Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf

PDF 2 MB Posted

Attached to
Redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area (RE-BID)
Solicitation number
25-P-00399
Issued by
Hillsborough County, Florida

About this file

This is a project design attachment for the City of Tampa, Florida, prepared by the Florida Department of Transportation (FDOT) for the Downtown Access project dated February 23, 2023. The document presents a draft site plan depicting the Locally Preferred Alternative with a modified North Downtown redevelopment concept for the Interstate 275 corridor in downtown Tampa. The plan illustrates proposed roadway and bridge modifications, including general use lanes and express lanes on I-275, with associated ramp configurations and local street connections. The project encompasses multiple downtown streets including Ashley Drive, Doyle, Carlton Drive, Fortune Street, Florida Avenue, Franklin Street, Tampa Street, Royal Street, Harrison Street, Tyler Street, Cass Street, Scott Street, Main Street, La Salle Street, Cypress Street, and connections to the Hillsborough River and Riverfront Park. The design shows both existing and proposed right-of-way configurations, with legend indicators for bridge and roadway removal areas, non-interstate roadway modifications, and lane designations for both standard and express use.

The attachment serves as a supporting technical document for the City of Tampa's Request for Proposals regarding the redevelopment of four key downtown properties within the Community Redevelopment Area. While the schematic does not specify pricing, funding sources, or contract terms, it provides critical infrastructure context for proposers evaluating the Downtown Community Redevelopment Area project, which requires the development of mixed-use transit-oriented housing with minimum 800 dwelling units and 15,000 square feet of non-residential space. The plan demonstrates the city's commitment to transit integration and accessibility improvements as core components of the overall downtown redevelopment initiative, with particular emphasis on establishing connections between the proposed residential and commercial development sites and existing transportation infrastructure.

View the file

Other files

File Type Posted
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID)_(Addendum_#1_Revision).pdf PDF
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID).pdf PDF
Attachment_Q_-_ARMY_NAVY_PROJECT_SUMMARY_TABLE-Final.xlsx XLSX spreadsheet
Attachment_P-FinancialSubmissionWorkbook-Final.xlsx XLSX spreadsheet
Attachment_O-Community_Benefit_Agreement_Information_Sheet_-_Final.pdf PDF
Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf PDF
Attachment_M_-UNITE_Ashley_Grant_-_City_of_Tampa_-_Narrative.pdf PDF
Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf PDF
Attachment_K-Section_5_ROW_Impacts_Scott_St_Exit_Ramp.pdf PDF
Attachment_J-Excerpts-from-Mayors-Institute-2022.pdf PDF
Attachment_I-Phase_I_and_Limited_Phase-II-Executive-Summary-Report-2020-11-19.pdf PDF
Attachment_H-Archelogical-Report-Desktop-for-13121N-Tampa-St-2020-11-17_(1).pdf PDF
Attachment_G_-_Surveys_for_1312-N-Tampa.pdf PDF
Attachment_F-Downtown_CRA_Plan_Final.pdf PDF
Attachment_E_-_Area-Map_5-22-24.pdf PDF
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
DMI-71-Form-for-RFQ-RFP-Evaluation-Points-V4-SLBE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
ADA_Requirements.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRC

10' shldr.

12'

10'

12' shldr.

SMaierle 2/23/2023 9:05:34 AM c:\caddlib\pw\smaierle\sediv\d0183321\Downtown Access.dgn

LEGEND

EXISTING LA RIGHT OF WAY

EXISTING RIGHT OF WAY

BRIDGE/ROADWAY REMOVAL

NON-INTERSTATE ROADWAY/BRIDGE

GENERAL USE LANES - BRIDGE

GENERAL USE LANES

EXPRESS LANES - BRIDGE

EXPRESS LANES

INTERSTATE

INTERSTATE

D R

A F T

/2

/2

LAUREL

ST

A S

H L E

Y

D R

D O

Y L E

C A

R L T

O N

FORTUNE ST

F L

O R I

V

E

F R

A N

K L I N

S

T

T A

M P

A

S

T

ROYAL ST

HARRIS

ON

ST

TYLE

R

ST

FORTUNE

ST

M A

C I N

N E

S

P

L

CASS

ST

SCOTT ST

TBNext LOCALLY PREFERRED ALTERNATIVE

WITH MODIFIED

NORTH DOWNTOWN REDEVELOPMENT CONCEPT

CITY OF TAMPA

B

U L E

V A

R D

W I L L

W

V

E

MAIN ST

LA SALLE ST

CYPRESS ST

H I L L S

B O

R O

U G

H

I V

E R

JULIAN B LANE RIVERFRONT PARK

N B

E

T

M P

S B

E

N T

R

A M

P

S B E

X

IT

R

A M P

NB EXIT

RAMP

SB ENT RAMP

File details come from the government source that posted it. Updated .