Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf
PDF 2 MB Posted
- Solicitation number
- 25-P-00399
- Issued by
- Hillsborough County, Florida
About this file
This is a project planning and design document prepared by the Florida Department of Transportation (FDOT) in collaboration with the City of Tampa for the Downtown Access project dated February 23, 2023. The document presents a draft design plan illustrating the Locally Preferred Alternative with a modified North Downtown redevelopment concept, featuring proposed roadway and infrastructure improvements in the downtown Tampa area. The plan depicts existing rights-of-way, proposed bridge and roadway removals, and new general use and express lanes for Interstate 275, along with modifications to local streets including Ashley Drive, Laurel Street, Franklin Street, Tampa Street, and other downtown thoroughfares. The design indicates connectivity improvements to the Hillsborough River and Julian B. Lane Riverfront Park, with entrance and exit ramps for northbound and southbound traffic. The project encompasses significant infrastructure modifications intended to support downtown redevelopment and improved accessibility.
The document serves as a supporting exhibit for the City of Tampa's Request for Proposals for the redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area. This planning visualization demonstrates the transportation infrastructure context and constraints relevant to the proposed mixed-use development project, which requires developers to incorporate transit-oriented design principles and ensure walkability within the urban framework. The FDOT involvement indicates coordination between state and local agencies to align the redevelopment project with regional transportation planning and infrastructure improvements, ensuring that proposed private development integrates effectively with planned public transportation and roadway enhancements.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRC
10' shldr.
12'
10'
12' shldr.
SMaierle 2/23/2023 9:05:34 AM c:\caddlib\pw\smaierle\sediv\d0183321\Downtown Access.dgn
LEGEND
EXISTING LA RIGHT OF WAY
EXISTING RIGHT OF WAY
BRIDGE/ROADWAY REMOVAL
NON-INTERSTATE ROADWAY/BRIDGE
GENERAL USE LANES - BRIDGE
GENERAL USE LANES
EXPRESS LANES - BRIDGE
EXPRESS LANES
INTERSTATE
INTERSTATE
D R
A F T
/2
/2
LAUREL
ST
A S
H L E
Y
D R
D O
Y L E
C A
R L T
O N
FORTUNE ST
F L
O R I
V
E
F R
A N
K L I N
S
T
T A
M P
A
S
T
ROYAL ST
HARRIS
ON
ST
TYLE
R
ST
FORTUNE
ST
M A
C I N
N E
S
P
L
CASS
ST
SCOTT ST
TBNext LOCALLY PREFERRED ALTERNATIVE
WITH MODIFIED
NORTH DOWNTOWN REDEVELOPMENT CONCEPT
CITY OF TAMPA
B
U L E
V A
R D
W I L L
W
V
E
MAIN ST
LA SALLE ST
CYPRESS ST
H I L L S
B O
R O
U G
H
I V
E R
JULIAN B LANE RIVERFRONT PARK
N B
E
T
M P
S B
E
N T
R
A M
P
S B E
X
IT
R
A M P
NB EXIT
RAMP
SB ENT RAMP
File details come from the government source that posted it. Updated .