Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf

PDF 2 MB Posted

Attached to
Redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area (RE-BID)
Solicitation number
25-P-00399
Issued by
Hillsborough County, Florida

About this file

This is a site plan and design document prepared by the Florida Department of Transportation (FDOT) for the City of Tampa, depicting the Locally Preferred Alternative for the Downtown Access project with modifications to the North Downtown Redevelopment Concept. The plan illustrates proposed roadway and bridge configurations along Interstate 275, including general use lanes and express lanes, along with right-of-way designations and removal areas. The document shows street-level details for key downtown thoroughfares including Ashley Drive, Doyle Carlton Drive, Florida Avenue, Franklin Street, Tampa Street, Royal Street, Harrison Street, Tyler Street, MacInnes Place, Cass Street, Scott Street, Main Street, La Salle Street, Cypress Street, and connections to the Hillsborough River and Julian B. Lane Riverfront Park. The plan was prepared by S. Maierle on February 23, 2023, and identifies both existing and proposed Louisiana right-of-way designations, bridge and roadway removals, and interstate access points including northbound and southbound entrance and exit ramps.

The document serves as a supporting design exhibit for the City of Tampa's downtown redevelopment initiative, which seeks proposals for mixed-use, transit-oriented development on four city-owned properties in the Central Business District. The project requires integration with the proposed transportation infrastructure improvements shown in this plan, emphasizing walkability and transit connectivity. The RFP deadline is December 12, 2025, with a mandatory pre-proposal conference scheduled for November 17, 2025. The development must include minimum 800 dwelling units with at least 30% affordable housing at 80% Area Median Income and 20% workforce housing at 80-140% AMI, plus 28 conservatory units for cultural arts professionals and minimum 15,000 square feet of non-residential space. Proposers will be evaluated on housing design, transportation infrastructure integration, sustainability, financing capability, team experience, and Small Local Business Enterprise participation in compliance with the City of Tampa's Equal Business Opportunity Program.

View the file

Other files

File Type Posted
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID)_(Addendum_#1_Revision).pdf PDF
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID).pdf PDF
Attachment_Q_-_ARMY_NAVY_PROJECT_SUMMARY_TABLE-Final.xlsx XLSX spreadsheet
Attachment_P-FinancialSubmissionWorkbook-Final.xlsx XLSX spreadsheet
Attachment_O-Community_Benefit_Agreement_Information_Sheet_-_Final.pdf PDF
Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf PDF
Attachment_M_-UNITE_Ashley_Grant_-_City_of_Tampa_-_Narrative.pdf PDF
Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf PDF
Attachment_K-Section_5_ROW_Impacts_Scott_St_Exit_Ramp.pdf PDF
Attachment_J-Excerpts-from-Mayors-Institute-2022.pdf PDF
Attachment_I-Phase_I_and_Limited_Phase-II-Executive-Summary-Report-2020-11-19.pdf PDF
Attachment_H-Archelogical-Report-Desktop-for-13121N-Tampa-St-2020-11-17_(1).pdf PDF
Attachment_G_-_Surveys_for_1312-N-Tampa.pdf PDF
Attachment_F-Downtown_CRA_Plan_Final.pdf PDF
Attachment_E_-_Area-Map_5-22-24.pdf PDF
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
DMI-71-Form-for-RFQ-RFP-Evaluation-Points-V4-SLBE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
ADA_Requirements.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRC

10' shldr.

12'

10'

12' shldr.

SMaierle 2/23/2023 9:05:34 AM c:\caddlib\pw\smaierle\sediv\d0183321\Downtown Access.dgn

LEGEND

EXISTING LA RIGHT OF WAY

EXISTING RIGHT OF WAY

BRIDGE/ROADWAY REMOVAL

NON-INTERSTATE ROADWAY/BRIDGE

GENERAL USE LANES - BRIDGE

GENERAL USE LANES

EXPRESS LANES - BRIDGE

EXPRESS LANES

INTERSTATE

INTERSTATE

D R

A F T

/2

/2

LAUREL

ST

A S

H L E

Y

D R

D O

Y L E

C A

R L T

O N

FORTUNE ST

F L

O R I

V

E

F R

A N

K L I N

S

T

T A

M P

A

S

T

ROYAL ST

HARRIS

ON

ST

TYLE

R

ST

FORTUNE

ST

M A

C I N

N E

S

P

L

CASS

ST

SCOTT ST

TBNext LOCALLY PREFERRED ALTERNATIVE

WITH MODIFIED

NORTH DOWNTOWN REDEVELOPMENT CONCEPT

CITY OF TAMPA

B

U L E

V A

R D

W I L L

W

V

E

MAIN ST

LA SALLE ST

CYPRESS ST

H I L L S

B O

R O

U G

H

I V

E R

JULIAN B LANE RIVERFRONT PARK

N B

E

T

M P

S B

E

N T

R

A M

P

S B E

X

IT

R

A M P

NB EXIT

RAMP

SB ENT RAMP

File details come from the government source that posted it. Updated .