Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf

PDF 417 KB Posted

Attached to
Redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area (RE-BID)
Solicitation number
25-P-00399
Issued by
Hillsborough County, Florida

About this file

Ashley Street Ramp Overview Summary

This is a project overview document for the City of Tampa, Florida, depicting infrastructure improvements to the northbound and southbound Interstate 275 exit and entrance ramps at Ashley Street. The project, identified as FPID 451462-1 and extending from Scott Street to Scott Street/Tampa Street, involves roadway and bridge construction, milling and resurfacing activities, and local roadway widening within the Hillsborough River area. The document presents a draft site plan dated February 26, 2025, illustrating proposed right-of-way adjustments, existing Louisiana right-of-way, bridge and roadway removal areas, sidewalk improvements, and proposed retaining walls. The plan identifies Bridge 100110 and Pond 1C as key features within the project scope, with designated areas for new bridge construction and roadway improvements serving as part of the larger TBNEXT Section 5 initiative.

The document functions as a technical planning attachment that supports the City of Tampa's broader downtown redevelopment efforts, specifically related to transportation infrastructure improvements that will facilitate access to the Royal Street Parking Lot and Army/Navy Store Site redevelopment project. This infrastructure work represents essential site preparation and transportation connectivity improvements necessary to support the mixed-use, transit-oriented development anticipated in the downtown Community Redevelopment Area. The ramp improvements align with the project's emphasis on walkability, transit integration, and comprehensive infrastructure modernization to accommodate increased density and public accessibility within the central business district.

View the file

Other files

File Type Posted
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID)_(Addendum_#1_Revision).pdf PDF
Redevelopment_of_the_Royal_Street_Parking_Lot_and_Army_Navy_Store_Site_in_the_Downtown_Community_Redevelopment_Area_(RE-BID).pdf PDF
Attachment_Q_-_ARMY_NAVY_PROJECT_SUMMARY_TABLE-Final.xlsx XLSX spreadsheet
Attachment_P-FinancialSubmissionWorkbook-Final.xlsx XLSX spreadsheet
Attachment_O-Community_Benefit_Agreement_Information_Sheet_-_Final.pdf PDF
Attachment_N-FDOT_Project_Downtown_Access_2023_02_23.pdf PDF
Attachment_M_-UNITE_Ashley_Grant_-_City_of_Tampa_-_Narrative.pdf PDF
Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf PDF
Attachment_K-Section_5_ROW_Impacts_Scott_St_Exit_Ramp.pdf PDF
Attachment_J-Excerpts-from-Mayors-Institute-2022.pdf PDF
Attachment_I-Phase_I_and_Limited_Phase-II-Executive-Summary-Report-2020-11-19.pdf PDF
Attachment_H-Archelogical-Report-Desktop-for-13121N-Tampa-St-2020-11-17_(1).pdf PDF
Attachment_G_-_Surveys_for_1312-N-Tampa.pdf PDF
Attachment_F-Downtown_CRA_Plan_Final.pdf PDF
Attachment_E_-_Area-Map_5-22-24.pdf PDF
DMI-40-Form-LOI-Letter-of-Intent_SLBE.pdf PDF
DMI-71-Form-for-RFQ-RFP-Evaluation-Points-V4-SLBE.pdf PDF
DMI-30-Form-Payment-Package-or-Final-with_Invoices_SLBE.pdf PDF
ADA_Requirements.docx DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND

PROPOSED RIGHT OF WAY

EXISTING LA RIGHT OF WAY

EXISTING RIGHT OF WAY

BRIDGE/ROADWAY REMOVAL

MILLING & RESURFACING

SIDEWALK

LOCAL ROADWAY - WIDENING

BRIDGE - NEW CONSTRUCTION

ROADWAY - NEW CONSTRUCTION

INTERSTATE

D R

A F T

/2

/2

LAUREL

ST

FORTUNE ST

F L

O R I D

A

V

E

T A

M P

A

S

T

SCOTT ST

S B E

X

IT

R

A M P

N B

E

N T

R

M P

S B

E

N T

R

A M

P

N B E

X

IT

R

A M P

H I L L S

B O

R O

U G

H

I V

E R

D O

Y L E

C

R L T

O N

D

M A

R I O

N

S

T

KAY ST

FPID 451462-1

TO SCOTT ST/TAMPA ST

NB I-275 EXIT RAMP

TBNEXT - SECTION 5

POND 1C

N

BRIDGE 100110

PROPOSED RETAINING WALLS

jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X

File details come from the government source that posted it. Updated .