This document is a draft engineering plan for the Florida Department of Transportation (FDOT) TBNEXT - Section 5 project, specifically focusing on the I-275 northbound exit ramp connecting to Scott Street and Tampa Street (FPID 451462-1). The plan details new roadway and bridge construction, including a new exit ramp, bridge (Bridge 100110), proposed retaining walls, and a stormwater retention pond (Pond 1C). The project involves widening local roadways, constructing sidewalks, and modifying existing right-of-way between Laurel Street, Fortune Street, Florida Avenue, and surrounding streets in the Tampa area. The draft is dated 2/26/2025, suggesting this is a preliminary planning stage for infrastructure improvements.
The plan includes detailed color-coded mapping showing proposed and existing rights-of-way, new roadway construction in yellow, bridge construction in orange, local roadway widening, sidewalk additions in teal, and areas for milling and resurfacing in blue. The project appears to be part of a larger transportation infrastructure enhancement, with specific attention to improving traffic flow and connectivity around the I-275 exit ramp. Proposed retaining walls and the stormwater pond indicate consideration for both structural support and environmental management in the project design.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
PROPOSED RIGHT OF WAY
EXISTING LA RIGHT OF WAY
EXISTING RIGHT OF WAY
BRIDGE/ROADWAY REMOVAL
MILLING & RESURFACING
SIDEWALK
LOCAL ROADWAY - WIDENING
BRIDGE - NEW CONSTRUCTION
ROADWAY - NEW CONSTRUCTION
INTERSTATE
D R
A F T
/2
/2
LAUREL
ST
FORTUNE ST
F L
O R I D
A
V
E
T A
M P
A
S
T
SCOTT ST
S B E
X
IT
R
A M P
N B
E
N T
R
M P
S B
E
N T
R
A M
P
N B E
X
IT
R
A M P
H I L L S
B O
R O
U G
H
I V
E R
D O
Y L E
C
R L T
O N
D
M A
R I O
N
S
T
KAY ST
FPID 451462-1
TO SCOTT ST/TAMPA ST
NB I-275 EXIT RAMP
TBNEXT - SECTION 5
POND 1C
N
BRIDGE 100110
PROPOSED RETAINING WALLS
jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X
File details come from the government source that posted it. Updated .