Attachment L-1 Mgt and Operations Scenario.pdf

PDF 95 KB Posted

Attached to
Presolictation Notice - Eglin Operations and Maintenance Services (EOMS) IIs
Solicitation number
FA248824RB003
Issued by

About this file

This is an Attachment L-1 Management Operations Scenario that presents a test case for offerors to demonstrate their capability to handle erratic test mission schedules while adhering to budget constraints for the Eglin Operations and Maintenance Services II (EOMS II) contract. The scenario outlines seven concurrent Maritime and Land Range Test missions occurring within a single day, including EW Training, RWR Testing, Weapon Tests, and Aircraft Tests, with varying instrumentation requirements such as Threat Systems, Telemetry, Radar, Flight Termination, and Cameras.

The attachment poses two specific questions for offerors to address: 1) How they will meet or stay within 2% under the Direct Budget Authority (DBA) expenditure goal while completing required maintenance and test operations, and 2) What management techniques they will employ to balance Regular Budget Authority (RBA) and DBA manpower and minimize overtime RBA charges, given that workers may charge DBA during normal business hours and overtime RBA for test mission support. The mission schedule spans from 0800L to 0100 the following day, with pre-mission times ranging from 3-4 hours and post-mission times of 1 hour for each mission.

View the file

Other files

File Type Posted
Draft Solicitation - FA248824RB003 - 19Feb2025.pdf PDF
Attachment 25 Exhibit A - CDRLs A001-A028.pdf PDF
Attachment 07 EOMS II DD Form 254.pdf PDF
Attachment 08 - CBA-2024.pdf PDF
Attachment 19 Okaloosa County DBA FL20250261 (Hwy).pdf PDF
Draft Solicitation - FA248824RB003 - 5Feb2025.pdf PDF
Attachment 02 PWS Appendix 1 Labor Category Descriptions.pdf PDF
Attachment 12 CBA 2024-123.pdf PDF
Attachment 14 Bay County DBA FL20250105 (Heavy).pdf PDF
Attachment L-5 Cost Model SubContractor Spreadsheet.xlsx XLSX spreadsheet
Attachment 23 Walton County DBA FL20250275 (Hwy).pdf PDF
Attachment 06 - Vehicle Authorized Listing.pdf PDF
Attachment 03 PWS Appendix 2 SUAS Support.pdf PDF
Attachment 21 Walton County DBA FL20250102 (Heavy).pdf PDF
Attachment 13 Bay County DBA FL2025005 (Bldg).pdf PDF
Attachment L-3 SB Participation Template.docx DOCX document
Attachment 16 Bay County SCA WD 2015-4559 Rev 28.pdf PDF
ATTACHMENT M-1 Incorporated Strengths.docx DOCX document
Attachment 24 Walton County SCA WD 2015-5731 Rev 28.pdf PDF
Attachment 17 Okaloosa County DBA FL20250127 (Heavy).pdf PDF
Attachment L-4 Cost Model Prime Spreadsheet.xlsx XLSX spreadsheet
Attachment 20 Okaloosa County SCA WD 2015-4531 Rev 29.pdf PDF
Attachment 04 Award Fee Plan.docx DOCX document
Attachment L-2 Sustainment and Modernization Scenario.pdf PDF
Attachment 15 Bay County DBA FL20250239 (Hwy).pdf PDF
Attachment 18 Okaloosa County DBA FL20250217 (Bldg).pdf PDF
Attachment 26 Section L Instructions to Offerors 7 Feb 2025.pdf PDF
Attachment 22 Walton County DBA FL20250231 (Bldg).pdf PDF
Attachment 05 GFP List.xlsx XLSX spreadsheet
Attachment 27 Section M Evaluation Factors for Award 7 Feb 2025.pdf PDF
Attachment 01 PWS 31 Jan 25.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L-1 Management Operations Scenario

Management Operations Scenario. The Offeror must demonstrate the capability to handle an erratic test mission schedule while adhering to budget constraints. This includes providing additional labor, equipment, and resources, while maintaining high-quality service and managing unexpected demands for short-notice and high-priority missions. The scenario consists of Maritime and Land Range Test missions. The Maritime and Land test periods run concurrently. The Offeror shall answer the associated Management and Operations Scenario Questions (Attachment L-1) in the Offeror's proposals, and the Government will evaluate the Offeror's proposal IAW Section M, paragraph M-2.2.4. Use the following mission designation and timing:

Table L3.2 – Mission Designation and Timing

Mission Range Instrumentation Mission Type Scheduled Pre-Mission Post Mission

MSN 001 Land range Threat Systems EW Training 2000 - 0100 4 hrs 1 hr

MSN 002 Land range Threat Systems RWR Testing 0800 L 4 hrs 1 hr

MSN 003 Land range Telemetry, Radar, Flight Termination, Cameras

Weapon Test, static target

1200 L 3 hrs 1 hr

MSN 004 Water range

Telemetry, Radar Aircraft Test 1200 L 3 hrs 1 hr

MSN 005 Water range

GRATV,

Telemetry, Radar, Flight Termination

Weapon Test, static target

1400 L 3 hrs 1 hr

MSN 006 Land range Telemetry, Radar, Flight Termination, Cameras

Weapon Test, moving target

1400 L 3 hrs 1 hr

MSN 007 Land range Threat Systems EW Training 2000 - 0100 4 hrs 1 hr

Given Eglin’s dynamic mission load:

1. Based on PWS section 4.1, provide strategy, key points, and critical techniques for how you will meet or stay no more than 2% under the Direct Budget Authority (DBA) expenditure goal, while completing required maintenance and appropriate time and resources for test operations?

2. The test mission’s fluid schedule can result in workers charging DBA during normal business hours and then charging overtime RBA to support test missions. What management techniques will the Offeror employ to balance RBA and DBA manpower and minimize overtime RBA charges?

Table L3.2 – Mission Designation and Timing

File details come from the government source that posted it. Updated .