Attachment 27 Section M Evaluation Factors for Award 7 Feb 2025.pdf

PDF 254 KB Posted

Attached to
Presolictation Notice - Eglin Operations and Maintenance Services (EOMS) IIs
Solicitation number
FA248824RB003
Issued by

About this file

This is Section M (Evaluation Factors for Award) for solicitation FA2488-24-R-B003 for the Eglin Operations and Maintenance Services (EOMS) II program. The document outlines how proposals will be evaluated, with Technical factors being more important than Cost/Price factors.

The technical evaluation includes five subfactors: Management Approach (including workload management and prior experience), Technical Sustainment and Modernization, Staffing Plan, Transition, and Subcontracting. Proposals will be rated using a color-coded system ranging from Blue (Outstanding) to Red (Unacceptable). The Subcontracting subfactor requires a minimum 20% small business participation and 2% AbilityOne participation of total contract value. Cost/Price proposals will be evaluated for completeness, reasonableness, realism, and unbalanced pricing, with a Total Evaluated Price (TEP) calculated across all option and award term periods, excluding transition costs. The government intends to award one contract and may conduct discussions with offerors, though it reserves the right to award without discussions.

View the file

Other files

File Type Posted
Draft Solicitation - FA248824RB003 - 19Feb2025.pdf PDF
Attachment 25 Exhibit A - CDRLs A001-A028.pdf PDF
Attachment 07 EOMS II DD Form 254.pdf PDF
Attachment 08 - CBA-2024.pdf PDF
Attachment 19 Okaloosa County DBA FL20250261 (Hwy).pdf PDF
Draft Solicitation - FA248824RB003 - 5Feb2025.pdf PDF
Attachment 02 PWS Appendix 1 Labor Category Descriptions.pdf PDF
Attachment 12 CBA 2024-123.pdf PDF
Attachment 14 Bay County DBA FL20250105 (Heavy).pdf PDF
Attachment L-5 Cost Model SubContractor Spreadsheet.xlsx XLSX spreadsheet
Attachment 23 Walton County DBA FL20250275 (Hwy).pdf PDF
Attachment 06 - Vehicle Authorized Listing.pdf PDF
Attachment 03 PWS Appendix 2 SUAS Support.pdf PDF
Attachment 21 Walton County DBA FL20250102 (Heavy).pdf PDF
Attachment 13 Bay County DBA FL2025005 (Bldg).pdf PDF
Attachment L-1 Mgt and Operations Scenario.pdf PDF
Attachment L-3 SB Participation Template.docx DOCX document
Attachment 16 Bay County SCA WD 2015-4559 Rev 28.pdf PDF
ATTACHMENT M-1 Incorporated Strengths.docx DOCX document
Attachment 24 Walton County SCA WD 2015-5731 Rev 28.pdf PDF
Attachment 17 Okaloosa County DBA FL20250127 (Heavy).pdf PDF
Attachment L-4 Cost Model Prime Spreadsheet.xlsx XLSX spreadsheet
Attachment 20 Okaloosa County SCA WD 2015-4531 Rev 29.pdf PDF
Attachment 04 Award Fee Plan.docx DOCX document
Attachment L-2 Sustainment and Modernization Scenario.pdf PDF
Attachment 15 Bay County DBA FL20250239 (Hwy).pdf PDF
Attachment 18 Okaloosa County DBA FL20250217 (Bldg).pdf PDF
Attachment 26 Section L Instructions to Offerors 7 Feb 2025.pdf PDF
Attachment 22 Walton County DBA FL20250231 (Bldg).pdf PDF
Attachment 05 GFP List.xlsx XLSX spreadsheet
Attachment 01 PWS 31 Jan 25.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2488-24-R-B003

Attachment 27

Section M

Evaluation Factors for Award

Eglin Operations and Maintenance Services

(EOMS) II

7 Feb 2025

1185868911C Draft

FA248824RB003

SECTION M

EVALUATION FACTORS FOR AWARD

M-1.0 EVALUATION CRITERIA

M-1.1 Basis for Contract Award This is a competitive best value source selection conducted in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 15.3, Source Selection, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS) Subpart 215.3, and the Department of Air Force Federal Acquisition Regulation Supplement (DAFFARS) Part 5315. To be eligible for award, the Offeror must be deemed responsible IAW FAR Subpart 9.1, as supplemented, conform to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by Attachment 26, Section L of this solicitation) and is judged, based on the evaluation factors and subfactors, to represent the best value to the Government. The Government will select the best overall offer, based upon an integrated assessment of Technical and Cost / Price. This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the superior technical capability, lower technical risk, and / or higher priced Offeror outweighs the price difference. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below). While the Government Source Selection Evaluation Board (SSEB) and the SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective; and therefore, professional judgment is implicit throughout the entire process.

M-1.2 Number of Contracts to be Awarded

The Government intends to award one contract for the Eglin Test and Training Complex (ETTC) Eglin Operations and Maintenance Services (EOMS) II Program.

M-1.3 Competitive Advantage from use of Government-Furnished Property (GFP)

The Government will evaluate any competitive advantage resulting from the Offeror’s proposed use of GFP (other than the list provided at Attachment 5) and make adjustment to Most Probable Cost (MPC) IAW FAR 45.2 and 52.245-9.

M-1.4 Correction Potential of Proposals

The Government will consider, throughout the evaluation, the "correction potential" of any deficiency. The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an Offeror's proposal does not meet the Government's requirements and is not considered correctable, the Offeror may be eliminated from the competitive range.

The Government may exclude a proposal from this competition prior to discussions or competitive range determination, if during evaluation, the proposal is found to be grossly deficient. Grossly deficient proposals are proposals that fail to address essential requirements of the solicitation, fail to furnish information demonstrating compliance with mandatory solicitation requirements set forth in the solicitation, or in some other manner do not represent a reasonable initial effort by the Offeror to satisfy the requirements of the solicitation. Further, the Government may reject any proposal that is incomplete (e.g., missing a volume or other information required by the solicitation).

M-1.5 Discussions

The Government anticipates that discussions may occur as part of this acquisition and reserves the right to award without discussions if the Procuring Contracting Officer (PCO) determines them to not be necessary. Therefore, the Offeror’s initial proposal should still contain the Offeror’s best terms. If the PCO determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the PCO with the approval of the SSA may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

Should the Government need to conduct written exchanges with Offerors, they will be in the form of Evaluation Notices (ENs). Page format and limitations will be placed on responses to ENs in the event they are issued. The specified page limits for EN responses will be identified in the letters forwarding the ENs to the Offerors. If discussions are required, they may be conducted either orally or in writing. The scope and extent of the discussions are a matter of the PCO’s judgment as set forth in FAR Subpart 15.306. Offerors may be restricted to a short turnaround (e.g., within 2-10 business days) in responding to the PCO.

M-1.6 Competitive Range

If discussions are conducted, the PCO will establish a competitive range comprised of the most highly rated proposals based on the ratings of each proposal against all evaluation criteria (except as provided for in M-1.4 above), which will be approved by the SSA. If the PCO determines that an Offeror’s proposal should not be included in the competitive range, whether for purposes of efficiency or otherwise, the proposal will be eliminated from consideration for award. A written notice of the decision will be provided to the unsuccessful Offeror IAW FAR 15.503, whereupon Offeror may request and receive a debriefing IAW FAR Subpart 15.505.

M-1.7 Final Proposal Revisions (FPRs)

FPRs will be requested from those Offerors remaining in the competitive range when discussions have been concluded. If the Offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any changes or exceptions in the FPR are subject to evaluation and may increase the risk that the Offeror’s proposal will be determined unacceptable and, thus, ineligible for award. Any changes to or non-concurrence with contract terms and conditions submitted in the FPR may not be subject to further discussion or negotiation and may render the offer unacceptable to the Government. This provision is not intended to restrict the Offeror’s opportunity to revise its proposal. Rather, it is intended to preclude any misunderstandings by the Government, which could result if new or revised terms and conditions are submitted in the FPR that have not been fully disclosed, discussed, and understood during discussions. Hence, such new or revised terms and conditions are not solicited and, if submitted in the FPR, may render the offer unacceptable to the Government.

M-1.8 Solicitation Requirements, Terms, and Conditions

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors to be eligible for award. Failure to comply with the terms and conditions of the solicitation and instructions contained in Attachment 26, Section L may result in the Offeror being removed from consideration for award; this includes incomplete proposal submission (e.g., missing a volume or other information required by the solicitation). Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable and the proposal, therefore, ineligible for award.

M-1.9 Integrating Proposal into the Contract

Offerors are advised that, if in the Government’s best interest, the awarded contract document will reflect all beneficial aspects of the awardee’s proposal and all above threshold (minimum) attributes, performance levels, or capabilities for which evaluation credit was given in the source selection process (e.g., purple or blue technical/risk rating, above threshold elements proposed for valued requirements). Attachment M-1 will be utilized to incorporate the applicable aspects of the Offeror’s proposal.

M-2.0 EVALUATION FACTORS

M-2.1 Evaluation Factors and Subfactors

M-2.1.1 The following evaluation factors and subfactors will be used to evaluate each proposal.

Award will be made to the Offeror proposing the combination most advantageous to the Government based upon an integrated assessment of the evaluation factors and subfactors described below.

• Factor 1: Technical

• Subfactor 1.1: Management Approach o Workload Management o Prior Experience

• Subfactor 1.2: Technical Sustainment and Modernization o Sustainment and Modernization Scenario

• Subfactor 1.3: Staffing Plan

• Subfactor 1.4: Transition

• Subfactor 1.5: Subcontracting o Small Business Participation Commitment Document o Small Business Subcontracting Plan o Subcontracting with AbilityOne

• Factor 2: Cost/Price

M-2.1.2 Relative Importance of Factors and Subfactors.

The relative importance of each factor and subfactor is as follows: The Technical factor is more important than the Cost / Price Factor. Within the Technical factor, Management Approach, Technical Sustainment and Modernization and subfactors are of equal importance and when combined are significantly more important than Staffing Plan and Transition subfactors. The Subcontracting subfactors will be rated as Acceptable/Unacceptable. If any Subfactors are rated as Unacceptable, the proposal will be unawardable.

M-2.2 Factor 1: Technical Ratings

Except for the Subcontracting subfactors, each Technical Subfactor will be assigned a Technical/Risk Rating. The Subcontracting subfactor will be rated as Acceptable/Unacceptable.

2.2.1 Combined Technical/Risk Rating.

The combined technical/risk rating includes consideration of risk in conjunction with the significant strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies in determining technical ratings. Unless specified, each Technical subfactor will receive one of the color ratings described in Table M-2.2.1-1. In arriving at a best value decision, the Government reserves the right to give positive consideration (i.e., assign a significant strength or strength), for performance in excess of threshold requirements. For any weakness identified, the evaluation will address the Offeror's proposed mitigation and why that mitigation is or is not manageable. The color/adjectival rating depicts how well the Offeror's proposal meets the Technical subfactor requirements.

As applicable, each subfactor will receive an independent color/adjectival rating that will not be rolled up into an overall rating at the factor level. However, a Technical/Risk rating or rating of "Unacceptable" in one or more Technical subfactors will result in a proposal that is not awardable.

Table M-2.2.1-1: Technical/Rating Definitions

Color Rating Adjectival Rating Description

Blue Outstanding

Proposal demonstrates an exceptional approach and understanding of the requirements and contains multiple strengths and/or at least one significant strength, and risk of unsuccessful performance is low.

Purple Good

Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength or significant strength, and risk of unsuccessful performance is low to moderate.

Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Red Unacceptable

Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable, and/or risk of performance is unacceptably high.

M-2.2.2 Risk Definitions.

Assessment of Technical Risk, which is manifested by the identification of weakness(es), significant weakness(es), and/or deficiency(ies), considers the potential for disruption of schedule, increased costs, degradation of performance, the need for increased Government oversight, and/or the likelihood of unsuccessful contact performance.

In determining the overall Technical/Risk Rating for each subfactor the definitions in Table M- 2.2.2-1 will be utilized.

Table M-2.2.2-1: Risk Definitions

Risk Description

Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost, or degradation of performance.

Normal contractor emphasis and normal Government monitoring will likely be able to overcome any difficulties.

Moderate Proposal contains a significant weakness or combination of weaknesses which may have a moderate potential to cause disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome any difficulties.

High Proposal contains a significant weakness or combination of weaknesses which is likely to have a high potential to cause significant disruption of schedule, increased cost, or degradation of performance. Special contractor emphasis and close Government monitoring will unlikely be able to overcome any difficulties.

Unacceptable Proposal contains a deficiency or a combination of significant weaknesses that causes an unacceptable level of risk of unsuccessful performance.

M-2.2.3 Evaluation Finding Types

Each proposal will be evaluated against the solicitation and its stated evaluation factors and subfactors for award. The Government's Technical evaluation will focus on compliance with solicitation requirements, including proposal significant strengths, strengths, excesses, uncertainties, weaknesses, significant weaknesses, and deficiencies (as defined in Table M- 2.2.3- 1).

Table M-2.2.3-1: Evaluation Finding Type Definitions

Finding Type Definition

Significant Strength An aspect of the proposal with appreciable merit or exceeds specified performance or capability requirements to the considerable advantage of the Government during contact performance.

Strength An aspect of the proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contact performance.

Meets Requirement Proposal indicates an adequate approach and understanding, meeting the minimum requirements.

Excess An aspect of the proposal that has exceeded mandatory minimums whose removal and corresponding price decrease may make an Offeror's proposal more competitive.

Uncertainty An aspect of the proposal for which the intent of the offer is unclear.

Weakness A flaw in the proposal that increases the risk of unsuccessful contract performance.

Significant Weakness

A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

Deficiency A material failure of the proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

M-2.2.4 Subfactor 1.1: Management Approach

This subfactor will receive a combined technical/risk rating reflecting the extent to which the Offeror's proposal demonstrates a comprehensive and proficient understanding of operational, management and improvement and modernization experience necessary to execute the requirements described in the PWS. The evaluation will assess:

M-2.2.4.1 Workload Management

The Offeror’s proposal clearly describes a sound approach to the Offeror's management as required in Performance Work Statement (PWS 4.1) including risk management and when the Offeror’s proposal describes a sound approach to the Management Operations Scenario description answering questions identified in paragraph L-3.2.2. Offerors shall clearly demonstrate how their approach capitalizes on the advantages of contemporary workforce management technology. The approach should clearly demonstrate how the methods and strategies result in a flexible union and non-union workforce capable of supporting dynamic test mission schedules while maintaining equipment and facilities within the Direct Budget Authority (DBA) fiscal constraints.

M-2.2.4.2 Prior Experience

1. Operational Experience. Offeror demonstrates operational experience in managing and operating efforts of the same scope as indicated in the PWS. Offeror demonstrates an understanding, knowledge and familiarity with various monitoring and control systems, data acquisition systems, and system interfaces of the same or similar type as specified in the PWS. Offeror’s prior experience demonstrates it has a comprehensive and proficient understanding of the planning and scheduling of missions similar to the requirements in the PWS. The Government will evaluate the extent, effectiveness and efficiency of the Offeror’s plan to leverage their operational experience to execute the requirements described in the PWS.

2. Personnel Management and Staffing: Offeror demonstrates it has experience in recruiting, managing, and retaining qualified personnel. Offeror’s prior experience demonstrates a comprehensive and proficient understanding of asset staffing requirements to support mission requirements as specified in the PWS. The Government will evaluate the extent, effectiveness and efficiency of the Offeror’s plan to leverage their experience in personnel management and staffing to execute the requirements described in the PWS.

3. Maintenance and Sustainment of Facilities and Equipment: Offeror demonstrates it has sufficient experience in maintaining and sustaining equipment, facilities, and infrastructure similar to those specified in the PWS. Offeror’s prior experience demonstrates a comprehensive and proficient understanding of maintenance programs, preventive and corrective maintenance practices, as well as specific knowledge of testing range infrastructure requirements as specified in the PWS. The Government will evaluate the extent, effectiveness and efficiency of the Offeror’s plan to leverage their experience in maintenance and sustainment of facilities and equipment to execute the requirements described in the PWS.

4. Continuous Improvement and Modernization Efforts: Offeror demonstrates sufficient experience in past efforts in improving, modernizing, or enhance operations similar to those specified in the PWS. Offeror demonstrated an ability to apply innovative and/or unique solutions in its prior experience. The Government will evaluate the extent, effectiveness and efficiency of the Offeror’s plan to leverage their experience with continuous improvement and modernization efforts to execute the requirements described in the PWS.

M-2.2.5 Subfactor 1.2: Technical Sustainment and Modernization This subfactor will receive a combined technical/risk rating reflecting the extent to which the Offeror's proposal demonstrates a comprehensive and proficient understanding of the system engineering and planning processes required for successful execution of Sustainment and Modernization projects IAW PWS 4.1.24 and the Offeror’s proposal describes a sound approach to the Sustainment and Modernization Scenario description and questions identified in paragraph L-

3.2.3. Offeror clearly demonstrate innovative strategies for agile manpower surges while sustaining current equipment and facilities. The Offeror's approach clearly demonstrates the ability to develop an optimized future range architecture while maximizing the performance of the Eglin Test and Training Complex (ETTC). The Offeror’s approach enables the Government to leverage technology to meet the demand for future range capacity and capability.

Offeror clearly demonstrates existing internal programs and policies that promote a culture of continuous improvement and the results of the programs and policies including an assessment of any risks uniquely associated with these specific ideas and plans, and the Offeror’s plan to mitigate these risks. Continuous improvement includes, but is not limited to, operational efficiencies, enhanced relevancy, a reduced reliance on DBA funding, and innovation.

M-2.2.6 Subfactor 1.3: Staffing Plan

Offeror's proposed Staffing Plan demonstrates a sound approach to recruit, train, and retain a qualified workforce to execute ETTC’s complex / dynamic projects IAW the PWS over the life of the contract.

M-2.2.7 Subfactor 1.4: Transition

Offeror's proposed Transition Plan demonstrates a sound approach to seamlessly transition during phase-in and phase-out activities, ensuring full continuity of test operations and sustainment services in accordance with PWS 8. Specifically, this subfactor evaluates the Offeror's Transition Plan and their ability to be fully prepared to achieve full performance on the first day of contract operations, without interrupting or degrading the performance of the ETTC mission.

M-2.2.8 Subfactor 1.5: Subcontracting

This subfactor will be evaluated on an acceptable or unacceptable basis and will not be assigned an adjectival rating. All factor elements below will be rated as acceptable or unacceptable. Rating definitions are as indicated in Table M-2.2.8-1.

Table M-2.2.8-1

Acceptable Proposal indicates an adequate approach and understanding of small business subcontracting objectives

Unacceptable Proposal does not meet small business subcontracting objectives

M-2.2.8.1 Small Business Participation Commitment Document This Measure of Merit is met when the Offeror’s proposal demonstrates a sound plan to meet the Minimum Quantitative Requirement of 20% of the total contract value for the participation of small businesses in performance of the contract, whether as a joint venture (JV), teaming arrangement, or subcontractor. The Offeror’s small business commitments must meet or exceed the percentages specified in 15 U.S.C. 644 (g)(1)(A).

M-2.2.8.2 Small Business Subcontracting Plan

This Measure of Merit is met when the Offeror’s Small Business Subcontracting Plan adequately addresses the elements required by FAR 52.219-9, Small Business Subcontracting Plan. Subcontracting plans are not evaluated; they are assessed for accuracy. It will be assessed as acceptable when:

• The offeror’s Small Business Subcontracting Plan meets the requirements of FAR 52.219-9.

• The offeror proposes to meet or exceed goals shown in para Section L-3.2.6.3 or provides substantiated rationale for proposed goals which are lower than those in this paragraph.

M-2.2.8.3 Subcontracting with AbilityOne The offeror will be evaluated on the extent to which the offeror is committed to using AbilityOne contractors. The Government will consider the extent to which the offeror proposed qualified AbilityOne contractors to perform aspects of the requirement, including work associated with the functional requirements of the SOW. The offeror will also be evaluated on meeting or exceeding an AbilityOne usage of 2% of the total contract value.

M-2.3 Factor 3: Cost / Price

M-2.3.1 Cost / Price Evaluation. The Government will evaluate the Cost / Price proposal for

(1) completeness, (2) reasonableness, (3) realism, (4) unbalanced pricing, and (5) Total Evaluated Price (TEP). Offerors whose price is determined to be unreasonable or unrealistic will not be considered for award. Proposals that are determined to be incomplete may be ineligible for award. Additionally, an offer may be rejected if the PCO determines unbalanced pricing poses an unacceptable risk to the Government.

M-2.3.1.1 Completeness. The Government will review the Offeror’s Cost / Price volume for completeness and compliance with Attachment 26, Section L-3.3 of the solicitation. The Government will evaluate both the Cost Model and accompanied Cost Narrative for completeness.

M-2.3.1.2 Reasonableness. The Offeror’s Cost / Price volume will be evaluated, using one or more of the techniques defined in FAR 15.404, in order to determine if it is reasonable. For Cost / Price to be reasonable, it must represent a cost/price to the Government that a prudent person would pay in the conduct of competitive business. Normally, reasonableness is established through analysis techniques as described in FAR 15.404. For additional information, see FAR 31.201-3.

M-2.3.1.3 Realism. The Cost / Price evaluation will include the extent to which proposed costs indicate a clear understanding of solicitation requirements and reflect a sound approach to resourcing those requirements, pursuant to FAR 15.404. The Offeror’s Cost / Price proposal will be evaluated by the Government computing a Most Probable Cost (MPC) for each proposal independently for the base, option periods / award terms. The MPC will be the Government’s estimate of anticipated performance costs plus any fee anticipated to be awarded. Additionally, the labor rates and associated costs as specified in Cost Model Attachments will be evaluated for realism.

M-2.3.1.4 Unbalanced Pricing. The Government will analyze proposals to determine whether they are balanced with respect to prices, IAW FAR 15.404-1(g). Unbalanced pricing exists when, despite an acceptable Total Evaluated Price, a proposed line item is significantly overstated or understated as indicated by the application of price analysis techniques.

Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices. An offer may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government. The burden of proof for demonstrating balance pricing rests with the Offeror.

M-2.3.1.5 TEP. The TEP will be calculated as the sum of the Offeror’s proposed costs for all options and award term periods, including the six-month extension of services period., The six-month extension of services is IAW FAR 52.217-8, Option to Extend Services, and will only be utilized if necessary. The TEP will not include Transition.

Evaluation of option periods and award terms shall not obligate the Government to exercise such options or award terms.

M-2.3.2 FAR 52.222-46, Evaluation of Compensation for Professional Employees.

The Professional Employee Compensation Plan will be evaluated in accordance with FAR 52.222-46 to assure that it reflects a sound management approach and understanding of the contract requirements. This evaluation will include an assessment of the offeror’s ability to provide uninterrupted high-quality work. The professional compensation proposed will be considered in terms of its impact upon recruiting and retention, its realism, and its consistency with a total plan for compensation.

Failure to comply with this provision may constitute sufficient cause to justify rejection of a proposal.

Attachment

M-1 INCORPORATED STRENGTHS OR CAPABILITY EXCEEDANCES

M-1.2 Number of Contracts to be Awarded
M-1.3 Competitive Advantage from use of Government-Furnished Property (GFP)
M-1.4 Correction Potential of Proposals
M-1.5 Discussions
M-1.6 Competitive Range
M-1.7 Final Proposal Revisions (FPRs)
M-1.8 Solicitation Requirements, Terms, and Conditions
M-1.9 Integrating Proposal into the Contract
M-2.0 EVALUATION FACTORS
M-2.2 Factor 1: Technical Ratings
Except for the Subcontracting subfactors, each Technical Subfactor will be assigned a Technical/Risk Rating. The Subcontracting subfactor will be rated as Acceptable/Unacceptable.
2.2.1 Combined Technical/Risk Rating.
Table M-2.2.1-1: Technical/Rating Definitions
Table M-2.2.3-1: Evaluation Finding Type Definitions
M-2.2.4.2 Prior Experience
M-2.2.5 Subfactor 1.2: Technical Sustainment and Modernization
M-2.2.6 Subfactor 1.3: Staffing Plan
M-2.2.7 Subfactor 1.4: Transition
M-2.2.8 Subfactor 1.5: Subcontracting
This subfactor will be evaluated on an acceptable or unacceptable basis and will not be assigned an adjectival rating. All factor elements below will be rated as acceptable or unacceptable. Rating definitions are as indicated in Table M-2.2.8-1.
Table M-2.2.8-1
M-2.2.8.1 Small Business Participation Commitment Document
This Measure of Merit is met when the Offeror’s proposal demonstrates a sound plan to meet the Minimum Quantitative Requirement of 20% of the total contract value for the participation of small businesses in performance of the contract, whether as a j...
M-2.2.8.2 Small Business Subcontracting Plan
M-2.2.8.3 Subcontracting with AbilityOne
The offeror will be evaluated on the extent to which the offeror is committed to using AbilityOne contractors. The Government will consider the extent to which the offeror proposed qualified AbilityOne contractors to perform aspects of the requirement...

File details come from the government source that posted it. Updated .