This document is an Energy Conservation Checklist for the Haven on Vine Renovation Project in Kissimmee, Florida, compiled using the EnergyGauge Summit® Fla/Com-2023 software and aligned with the Florida Building Code, 8th Edition (2023). The document covers a multi-family renovation of an existing building located at 1815 West Vine Street, with a total conditioned area of 1,040 square feet. The project involves a comprehensive energy compliance review across multiple systems including lighting controls, HVAC systems, water heating, and building envelope performance, utilizing the Total Building Performance Compliance Option (C407) to demonstrate energy efficiency.
The compliance report shows the proposed building's energy cost at $620, which is 79.5% of the baseline cost of $780, successfully meeting the energy efficiency requirements. The documentation includes detailed assessments of lighting controls in various spaces (office, bathroom, electric-fire room), HVAC system performance for packaged terminal systems, water heater efficiency, and piping system compliance. The project incorporates energy-efficient components such as LED lighting with occupancy sensors, a constant volume packaged terminal system with specific cooling and heating efficiencies, and an electric instantaneous water heater with 97% efficiency. The comprehensive checklist covers mandatory requirements, plan review specifications, and post-construction inspections to ensure full compliance with Florida's energy conservation standards.
View the file
Other files for this state and local contract opportunity
Show all 50
Haven on Vine Renovation Project has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Building Code, 8th Edition (2023) - Energy Conservation
EnergyGauge Summit® Fla/Com-2023, Effective Date: Dec 31, 2023
C407: FBC Total Building Performance Compliance Option Compliance applying the requirements of Sections C402.5, C403.2, C404,C405.2, C405.4, C405.5, C407 and
C408. The building energy cost shall be equal to or less than 85 percent of the standard reference design building.
Check List
Applications for compliance with the Florida Building Code, Energy Conservation shall include:
The full compliance report generated by the software that contains the project summary, compliance summary, certifications and detailed component compliance reports.
The compliance report must include the full input report generated by the software as contigous part of the compliance report.
Boxes appropriately checked in the Mandatory Section of the complaince report.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 1 of 45
PROJECT SUMMARY
Short Desc: ICE24091 Description: Builing 2B
Owner:
Address1: 1815 West Vine Street City: Kissimmee
Address2: Builing 2B State: FL
Zip: 34741
Type: Multi-Family Class: Renovation to existing buildi
Jurisdiction: KISSIMMEE, OSCEOLA COUNTY, FL (591100)
Conditioned Area: 1040 SF Conditioned & UnConditioned Area: 1040 SF
No of Stories: 1 Area entered from Plans 1040 SF
Permit No: 0 Max Tonnage 0.8
If different, write in: ______________________
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 2 of 45
ResultCriteriaDesignComponent
Compliance Summary
Gross Energy Cost (in $) 620.00 663.00 PASSED
LIGHTING CONTROLS PASSES
EXTERNAL LIGHTING No Entry
HVAC SYSTEM PASSES
PLANT No Entry
WATER HEATING SYSTEMS PASSES
PIPING SYSTEMS PASSES
Met all required compliance from Check List? Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 3 of 45
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the Florida Energy Code
Prepared By: Draftronic Building Official:
Date: _________________ Date: __________________
I certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent: __________________ Date: __________________
If Required by Florida law, I hereby certify (*) that the system design is in compliance with the Florida Energy Efficiency Code
Architect: __________________ Reg No: __________________ Signature____________
Electrical Designer:
Francisco Cabral Reg No: 87110 Signature____________
Lighting Designer:
Francisco Cabral Reg No: 87110 Signature____________
Mechanical Designer:
Farshad Antikchi Reg No: 72998 Signature____________
Plumbing Designer:
Farshad Antikchi Reg No: 72998 Signature____________
(*) Signature is required where Florida Law requires design to be performed by registered design professionals per C103.1.1.1.2
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 4 of 45
Project: ICE24091 Title: Builing 2B Type: Multi-Family (WEA File: FL_ORLANDO_INTL_ARPT.tm3)
39.80
$620
39.80 11680
$620
2.90
$46
15.60
$243
0.00
$0
11.50
$179
0.50
$8
9.30
$144
50.00
$780
50.00 14665
$780
8.00
$125
15.60
$243
0.00
$1
11.80
$183
0.40
$6
14.20
$222
Total
ELECTRICITY(MBtu/kWh/$)
AREA LIGHTS
MISC EQUIPMT
PUMPS & MISC
SPACE COOL
SPACE HEAT
VENT FANS
2) Baseline1) Proposed
Building End Uses
Credits Applied: None Passing Criteria = 663 Design (including any credits) = 620 Passing requires Proposed Building cost to be at most 85% of Baseline cost. This Proposed Building is at 79.5%
PASSES
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 5 of 45
CLP
(W)
Area or Length or No. of Units
(Sqft or ft)
Allowance (W/Unit)
CategoryDescription
External Lighting Compliance
ELPA
(W)
Tradable?
None
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 6 of 45
Type: Multi-Family (WEA File: FL_ORLANDO_INTL_ARPT.tm3)
ComplianceDescriptionAcronym
Lighting Controls Compliance
ID Area (sq.ft)
17 Office - 1 ( Office - Enclosed ) 780 COMPLIANCE: PASSES
REQUIRED:
All of |1|; one of |2|3|; one of |8|
CONTROLS IN SPACE:
1-Manual (Local Control) 2-Occupancy Sensor - Manual ON only 3-Occupant Sensor (50%) 4-Light Reduction (30%-70%) 7-Occupant Sensor Auto OFF (Full or
Partial) 8-Occupant Sensor Auto Full OFF 9-Time-Switch: Auto Full Off or
Scheduled Off
Office-1
17 Bathroom ( Office - Enclosed ) 49 COMPLIANCE: PASSES
REQUIRED:
All of |1|; one of |2|3|; one of |8|
CONTROLS IN SPACE:
1-Manual (Local Control) 2-Occupancy Sensor - Manual ON only 3-Occupant Sensor (50%) 4-Light Reduction (30%-70%) 7-Occupant Sensor Auto OFF (Full or
Partial) 8-Occupant Sensor Auto Full OFF 9-Time-Switch: Auto Full Off or
Scheduled Off
Bathroom
17 Electric - Fire ( Office - Enclosed ) 162 COMPLIANCE: PASSES
REQUIRED:
All of |1|; one of |2|3|; one of |8|
CONTROLS IN SPACE:
1-Manual (Local Control) 2-Occupancy Sensor - Manual ON only 3-Occupant Sensor (50%) 4-Light Reduction (30%-70%) 7-Occupant Sensor Auto OFF (Full or
Partial) 8-Occupant Sensor Auto Full OFF 9-Time-Switch: Auto Full Off or
Scheduled Off
Electric-Fire
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 7 of 45
PASSES
Title: Builing 2B Type: Multi-Family (WEA File: FL_ORLANDO_INTL_ARPT.tm3)
System Report Compliance PTAC-1 System 1 Constant Volume Packaged
Terminal System
Component Category Capacity Eff Design
Eff Criteria
Integrated Eff-Design
Integrated Eff-Criteria
Comp-liance
No. of Units
Cooling System PTHP All Capacities 7000-15000 Btu/h(Cooling Mode)
9800 12.60 11.06 PASSES
Heating System PTHP All Capacities 7000 - 15000 Btu/h (Heating Mode)
9800 4.28 4.21 PASSES
Air Handling System -Supply
Air Handler (Supply) - Constant Volume
1500 0.80 0.82 PASSES
PASSES
Comp liance
CategoryMin
IPLV
Min Eff
Design
IPLV
Design Eff
SizeInstalled No
Description
Plant Compliance
None
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 8 of 45
Type: Multi-Family (WEA File: FL_ORLANDO_INTL_ARPT.tm3)
Comp liance
Design Loss
Design Eff
Max Loss
Min Eff
CategoryTypeDescription
Water Heater Compliance
Water Heater 3 Electric Instantaneous Water Heater
< 2 gal 0.9197.00 PASSES
PASSES
Project: ICE24091 Title: Builing 2B Type: Multi-Family (WEA File: FL_ORLANDO_INTL_ARPT.tm3)
Piping System Compliance
Category Pipe Dia [inches]
Ins Cond [Btu-in/hr
.SF.F]
Operating Temp
[F]
Is Runout?
Ins Thick [in]
Compl-iance
Req Ins Thick [in]
Heating System (Steam, Steam Condensate, & Hot Water)
105.00 0.280.25 1.00 0.50False PASSES
PASSES
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 9 of 45
Topic Section Component Description Yes N/A Exempt
Mandatory Requirements (as applicable) Requirements compiled by US Department of Energy and Pacific Northwest National Laboratory. Adopted for FBC with permission. Not all may be applicable
1. To be checked by Designer or Engineer
6037 Post Constructio C401.3 Envelope A thermal envelope certificate will be supplied and completed by an approved third party.
6031 Fenestration C402.4.1 Envelope The vertical fenestration area <= 30 percent of the gross above-grade wall area.
6033 Fenestration C402.4.1 Envelope The skylight area <= 3 percent of the gross roof area.
6036 Fenestration C402.4.1.1 Envelope Vertical Fenestration Area Allowance: A maximum of 40 percent of gross above-grade wall area is permitted to be vertical fenestration area provided in buildings not greater than two stories above grade, >= 50 percent of the conditioned floor area is within a daylight zone, in buildings three or more stories above grade, not less than 25 percent of the net floor area is within a daylight zone, daylight responsive controls are installed, and glazing assemblies within the scope of NFRC 200 have visible transmittance >= 1.1 times
SHGC.
6038 Fenestration C402.4.1.2 Envelope A maximum of 6 percent of roof area is permitted to be skylight area provided daylight responsive controls are installed in daylight zones under skylights.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 10 of 45
6039 Fenestration C402.4.2 Envelope In enclosed spaces > 2,500 ft2 directly under a roof with ceiling heights > 15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non-refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is <= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent.
[]- Exception 1:C402.4.2: Buildings in climate zones 6 through 8.
[]- Exception 2:C402.4.2: Spaces where the proposed general lighting power densities < 0.5 W/ft2.
[]- Exception 3:C402.4.2: Areas with obstructions that block direct beam sunlight on >= 1/2 of the roof over the enclosed area for more than 1,500 daytime hours per year between 8 am and 4 pm.
[]- Exception 4:C402.4.2: Spaces where the daylight zone under rooftop monitors is > 50 percent of the enclosed space floor area.
[]- Exception 5:C402.4.2: Spaces where the total area net of daylight zones adjacent to vertical fenestration < 2,500 s.f. and where the lighting is controlled.
[]- Exception 6:C402.4.2: Requirement does not apply.
6032 Fenestration C402.4.3 Envelope Vertical fenestration Maximum U-factor and SHGC value.
6034 Fenestration C402.4.3 Envelope Skylight SHGC value.
6040 Fenestration C402.4.5 Envelope U-factor of opaque swinging and nonswinging doors associated with the building thermal envelope meets requirements.
6046 Post Constructio C402.5.11 Envelope Operable openings > 40 ft2 will be interlocked with heating and cooling systems to setback setpoint temperatures within 10 minutes of opening.
[]- Exception 1:C402.5.11: Separately zoned areas.
[]- Exception 2:C402.5.11: Warehouses with overhead doors for occupancy.
[]- Exception 3:C402.5.11: Entrance doors located in exterior wall as part of a vestibule.
6056 HVAC C403.2.1 Mechanical HVAC systems and equipment design loads calculated in accordance with ANSI/ASHRAE/ACCA Standard 183 or by an approved equivalent computational procedure []- Exception 1:C403.2.1: Mechanical systems are designed by a registered engineer
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 11 of 45
6096 HVAC C403.2.12.1 Mechanical HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp.
[]- Exception 1:C403.2.12.1: Hospital and laboratory systems that utilize flow control devices on exhaust and/or return.
[]- Exception 2:C403.2.12.1: Individual exhaust fans with motor nameplate horsepower less than or equal 1 hp.
[]- Exception 3:C403.2.12.1: Requirement does not apply.
6055 HVAC C403.2.12.2 Mechanical HVAC fan motors not oversized beyond allowable limits.
[]- Exception 1:C403.2.12.2: Fans equipped with electronic speed control devices
[]- Exception 2:C403.2.12.2: Fans with fan nameplate electrical input power < 0.89 kW
[]- Exception 3:C403.2.12.2: Fan system complying with Section C403.2.12.1 motor nameplate hp (Option 1).
[]- Exception 4:C403.2.12.2: Fans with motor nameplate horsepower < 1 hp (746 W).
[]- Exception 5:C403.2.12.2: Requirement does not apply.
6141 SYSTEM_SPEC C403.2.12.3 Mechanical Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95 at the design point of operation.
[]- Exception 1:C403.2.12.3: Single not embedded fans with motor nameplate horsepower of less than 1 hp (0.89 kW).
[]- Exception 2:C403.2.12.3: Embedded fans with motor nameplate horsepower exceeding 5 hp (4.1 kW).
[]- Exception 3:C403.2.12.3: Multiple fans in series or parallel have a combined motor nameplate horsepower of less or equal 5 hp and are operated functionally as a single fan.
[]- Exception 4:C403.2.12.3: Fans integral to equipment listed under Section C403.2.3.
[]- Exception 5:C403.2.12.3: Fans included in equipment having certified seal for air or energy performance of the equipment package.
[]- Exception 6:C403.2.12.3: Ceiling fans.
[]- Exception 7:C403.2.12.3: Fans for gases at temperatures above 425F.
[]- Exception 8:C403.2.12.3: Fans for operation in explosive atmospheres.
[]- Exception 9:C403.2.12.3: Reversible fans for tunnel ventilation.
[]- Exception 10:C403.2.12.3: Fans not covered by
AMCA 208.
[]- Exception 11:C403.2.12.3: Fans intended to operate only during emergency conditions.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 12 of 45
6057 HVAC C403.2.2 Mechanical HVAC systems and equipment capacity does not exceed calculated loads.
[]- Exception 1:C403.2.2: Required standby equipment with proper controls per code.
[]- Exception 2:C403.2.2: Multiple units of the same type of equipment with sequencing controls.
[]- Exception 3:C403.2.2: Living spaces in commercial buildings shall be sized in accordance with Section R403.7.1.1 and its exceptions
6087 HVAC C403.2.7 Mechanical Exhaust air energy recovery on systems meeting Table C403.7.4(1) and C403.7.4(2).
[]- Exception 1:C403.2.7: Where energy recovery systems are prohibited by the Florida Building Code, Mechanical
[]- Exception 2:C403.2.7: Laboratory fume hood systems
[]- Exception 3:C403.2.7: Systems serving spaces that are heated to less than 60°F (15.5°C) and are not cooled
[]- Exception 4:C403.2.7: Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy
[]- Exception 5:C403.2.7: Heating energy recovery in Climate Zones 1 and 2
[]- Exception 6:C403.2.7: Cooling energy recovery in Climate Zones 3C, 4C, 5B, 5C, 6B, 7 and 8
[]- Exception 7:C403.2.7: Systems requiring dehumidification that employ energy recovery in series with the cooling coil
[]- Exception 8:C403.2.7: Where the largest source of air exhausted at a single location at the building exterior is less than 75 percent of the design outdoor air flow rate.
[]- Exception 9:C403.2.7: Systems expected to operate less than 20 hours per week at the outdoor air percentage covered by Table C403.2.7(1).
[]- Exception 10:C403.2.7: Systems exhausting toxic, flammable, paint or corrosive fumes or dust.
[]- Exception 11:C403.2.7: Commercial kitchen hoods used for collecting and removing grease vapors and smoke
6047 HVAC C403.3.2 Mechanical Economizer operation will not increase heating energy use during normal operation.
[]- Exception 1:C403.3.2: Economizers on VAV systems.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 13 of 45
6093 HVAC C403.3.3,
C403.3.3.1, C403.3.3.2, C403.3.3.3, C403.3.3.4, C403.3.3.5
Mechanical Air economizers provided where required, meet the requirements for design capacity, control signal, ventilation controls, high-limit shut-off, integrated economizer control, and provide a means to relieve excess outside air during operation.
[]- Exception 1:C403.3_C403.3.2: Buildings located in Climate Zones 1A and 1B.
[]- Exception 2:C403.3_C403.3.2: Individual DX fan cooling units have a capacity is < 54 KBtu/h (15.8 kW) or total chilled water system capacity < minimum specified in Table C403.3(1).
[]- Exception 3:C403.3_C403.3.2: Where more than 25 % of the air supplied to spaces that are designed to be humidified above 35°F (1.7°C) dewpoint temperature to satisfy process needs
[]- Exception 4:C403.3_C403.3.2: Systems that serve residential spaces where the system capacity is < 270 kBtu/h
[]- Exception 5:C403.3_C403.3.2: Systems expected to operate less than 20 hours per week
[]- Exception 6:C403.3_C403.3.2: System serves supermarket areas with open refrigerated casework.
[]- Exception 7:C403.3_C403.3.2: Where the minimum code required cooling efficiency of the HVAC unit rated with an IPLV, IEER or SEER is increased by at least 17 %.
[]- Exception 8:C403.3_C403.3.2: Chilled-water cooling systems that are passive (without a fan) capacity is < the minimum specified in Table C403.3(1).
[]- Exception 9:C403.3_C403.3.2: Systems that include a heat recovery system in accordance with Section C403.4.5
[]- Exception 10:C403.3_C403.3.2: Economizers on VAV systems cause zone-level heating to increase due to a reduction in supply air temperature.
6042 HVAC C403.3.4,
C403.3.4.1, C403.3.4.2, C403.3.1
Mechanical Water economizers provided where required, meet the requirements for design capacity, maximum pressure drop and integrated economizer control.
[]- Exception 1:C403.2.12.5_C403.2.12.5.1_C403.2.12.5.2:
Modulating fan control not required for chilled water and evaporative cooling units with fan motors of < 1 hp where the units are not used to provide ventilation air and the indoor fan cycles with the load.
[]- Exception 2:C403.2.12.5_C403.2.12.5.1_C403.2.12.5.2:
Requirement does not apply.
6053 HVAC C403.4.2.3.1 Mechanical Hydronic heat pump systems connected to a common water loop meet heat rejection and heat addition requirements.
[]- Exception 1:C403.4.2.3.1: A deadband of less than 20°F is allowed where a temperature optimization controller is used.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 14 of 45
6144 Mandatory Addit C406.6 Project Dedicate outdoor air system efficiency energy credit - Building equipped with independent ventilation system designed to provide 100-percent outdoor air to each individual occupied space, as specified by the IMC. The ventilation system is capable of total energy recovery and includes HVAC system controls that manage temperature resets at least 25 percent of delta design supply-air / room-air temp.
2. To be checked by Plan Reviewer
6004 Plan Review C103.2 Mechanical Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical and service water heating systems and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Hot water system sized per manufacturer's sizing guide.
6011 Plan Review C103.2 Interior Lighting Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. The information provided should include lighting controls per sections C405.2 and C405.3.
6023 Plan Review C103.2 Exterior Lighting Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. The information provided should include Exterior lighting power requirements (Mandatory) per section C405.4.
6001 Plan Review C103.2, C103.2.1 Envelope Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed.
6081 HVAC C402.2.6 Mechanical Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5.
[]- Exception 1:C402.2.6: Heated slabs on grade insulated in accordance with Section C402.2.5
[]- Exception 2:C402.2.6: Requirement does not apply.
6100 HVAC C403.2.13 Mechanical Systems that heat outside the building envelope are radiant heat systems controlled by an occupancy sensing device or timer switch.
[]- Exception 1:C403.12.1: Requirement does not apply.
6068 HVAC C403.2.4.1.3 Mechanical Reset static pressure setpoint for DDC controlled VAV boxes reporting to central controller based on the zones requiring the most pressure.
[]- Exception 1:C403.4.1.3: Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 15 of 45
6107 HVAC C403.2.4.2 Mechanical Each zone equipped with setback controls using automatic time clock or programmable control system.
[]- Exception 1:C403.2.4.2: Zones operated continuously.
[]- Exception 2:C403.2.4.2: Zones have a full HVAC load demand not exceeding 6,800 Btu/h (2 kW) and having a readily accessible manual shutoff switch.
[]- Exception 3:C403.2.4.2: Requirement does not apply.
6123 HVAC C403.2.4.4 Mechanical Zone isolation devices and controls installed where applicable.
[]- Exception 1:C403.2.4.4: Exhaust and outdoor air connections having fan systems 5000 cfm or smaller.
[]- Exception 2:C403.2.4.4: Exhaust airflow less than 10% of design.
[]- Exception 3:C403.2.4.4: Zones and systems intended to operate continuously or are inoperative when all other zones are inoperative.
[]- Exception 4:C403.2.4.4: Requirement does not apply.
6124 HVAC C403.2.4.7 Mechanical Fault detection and diagnostics installed with air-cooled unitary DX units or VRF units having economizers.
[]- Exception 1:C403.2.4.7: Requirement does not apply.
6125 HVAC C403.2.5 Mechanical Hot water boilers supplying heat via one- or two-pipe systems include outdoor setback control.
[]- Exception 1:C403.2.5: Requirement does not apply.
6089 HVAC C403.2.6 Mechanical Natural or mechanical ventilation is provided in accordance with International Mechanical Code Chapter 4. Mechanical ventilation has capability to reduce outdoor air supply to minimum per IMC Chapter 4.
[]- Exception 1:C403.2.2: Requirement does not apply.
6090 HVAC C403.2.6.1 Mechanical Demand control ventilation provided for spaces >500 ft2 and >=25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm.
[]- Exception 1:C403.2.6.1: Systems with energy recovery complying with Section C403.2.7.
[]- Exception 2:C403.2.6.1: Multiple-zone systems without DDC.
[]- Exception 3:C403.2.6.1: Multiple-zone systems with design outdoor air of less than 1200 cfm.
[]- Exception 4:C403.2.6.1: Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is < 1,200 cfm
[]- Exception 5:C403.2.6.1: Ventilation provided for process loads only
[]- Exception 6:C403.2.6.1: Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 16 of 45
6098 HVAC C403.4.2 Mechanical The heating of fluids in hydronic systems that have been previously mechanically cooled, and the cooling of fluids that have been previously mechanically heated are limited in accordance with Sections C403.4.2.1-C403.4.2.3. Single boiler systems >500 kBtu/h have multistaged or modulating burner.
[]- Exception 1:C403.4.2: Requirement does not apply.
6142 HVAC C403.4.2.3.2 Mechanical Closed-circuit cooling tower within heat pump loop have either automatic bypass valve or lower leakage positive closure dampers. Open-circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower. Open- or closed-circuit cooling towers used in conjunction with a separate heat exchanger have heat loss by shutting down the circulation pump on the cooling tower loop. Open- or closed circuit cooling towers have a separate heat exchanger to isolate the cooling tower from the heat pump loop, and heat loss is controlled by shutting down the circulation pump on the cooling tower loop.
[]- Exception 1:C403.4.2.3.2: Heat pump system must reject heat throughout the year.
[]- Exception 2:C403.4.2.3.2: Requirement does not apply.
6116 HVAC C403.4.2.5 Mechanical System turndown requirement met through multiple single-input boilers, one or more modulating boilers, or a combination of single-input and modulating boilers. Boiler shall comply with the turndown ratio specified in Table C403.4.2.5.
6071 HVAC C403.4.2.6 Mechanical Chilled water plants with multiple chillers have capability to reduce flow automatically through the chiller plant when a chiller is shut down. Boiler plants with multiple boilers have the capability to reduce flow automatically through the boiler plant when a boiler is shut down.
6099 HVAC C403.4.3.1 Mechanical Fan systems with total system motor capacity >=5 hp associated with heat rejection equipment configured to automatically modulate the fan speed to control the leaving fluid temperature or condensing temp/pressure of heat rejection device.
[]- Exception 1:C403.4.3.1: Fans serve multiple refrigerant or fluid cooling circuits.
[]- Exception 2:C403.4.3.1: Condenser fans serve flooded condensers.
[]- Exception 3:C403.4.3.1: Requirement does not apply.
6120 HVAC C403.4.3.4 Mechanical Open-circuit cooling towers having water cooled chiller systems and multiple or variable speed condenser pumps, are designed so that tower cells can run in parallel with larger of flow criteria.
[]- Exception 1:C403.4.3.4: Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 17 of 45
6103 HVAC C403.6.1 Mechanical Hydronic and multizone HVAC system controls are VAV fans driven by mechanical or electrical variable speed drive per Table C403.4.1.1.
[]- Exception 1:C403.4.4: Zones or supply air systems where >= 75 % of the energy for reheating or for providing warm air in mixing systems is provided from a site-recovered or site-solar energy source
[]- Exception 2:C403.4.4: Zones where special humidity levels are required to satisfy process needs
[]- Exception 3:C403.4.4: Zones with a peak supply air of <= 300 cfm (142 L/s) and where the flow rate is < 10 % of the total fan system supply airflow rate.
[]- Exception 4:C403.4.4: Zones where the volume of air to be reheated, recooled or mixed is <= the minimum ventilation requirements of Chapter 4 of the Florida Building Code, Mechanical
[]- Exception 5:C403.4.4: Zones or supply air systems with thermostatic and humidistatic controls capable of preventing reheating, recooling, mixing or simultaneous supply of air that has been previously cooled
[]- Exception 6:C403.4.4: Requirement does not apply.
6122 HVAC C404.2.1 Mechanical Gas-fired water-heating equipment installed in new buildings: where a singular piece of water-heating equipment >= 1,000 kBtu/h serves the entire building, thermal efficiency <= 92 Et.
Where multiple pieces of water-heating equipment serve the building with combined rating <= 1,000 kBtu/h, the combined input-capacity-weighted-average thermal efficiency <= 90 Et. Exclude input rating of equipment in individual dwelling units and equipment <= 100 kBtu/h []- Exception 1:C404.2.1: 25 percent or more of the annual service water heating requirement is provided by on-site renewable energy or site-recovered energy.
[]- Exception 2:C404.2.1: Water heaters installed in individual dwelling units shall not be required to be included in the total input rating of service waterheating equipment
[]- Exception 3:C404.2.1: Water heaters with an input rating of <= 100,000 Btu/h (29.3 kW) not required to be included in the total input rating of service water-heating equipment
[]- Exception 4:C404.2.1: Requirement does not apply.
6114 HVAC C404.4 Mechanical All piping insulated in accordance with section details and Table C403.12.3.
[]- Exception 1:C404.4: Requirement does not apply.
6019 HVAC C404.5, C404.5.1,
C404.5.2
Mechanical Heated water supply piping conforms to pipe length and volume requirements. Refer to section details.
[]- Exception 1:C404.5_C404.5.1_C404.5.2:
Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 18 of 45
6022 HVAC C404.6.3 Mechanical Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle.
[]- Exception 1:C404.6.3: Requirement does not apply.
6026 HVAC C404.7 Mechanical Demand recirculation water systems have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F.
[]- Exception 1:C404.7: Requirement does not apply.
6048 Plan Review C405.5.2 Project Group R-2 dwelling units have separate electrical meters.
[]- Exception 1:C405.5.2: Requirement does not apply.
6030 Plan Review C406 Project Plans, specifications, and/or calculations provide all information with which compliance can be determined for the additional energy efficiency package options.
6084 HVAC C408.2.2.2 Mechanical HVAC hydronic heating and cooling coils have means to balance and have pressure test connections.
[]- Exception 1:C408.2.2.2: Pumps with pump motors of 5 hp (3.7 kW) or less.
[]- Exception 2:C408.2.2.2: Where throttling results in no greater than 5 percent of the nameplate horsepower draw above that required if the impeller were trimmed.
3. To be checked by Inspector
6016 Insulation C104 Envelope Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans.
6006 Insulation C104, C303.1.1 Envelope Installed roof insulation type and R-value consistent with insulation specifications reported in plans. For some ceiling systems, verification may need to occur during Framing Inspection.
6008 Insulation C104.2.1 Envelope Installed slab-on-grade insulation type and R-value consistent with insulation specifications reported in plans.
6007 Insulation C303.1, C303.1.1 Envelope Roof insulation installed per manufacturer’s instructions and is labeled with R-value or insulation certificate providing R-value and other relevant data. Blown or poured loose-fill insulation is installed only where the roof slope is > 3 in 12.
6035 Fenestration C303.1.3 Envelope Fenestration products rated in accordance with NFRC certified and as to performance labels or certificates provided.
[]- Exception 1:C303.1.3: Default values are used.
6020 Insulation C303.2 Envelope Above-grade wall insulation installed per manufacturer’s instructions.
6005 Insulation C303.2, C303.2.1 Envelope Below-grade wall insulation installed per manufacturer’s instructions.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 19 of 45
6013 Insulation C303.2, C303.2.1 Envelope Slab edge insulation installed per manufacturer’s instructions and the Florida Building Code, Building.
6027 Insulation C303.2, C402.2.4 Envelope Floor insulation installed per manufacturer’s instructions. Cavity or structural slab insulation installed in permanent contact with underside of decking or structural slabs.
[]- Exception 1:C303.2_C402.2.4: All perimeter framing fully insulated at metal or wood framed prescriptive levels.
[]- Exception 2:C303.2_C402.2.4: Concrete floor slab insulation turns up and contacts underside of floor under wall assembly.
[]- Exception 3:C303.2_C402.2.4: Requirement does not apply.
6015 Insulation C303.2.1 Envelope Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities.
6002 Insulation C402.1.3 Envelope Installed below-grade wall insulation type and R-value consistent with insulation specifications reported in plans.
6061 Insulation C402.1.3 Envelope Non-swinging opaque doors have R-4.75 insulation.
[]- Exception 1:C402.1.3: Requirement does not apply.
6012 Insulation C402.2.2 Envelope Skylight curbs are insulated to the level of roofs with insulation above deck or R-5, whichever is less.
[]- Exception 1:C402.2.1.5: Unit skylight curbs included as a component of a skylight listed and labeled per NFRC 100.
[]- Exception 2:C402.2.1.5: Requirement does not apply.
6064 Insulation C402.2.2 Envelope Roof assembly meets minimal thermal resistance installed between roof framing or in a continuous fashion on the roof assembly as stipulated in Table C402.1.3. Requirements for above deck insulation, minimum thickness, suspended ceilings, staggered joints and skylight curbs will be met.
[]- Exception 1:C402.2.1: Requirement does not apply.
6024 Insulation C402.2.3 Envelope Installed floor insulation type and R-value consistent with insulation specifications reported in plans.
6021 Insulation C402.2.5, C402.2.5.1
Envelope Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil.
[]- Exception 1:C402.2.5_C402.2.5.1:
Requirement does not apply.
6051 Insulation C402.2.6 Envelope Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5.
[]- Exception 1:C402.2.6: Heated slab-on-grade.
[]- Exception 2:C402.2.6: Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 20 of 45
6014 Insulation C402.3 Envelope High-albedo roofs satisfy one of the following:
3-year-aged solar reflectance >= 0.55 (0.63 for Climate Zone 1A) and thermal emittance >= 0.75 or 3-year-aged solar reflectance index >= 64.0 (75 for Climate Zone 1A).
[]- Exception 1:C402.3: Roof Over Conditioned Space With No Cooling.
[]- Exception 2:C402.3: Ballasted Roof.
[]- Exception 3:C402.3: Vegetated Roof (75% coverage).
[]- Exception 4:C402.3: Shaded or Covered Roof (75% coverage).
[]- Exception 5:C402.3: Asphaltic Membrane Roof.
[]- Exception 6:C402.3: Steep Sloped Roof.
6028 Fenestration C402.4.3 Envelope Installed skylight U-factor and SHGC consistent with label specifications and as reported in plans.
6025 Fenestration C402.4.3, C402.4.3.4
Envelope Installed vertical fenestration U-factor and SHGC consistent with label specifications and as reported in plans.
6043 Air Leakage C402.5 Envelope Building envelope contains a continuous air barrier that has been tested and deemed to limit air leakage <= 0.40 cfm/ft2 of the building thermal envelope area at a pressure differential of 0.3 inch water gauge (75 Pa).
6044 Air Leakage C402.5.1 Envelope The building envelope contains a continuous air barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner.
[]- Exception 1:C402.5.1: Requirement does not apply.
6003 Air Leakage C402.5.1.1 Envelope All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor-permeable wrapping material to minimize air leakage.
6062 Air Leakage C402.5.1.2.1 Envelope The building envelope contains a continuous air barrier that is sealed in an approved manner and material permeability <= 0.004 dfm/ft2. Air barrier penetrations are sealed in an approved manner.
[]- Exception 1:C402.5.1.2.1: Requirement does not apply.
6065 Air Leakage C402.5.1.2.2 Envelope The building envelope contains a continuous air barrier that is sealed in an approved manner and average assembly air leakage <= 0.04 cfm/ft2. Air barrier penetrations are sealed in an approved manner.
[]- Exception 1:C402.5.1.2.2: Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 21 of 45
6052 Air Leakage C402.5.4 Envelope Factory-built fenestration and doors are labeled as meeting air leakage requirements.
[]- Exception 1:C402.5.4: Field fabricated fenestration assemblies.
[]- Exception 2:C402.5.4: Fenestration in buildings that comply with air leakage requirements with a whole building air leakage test.
[]- Exception 3:C402.5.4: Doors that comply with special International Building Code requirements.
6009 Air Leakage C402.5.5, C402.5.11, 403.6
Envelope Stair and elevator shaft vents have motorized dampers that automatically close. Reference section C403.6 for operational details.
6049 Air Leakage C402.5.6 Envelope Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway.
[]- Exception 1:C402.5.6: Requirement does not apply.
6050 Air Leakage C402.5.7 Envelope Vestibules are installed on all building entrances.
Doors have self-closing devices.
[]- Exception 1:C402.5.7: Building entrances with revolving doors.
[]- Exception 2:C402.5.7: Doors not intended to be used as a building entrance.
[]- Exception 3:C402.5.7: Doors opening directly from a sleeping unit or dwelling unit.
[]- Exception 4:C402.5.7: Doors that open directly from a space <=3000 ft2.
[]- Exception 5:C402.5.7: Doors with air curtain.
[]- Exception 6:C402.5.7: Existing door is being replaced and existing vestibules not removed.
[]- Exception 7:C402.5.7: Requirement does not apply.
6045 Air Leakage C402.5.8 Envelope Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing.
[]- Exception 1:C402.5.10: Requirement does not apply.
6086 HVAC C403.2 Mechanical HVAC equipment efficiency verified.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 22 of 45
6092 HVAC C403.2.10 Mechanical HVAC piping insulation insulated in accordance with Table C403.2.10. Insulation exposed to weather is protected from damage and is provided with shielding from solar radiation.
[]- Exception 1:C403.2.10: Factory-installed piping within HVAC equipment
[]- Exception 2:C403.2.10: Factory-installed piping within room fan-coils and unit ventilators tested under AHRI 440.
[]- Exception 3:C403.2.10: Piping that conveys fluids that have a design operating temperature range between 60 and 105°F.
[]- Exception 4:C403.2.10: Fluid not heated or cooled.
[]- Exception 5:C403.2.10: Strainers and valves associated with 1 inch or smaller piping.
[]- Exception 6:C403.2.10: Underground piping with fluids no hotter than 60⁰F.
[]- Exception 7:C403.2.10: Piping design for radiant heating systems
[]- Exception 8:C403.2.10: Requirement does not apply.
6171 HVAC C403.2.12.4 Mechanical Motors for fans that are not less than 1/12 hp and less than 1 hp are electronically commutated motors or have a minimum motor efficiency of 70 percent. These motors have the means to adjust motor speed for either balancing or remote control.
[]- Exception 1:C403.2.12.4: Motors in the airstream within fan coils and terminal units only provide heating to the space served.
[]- Exception 2:C403.2.12.4: Motors in space-conditioning equipment that comply with Section C403.2.3 or C403.2.12.
[]- Exception 3:C403.2.12.4: Motors that comply with Section C405.7.
[]- Exception 4:C403.2.12.4: Requirement does not apply.
6173 HVAC C403.2.12.5.1 Mechanical Each DX cooling system >= 65 kBtu and chiller water/evaporative cooling system with fans >= 1/4 hp are designed to vary the indoor fan airflow as a function of load and comply with detailed requirements of this section.
[]- Exception 1:C403.2.12.5.1: Modulating fan control is not required for chilled water and evaporative cooling units with fan motors of less than 1 hp where the units are not used to provide ventilation air and the indoor fan cycles with the load.
[]- Exception 2:C403.2.12.5.1: Where the volume of outdoor air required to comply with the ventilation requirements of the IMC at low speed exceeds the air that would be delivered per Section C403.2.12.5
[]- Exception 3:C403.2.12.5.1: Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 23 of 45
6097 HVAC C403.2.12.5.2 Mechanical VAV fans have static pressure sensors located so controller setpoint <=1.2 w.c..
[]- Exception 1:C403.2.12.5.2: Requirement does not apply.
6168 HVAC C403.2.12.5.2 Mechanical Static pressure sensors used to control VAV fans located such that the controller setpoint is <= 1.2 inches w.c.. Where this results in one or more sensors being located downstream of major duct splits, not less than one sensor located on each major branch.
[]- Exception 1:C403.2.12.5.2: Requirement does not apply.
6167 HVAC C403.2.12.5.3 Mechanical Systems with DDC of individual zones reporting to the central control panel configured to reset the static pressure setpoint based on zone requiring the most pressure. The DDC is capable of monitoring zone damper positions or have an alternative method of indicating the need for static pressure. See section for details.
[]- Exception 1:C403.2.12.5.3: Requirement does not apply.
6178 HVAC C403.2.12.6 Mechanical Large diameter fans where installed shall be tested and labeled in accordance with AMCA 230.
[]- Exception 1:C403.2.12.6: Requirement does not apply.
6155 HVAC C403.2.14,
C403.2.14.1, C403.2.14.2
Mechanical Refrigeration equipment performance shall be determined in accordance with sections C403.2.14.1 and C403.2.14.2 for commercial refrigerators, freezers, refrigerator-freezers, walk-in coolers, walk-in freezers and refrigeration equipment.
[]- Exception 1:C403.5: Systems have working fluid in the refrigeration cycle that goes through both subcritical and supercritical states (transcritical).
[]- Exception 2:C403.5: Systems use ammonia refrigerant.
[]- Exception 3:C403.5: Requirement does not apply.
6102 HVAC C403.2.3 Mechanical PTAC and PTHP with sleeves 16 in. by 42 in.
labeled for replacement only as per Footnote b to Tables C403.2.3(1) and C403.2.3(2).
[]- Exception 1:C403.3: Requirement does not apply.
6058 HVAC C403.2.4.1 Mechanical Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system.
[]- Exception 1:C403.2.4.1: TRUE
6059 HVAC C403.2.4.1.1 Mechanical Heat pump controls prevent supplemental electric resistance heat from coming on when not needed.
[]- Exception 1:C403.2.4.1.1: Requirement does not apply.
6060 HVAC C403.2.4.1.2 Mechanical Thermostatic controls have a 5 °F deadband.
[]- Exception 1:C403.2.4.1.2: Manual changeover thermostats.
[]- Exception 2:C403.2.4.1.2: Precision indoor temperature control required.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 24 of 45
6085 HVAC C403.2.4.1.3 Mechanical Temperature controls have setpoint overlap restrictions.
[]- Exception 1:C403.2.4.1.3: Requirement does not apply.
6108 HVAC C403.2.4.2.1,
C403.2.4.2.2
Mechanical Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hour backup []- Exception 1:C403.2.4.2.1_C403.2.4.2.2:
Requirement does not apply.
6110 HVAC C403.2.4.2.3 Mechanical Systems include optimum start controls.
[]- Exception 1:C403.2.4.2.3: Requirement does not apply.
6088 Air Leakage C403.2.4.3 Mechanical Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Reference section language for operational details.
[]- Exception 1:C403.2.4.3: Gravity dampers acceptable in buildings less than 3 stories.
[]- Exception 2:C403.2.4.3: Gravity dampers acceptable for exhaust and relief dampers in climate zones 0, 1, 2, or 3.
[]- Exception 3:C403.2.4.3: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than or equal to 300 cfm.
[]- Exception 4:C403.2.4.3: Dampers no larger than 24 inches in any dimension are to have a leakage rate of 40 cfm/ft2 at 1.0 inch water gauge when tested with AMCA 500D.
[]- Exception 5:C403.2.4.3: Requirement does not apply.
6029 HVAC C403.2.4.5 Mechanical Snow/ice melting system and freeze protection systems have sensors and controls configured to limit service for pavement temperature above 50°F and outdoor temperature above 40°F.
[]- Exception 1:C403.12.2_C403.12.3:
Requirement does not apply.
6170 HVAC C403.2.4.8 Mechanical HVAC systems serving guestrooms in Group R-1 buildings with < 50 guestrooms: Each guestroom is provided with controls that automatically manage temperature setpoint and ventilation (see sections C403.2.4.8.1 and C403.2.4.8.2).
[]- Exception 1:C403.2.4.8: Requirement does not apply.
6128 HVAC C403.2.6.2 Mechanical Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity.
[]- Exception 1:C403.2.6.2: Garages with no mechanical cooling or heating that have exhaust capacity < 8,000 cfm.
[]- Exception 2:C403.2.6.2: Garages with no mechanical cooling or heating that have a ratio of garage area ventilation to ventilation system motor nameplate hp exceed 1125 cfm/hp.
[]- Exception 3:C403.2.6.2: Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 25 of 45
6169 HVAC C403.2.7 Mechanical Units that provide ventilation air to multiple zones and operate in combination with zone heating and cooling systems do not use heating or heat recovery to warm supply air to a temperature greater than 60°F when representative building loads or outdoor air temperatures indicate that the majority of zones require cooling.
[]- Exception 1:C403.7.3: Requirement does not apply.
6129 HVAC C403.2.8 Mechanical Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria.
[]- Exception 1:C403.2.8: Requirement does not apply.
6091 HVAC C403.2.9 Mechanical HVAC ducts and plenums insulated in accordance with C403.2.9.1 and constructed in accordance with C403.2.9.2, Sealed in accordance with C403.2.9.3. verification may need to occur during Foundation Inspection.
[]- Exception 1:C403.2.9_C403.2.9.1:
Factory-installed as part of HVAC equipment.
[]- Exception 2:C403.2.9_C403.2.9.1: Where the design temperature difference between the inside and outside of the duct or plenum is less than 15⁰F.
[]- Exception 3:C403.2.9_C403.2.9.1: Runouts less than 10 feet (3048 mm) in length to air terminals or air outlets, the rated R-value of insulation need not exceed R-5.
[]- Exception 4:C403.2.9_C403.2.9.1: Backs of air outlets and outlet plenums exposed to unconditioned spaces need not exceed R-2.
[]- Exception 5:C403.2.9_C403.2.9.1: Return air ducts meeting all the requirements for building cavities that will be used as return air plenums
[]- Exception 6:C403.2.9_C403.2.9.1:
Requirement does not apply.
6174 SYSTEM_SPEC C403.3.2 Mechanical Equipment minimum efficiency:
6175 SYSTEM_SPEC C403.3.2 Mechanical Equipment minimum efficiency:
6157 HVAC C403.3.3.3 Mechanical Air economizers automatically reduce outdoor air intake to the design minimum outdoor air quantity when outdoor air intake will not reduce cooling energy usage. See Table C403.3.3.3 for applicable device types and climate zones.
[]- Exception 1:C403.3.3.3: Requirement does not apply.
6158 HVAC C403.3.3.4 Mechanical System capable of relieving excess outdoor air during air economizer operation to prevent over pressurizing the building. The relief air outlet located to avoid recirculation into the building.
[]- Exception 1:C403.3.3.4: Requirement does not apply.
EnergyGauge Summit® Fla/Com-2023. Effective Date: Dec 31, 2023 Florida Building Code, 8th Edition (2023) - Energy Conservation C407: FBC Total Building Performance Compliance Option
2/20/2025 Page 26 of 45
6159 HVAC C403.3.3.5 Mechanical Return, exhaust/relief and outdoor air dampers used in economizers have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Reference section C403.2.4.3 for details.
[]- Exception 1:C403.3.3.5: Requirement does not apply.
6094 HVAC C403.4.1.4 Mechanical Heating for vestibules and air curtains with integral heating include automatic controls that shut off the heating system when outdoor air temperatures < 45F.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .