Attachment_M_-_Project_Location.pdf

PDF 227 KB Posted

Attached to
Haven on Vine Renovation Project
Solicitation number
RFP2025-010
Issued by
Polk County, Lake Harbor CDP, Florida

About this file

The document is a Google Maps aerial view image depicting the project location for the Haven on Vine Renovation Project in Kissimmee, Florida. The image encompasses multiple adjacent properties along W. Vine Street, including a hotel, IHOP, Express Phone Repair, Taco Bell, and surrounding residential and commercial buildings. The project site is delineated by a red boundary line that encompasses several parcels.

The aerial view provides a detailed site context for the City of Kissimmee's planned affordable housing development. The project will transform an existing hotel property located at 1815 W. Vine Street into a comprehensive housing solution, featuring 40 emergency housing units and 80 apartment units. The development is strategically designed to provide housing for low- and moderate-income residents, with a mix of emergency beds, studio apartments, and two-bedroom units. The project is funded through multiple sources, including American Rescue Plan funds, county and city contributions, HOME Investment Partnerships, and Community Development Block Grant resources, demonstrating a multi-jurisdictional approach to addressing housing needs in the Kissimmee area.

View the file

Other files

File Type Posted
Notice_of_Intent_-_RFP2025-010_Haven_on_Vine_Restoration_Project.pdf PDF
abstract._RFP2025-010_Haven_on_Vine_Project_Renovation_Project.pdf PDF
E801_-_ELECTRICAL_SCHEDULES_AND_DIAGRAMS.pdf PDF
Mailboxes.pdf PDF
2025-05-07_REV_1_Sheets.dwf.pdf PDF
Addendum_2_RFP2025-010_Haven_on_Vine_Restoration_Project.pdf PDF
E001_-_ELECTRICAL_-_GENERAL.pdf PDF
Super_8_Hotel_Structural_Inspection_Report_S&S.pdf PDF
City_of_Kissimmee_Super_8_Motel_Inspection_Report_2_8_23_-_Structural_Comments.pdf PDF
LMA_Report.pdf PDF
1815_W_Vine_St___Sewer_Inspection.pdf PDF
Lead_Survey_Report.pdf PDF
Addendum_1_RFP2025-010_Haven_on_Vine_Restoration_Project.pdf PDF
Attachment_I_-_Phase_2B_–_Office_Building_Renovation.pdf PDF
Attachment_K_–_Specifications.pdf PDF
Attachment_E_-_Phase_1A_–_Energy_Cals.pdf PDF
Attachment_G_-_Phase_2A_–_40-Efficiency_Studio_Apartment_Units.pdf PDF
Attachment_H_-_Phase_2A_–_Energy_Conservation_Checklist-2A-022025-Signed.pdf PDF
RFP20205-010_HAVEN_ON_VINE_-_Renovation_Project.pdf PDF
Attachment_L_-_General_Wage_Decision_3.29.24.pdf PDF
Attachment_J_-_Phase_2B_–_Energy_Conservation_Checklist-2B-022025-Signed.pdf PDF
Attachment_F_-_Phase_1B_–_Ten_Fourplex_Apartment_Building_Renovation.pdf PDF
Attachment_D_-_Phase_1A_–_43-Efficiency_Studio_Apartment_Units.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .