Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf
PDF 417 KB Posted
- Solicitation number
- 25-P-00399
- Issued by
- Hillsborough County, Florida
About this file
This is a project overview map prepared by the City of Tampa for the redevelopment of multiple properties in the Downtown Community Redevelopment Area, specifically showing infrastructure improvements related to the Ashley Street Ramp project (FPID 451462-1). The map illustrates proposed modifications to the Interstate 275 corridor in Tampa, Florida, including the northbound and southbound entrance and exit ramps at Scott Street and Tampa Street. The project encompasses bridge and roadway removal, new bridge construction, new roadway construction, milling and resurfacing, sidewalk improvements, and local roadway widening. The plan also identifies proposed retaining walls and indicates changes to the existing right-of-way boundaries and Louisiana right-of-way designations. The map was drafted on February 26, 2025, and serves as a technical attachment to support the City's broader redevelopment initiative for the four key properties within the Central Business District.
The Ashley Street Ramp project depicted in this attachment represents critical infrastructure preparation necessary to support the larger mixed-use, transit-oriented redevelopment project seeking a developer for the 1420 Parking Lot, 103 E. Laurel Street, Royal Street Parking Lot, and Army/Navy Store property. This infrastructure work is a prerequisite component that will facilitate access and site integration for the proposed high-density development requiring a minimum of 800 dwelling units with substantial affordable and workforce housing components. The project timeline indicates a mandatory pre-proposal conference scheduled for November 17, 2025, with a proposal submission deadline of December 12, 2025, suggesting the infrastructure improvements are being coordinated concurrently with the developer selection process to ensure timely project delivery.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
PROPOSED RIGHT OF WAY
EXISTING LA RIGHT OF WAY
EXISTING RIGHT OF WAY
BRIDGE/ROADWAY REMOVAL
MILLING & RESURFACING
SIDEWALK
LOCAL ROADWAY - WIDENING
BRIDGE - NEW CONSTRUCTION
ROADWAY - NEW CONSTRUCTION
INTERSTATE
D R
A F T
/2
/2
LAUREL
ST
FORTUNE ST
F L
O R I D
A
V
E
T A
M P
A
S
T
SCOTT ST
S B E
X
IT
R
A M P
N B
E
N T
R
M P
S B
E
N T
R
A M
P
N B E
X
IT
R
A M P
H I L L S
B O
R O
U G
H
I V
E R
D O
Y L E
C
R L T
O N
D
M A
R I O
N
S
T
KAY ST
FPID 451462-1
TO SCOTT ST/TAMPA ST
NB I-275 EXIT RAMP
TBNEXT - SECTION 5
POND 1C
N
BRIDGE 100110
PROPOSED RETAINING WALLS
jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X
File details come from the government source that posted it. Updated .