Attachment_L_-Ashley_St_Ramp_Overview_2025_02_26.pdf
PDF 417 KB Posted
- Solicitation number
- 25-P-00399
- Issued by
- Hillsborough County, Florida
About this file
This is a project overview map prepared for the City of Tampa, Florida, depicting the Ashley Street Ramp infrastructure improvements project (FPID 451462-1), which extends from Scott Street to Scott Street/Tampa Street along the northbound I-275 exit ramp. The map illustrates proposed roadway and bridge improvements including new bridge construction, roadway new construction, milling and resurfacing, local roadway widening, sidewalk improvements, bridge and roadway removal, and proposed retaining walls. The project area encompasses multiple intersections and local streets including Laurel Street, Fortune Street, Florida Avenue, Tampa Street, Scott Street, Doyle Carlton Drive, Marion Street, and Kay Street, with the Hillsborough River identified as a geographic boundary. The map legend differentiates between existing Louisiana right-of-way, existing right-of-way, and proposed right-of-way designations. The document is dated February 26, 2025, and is marked as draft status, indicating ongoing planning and design phases for this I-275 infrastructure initiative.
This attachment serves as supporting documentation for the City of Tampa's Request for Proposals for the Redevelopment of the Royal Street Parking Lot and Army/Navy Store Site in the Downtown Community Redevelopment Area. The infrastructure improvements depicted relate to transportation connectivity and site access for the larger mixed-use development project, which requires minimum 800 dwelling units with 30% affordable housing and 20% workforce housing, along with 15,000 square feet of non-residential space. The project encompasses City of Tampa and Community Redevelopment Agency properties, with the mandatory pre-proposal conference scheduled for November 17, 2025, and proposal submissions due December 12, 2025. Complex site preparation including archaeological assessments and environmental site evaluations have been conducted, and the City will negotiate site disposition terms including potential sale, lease, or partial ownership retention.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
PROPOSED RIGHT OF WAY
EXISTING LA RIGHT OF WAY
EXISTING RIGHT OF WAY
BRIDGE/ROADWAY REMOVAL
MILLING & RESURFACING
SIDEWALK
LOCAL ROADWAY - WIDENING
BRIDGE - NEW CONSTRUCTION
ROADWAY - NEW CONSTRUCTION
INTERSTATE
D R
A F T
/2
/2
LAUREL
ST
FORTUNE ST
F L
O R I D
A
V
E
T A
M P
A
S
T
SCOTT ST
S B E
X
IT
R
A M P
N B
E
N T
R
M P
S B
E
N T
R
A M
P
N B E
X
IT
R
A M P
H I L L S
B O
R O
U G
H
I V
E R
D O
Y L E
C
R L T
O N
D
M A
R I O
N
S
T
KAY ST
FPID 451462-1
TO SCOTT ST/TAMPA ST
NB I-275 EXIT RAMP
TBNEXT - SECTION 5
POND 1C
N
BRIDGE 100110
PROPOSED RETAINING WALLS
jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X jcdrapp Text Box X
File details come from the government source that posted it. Updated .