Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf

PDF 2 MB Posted

Attached to
Redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area (RE-BID)
Solicitation number
25-P-00399
Issued by
Hillsborough County, Florida

About this file

This document is a draft engineering design plan for the North Downtown Redevelopment Concept in the City of Tampa, Florida, specifically showing the TBNext Locally Preferred Alternative for infrastructure modifications. The plan details a comprehensive roadway and transportation infrastructure redesign centered on Interstate 275, involving reconfiguration of existing roadways, exit and entry ramps, and urban street networks. The design includes modifications to general use lanes, express lanes, and bridge/roadway removals, with a focus on reimagining the downtown transportation corridor.

The plan encompasses significant urban planning elements, including redesigning street connections near Julian B Lane Riverfront Park and integrating new transportation infrastructure with existing urban fabric. The design shows complex lane configurations, including green and yellow-coded express and general use lanes, with specific attention to ramp configurations and right-of-way adjustments. The draft plan appears to be part of a larger urban mobility and redevelopment strategy, potentially aimed at improving traffic flow, urban connectivity, and supporting future development in Tampa's downtown area.

View the file

Other files

File Type Posted
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID)_(Addendum_#1_Revision).pdf PDF
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID).pdf PDF
Attachment_Q_-_ARMY_NAVY_PROJECT_SUMMARY_TABLE-Final.xlsx XLSX spreadsheet
Attachment_P-FinancialSubmissionWorkbook-Final.xlsx XLSX spreadsheet
Attachment_O-Community_Benefit_Agreement_Information_Sheet_-_Final.pdf PDF
Attachment_M_-UNITE_Ashley_Grant_-_City_of_Tampa_-_Narrative.pdf PDF
Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf PDF
Attachment_K-Section_5_ROW_Impacts_Scott_St_Exit_Ramp.pdf PDF
Attachment_J-Excerpts-from-Mayors-Institute-2022.pdf PDF
Attachment_I-Phase_I_and_Limited_Phase-II-Executive-Summary-Report-2020-11-19.pdf PDF
Attachment_H-Archelogical-Report-Desktop-for-13121N-Tampa-St-2020-11-17_(1).pdf PDF
Attachment_G_-_Surveys_for_1312-N-Tampa.pdf PDF
Attachment_F-Downtown_CRA_Plan_Final.pdf PDF
Attachment_E_-_Area-Map_5-22-24.pdf PDF
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
DMI-71-Form-for-RFQ-RFP-Evaluation-Points-V4-SLBE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
ADA_Requirements.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRC

10' shldr.

12'

10'

12' shldr.

SMaierle 2/23/2023 9:05:34 AM c:\caddlib\pw\smaierle\sediv\d0183321\Downtown Access.dgn

LEGEND

EXISTING LA RIGHT OF WAY

EXISTING RIGHT OF WAY

BRIDGE/ROADWAY REMOVAL

NON-INTERSTATE ROADWAY/BRIDGE

GENERAL USE LANES - BRIDGE

GENERAL USE LANES

EXPRESS LANES - BRIDGE

EXPRESS LANES

INTERSTATE

INTERSTATE

D R

A F T

/2

/2

LAUREL

ST

A S

H L E

Y

D R

D O

Y L E

C A

R L T

O N

FORTUNE ST

F L

O R I

V

E

F R

A N

K L I N

S

T

T A

M P

A

S

T

ROYAL ST

HARRIS

ON

ST

TYLE

R

ST

FORTUNE

ST

M A

C I N

N E

S

P

L

CASS

ST

SCOTT ST

TBNext LOCALLY PREFERRED ALTERNATIVE

WITH MODIFIED

NORTH DOWNTOWN REDEVELOPMENT CONCEPT

CITY OF TAMPA

B

U L E

V A

R D

W I L L

W

V

E

MAIN ST

LA SALLE ST

CYPRESS ST

H I L L S

B O

R O

U G

H

I V

E R

JULIAN B LANE RIVERFRONT PARK

N B

E

T

M P

S B

E

N T

R

A M

P

S B E

X

IT

R

A M P

NB EXIT

RAMP

SB ENT RAMP

File details come from the government source that posted it. Updated .