Attachment_K-Section_5_ROW_Impacts_Scott_St_Exit_Ramp.pdf

PDF 321 KB Posted

Attached to
Redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area (RE-BID)
Solicitation number
25-P-00399
Issued by
Hillsborough County, Florida

About this file

This document is a Right-of-Way (ROW) Map produced by the Florida Department of Transportation (FDOT) for Hillsborough County, specifically detailing a road project involving the NB I-275 Exit Ramp to Scott Street in Tampa. The map shows a proposed right-of-way modification for Road No. 93, with the Financial Project ID 434045-3-22-01, dated 2-26-2025. The project involves land acquisition for two parcels: one 12,910 square foot parcel (192605-0014) and another 32,828 square foot parcel (192605-0014R), which appear to be full or partial takes for road infrastructure improvements.

The map is a conceptual-level graphic created for planning and discussion purposes, clearly marked as not intended for use in Project Development and Environment (PD&E) or construction. The graphic includes detailed road layout, existing and proposed right-of-way lines, and surrounding street context including E. Scott Street, Franklin Street, Nashville Drive, and Tampa Street. The map uses color-coded lines to indicate existing and proposed right-of-way boundaries, with a yellow highlight indicating full/partial land take areas. The document emphasizes that parcel lines are based on Hillsborough County GIS data and should be considered approximate.

View the file

Other files

File Type Posted
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID)_(Addendum_#1_Revision).pdf PDF
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID).pdf PDF
Attachment_Q_-_ARMY_NAVY_PROJECT_SUMMARY_TABLE-Final.xlsx XLSX spreadsheet
Attachment_P-FinancialSubmissionWorkbook-Final.xlsx XLSX spreadsheet
Attachment_O-Community_Benefit_Agreement_Information_Sheet_-_Final.pdf PDF
Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf PDF
Attachment_M_-UNITE_Ashley_Grant_-_City_of_Tampa_-_Narrative.pdf PDF
Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf PDF
Attachment_J-Excerpts-from-Mayors-Institute-2022.pdf PDF
Attachment_I-Phase_I_and_Limited_Phase-II-Executive-Summary-Report-2020-11-19.pdf PDF
Attachment_H-Archelogical-Report-Desktop-for-13121N-Tampa-St-2020-11-17_(1).pdf PDF
Attachment_G_-_Surveys_for_1312-N-Tampa.pdf PDF
Attachment_F-Downtown_CRA_Plan_Final.pdf PDF
Attachment_E_-_Area-Map_5-22-24.pdf PDF
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
DMI-71-Form-for-RFQ-RFP-Evaluation-Points-V4-SLBE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
ADA_Requirements.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROAD NO.

DEPARTMENT OF TRANSPORTATION

STATE OF FLORIDA

HILLSBOROUGH

COUNTY

SMaierle

FINANCIAL PROJECT ID

NO.

SHEET

N

3:24:02 PM

L E

G E

N D

2/26/2025 c:\caddlib\pw\smaierle\sediv\d0136210\Section 5 ROW Impacts Scott St Exit Ramp.DGN

EXISTING LA R/W

PARCEL LINE

EXISTING R/W

PROPOSED LA R/W

PROPOSED R/W

FULL/PARTIAL TAKE

E SCOTT ST.

N

F

R A

N K

L I

N

S

T

N

A

S H

L E

Y

D

R

N

T

A M

P A

S

T

SCOTT ST/TAMPA ST

NB I-275 EXIT RAMP TO

TBNext Section 5

RIGHT-OF-WAY MAP

434045-3-22-01

0 25 50

Feet

INTERSTATE

12,910 SF

192605-0014

32,828 SF

192605-0014R

SHOULD BE CONSIDERED APPROXIMATE

HILLSBOROUGH COUNTY GIS AND

PARCEL LINES ARE BASED ON

DATE: 2-26-2025

DESIGN OR CONSTRUCTION.

IT IS NOT INTENDED FOR USE IN PD&E,

FOR PLANNING AND DISCUSSION PURPOSES ONLY.

THIS IS A CONCEPTUAL - LEVEL GRAPHIC CREATED

File details come from the government source that posted it. Updated .