23-0016 Addendum 1.pdf
PDF 62 KB Posted
- Attached to
- ITB 23-0016 Capital Center PA Replacement
- Solicitation number
- S-P34048-00009210
- Issued by
- Washington County, Barlow City, Oregon
About this file
This document is Addendum No. 1 to Invitation to Bid (ITB) 23-0016 for the Capital Center PA Replacement project, issued by the Washington County and Hillsboro City, Oregon. The addendum provides clarifications and answers to questions related to the project, including the requirements for localized amplification, speaker color preference, console functionality, bell scheduling, and the need to replace all existing speakers. The closing date for the solicitation is February 29, 2024, at 2:00 PM Pacific Time.
The project involves the replacement of the existing public address (PA) system at the Capital Center. Contractors are responsible for directly observing each area and providing loudspeakers to replace all existing equipment. The scope of work includes the replacement of speakers, demolition of old equipment, and the installation of new pink cabling. Bidders are advised that the controller specified in the bid documents should be provided, as no plans for future system upgrades were indicated.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Business Services Procurement and Contracting 1260 NW Waterhouse Avenue
Beaverton, OR 97006
(503) 356-4324
February 3, 2024
SOLICITATION ADDENDUM NO. 1
ITB 23-0016
Capital Center PA Replacement
THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED:
This Addendum modifies the Invitation to Bid (ITB) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the ITB document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the ITB.
Failure to do so may result in Bid rejection. See the ITB regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing.
This addendum is to be acknowledged in the space provided on the Bidder Certification form supplied in the solicitation document.
Failure to acknowledge receipt of this addendum may be cause to reject your offer.
The closing date Is:
February 29, 2024 at 2:00 PM Pacific Time
CLARIFICATIONS/QUESTIONS
QUESTION: In Rack Frame 4 and the Kitchen Office, are the areas close enough to run one four channel amplifier from one location to handle all of the associated endpoints from both racks?
ANSWER: The Kitchen Office will require localized amplification and zone control, separate from Rack Frame 4 distribution. Zone 17 will be split into two zones in forthcoming revision documentation. This will allow for separate volume control and announcements in the Cafeteria area of the building.
QUESTION: Our surface mounted loudspeakers come in white or black. Which color do you prefer?
ANSWER: Provide in white to match surrounding finishes.
QUESTION: Is the console station going to be set up for all-call only or does it need to be able to call out separately to different zones?
ANSWER: Console should be able to call individual zones as well as all-call and preset groups. Final configuration to be coordinated with BSD.
QUESTION: Does the system need to perform bell scheduling?
ANSWER: Yes
QUESTION: The drawings show options in the legend on page 1 shows that the speakers will be marked with an E,X,R,or F for existing to remain, existing to be removed, existing to be replaced, or future. I do not see any of those markings on the drawings themselves. Does this mean that all speakers and horns listed on the drawings are sites that are to be replaced or new sites? If these markings are supposed to be on the drawings can I have a copy of the drawings that shows them so we know how many new speakers to put in the BOM?
ANSWER: Those are standard symbols in the legends sheet. The scope notes hopefully add clarity – the intent is for all speakers to be replaced in all locations and for old speakers to be demolished, existing wire pulled and all new pink cabling to the new speakers. The locations shown on drawings are from field observations and detailed takeoffs are the responsibility of bidders. Contractor is responsible to directly observe each area and provide loudspeakers to replace all existing.
QUESTION: What are the plans, if any, for the future of this system. If we must go back and put in additional amplifiers in the future, we will need to upgrade from a small controller to our larger controller. Do you want me to quote the small or large controller based on the future plans for the system?
ANSWER: Provide controller part number as specified in bid documents.