Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf
PDF 417 KB Posted
- Solicitation number
- 25-P-00399
- Issued by
- Hillsborough County, Florida
About this file
This is a site plan and infrastructure overview document related to the City of Tampa's redevelopment project in the Downtown Community Redevelopment Area, specifically the NB I-275 Exit Ramp to Scott St/Tampa St section (FPID 451462-1). The document outlines proposed infrastructure improvements including roadway and bridge construction, milling and resurfacing, sidewalk improvements, local roadway widening, and proposed retaining walls. The plan indicates modifications to the existing right-of-way and removal of certain bridge and roadway elements to accommodate the development. The site encompasses areas bounded by Hillsborough River, Doyle Carlton Drive, Marion Street, Kay Street, and the I-275 interchange, with specific notation of Pond 1C and Bridge 100110. This infrastructure work is integral to supporting the high-density, mixed-use transit-oriented development project involving the 1420 Parking Lot, 103 E. Laurel Street, Royal Street Parking Lot, and Army/Navy Store property.
The plan is dated February 26, 2025, and represents preliminary design work necessary to facilitate the broader redevelopment initiative that requires minimum 800 dwelling units with specified affordable and workforce housing components. The infrastructure improvements shown are essential to the project's success, particularly regarding transportation integration and site accessibility as outlined in the City of Tampa's RFP evaluation criteria. The document serves as supporting documentation demonstrating the scope of site preparation and infrastructure modifications required to implement the comprehensive mixed-use development project with an expected response submission deadline of December 12, 2025.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
PROPOSED RIGHT OF WAY
EXISTING LA RIGHT OF WAY
EXISTING RIGHT OF WAY
BRIDGE/ROADWAY REMOVAL
MILLING & RESURFACING
SIDEWALK
LOCAL ROADWAY - WIDENING
BRIDGE - NEW CONSTRUCTION
ROADWAY - NEW CONSTRUCTION
INTERSTATE
D R
A F T
/2
/2
LAUREL
ST
FORTUNE ST
F L
O R I D
A
V
E
T A
M P
A
S
T
SCOTT ST
S B E
X
IT
R
A M P
N B
E
N T
R
M P
S B
E
N T
R
A M
P
N B E
X
IT
R
A M P
H I L L S
B O
R O
U G
H
I V
E R
D O
Y L E
C
R L T
O N
D
M A
R I O
N
S
T
KAY ST
FPID 451462-1
TO SCOTT ST/TAMPA ST
NB I-275 EXIT RAMP
TBNEXT - SECTION 5
POND 1C
N
BRIDGE 100110
PROPOSED RETAINING WALLS
jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X
File details come from the government source that posted it. Updated .