The provided document is an Asbestos Materials Report for the Capital Center in Beaverton, Oregon. The report details various asbestos-containing materials found throughout the facility, including vinyl floor tiles, covebase, concrete, and floor tile and mastic. Some materials have been abated, while others are presumed to contain asbestos and require testing prior to any demolition or renovation work.
The related state and local contract opportunity is for the replacement of the Capital Center's PA system, as outlined in ITB 23-0016. The contract is for the Washington County and Hillsboro City jurisdictions in Oregon. The report does not provide details on the pricing terms, set-asides, incumbents, funding requirements, or other salient information related to the PA system replacement project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS MATERIALS
The following materials either tested positive or are presumed to be asbestoscontaining. Materials that had mixed results are considered positive. Materials not sampled or not listed in this report may contain asbestos and should be tested to verify asbestos content prior to impact, demolition, renovation, etc.
(+) Tested Positive, (M) Mixed Results, (P) Presumed Positive Capital Center (CC)
Result Material Location Quantity
+ Vinyl Floor Tile/Mastic 1042; floor tile and mastic 0
+ Covebase/Mastic Capital center; north hall men's restroom | July 2019: Abated all cove base and mastic
+ Vinyl Floor Tile
Capital center; north hall men's restroom, offwhite vinyl floor tile, with black mastic, under sheet floor covering | July 2019:
Abated 340 SF VAT under nonACM sheet flooring
+ Vinyl Floor Tile/Mastic Hall by 1027 (library); floor tile and mastic 0
+ Concrete Hall by 1065; soft concrete 0
+ Vinyl Floor Tile/Mastic Hall by 1411 west;floor tile and mastic 0
Floor Tile and Mastic / Tile Tested Positive, Cmnt: Tile Tested 6% Chrysotile (19766.0240057phase 5)/ 2x2 tile squares
[ID: 27364]
Level 1 / 1002 999 nq
Bottom Layer Floor Tile and Mastic / Tested Positive, Cmnt: Tested 4% and 5% Chrysotile (19766.0240058 phase 5)/ 2x2 tile squares [ID: 27365]
Level 1 / 1002 999 nq
Floor Tile and Mastic / Tile Tested Positive, Cmnt: (19766.0240061 phase 5) Abated
2008 [ID: 27368]
Level 1 / 1008 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet. Abated: 2017 [ID: 27291]
Level 1 / 1025 999 nq
Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Non Visible, Cmnt: Presumed Positive. Carpet. Tested 3% Chrysotile (19766.0240031 phase 9); Abated 2225 SF Summer 2010. [ID: 27430]
Level 1 / 1026 / Auditorium 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Non Visible, Cmnt: Presumed Positive. Carpet [ID: 27286]
Level 1 / 1027 / Library 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27287]
Level 1 / 1027A / Office 999 nq
Beaverton School District Snap Report Capital Center
1 Report Date: May 2023
(+) Tested Positive, (M) Mixed Results, (P) Presumed Positive Capital Center (CC)
Result Material Location Quantity
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27288]
Level 1 / 1027B / Office 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27289]
Level 1 / 1027C / Work Room 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27290]
Level 1 / 1027D / Conference Room 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018 [ID: 27292]
Level 1 / 1029 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018. [ID: 27520]
Level 1 / 1031 0 sf
+ Mastic under carpet cmt: sampled January 2017 Level 1 / 1032 999 nq
+ Mastic under carpet cmt: sampled January 2017 Level 1 / 1034 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27517]
Level 1 / 1035 / Storage 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27521]
Level 1 / 1040 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27522]
Level 1 / 1041 999 nq
+ Mastic under carpet cmt: sampled January 2017 Level 1 / 1042 999 nq
Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet. Tested 2% Chrysotile (19766.0240025 phase 9); Abated 1170 SF Summer 2010. [ID: 27524]
Level 1 / 1043 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018 [ID: 27532]
Level 1 / 1045 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet. [ID: 27530]
Level 1 / 1048 999 nq
Beaverton School District Snap Report
2 Report Date: May 2023
Result Material Location Quantity
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet. [ID: 27531]
Level 1 / 1049 999 nq
Floor Tile and Mastic / Tested Positive, Cmnt: Tested 2% Chrysotile (19766.024 0015 phase 9). Area abated for Summer 2010 is combined with Room 1052, due to unclear numbering of rooms. Carpet [ID:
28577]
Level 1 / 1051 999 nq
P Floor Tile and Mastic / Visible Positive, Cmnt: Abated 1338 SF Summer 2010 (combined with Room 1051, due to unclear numbering of rooms). [ID: 28713]
Level 1 / 1052 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27529]
Level 1 / 1053 999 nq
P Carpet and Mastic / / /, Cmnt: abated August 2009 [ID: 27746] Level 1 / 1059 0 sf
P Floor Tile and Mastic / / /, Cmnt: abated August 2009 [ID: 27745] Level 1 / 1059 0 sf
P Carpet and Mastic / / /, Cmnt: abated August 2009 [ID: 27747] Level 1 / 1060 0 sf
P Floor Tile and Mastic / / /, Cmnt: abated August 2009 [ID: 27748] Level 1 / 1060 0 sf
P Carpet and Mastic / / /, Cmnt: abated August 2009 [ID: 27750] Level 1 / 1061 0 sf
P Floor Tile and Mastic / / /, Cmnt: abated August 2009 [ID: 27749] Level 1 / 1061 0 sf
Floor Tile and Mastic / Tested Positive, Cmnt: Tested 2% Chrysotile (19766.024 0032 phase 9); Abated 975 SF Summer
2010. [ID: 28588]
Level 1 / 1062 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27535]
Level 1 / 1063 999 nq
P Carpet and Mastic / / /, Cmnt: abated August 2009 [ID: 27751] Level 1 / 1065 0 sf
P Floor Tile and Mastic / / /, Cmnt: abated August 2009 [ID: 27752] Level 1 / 1065 0 sf
Vinyl Floor Tile and Mastic / Tested Positive, Cmnt: Abated 1000 SF September 2007 [ID: 26067]
Level 1 / 1070 & Entryway 0 sf
Beaverton School District Snap Report
3 Report Date: May 2023
Result Material Location Quantity
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27527]
Level 1 / 1100 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27526]
Level 1 / 1101 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27525]
Level 1 / 1102 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27533]
Level 1 / 1103 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27534]
Level 1 / 1105 999 nq
Vinyl Floor Tile / Grey / Older / Tested Positive / 12", Cmnt: 2% Chrysotile [ID:
26048]
Level 1 / 1114 999 nq
Vinyl Floor Tile / Tan / Newer / Tested Positive / 12", Cmnt: 2% Chrysotile [ID:
26050]
Level 1 / 1114 999 nq
+ Floor Tile Mastic / Black / Older / Tested Positive, Cmnt: 4% Chrysotile [ID: 26049] Level 1 / 1114 999 nq
+ Floor Tile Mastic / Black / Newer / Tested Positive, Cmnt: 12% Chrysotile [ID: 26051] Level 1 / 1114 999 nq
Floor Tile and Mastic / Tested Positive, Cmnt: <1% and 4% Chrysotile (19766.024 0002 phase 100) [ID: 27546]
Level 1 / 1206 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018[ID: 27293]
Level 1 / 1305 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018[ID: 27511]
Level 1 / 1305A / Storage 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018[ID: 27510]
Level 1 / 1306 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018[ID: 27512]
Level 1 / 1308 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018[ID: 27513]
Level 1 / 1309 0 sf
Beaverton School District Snap Report
4 Report Date: May 2023
Result Material Location Quantity
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018[ID: 27514]
Level 1 / 1309A 0 sf
Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abate July 2018 (19766.0240021 phase 9) [ID: 27515]
Level 1 / 1310 0 sf
Sheet Vinyl and Mastic / Tested Positive, Cmnt: <1% and 4% Chrysotile (19766.024 0001 phase 100) / removed all visible mastic throughout room & 3 rows of tile by roll up door January 2009 [ID: 27539]
Level 1 / 1314 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible [ID: 27536] Level 1 / 1314 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018[ID: 27516]
Level 1 / 1315 0 sf
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet [ID: 27537]
Level 1 / 1318 999 nq
P Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Abated July
2018[ID: 27538]
Level 1 / 1318A 0 sf
P Gluedon Ceiling Tile and Mastic / Mastic Presumed Positive, Cmnt: Presumed positive (19766.0240011 phase 5) [ID:
27374]
Level 1 / 1502 999 nq
Gluedon Ceiling Tile and Mastic / Mastic Tested Positive, Cmnt: Tested 1% Chrysotile (19766.0240010 phase 5) [ID:
27351]
Level 1 / 1502 999 nq
Asbestoscontaining Floor Tile and Mastic / 12 x 12 / Nonvisible, Cmnt: Presumed Positive. Carpet. Tested 2% Chrysotile (19766.0240014 phase 9) [ID: 27528]
Level 1 / 1502 999 nq
P Floor Tile and Mastic / / /, Cmnt: Abated 200 SF August 2009 [ID: 27753] Level 1 / 1522a Janitor 0 sf
AC Pipe Insulation / On 10" Pipe / Tested Positive, Cmnt: Abated 3 LF March 2007
[ID: 26162]
Level 1 / Boiler 0 lf
Beaverton School District Snap Report
5 Report Date: May 2023
Result Material Location Quantity
Floor Tile and Mastic / Tested Positive, Cmnt: Tested 2% & 3% Chrysotile (19766.0240030, 0034, 0035 phase 9); NonDetect (19766.0240026, 0027, 0028 phase 9); Abated 3540 SF Summer 2010.
[ID: 28586]
Level 1 / Food Service Room 0 sf
Vinyl Floor Tile / Beige / Tested Positive / 12", Cmnt: 2% Chrysotile Abated Summer 2008 / abated 10 SF January 2009, some chipped tiles, one loose, noted during Dec.
2012 inspection. [ID: 26061]
Level 1 / Gym 2000 sf
Floor Tile Mastic / Black / Tested Positive, Cmnt: 8% Chrysotile Abated Summer 2008 / abated 10 SF January 2009 [ID: 26062]
Level 1 / Gym 2000 sf
+ Mastic under carpet cmt: sampled January
Level 1 / Hallways throughout West Side of Building 999 nq
Gypsum Wallboard/Joint Compound / Tested Positive, Cmnt: Tested 2% Chrysotile (19766.0240038 phase 5) Abated summer 2008 [ID: 27401]
Level 1 / Loading Dock 0 sf
P Floor Tile and Mastic / / /, Cmnt: 09/2015 200 SF floor tile and mastic (under carpet) abated July 2014 [ID: 29229]
Level 1 / Nutrition Services / Vestibule / Outside of Restrooms 0 sf
+ Vinyl Floor Tile/Mastic cmt: sampled January 2017
Level 1 / NW Hallways around rooms 1040, 1041, 1049, 1054 1060, 1065 & 1064 0
Hard Pan Ceiling / Tested Negative, Cmnt:
Tested <1% Chrysotile (19766.0240001 phase 100) [ID: 28887]
Level 1 / Restroom Women 2 0 sf
P Gluedon Ceiling Tile and Mastic / Mastic Presumed Positive, Cmnt: Presumed positive (19766.0240012 phase 5) [ID:
27375]
Level 1 / South Break Room adjacent to Entry D 999 nq
Floor Tile and Mastic / Tested Positive, Cmnt: Tested 3% Chrysotile (19766.024 0036 phase 9); Abated 635 SF Summer 2010. Carpet. [ID: 28590]
Level 1 / Stage 999 nq
P Lower Layer Builtup Roofing / Presumed Positive, Cmnt: Presumed Positive (19766.0240003,0004,0006 phase 6) [ID:
27416]
Roof 999 nq
Lower Layer Builtup Roofing / Tested Positive, Cmnt: Tested 12% Chrysotile (19766.0240002,0005 phase 6) [ID: 27415]
Roof 999 nq
+ Vinyl Floor Tile/Mastic Room 1032; vinyl floor tile and mastic 0
Beaverton School District Snap Report
6 Report Date: May 2023
MATERIALS THAT TESTED NEGATIVE FOR ASBESTOS
The following materials tested negative. Although no asbestos was detected, it is possible that further sampling could indicate asbestos content. It may be prudent to test prior to impact, demolition, renovation, etc.
Capital Center (CC)
Material Location
Mastic 1042; carpet (gray) and mastic
Soft Concrete Borth main entrance; soft concrete
Covebase/Mastic Cafeteria Building / Cafeteria
Stair Tread Cafeteria Building / Cafeteria
Gypsum Wallboard/Joint Compound Cafeteria Building / Electrical Room
Gypsum Wallboard/Joint Compound Cafeteria Building / Janitorial Room
Ceramic Tile/Grout Cafeteria Building / Kitchen Hall
Laminate Capital center; north hall men's restroom, blue laminate wainscot with yellow mastic
Leveling Compound Capital center; north hall men's restroom, gray leveling compound
Gypsum Wallboard/Joint Compound Capital center; north hall men's restroom, gypsum wallboard and joint compound
Sheet Floor Covering Capital center; north hall men's restroom, red juteback sheet floor covering
Vinyl Floor Tile Hall by 1013B; 12X12 vinyl floor tile
Covebase/Mastic Hall by 1013B; 6" covebase
Mastic Hall by 1027 (library); carpet (gray) and mastic
Mastic Hall by 1051; carpet and mastic (red and gray)
Covebase/Mastic Hall by 1051; covebase and mastic
Covebase/Mastic Hall by 1065; 6" covebase
Vinyl Floor Tile/Mastic Hall by 1106; 12X12 vinyl floor tile (white/blue) and mastic
Mastic Hall by 1310; carpet and mastic (gray)
Mastic Hall by 1411 west; carpet and mastic (red/gray)
Mastic Hall by 1411 west; carpet design square and mastic(red/gray)
Covebase/Mastic Hall by 1411 west; covebase and mastic
Mastic Hall by 1567; carpet and mastic (gray)
Leveling Compound Hall by 1567; leveling material
Beaverton School District Snap Report
7 Report Date: May 2023
Material Location
Pedestal Mastic / Tested Negative, Cmnt: nondetect (19766.0240056 phase 5) [ID: 27363] Level 1 / 1002
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240009 phase 5) [ID: 27350] Level 1 / 1008
Covebase and Mastic / Tested Negative, Cmnt: Non Detect (19766.0240019 phase 9) [ID: 28581] Level 1 / 1014
Gypsum and Plaster / Tested Negative, Cmnt: non detect (19766.0240051 phase 5) [ID: 27358] Level 1 / 1020
Sheet Flooring Material / Tested Negative, Cmnt: non detect (19766.0240053 phase 5) [ID: 27360] Level 1 / 1020
Sink Undercoating / Tested Negative, Cmnt: nondetect (19766.0240052 phase 5) [ID: 27359] Level 1 / 1020
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240006 phase 5) [ID: 27347] Level 1 / 1025
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240014 phase 5) [ID: 27377] Level 1 / 1028
Floor Tile and Mastic / Tested Negative, Cmnt: non detect (19766.0240050 phase 5) [ID: 27357] Level 1 / 1030
Covebase and Mastic / Tested Negative, Cmnt: Non Detect (19766.0240009 phase 9) [ID: 28574] Level 1 / 1051
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: NonDetect (19766.0240003 phase 9) [ID:
28570]
Level 1 / 1051
Layin Ceiling Tile / Tested Negative, Cmnt: NonDetect (19766.0240004 phase 9) [ID: 28571] Level 1 / 1051
Covebase and Mastic / Tested Negative, Cmnt: Non Detect (19766.0240007, 0008 phase 9) [ID: 28573] Level 1 / 1052
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: NonDetect (19766.0240001, 0002 phase 9)
[ID: 28569]
Level 1 / 1052
Layin Ceiling Tile / Tested Negative, Cmnt: NonDetect (19766.0240005, 0006 phase 9) [ID: 28572] Level 1 / 1052
Duct Mastic / Tested Negative, Cmnt: NonDetect (19766.0240011, 0012, 0013 phase 9) [ID: 28576] Level 1 / 1052
Sink Undercoating / Tested Negative, Cmnt: Non Detect (19766.0240010 phase 9) [ID: 28575] Level 1 / 1052
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: NonDetect (19766.0240017 phase 9) [ID:
28579]
Level 1 / 1054
Beaverton School District Snap Report
8 Report Date: May 2023
Floor Tile and Mastic / Tested Negative, Cmnt: Non Detect (19766.0240016 phase 9) [ID: 28578] Level 1 / 1054
Vinyl Stringer / Tested Negative, Cmnt: nondetect (19766.0240046 phase 5) [ID: 27353] Level 1 / 1059
Vinyl Stringer / Tested Negative, Cmnt: nondetect (19766.0240045 phase 5) [ID: 27352] Level 1 / 1061
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240008 phase 5) [ID: 27349]
Level 1 / 1066 Reconfigured, Interior Staffroom 1048 removed
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240025 phase 5) [ID: 27388] Level 1 / 1070
Floor Tile and Mastic / Tested Negative, Cmnt: non detect (19766.0240060 phase 5) [ID: 27367] Level 1 / 1070
Paint / Blue / Tested Negative, Cmnt: nondetect [ID:
26046] Level 1 / 1100 / South Wall
Gypsum Wallboard and Joint Compound / Compact Chalky Material with Paper / White / Tested Negative, Cmnt: nondetect [ID: 26047]
Level 1 / 1100 / South Wall
Paint / Blue / Tested Negative, Cmnt: nondetect [ID:
26043] Level 1 / 1101 / East Wall
Gypsum Wallboard and Joint Compound / Tested Negative, Cmnt: nondetect [ID: 26044] Level 1 / 1101 / East Wall
Glue Dots / Loose Particulate / Blue & Yellow / Tested Negative, Cmnt: nondetect [ID: 26045] Level 1 / 1101 / East Wall
Layin Ceiling Tile / Compressed Fibers / Grey / Tested Negative / 2'x4' with 2' squares, Cmnt: nondetect [ID:
26042]
Level 1 / 1103
Glue Dots / Mastic / Yellow / Tested Negative, Cmnt:
nondetect [ID: 26039] Level 1 / 1103 / East Wall
Paint / Blue / Tested Negative, Cmnt: nondetect [ID:
26040] Level 1 / 1103 / East Wall
Gypsum Wallboard and Joint Compound / Tested Negative, Cmnt: nondetect [ID: 26041] Level 1 / 1103 / East Wall
Glue Dots / Mastic / Yellow / Tested Negative, Cmnt:
nondetect [ID: 26036] Level 1 / 1105 / South Wall
Paint / Blue / Tested Negative, Cmnt: nondetect [ID:
26037] Level 1 / 1105 / South Wall
Gypsum Wallboard and Joint Compound / Tested Negative, Cmnt: nondetect [ID: 26038] Level 1 / 1105 / South Wall
Grout / Cementitious Material / Grey / CMU Wall / Tested Negative, Cmnt: nondetect [ID: 26052] Level 1 / 1114
Beaverton School District Snap Report
9 Report Date: May 2023
Vinyl Covebase / Tan / Tested Negative / 4", Cmnt:
nondetect [ID: 26053] Level 1 / 1114
Covebase Mastic / Brown / Tested Negative, Cmnt:
nondetect [ID: 26054] Level 1 / 1114
Vinyl Covebase / Brown / Tested Negative / 4", Cmnt:
nondetect [ID: 26055] Level 1 / 1114
Layin Ceiling Tile / Compressed Fibers / Tan / Tested Negative / 2' x 4', Cmnt: nondetect [ID: 26058] Level 1 / 1114
Gypsum Panel / Paint / Tan / Tested Negative, Cmnt:
nondetect [ID: 26059] Level 1 / 1114
Gypsum Panel / Compact Chalky Material with Paper / White / Tested Negative, Cmnt: nondetect [ID: 26060] Level 1 / 1114
Hard fittings / Fibrous wrap with foil / Grey and Silver / Tested Negative, Cmnt: nondetect [ID: 26163] Level 1 / 1114
Fiberglass / Fluffy Fibrous Material / Yellow / Tested Negative, Cmnt: nondetect [ID: 26164] Level 1 / 1114
Paint / Tan / Tested Negative, Cmnt: nondetect [ID:
26056] Level 1 / 1114 / East Wall
Gypsum Wallboard and Joint Compound / Tested Negative, Cmnt: nondetect [ID: 26057] Level 1 / 1114 / East Wall
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240016 phase 5) [ID: 27379] Level 1 / 1200
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240017 phase 5) [ID: 27380] Level 1 / 1202
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240018 phase 5) [ID: 27381] Level 1 / 1203
Mastic under carpet cmt: sampled January 2017 Level 1 / 1207
Tectum Ceiling Tile / Tested Negative, Cmnt: non detect (19766.0240021 phase 5) [ID: 27384] Level 1 / 1208
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240005 phase 5) [ID: 27346] Level 1 / 1300
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240030 phase 5) [ID: 27393] Level 1 / 1302
Floor Tile and Mastic / Tested Negative, Cmnt: non detect (19766.0240055 phase 5) [ID: 27362] Level 1 / 1302
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240026,0029 phase 5) [ID: 27392] Level 1 / 1305
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240032 phase 5) [ID: 27395] Level 1 / 1306
Beaverton School District Snap Report
10 Report Date: May 2023
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: NonDetect (19766.0240022 phase 9) [ID:
28583]
Level 1 / 1310
Layin Ceiling Tile / Tested Negative, Cmnt: NonDetect (19766.0240020 phase 9) [ID: 28582] Level 1 / 1310
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240031 phase 5) [ID: 27394] Level 1 / 1400
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240013 phase 5) [ID: 27376] Level 1 / 1400
Floor Tile and Mastic / Tested Negative, Cmnt: non detect (19766.0240059 phase 5) [ID: 27366] Level 1 / 1507
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: nondetect (19766.0240042 phase 5) [ID: 27405] Level 1 / 1508
Floor Tile and Mastic / Tested Negative, Cmnt: non detect (19766.0240054 phase 5) [ID: 27361] Level 1 / 1508
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240003 phase 5) [ID: 27344] Level 1 / 1509 wallboard and joint compound / Tested Negative, Cmnt:
NonDetect (CC01 006752001 NE corner, CC02 006752002 NW corner) [ID: 29159]
Level 1 / 1512
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240004 phase 5) [ID: 27345] Level 1 / 1527
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: NonDetect (19766.0240023 phase 9) [ID:
28584]
Level 1 / 1531
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240034 phase 5) [ID: 27397] Level 1 / 1531
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: nondetect (19766.0240041 phase 5) [ID: 27404] Level 1 / 1533
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240033 phase 5) [ID: 27396] Level 1 / 1534
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240002 phase 5) [ID: 27343] Level 1 / 1534
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240015 phase 5) [ID: 27378] Level 1 / 1537
Gypsum Wallboard / Tested Negative, Cmnt: non detect (19766.0240037 phase 5) [ID: 27400] Level 1 / 1541
Gypsum Wallboard / Tested Negative, Cmnt: non detect (19766.0240036 phase 5) [ID: 27399] Level 1 / 1563
Beaverton School District Snap Report
11 Report Date: May 2023
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240028 phase 5) [ID: 27391] Level 1 / 1565
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240001 phase 5) [ID: 27342] Level 1 / 1570
Sheet Floor Covering / Tested Negative, Cmnt: Non Detect (19766.0240029 phase 9) [ID: 28587] Level 1 / Food Service Room
Vinyl Floor Tile/Mastic comment: all abated in generator room and adjacent closet summer 2016 Level 1 / Generator & closet
Vinyl Covebase / Black / Tested Negative / 4", Cmnt:
nondetect [ID: 26063] Level 1 / Gym
Covebase Mastic / Off white / Tested Negative, Cmnt:
nondetect [ID: 26064] Level 1 / Gym
Covebase Mastic / Brown / Tested Negative, Cmnt:
nondetect [ID: 26065] Level 1 / Gym
Covebase Mastic / Fibrous Material / Tan / Tested Negative, Cmnt: nondetect [ID: 26066] Level 1 / Gym
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: NonDetect (19766.0240018 phase 9) [ID:
28580]
Level 1 / Hallway (Rm 1014)
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240024 phase 5) [ID: 27387] Level 1 / Janitor Closet Adjacent to Entry C
Tectum Ceiling Tile / Tested Negative, Cmnt: non detect (19766.0240019 phase 5) [ID: 27382] Level 1 / Loading Dock
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240022 phase 5) [ID: 27385] Level 1 / Loading Dock
Gypsum Wallboard / Tested Negative, Cmnt: non detect (19766.0240025 phase 5) [ID: 27398] Level 1 / Loading Dock
Hard Fittings / Tested Negative, Cmnt: nondetect (19766.0240047,0048,0049 phase 5) [ID: 27354] Level 1 / Mech Room East of Loading Dock
Layin Ceiling Tile / Tested Negative, Cmnt: nondetect (19766.0240020 phase 5) [ID: 27383] Level 1 / Mech Room East of Loading Dock
Hard Fittings / Tested Negative, Cmnt: NonDetect (19766.0240024 phase 9) [ID: 28585] Level 1 / Men's Restroom
Gypsum Wallboard and Joint compound / Tested Negative, Cmnt: Tested <1% Chrysotile (19766.024 0002 phase 100) [ID: 28888]
Level 1 / Restroom Women 2
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240023 phase 5) [ID: 27386] Level 1 / South Break Room Adjacent to Entry D
Covebase and Mastic / Tested Negative, Cmnt: non detect (19766.0240043 phase 5) [ID: 27406] Level 1 / South Hub
Beaverton School District Snap Report
12 Report Date: May 2023
Floor Tile and Mastic / Tested Trace, Cmnt: Tile tested <1% Chrysotile (19766.0240044 phase 5) [ID: 27407] Level 1 / South Hub
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: nondetect (19766.0240040 phase 5) [ID: 27403] Level 1 / South Hub Stairwell
Gypsum Wallboard/Joint Compound / Tested Negative, Cmnt: nondetect (19766.0240039 phase 5) [ID: 27402] Level 1 / South Hub Wall
Sheet Flooring and Mastic / Grey/White / Yellow / Tested Negative, Cmnt: NonDetect (CC01 1324320A, CC01 1324320B) [ID: 28840]
Level 1 / Staff Restroom 1311
Sheet Flooring and Mastic / Grey/White / Yellow / Tested Negative, Cmnt: NonDetect (CC02 1324321A, CC02 1324321B) [ID: 29066]
Level 1 / Staff Restroom 1311
Carpet and Mastic / Tested Negative, Cmnt: Tested 3% Chrysotile (19766.0240033 phase 9) [ID: 28589] Level 1 / Stage
Covebase and Mastic / Tested Negative, (Old Room:
Main Building / Level 1 / 1064 Reconfigured Summer 2008), Cmnt: nondetect (19766.0240027 phase 5) [ID:
27390]
Level 1 / Storages 1067 and 1068
Layin Ceiling Tile / Tested Negative, (Old Room: Main Building / Level 1 / 1064 Reconfigured 2008), Cmnt:
nondetect (19766.0240007 phase 5) [ID: 27348]
Level 1 / Storages 1067 and 1068
Mastic North main entrance; carpet and mastic (gray)
Mastic North main entrance; carpet and mastic (red/gray)
Asphaltic Pavers / Tested Negative, Cmnt: nondetect (19766.0240001 phase 6) [ID: 27373] Roof
Pavers / Tested Negative, Cmnt: nondetect (19766.0240001 phase 6) [ID: 27414] Roof
Mastic Room 1032; carpet (gray) and mastic
Vinyl Floor Tile/Mastic Room 1207; 12X12 vinyl floor tile and mastic
Covebase/Mastic Room 1532; entryway wall, black rubber covebase, white glue
Sheet Floor Covering Room 1532; north wall, kitchen area, brown, pebble vinyl with brown glue
Mastic Room 1532; southeast corner, under desk, flexible tan/brown carpet mastic
Mastic Room 1539; east side, brown/yellow on concrete
Mastic Room 1539; mid/north, yellow with leveling compound
Covebase/Mastic Room 1539; northeast corner, 4" black, white mastic and joint compound
Beaverton School District Snap Report
13 Report Date: May 2023
Covebase/Mastic Room 1539; southwest corner, 4" black and white, brown mastic
Mastic Room 1539; southwest corner, brown/yellow with leveling compound
Mastic Room 1544; doorway to back office, tan/brown carpet mastic
Covebase/Mastic Room 1544; inside back office doorway, black covebase, white glue
ASBESTOS SUMMARY
The following shows asbestos activities and projects. For more detailed information or related documents see the individual activity information in the database.
January 2004 to December 2012 Activity: Database Update Location: CC
CC Import Historical Materials without samples
January 2004 to December 2012 19766.024 p06 Activity: Database Update Location: CC p06
CC Import Historical materials with Samples
January 2004 to December 2012 19766.024 p09 Activity: Database Update Location: CC p09
CC Import Historical materials with Samples
January 2004 to December 2012 19766.024 p100 Activity: Database Update Location: CC p100
CC Import Historical materials with Samples
January 2004 to December 2012 19766.024 p05 Activity: Database Update Location: CC p05
CC Import Historical materials with Samples
August 2016 to August 2016 CCabatement1 Activity: Major Abatement Location: Level 1 / Generator
DEQ notification disposal manifest
January 2017 to January 2017 23816.129 Phase 1
Beaverton School District Snap Report
14 Report Date: May 2023
January 2017 to January 2017 23816.129 Phase 1 Activity: Sampling Location: Hallways and Rooms 1034, 1032, 1042, and 1207
June 2017 to September 2017 CCabatement1 Activity: Major Abatement Location: Level 1 / A Entry, Hallways, 1051, 1052, 1048, 1061, 1040, 1041, 1042, 1034, 1032, 1025
BOLI? y
Certified Payroll
Daily Log
DEQ Notification
Disposal Manifest
Close out and TEM Air Clearance Samples in Verdant x
Floor Plan x IN RFQ
Area abated in Verdant
Abatement contractor invoice received X
PBS invoice received X
July 2018 to July 2018 1 Activity: Reinspection Location: Capital Center
REINSPECTION SUMMARY
The 2018 Asbestos Hazard Emergency Response Act (AHERA) 3Year Asbestos Reinspection for the Capital Center facility was completed on July 10, 2018, in accordance with the requirements of 40 CFR, Part 763, AsbestosContaining Materials in Schools; Final Rule and Notice.
December 2018 to December 2018 23816.218
Beaverton School District Snap Report
15 Report Date: May 2023
December 2018 to December 2018 23816.218 Activity: Sampling Location: CC
Sampled flooring and wall materials in north central men's restroom. Sheet flooring appears to have developed cracks and fissures in some places. Materials tested negative, with the exception of old offwhite vinyl floor tile and black mastic on concrete under the newer nonasbestos red sheet flooring. Buried asbestos floor tile is a common condition in this building. Removing the red sheet flooring may disturb the tile.
BSD Project Coordinator: Kari McGatha
Floor plan X
Results received X Results in Verdant X
Consultant Invoice x
February 2019 to February 2019 23816.227 Activity: Sampling Location: CC
Sampled stair tread and drywall in the Capital Center cafeteria building by the bathrooms and electrical room. All materials tested negative for asbestos.
Floor plan
Results in Verdant
Consultant invoice
July 2019 to July 2019 23816.222 Activity: Major Abatement Location: CC
BSD Project Coordinator: Kari McGatha x Floor plan x Results received x Results in Verdant _ Daily log _ Consultant Invoice _ Contractor Invoice _ DEQ Notification _ Disposal Manifest x Consultant Close out documents in Verdant
Beaverton School District Snap Report
16 Report Date: May 2023
August 2021 to August 2021 1 Activity: Reinspection Location: Capital Center
REINSPECTION SUMMARY
The 2021 Asbestos Hazard Emergency Response Act (AHERA) 3Year Asbestos Reinspection for the Capital Center facility was completed on August 31, 2021, in accordance with the requirements of 40 CFR, Part 763, AsbestosContaining Materials in Schools; Final Rule and Notice.
May 2022 to May 2022 CC20221 Activity: Sampling Location: Room 1544 / Room 1532
_ Floor plan _ Results received _ Results in Verdant _ Daily log _ Consultant Invoice _ Contractor Invoice _ DEQ Notification _ Disposal Manifest _ Lab samples in Verdant _ TEM Air clearance samples _ Consultant Close out documents in Verdant _ BOLI Form _ Certified Payroll dates
May 2022 to May 2022 CC20222 Activity: Sampling Location: Room 1539
_ Floor plan _ Results received _ Results in Verdant _ Daily log _ Consultant Invoice _ Contractor Invoice _ DEQ Notification _ Disposal Manifest _ Lab samples in Verdant _ TEM Air clearance samples _ Consultant Close out documents in Verdant _ BOLI Form _ Certified Payroll dates
Beaverton School District Snap Report
17 Report Date: May 2023
ACTIVITIES
The following shows historic activities and projects. For more detailed information or related documents see the individual activity information in the database.
Activity Type Location Start Date Related Documents
Sampling Room 1539 05/17/2022 Yes
Sampling Room 1544 / Room 1532 05/05/2022 Yes
Reinspection Capital Center 08/31/2021 Yes
Major Abatement CC 07/29/2019 Yes
Sampling CC 02/20/2019 Yes
Sampling CC 12/13/2018 Yes
Reinspection Capital Center 07/10/2018 Yes
Major Abatement Throughout 07/10/2018 Yes
Major Abatement Level 1 / A Entry, Hallways, 1051, 1052, 1048, 1061, 1040, 1041, 1042, 1034, 1032, 1025 06/23/2017 Yes
Sampling Hallways and Rooms 1034, 1032, 1042, and 1207 01/23/2017 Yes
Major Abatement Level 1 / Generator 08/22/2016 Yes
Clearance Capital Center HS 08/19/2016 Yes
Database Update CC 01/01/2004 No
Database Update CC p06 01/01/2004 No
Database Update CC p09 01/01/2004 No
Database Update CC p100 01/01/2004 No
Database Update CC p05 01/01/2004 No
Beaverton School District Snap Report
18 Report Date: May 2023
LIMITED SUPPLEMENTAL ASBESTOS
SURVEY REPORT
HVAC Upgrade Project 10740 NE Walker Road Beaverton, OR 97006
Prepared for:
16550 SW Merlo Road
Inspection Date: October 27, 2023 Report Prepared: November 17, 2023
Prepared By:
4000 SE International Way, Suite F101 Milwaukie, OR 97222
503.387.3251
TRC Project Number: 573333
TABLE OF CONTENTS
EXECUTIVE SUMMARY
BACKGROUND
Asbestos Containing Materials
OSHA Regulated Materials
Asbestos Sampling and Analytical Procedures
ASBESTOS FINDINGS & RECOMMENDATIONS
RECOMMENDATIONS
DISCLAIMER
Appendices
Appendix A – Figures and Photo Pages Appendix B – Laboratory Analytical Data Sheets Appendix C – Inspector Certification(s) Appendix D – Prior Reports and Documentation
Limited Supplemental Asbestos Survey Report November 17, 2023 Capital Center – Beaverton, OR TRC Job #573333
- 1 -
EXECUTIVE SUMMARY
TRC Environmental Corporation (TRC) was contracted by the Beaverton School District to conduct a supplemental asbestos survey, including collection of bulk samples, laboratory analysis, and preparation of a report for Capital Center located at 10740 NE Walker Road in Beaverton, Oregon 97006. Mr. Jason Stone, an AHERA accredited building inspector, performed the survey on October 27th, 2023. The survey activities included the review of prior sampling documentation and reports provided by the District, inspection and assessment of accessible suspect building materials, collection of bulk samples of suspect asbestos containing building materials that had previously not be sampled, and submission of bulk samples for laboratory analysis.
ASBESTOS MATERIAL SUMMARY
Suspect asbestos containing building materials were sampled and submitted under the chain-of-custody (COC) protocol to an accredited laboratory for polarized light microscopy (PLM) bulk sample analysis. Inspection, sampling and analytical procedures were performed in general accordance with the U.S. Environmental Protection Agency’s (EPA’s) National Emission Standards for Hazardous Air Pollutants (NESHAP) EPA 40 CFR 61 Subpart M, the EPA Asbestos Hazard Emergency Response Act (AHERA) 40 CFR Part 763, and Federal Occupational Safety and Health Administration (OSHA) 29 CFR 1926.1101 guidelines.
The following materials sampled during this investigation and prior investigations were identified as asbestos containing materials:
Roof Vent Caulking Hard Fittings – Mechanical Room (Assumed) Fire Doors (Assumed).
Additionally, any materials uncovered during renovation activities that are not addressed in this inspection report or prior reports for the building are considered presumed asbestos containing materials and must be sampled by an accredited asbestos inspector prior to disturbance, or they must be treated as asbestos containing.
- 2 -
INTRODUCTION
A supplemental asbestos survey was conducted by TRC at Capital Center, located at 10740 NE Walker Road in Beaverton, Oregon. It was reported by the client that this limited supplemental asbestos survey is being conducted in conjunction with a planned HVAC upgrade project. The survey activities were performed on October 27th, 2023 and included the review of prior sampling documentation and reports as well as the inspection, assessment and bulk sampling of suspect asbestos containing building materials that had not previously been sampled. Sample locations are presented on the Sample Location Diagram in Appendix A.
Mr. Jason Stone, an AHERA accredited building inspector, conducted the asbestos survey inspection and sampling activities. Copies of training certificates and state licenses (where applicable) are presented in Appendix C, Inspector Certifications.
BACKGROUND
Asbestos Containing Materials The United States Environmental Protection Agency (EPA) define an asbestos-containing material (ACM) as any material containing more than one percent (>1.0%) asbestos by weight. In addition, ACMs are designated as:
Friable asbestos - material which can be crumbled, pulverized or reduced to powder by hand pressure, a.k.a. Regulated Asbestos Containing Materials (RACM).
Category I Non-friable - includes resilient floor coverings, asphalt roofing products, gaskets and packing.
Category II Non-friable - any non-friable ACM that is not in Category I (i.e. Asbestos-cement (Transite) siding or roofing material).
OSHA Regulated Materials The Occupational Safety and Health Administration (OSHA) regulates all materials containing any detectable level of asbestos by weight, including those materials containing 1.0% or less.
Asbestos Sampling and Analytical Procedures Representative bulk samples of suspect asbestos-containing building materials were randomly collected from the interior of the building. Homogenous material determination was based on the following criteria:
Similar physical characteristics (same color and texture, etc.), Application (sprayed or trowel-on, assembly into a system, etc.), Material function (thermal insulation, floor tile, wallboard system, etc.).
The bulk samples were collected, labeled, and shipped to the certified analytical laboratory under proper COC documentation, and condition and approximate quantity assessments were performed by the accredited inspector during the inspection.
Laboratory services were provided by TRC Laboratory, in Windsor, Connecticut, a National Voluntary Laboratory Accreditation Program (NVLAP code #101424-0).
- 3 -
Bulk samples were analyzed by PLM utilizing the EPA’s Test Methods: Methods for the Determination of Asbestos in Bulk Building Materials (EPA 600/R-93/116, July 1993) and the McCrone Research Institute’s The Asbestos Particle Atlas as method references.
Analysis by PLM was performed by visual observation of the bulk sample and slides prepared of the bulk sample for microscopic examination and identification. The samples were analyzed for asbestos (Chrysotile, Amosite, Crocidolite, Anthophyllite, and Actinolite/Tremolite), fibrous non-asbestos constituents (mineral wool, cellulose, etc.) and non-fibrous constituents. Using a stereoscope, the microscopist visually estimates the relative amounts of each constituent by determining the estimated area of the asbestos compared with the area estimate of the total sample.
ASBESTOS FINDINGS & RECOMMENDATIONS
The following table presents the location and quantities of each suspect building material identified and sampled during this survey as well as all applicable analytical results:
Sample No.
Material Sample Location Asbestos Content
Approximate Quantity
CC-01A
CC-01B
CC-01C
Roof HVAC Caulking, Light Gray
Roof HVAC Units ND 200 LF
CC-02A
CC-02B
CC-02C
Roof Vent Caulking, Black
Roof Vents 15%
Chrysotile
50 LF
CC-03A
CC-03B
CC-03C
HVAC Duct Caulking, Clear
Roof Vents ND 200 LF
CC-04A
CC-04B
CC-04C
Roof Vent Caulking, White Roof Vents ND 30 LF
CC-05A
CC-05B
CC-05C
Duct Tape, Tan HVAC Duct Work (Fiberglass Lines)
ND N/A
CC-06A
CC-06B
CC-06C
2’ x 4’ Drop-in Ceiling Tile (2’ x 2’ Pattern)
Throughout ND N/A
CC-07A
CC-07B
CC-07C
HVAC Duct Tape, White Metal Duct Work ND 500 LF
CC-08A
CC-08B
CC-08C
CC-08D
CC-08E
CC-08F
Wallboard, Gypsum with Joint Compound
Throughout
G.B. – ND
J.C. – ND
50,000 SF
CC-09A
CC-09B
CC-09C
2’ x 4’ Drop-in Ceiling Tile with Pinholes and
Fissures IT Server Room ND N/A
ND = Non-detect SF = Square feet LF = Linear Feet N/A = Not Applicable
- 4 -
Asbestos Containing Materials (ACMs)
Asbestos was detected in the following materials sampled during this and prior investigations conducted at the school:
Material Approximate Location(s)
Roof Vent Caulking, Black Roof Vents
Hard Fittings (Assumed) Throughout
Fire Doors (Assumed) Throughout
Prior reports and additional documentation provided by the district showing other materials known to contain asbestos that were sampled by other consultants can be found in Appendix D.
Non-Detect Materials (ND)
Asbestos was not detected in the following materials sampled during this and prior investigations at the school:
Roof HVAC Caulking, Light Gray Roof HVAC Units
HVAC Duct Caulking, Clear Roof Vents
Roof Vent Caulking, White Roof Vents
Duct Tape, Tan HVAC Duct Work (Fiberglass Lines)
2’ x 4’ Drop-in Ceiling Tile (2’ x 2’ Pattern) Throughout
HVAC Duct Tape, White Metal Duct Work
Wallboard, Gypsum with Joint Compound Throughout
2’ x 4’ Drop-in Ceiling Tile with Pinholes and Fissures
IT Server Room
Gypsum Board and Joint Compound Throughout (Previously Sampled)
Black Cove Base and Associated Glue Throughout (Previously Sampled)
12” x 12” Beige/Gray Vinyl Floor Tile and Associated Glue
Various Location Throughout (Previously Sampled)
Carpet Glue Room 1061 (Previously Sampled)
2’ x 4’ Drop-in Ceiling Tile (Faux 2’ x 2’) with Fissures and Pinholes
Throughout (Previously Sampled)
Lab Countertops Room 1209 (Previously Sampled)
2’ x 4’ Drop-in Ceiling Tiles with Fissures and Pinholes
Storage Room 206 & Storage Room 1038 (Previously Sampled)
12” x 12” Red Vinyl Floor Tile and Associated Glue Storage Room 1038 (Previously Sampled)
Residual Mastic, Black Mechanical Room
(Previously Sampled)
Residual Cove Base Glue, Brown Mechanical Room
(Previously Sampled)
CMU Grout, Light Gray Mechanical Room
(Previously Sampled)
Concrete, Gray Mechanical Room
(Previously Sampled)
- 5 -
Due to the Site being an occupied building at the time of the inspection and sampling, a full destructive investigation for concealed materials was not performed. Hidden building materials (e.g., old floor mastic patches hidden under carpeting, chalkboard mastic, mirror mastic, wood paneling mastic, etc.), other than those discussed in this report, could be uncovered when removing building finishes during renovation activities.
Any materials encountered during the renovation activities that are not identified in this report (Tectum Board & Mastic in Gym, Wall Paneling Glue throughout, Fire Doors, Etc.), should either be presumed to be asbestos containing and handled as ACM or be sampled by an accredited asbestos inspector to determine if it contains asbestos.
RECOMMENDATIONS
All asbestos-containing materials identified during this survey and previous investigations, which will be impacted by the scope of work for the renovation activities, must be removed by a licensed asbestos abatement contractor prior to any renovation or demolition activities. Additionally, any materials uncovered during renovation or demolition activities that are not addressed in this inspection report or prior reports for the building are considered presumed asbestos containing materials and must be sampled by an accredited asbestos inspector prior to disturbance, or they must be treated as asbestos containing.
Results of the bulk sampling indicated one (1) of the nine (9) materials sampled during this survey contained detectable levels of asbestos greater than 1%, based on the PLM method. Additionally, any materials uncovered during renovation or demolition activities that are not addressed in this inspection report or prior reports for the building are considered presumed asbestos containing materials and must be sampled by an accredited asbestos inspector prior to disturbance, or they must be treated as asbestos containing.
All identified or assumed asbestos containing materials that will be impacted by the scope of renovation activities must be removed and disposed of by a licensed asbestos abatement contractor in accordance with all applicable regulations.
DISCLAIMER
The content presented in this report is based on data collected during the site inspection and survey, review of pertinent regulations, requirements, guidelines and commonly followed industry standards, and information provided by the Beaverton School District, their clients, agents, and representatives.
The work has been conducted in an objective and unbiased manner and in accordance with generally accepted professional practice for this type of work. TRC believes the data and analysis to be accurate and relevant; but cannot accept responsibility for the accuracy or completeness of available documentation or possible withholding of information by other parties.
This asbestos survey report is designed to aid the property owner, architect, construction manager, general contractor, and asbestos abatement contractor in locating potential
- 6 -
ACMs. This report is not intended for, and may not be utilized as, a bidding document or as an abatement project specification document.
If you have any questions, or need any further clarification regarding this report, please do not hesitate to contact Mr. Ron Landolt at (503) 407-0734.
Sincerely, TRC Environmental Corporation
Matthew Cuda Ron Landolt, CAC Project Manager NW Region BSI Practice Manager
Appendix A – Figure(s) and Photo Pages
SUPPLEMENTAL ASBESTOS SURVEY REPORT
TRC Project No.: 573333 Figure: 1.1
Drawn by: JS Date: November 2023Reviewed by: RAL
4000 SE International Way, Suite F101
Milwaukie, Oregon 97222
Phone: (503) 387-3251
CAPITAL CENTER
MAIN FLOOR
10740 NE WALKER ROAD
HILLSBORO, OREGON 97006
LEGEND
Non-Asbestos Sample Location
Asbestos-Containing Sample Location
CC-05A
CC-05B
CC-06A
CC-06B
CC-08B
CC-09A
CC-09B
CC-09C
CC-07A
CC-07B
CC-08D
CC-08G
CC-08F
CC-05C
CC-08C
CC-08E
CC-08H
CC-07C
CC-06C
CC-08A
CC-08I
SUPPLEMENTAL ASBESTOS SURVEY REPORT
TRC Project No.: 573333 Figure: 1.2
Drawn by: JS Date: November 2023Reviewed by: RAL
4000 SE International Way, Suite F101
Milwaukie, Oregon 97222
Phone: (503) 387-3251
CAPITAL CENTER
ROOF
10740 NE WALKER ROAD
HILLSBORO, OREGON 97006
LEGEND
Non-Asbestos Sample Location
Asbestos-Containing Sample Location
CC-01A
CC-01B
CC-01C
CC-02B
CC-02C
CC-03A
CC-03B
CC-04A
CC-04B
CC-04C
CC-02A
CC-03C
BEAVERTON SCHOOL DISTRICT – CAPITAL CENTER
OVERVIEW PHOTOGRAPHIC LOG
SUSPECT ASBESTOS CONTAINING MATERIALS PHOTOGRAPHIC LOG
Sample Numbers: CC-01A, CC-01B, CC-01C
Material Description: Roof HVAC Caulking
Material Color: Light Gray
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Negative
Asbestos Type: No Asbestos Detected
Homogeneous Area: Roof HVAC Units
Total Approximate Quantity: 200 LF
Condition: Good
Material Type: Misc.
NESHAP Category: N/A
Notes: Not Applicable
Sample Numbers: CC-02A, CC-02B, CC-02C
Material Description: Roof Vent Caulking
Material Color: Black
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Positive
Asbestos Type: 15% Chrysotile
Homogeneous Area: Roof Vents
Total Approximate Quantity: 50 LF
Condition: Good
Material Type: Misc.
NESHAP Category: N/A
Notes: Not Applicable
Sample Numbers: CC-03A, CC-03B, CC-03C
Material Description: HVAC Duct Caulking
Material Color: Clear
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Negative
Asbestos Type: No Asbestos Detected
Homogeneous Area: Roof Vents
Total Approximate Quantity: 200 LF
Condition: Good
Material Type: Misc.
NESHAP Category: N/A
Notes: Not Applicable
Sample Numbers: CC-04A, CC-04B, CC-04C
Material Description: Roof Vent Caulking
Material Color: White
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Negative
Asbestos Type: No Asbestos Detected
Homogeneous Area: Roof Vents
Total Approximate Quantity: 30 LF
Condition: Good
Material Type: Misc.
NESHAP Category: N/A
Notes: Not Applicable
Sample Numbers: CC-05A, CC-05B, CC-05C
Material Description: Duct Tape
Material Color: Tan
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Negative
Asbestos Type: No Asbestos Detected
Homogeneous Area: HVAC Duct Work (Fiberglass Lines)
Total Approximate Quantity: TBD
Condition: Good
Material Type: Misc.
NESHAP Category: N/A
Notes: Not Applicable
Sample Numbers: CC-06A, CC-06B, CC-06C
Material Description: 2' x 4' Drop-in Ceiling Tile (2' x 2' Pattern)
Material Color: White
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Negative
Asbestos Type: No Asbestos Detected
Homogeneous Area: Throughout
Total Approximate Quantity: TBD
Condition: Good
Material Type: Misc.
Sample Numbers: CC-07A, CC-07B, CC-07C
Material Description: HVAC Duct Tape
Material Color: White
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Negative
Asbestos Type: No Asbestos Detected
Homogeneous Area: Metal Duct Work
Total Approximate Quantity: 500 LF
Condition: Good
Material Type: Misc.
NESHAP Category: N/A
Notes: Not Applicable
Sample Numbers: CC-08A, CC-08B, CC-08C, CC-08D, CC-
08E, CC-08F
Material Description: Wallboard Gypsum with Joint Compound
Material Color: White
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Negative
Asbestos Type: No Asbestos Detected
Homogeneous Area: Throughout
Total Approximate Quantity: 50,000 SF
Condition: Good
Material Type: Misc.
NESHAP Category: N/A
Notes: Not Applicable
Sample Numbers: CC-09A, CC-09B, CC-09C
Material Description: 2' x 4' Drop-in Ceiling Tile (Pinholes & Fissures)
Material Color: White
Accessible Material: Accessible
Reason Inaccessible: N/A
Asbestos Detected: Negative
Asbestos Type: No Asbestos Detected
Homogeneous Area: I.T. Server Room
Total Approximate Quantity: TBD
Condition: Good
Material Type: Misc.
Industrial Hygiene Laboratory
21 Griffin Road North
Windsor, CT 06095
(860) 298-6308
63043.BeavertonSD.doc
Lab Log #: 0063043
Capital Center, 10740 NE Walker Road, Hillsboro, OR
CLIENT: Beaverton School District
Site:
Date Analyzed:
Date Received:
10/31/2023
10/30/2023
Project #: 573333.0000.0000
BULK ASBESTOS ANALYSIS REPORT
Asbestos
Type
Other Matrix
MaterialsSample No.
Asbestos
POLARIZED LIGHT MICROSCOPY by EPA 600/R-93/116
Sample Location
Homogeneous
Material Description
See Diagram - - - NoneCC-01A NDLight Gray Roof HVAC Caulking
See Diagram - - - NoneCC-01B NDLight Gray Roof HVAC Caulking
See Diagram - - - NoneCC-01C NDLight Gray Roof HVAC Caulking
See Diagram - - - ChrysotileCC-02A 15%Black Roof Vent Caulking
See Diagram - - - -CC-02B NA/PS- -
See Diagram - - - -CC-02C NA/PS- -
See Diagram - - - NoneCC-03A NDColorless HVAC Duct Caulking
See Diagram - - - NoneCC-03B NDColorless HVAC Duct Caulking
See Diagram - - - NoneCC-03C NDColorless HVAC Duct Caulking
See Diagram - - - NoneCC-04A NDWhite Roof Vent Caulking
See Diagram - - - NoneCC-04B NDWhite Roof Vent Caulking
See Diagram - - - NoneCC-04C NDWhite Roof Vent Caulking
See Diagram cellulose NoneCC-05A ND90%Tan Duct Tape
See Diagram cellulose NoneCC-05B ND90%Tan Duct Tape
See Diagram cellulose NoneCC-05C ND90%Tan Duct Tape
See Diagram cellulose mineral wool
NoneCC-06A ND50%
49%
White/Grey 2' x 4' Drop-in Ceiling Tile
(2' x 2' Pattern)
TRC LABORATORY ASBESTOS ANALYTICAL ACCREDITATIONS
NVLAP Lab Code 101424-0
RI #PLM0007 TX #300354
CO# AL-15020
AIHA-LAP,LLC #100122
VT #AL910359 LA#05011
PHIL# 461
CT #PH-0426
VA #3333 000283
PA#68-03387
NY #10980
NJ #CT004
WV #000622
CA #2907
ME LA-0075, LB-0071
AZ #A20944
MA #AA000052
HI #L-09-004
21 Griffin Road North
Windsor, CT 06095
(860)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .