pdf PDF
Attachment_G_-_Surveys_for_1312-N-Tampa.pdf PDF
Attachment_F-Downtown_CRA_Plan_Final.pdf PDF
Attachment_E_-_Area-Map_5-22-24.pdf PDF
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
DMI-71-Form-for-RFQ-RFP-Evaluation-Points-V4-SLBE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
ADA_Requirements.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

#S4JWMKON0D7G9Ov3 EXHIBIT “A”

Community Benefit Agreement Information Sheet

To be filled out by City administration for projects that are required by Section 2-853, City of Tampa Code of Ordinances to include a community benefit component. This form shall be submitted to City Council when approval is sought for the final agreement.

Developer: ____________________________________________________________________ Location of Development: ________________________________________________________ Impacted Neighborhoods: ________________________________________________________ Approximate Construction Value of Project: __________________________________________ Method(s) of City Participation: ____________________________________________________ Date of Community Impact Report: _________________________________________________ Date of meeting with Community Benefit Advisory Council: _____________________________ Summary of advice: _____________________________________________________________ Date and location of first public meeting: _____________________________________________ Summary of response: ___________________________________________________________ Date and location of second public meeting: __________________________________________ Summary of response: ___________________________________________________________

Select items to be completed by Developer/included in final agreement.

Tier 1 – Mandatory for all projects more than $5 Million in total construction cost receiving City participation consisting of at least 20% of the overall project cost OR any new development or redevelopment project that has City participation value equal to or greater than $10 Million, regardless of construction cost:

o File a Construction Planning Worksheet (construction mitigation and communication).

o Hold two public meetings in neighborhood in which project is occurring:

• The first meeting will occur at the start of the project prior to the drafting of the Term Sheet

• The second meeting will occur prior to the approval of the negotiated Community Benefit Agreement o Construct streetscape/public realm improvements to match the community’s master plan, CRA Plan, or related neighborhood plans (if applicable).

o The developer shall include a minimum of 15% SBE/MBE participation requirement for construction with a goal of 20% or greater participation for construction.

o The project will utilize _________________ to employ local residents for job opportunities created by the project. Specific thresholds will be negotiated with the City for each project.

o The developer shall create a Community Impact Report including, but not limited to the project’s fiscal, housing, employment, utility, traffic, small business, environmental, social/community, health, and sustainability/resiliency impacts (subject to City review and approval.

o The developer shall follow all existing City land development regulations.

o Projects that receive City participation value equal to or greater than $10 Million shall achieve LEED certification.

o The developer shall exceed minimum energy performance standards and use Energy Star and Home Energy Rating System (HERS) components.

a. The developer shall also use other sustainable design practices such as green infrastructure, cool roofs, and use of materials that benefit the environment and occupant health.

b. The developer may also propose alternate green building certifications and resilience measures based on the Community Impact results and approved by the Mayor or the Mayor’s designee.

Tier 2 – Mandatory for all projects more than $10 Million in total construction cost receiving City participation consisting of at least 20% of the overall project cost OR any new development or redevelopment project that has City participation value equal to or greater than $20 Million, regardless of construction cost:

o The developer shall complete all the requirements for Tier 1.

o The developer shall include a minimum of 15% SBE/MBE participation requirement for construction with a goal of 25% or greater participation for construction.

o The project shall establish or utilize an existing apprenticeship program registered with the

State of Florida Department of Education (if available), or industry certification training program, or company sponsored training program, or an on-the-job training program (such as the Florida Department of Transportation On-the-Job Training Program) for local residents. These programs should emphasize participation of locally disadvantaged individuals. Specific thresholds will be negotiated with the City for each project.

o Projects that receive City participation value equal to or greater than $20 Million shall achieve LEED Silver certification.

o The developer shall exceed minimum energy performance standards and use Energy Star and Home Energy Rating System (HERS) components.

a. The developer shall also use other sustainable design practices such as green infrastructure, cool roofs, and use of materials that benefit the environment and occupant health.

b. The developer may also propose alternate green building certifications and resilience measures based on the Community Impact results and approved by the Mayor or the Mayor’s designee.

o In addition to the above, the developer must select at least one of the following:

a. Construct new affordable and/or workforce housing units within the project.

b. Contribute to historic building renovation within the project.

c. Construct public parking.

d. Make complete streets & multi-modal transit improvements (e.g., bus stop amenities, trails, bike share, bike parking/storage).

e. Provide technological public improvements such as free wi-fi.

f. Contribute to sustainability/resiliency efforts (e.g., seawall repair, building hardening, shelter creation, etc.).

g. Provide for demolition of vacant housing or other structures.

h. Develop on- of off-site public space beyond Code requirements or contribute to new public space.

i. Other (to be provided by developer after meeting with the community and

Community Benefits Advisory Council, agree to by City Administration, and approved by City Council).

Tier 3 – Mandatory for all projects more than $25 Million in total construction cost receiving City participation consisting of at least 20% of the overall project cost OR any new development or redevelopment project that has City participation value equal to or greater than $30 Million, regardless of construction cost:

o The developer shall complete all of the requirements for Tier 1 and Tier 2.

o The developer shall include a minimum of 15% SBE/MBE participation requirement for construction with a goal of 30% or greater participation for construction.

o The project will establish or utilize an existing apprenticeship program registered with the

State of Florida Department of Education (if available), or industry certification training program, or company sponsored training program, or an on-the-job training program (such as the Florida Department of Transportation On-the-Job Training Program) for local residents. These programs should emphasize participation of locally disadvantaged individuals. Specific thresholds will be negotiated with the City for each project.

o Projects that receive City participation value equal to or greater than $15 Million shall achieve LEED Silver certification.

o The developer shall exceed minimum energy performance standards and use Energy Star and Home Energy Rating System (HERS) components.

a. The developer shall also use other sustainable design practices such as green infrastructure, cool roofs, and use of materials that benefit the environment and occupant health.

b. The developer may also propose alternate green building certifications and resilience measures based on the Community Impact results and approved by the Mayor or the Mayor’s designee.

o The developer shall provide the additional item selected from the Tier 2 list and must also select at least one of the following:

a. Provide a responsible wage with benefits for all project employees during development and construction. The City will review MIT Living Wage Calculator and Responsible Wage Ordinances throughout Florida to determine appropriate wage levels. http://livingwage.mit.edu/states/12

b. Provide housing subsidies for company’s employees under 100% average state wage.

c. Other (to be provided by developer after meeting with the community and Community Benefits Advisory Council, agreed to by City Administration and approved by City Council). Items proposed in Tier 3 must be commensurate with the City’s contribution to the project.

http://livingwage.mit.edu/states/12