This document is a draft engineering plan for the Florida Department of Transportation (FDOT) TBNEXT - Section 5 project, specifically focusing on the I-275 northbound exit ramp connecting to Scott Street and Tampa Street (FPID 451462-1). The plan details new roadway and bridge construction, including a new exit ramp, bridge (Bridge 100110), proposed retaining walls, and a stormwater retention pond (Pond 1C). The project involves widening local roadways, constructing sidewalks, and modifying existing right-of-way between Laurel Street, Fortune Street, Florida Avenue, and surrounding streets in the Tampa area. The draft is dated 2/26/2025, suggesting this is a preliminary planning stage for infrastructure improvements.

The plan includes detailed color-coded mapping showing proposed and existing rights-of-way, new roadway construction in yellow, bridge construction in orange, local roadway widening, sidewalk additions in teal, and areas for milling and resurfacing in blue. The project appears to be part of a larger transportation infrastructure enhancement, with specific attention to improving traffic flow and connectivity around the I-275 exit ramp. Proposed retaining walls and the stormwater pond indicate consideration for both structural support and environmental management in the project design.

View the file

Other files

File Type Posted
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID)_(Addendum_#1_Revision).pdf PDF
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID).pdf PDF
Attachment_Q_-_ARMY_NAVY_PROJECT_SUMMARY_TABLE-Final.xlsx XLSX spreadsheet
Attachment_P-FinancialSubmissionWorkbook-Final.xlsx XLSX spreadsheet
Attachment_O-Community_Benefit_Agreement_Information_Sheet_-_Final.pdf PDF
Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf PDF
Attachment_M_-UNITE_Ashley_Grant_-_City_of_Tampa_-_Narrative.pdf PDF
Attachment_K-Section_5_ROW_Impacts_Scott_St_Exit_Ramp.pdf PDF
Attachment_J-Excerpts-from-Mayors-Institute-2022.pdf PDF
Attachment_I-Phase_I_and_Limited_Phase-II-Executive-Summary-Report-2020-11-19.pdf PDF
Attachment_H-Archelogical-Report-Desktop-for-13121N-Tampa-St-2020-11-17_(1).pdf PDF
Attachment_G_-_Surveys_for_1312-N-Tampa.pdf PDF
Attachment_F-Downtown_CRA_Plan_Final.pdf PDF
Attachment_E_-_Area-Map_5-22-24.pdf PDF
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
DMI-71-Form-for-RFQ-RFP-Evaluation-Points-V4-SLBE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
ADA_Requirements.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND

PROPOSED RIGHT OF WAY

EXISTING LA RIGHT OF WAY

EXISTING RIGHT OF WAY

BRIDGE/ROADWAY REMOVAL

MILLING & RESURFACING

SIDEWALK

LOCAL ROADWAY - WIDENING

BRIDGE - NEW CONSTRUCTION

ROADWAY - NEW CONSTRUCTION

INTERSTATE

D R

A F T

/2

/2

LAUREL

ST

FORTUNE ST

F L

O R I D

A

V

E

T A

M P

A

S

T

SCOTT ST

S B E

X

IT

R

A M P

N B

E

N T

R

M P

S B

E

N T

R

A M

P

N B E

X

IT

R

A M P

H I L L S

B O

R O

U G

H

I V

E R

D O

Y L E

C

R L T

O N

D

M A

R I O

N

S

T

KAY ST

FPID 451462-1

TO SCOTT ST/TAMPA ST

NB I-275 EXIT RAMP

TBNEXT - SECTION 5

POND 1C

N

BRIDGE 100110

PROPOSED RETAINING WALLS

jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X

File details come from the government source that posted it. Updated .