About this file

This document is an Addendum to the Invitation to Bid (ITB) 23-0016 for the Capital Center PA Replacement project issued by the Business Services Procurement and Contracting department of the Washington County School District in Beaverton, Oregon. The addendum modifies the original ITB to provide clarification on the scope of work, including details related to the installation of new speakers, drywall and painting finishes, fire rating requirements, and availability of as-built drawings and structural details. The project requires the installation of new speakers and audio equipment, with the bid closing on February 29, 2024 at 2:00 PM Pacific Time. The contractor is responsible for providing all required engineered and stamped details for permitting, and is expected to perform a field investigation prior to commencing work to verify existing conditions.

The addendum does not provide an engineer's estimate or budget for the project. Bidders are advised to coordinate with the District after being awarded the contract to obtain existing as-built documentation. The District has not provided any information regarding pricing terms, set-asides, incumbents, funding requirements, or other financial details in this addendum.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Business Services Procurement and Contracting

1260 NW Waterhouse Avenue Beaverton, OR 97006

(503) 356-4324

February 9, 2024

SOLICITATION ADDENDUM NO. 1

ITB 23-0016

Capital Center PA Replacement

THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED:

This Addendum modifies the Invitation to Bid (ITB) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the ITB document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the ITB.

Failure to do so may result in Bid rejection. See the ITB regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing.

This addendum is to be acknowledged in the space provided on the Bidder Certification form supplied in the solicitation document.

Failure to acknowledge receipt of this addendum may be cause to reject your offer.

The closing date Is:

February 29, 2024 at 2:00 PM Pacific Time

CLARIFICATIONS/QUESTIONS

*Clarification in the Drawings and Specifications. See the attached documents.

QUESTION: When we install the new speakers in the hard lid both the face layer and back layer of the drywall will need to be removed to accommodate the housing. Structural framing retrofits may be required depending on the location. Can you please provide a detail for this if we encounter any required framing modifications?

ANSWER: The contractor is responsible for all engineered stamped details required for permitting. Assume that there will be structural supports required for the project. Final finishes are to match existing conditions. Contractor will perform field investigation prior to performing work to verify.

QUESTION: Please detail and give a quantifiable explanation and or detail of how the drywall finish and painting is to be returned after the installation of speaker surface mounted or recessed.

ANSWER: Final finishes are to match existing conditions. Contractor will perform field investigation prior to performing work to verify.

QUESTION: Are we to maintain the fire rating after the install of new speakers?

ANSWER: The contractor is responsible for all engineered stamped details required for permitting. Assume that there will be fire rated penetrations. Contractor will perform field investigation prior to performing work to verify.

QUESTION: If fire rating is required, can we get an acceptable detail on the assembly?

ANSWER: The contractor is responsible for all engineered stamped details required for permitting. Assume that there will be fire rated penetrations. Contractor will perform field investigation prior to performing work to verify.

QUESTION: Are there as-builts available for the existing rated system?

ANSWER: The contractor will need to coordinate with the District after being awarded the project for existing as-built documentation research.

QUESTION: Are there any structural details and/or calculations available of the existing ceiling framing? We Request this information to know if it possible to somehow get a tradesperson on top of the faming in the plenum space to not only work on the new speaker housing install but also to demo and install cabling for the system?

ANSWER: The contractor will need to coordinate with the District after being awarded the project for existing as-built documentation research.

QUESTION: Please confirm that per comment at bid walk- all speaker cabling is to be NEW and PINK in color.

ANSWER: YES.

QUESTION: Is there a engineers estimate for budget on this project? We will need this information for project bonding.

ANSWER: No engineers estimate.

1,17, S

1,17, S

3,1 8, S

1,17, S

1,17, S

1,17, S

2,18, S

2,18, S

2,18, S

1,17, S

3,18, S

3,18, S

3,18, S

1,17, S

CHECKED BY:

DRAWN BY:

SCALE:

JOB NO.

DATE:

SHEET NUMBER:

SHEET TITLE:

SET TITLE:

STAMP:

G

A

B

FE

CD

Keyplan:

/7

/2

:1 :2

P

M

1/8" = 1'-0"

A u to d e s k D o c s

/2 -1

B S

D C a p it a l C e n te r P

A S y s te m R e p la c e m e n t

T /2

-1

B S

D C a p it a l

T C e n tr a l.

rv t

N

W W

A

LK

E R

R D

B

E A

V E

R

TO

N , O

R

C A

P

IT

A L

C E

N

TE

R

T201H

FLOOR PLAN - LEVEL

1 SECTOR H

JDH

CLH

22-1116

2024-01-11

ISSUE FOR BID

NO. REVISION DATE

1 Addendum 02/08/24

1/8" = 1'-0"

1 FLOOR PLAN - LEVEL 1 OVERALL

1. MOUNT AT 11'-0" ABOVE FINISHED GRADE. AIM AT X/Y = 225 DEGREES,

Z = -48 DEGREES.

2. MOUNT AT 11'-0" ABOVE FINISHED GRADE. AIM AT X/Y = 135 DEGREES,

Z = -48 DEGREES.

3. EXISTING EQUIPMENT RACK LOCATION. MOUNT NEW EQUIPMENT IN

EXISTING RACK. COORDINATE RACK MOUNTED PAGING EQUIPMENT

MOUNTING LOCATION WITH OWNER PRIOR TO PERFORMING WORK.

4. WHERE POSSIBLE, USE EXISTING BEAM PENETRATIONS TO RUN

SPEAKER CABLING. USE EXISTING ARCHITECTURAL ELEMENTS TO

CONCEAL SPEAKER WIRING WHERE POSSIBLE. PROVIDE WIREMOLD

700 (OR EQ) WHERE WIRING MUST BE EXPOSED. PAINT TO MATCH

EXISTING FINISHES.

NOTES:

A. SPEAKER LOCATIONS IN CLASSROOMS AND CORRIDORS ARE

DIAGRAMMATIC. WHEREVER POSSIBLE, INSTALL NEW SPEAKERS

IN SPACE VACATED BY REMOVAL OF EXISTING SPEAKERS.

B. REFERENCE T101 FOR CEILING CONDITIONS.

GENERAL NOTES:

L

R E

N

G

O

R

I

E

I

S

ST

S

E

E

N

ER

F

E

E

G

OD R

N

EXPIRES: 06/30/2025

P

A

I

099926PE

OREGONJ

U

L Y 12 , 2

2J O

N

A

THA N DAV ID

H

U N

T

02/07/2024

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 8

ZM1

CAT6FROM CAMPUS LAN

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 8

ZM1

CAT6FROM CAMPUS LAN

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 8

ZM1

CAT6FROM CAMPUS LAN

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 8

ZM1

CAT6FROM CAMPUS LAN AUDB

AUDB

AUDB

AUDB

AUDB

AUDB

AUDB

AUDB

AUDIO POWER AMPLIFIER

EQUIPMENT RACK

FRAME 8

AMP2

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

S#

S#

S#

S#

S#

S#

S#

S#

S#

S#

S#

S#

FRAME 8 1

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 5

ZM1

CAT6FROM CAMPUS LAN

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 5

ZM1

CAT6FROM CAMPUS LAN

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 5

ZM1

CAT6FROM CAMPUS LAN

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 5

ZM1

CAT6FROM CAMPUS LAN AUDB

AUDB

AUDB

AUDB

AUDB

AUDB

AUDB

AUDB

AUDIO POWER AMPLIFIER

EQUIPMENT RACK

FRAME 5

AMP2

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

S#

S#

S#

S#

S#

S#

S#

S#

S#

S#

S#

S#

ZONE 6, QTY PER PLANS, DAY 1 LOAD: 41.50WATT

ZONE 11, QTY PER PLANS, DAY 1 LOAD: 5WATT

ZONE 12, QTY PER PLANS, DAY 1 LOAD: 2.50WATT

ZONE 13, QTY PER PLANS, DAY 1 LOAD: 27.50WATT

ZONE 14, QTY PER PLANS, DAY 1 LOAD: 20WATT

ZONE 18, QTY PER PLANS, DAY 1 LOAD: 3.75WATT

FRAME 5 1

AUXILIARY I/O

EQUIPMENT RACK

FRAME 1

AI01

CTLR/PHXLAN (PoE)/RJ45CAT6FROM CAMPUS LAN

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 1

ZM1

CAT6FROM CAMPUS LAN

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 1

ZM1

AUDB/PHXLAN (PoE)/RJ45CAT6FROM CAMPUS LAN

CAMPUS CONTROLLER

EQUIPMENT RACK

FRAME 1

CC1

LAN (PoE)/RJ45CAT6FROM CAMPUS LAN

AUDB

AUDB

AUDB

AUDIO POWER AMPLIFIER

EQUIPMENT RACK

FRAME 1

AMP2

SPKR/70V

SPKR/70V

SPKR/70V

S1

S1

S1

S1

S1

S1

ZONE 1, QTY PER PLANS, DAY 1 LOAD: 41.25WATT

ZONE 2, QTY PER PLANS, DAY 1 LOAD: 45WATT

ZONE 3, QTY PER PLANS, DAY 1 LOAD: 38.75WATT

FRAME 1

PAGING ZONE MODULE

EQUIPMENT RACK

FRAME 4

ZM1

CAT6FROM CAMPUS LAN AUDB

AUDB

AUDIO POWER AMPLIFIER

EQUIPMENT RACK

FRAME 4

AMP1

SPKR/70V

SPKR/70V

S#

S#

S#

S#

ZONE 7, QTY PER PLANS, DAY 1 LOAD: 28.75WATT

ZONE 8, QTY PER PLANS, DAY 1 LOAD: 26.25WATT

FRAME 4 1

CTLRFROM CAMPUS FIRE ALARM

CTLRFROM CAMPUS FIRE ALARM

PAGING ZONE MODULE

EQUIPMENT RACK

KITCHEN OFFICE

ZM1

CAT6FROM CAMPUS LAN AUDB

AUDB

AUDIO POWER AMPLIFIER

EQUIPMENT RACK

KITCHEN OFFICE

AMP1

70V/PHX

AUDB/PHX

ZONE 17, QTY PER PLANS, DAY 1 LOAD: 10.70WATT

KITCHEN OFFICE 1

1. TAP LOUDSPEAKERS AS INDICATED IN

AV EQUIPMENT SCHEDULE.

2. PROVIDE QUANTITY TERMINAL STRIPS TO

ENABLE TERMINATION OF ALL AMPLIFIER

CHANNELS. TERMINATE SPARE

AMPLIFIER CHANNELS ON SPARE

TERMINALS. TYPICAL.

3. PROVIDE UPS TO SUPPORT PA

EQUIPMENT IN THIS SPACE.

NOTES:

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

AUDIO POWER AMPLIFIER

EQUIPMENT RACK

FRAME 5

AMP2

SPKR/70V

SPKR/70V

SPKR/70V S# S#SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

AUDIO POWER AMPLIFIER

EQUIPMENT RACK

FRAME 8

AMP2

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

SPKR/70V

A. PROVIDE MOUNTING APPURTENANCES TO RACK

MOUNT ALL PAGING EQUIPMENT, INCLUDING

TERMINAL STRIPS.

GENERAL NOTES:

70V/PHX

AUDB/PHX

70V/PHX

AUDB/PHX 70V/PHX

AUDB/PHX

70V/PHX

AUDB/PHX 70V/PHX

AUDB/PHX

AUDB/PHX 70V/PHX

70V/PHX

70V/PHX

AUDB/PHX 70V/PHX

AUDB/PHX

AUDB/PHX 70V/PHX

70V/PHXAUDB/PHX

70V/PHX

AUDB/PHX 70V/PHX

AUDB/PHX

AUDB/PHX 70V/PHX

70V/PHXAUDB/PHX

70V/PHX

AUDB/PHX 70V/PHX

AUDB/PHX

AUDB/PHX 70V/PHX

70V/PHXAUDB/PHX

70V/PHX

AUDB/PHX 70V/PHX

AUDB/PHX

AUDB/PHX 70V/PHX

70V/PHXAUDB/PHX

CTLR/PHX

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

CTLR/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

AUDB/PHXLAN (PoE)/RJ45

AUDB/PHX

RC/PHX

ZONE 4, QTY PER PLANS, DAY 1 LOAD: 27.50WATT

ZONE 5, QTY PER PLANS, DAY 1 LOAD: 47.50WATT

ZONE 9, QTY PER PLANS, DAY 1 LOAD: 25WATT

ZONE 10, QTY PER PLANS, DAY 1 LOAD: 35WATT

ZONE 15, QTY PER PLANS, DAY 1 LOAD: 32.50WATT

ZONE 16, QTY PER PLANS, DAY 1 LOAD: 25WATT

ZONE 18, QTY PER PLANS, DAY 1 LOAD: 11.70WATTSPKR/70V S# S# 1

CHECKED BY:

DRAWN BY:

SCALE:

JOB NO.

DATE:

SHEET NUMBER:

SHEET TITLE:

SET TITLE:

STAMP:

G

A

B

FE

CD

Keyplan:

/7

/2

:1 :4

P

M

NONE

A u to d e s k D o c s

/2 -1

B S

D C a p it a l C e n te r P

A S y s te m R e p la c e m e n t

T /2

-1

B S

D C a p it a l

T C e n tr a l.

rv t

N

W W

A

LK

E R

R D

B

E A

V E

R

TO

N , O

R

C A

P

IT

A L

C E

N

TE

R

T601

DIAGRAMS

JDH

CLH

22-1116

2024-01-11

ISSUE FOR BID

NO. REVISION DATE

1 Addendum 02/08/24

NONE

1 AV SYSTEM DIAGRAM

L

R E

N

G

O

R

I

E

I

S

ST

S

E

E

N

ER

F

E

E

G

OD R

N

EXPIRES: 06/30/2025

P

A

I

099926PE

OREGONJ

U

L Y 12 , 2

2J O

N

A

THA N DAV ID

H

U N

T

02/07/2024

23-0016 Addendum 2 Working
2024-02-07 Addendum 2 Set
T201H
T601

File details come from the government source that posted it. Updated .