This is a formal external inspection report for Tank Facility T3653 (Tank 2) at Camp Blanding Joint Training Center in Starke, Florida, conducted by Austin Brockenbrough & Associates under Contract W9128F-12-D-0006 for the U.S. Army Corps of Engineers Omaha District.
The report details the inspection of a 10,000-gallon jet fuel (F-24) storage tank manufactured by Buffalo Tank Corporation in 1994. The tank is a UL-listed closed type diked aboveground tank measuring 10'-6" in diameter and 15'-6" in length. While the tank was found to be fully serviceable with no mandatory repairs required, several recommended repairs were identified totaling $18,500, including installation of a full-length galvanized steel platform ($14,000), exterior cleaning and labeling ($3,000), and programming additional alarm points ($1,500). The tank features an integral steel containment dike, Veeder Root TLS 350 ATG monitoring system, and both normal and emergency venting. As a Category 1 tank, the next formal external inspection is recommended before December 2035.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TANK FACILITY T3653 (TANK 2) STI SP001
FORMAL EXTERNAL INSPECTION REPORT
Camp Blanding JTC, Starke, Florida
A/E Contract No. W9128F-12-D-0006; Delivery Order No. 0010
Submitted to:
U.S. Army Corps of Engineers Omaha District
1616 Capital Avenue; Omaha, NE 68102
6 March 2016
Submitted by:
1011 Boulder Springs Drive, Suite 200; Richmond, Virginia 23225 Phone: 804.592.3900 Fax: 804.592.3901 www.brockenbrough.com
Job No. 15-104.03
SPCC Mandated Shop-Built AST Inspections Camp Blanding JTC, Tank T3653
Executive Summary page i
EXECUTIVE SUMMARY
Austin Brockenbrough & Associates, LLP (Brockenbrough) was retained by Omaha District USACE under
Contract No. W9128F-10-D-0006 Delivery Order 0010 to perform SPCC Mandated Shop Built AST
Inspections. As required by this task, Brockenbrough executed a tank inspection site visit to Camp
Blanding JTC near Starke, Florida. A formal external inspection per the guidelines of STI SP001 “Standard for the Inspection of Aboveground Storage Tanks” was conducted for Tank Facility No. T3653 (locally identified as the Tank 2) on November 15, 2015. This inspection is in compliance with applicable federal, state, and local regulations, as well as the facility’s SPCC Plan.
Tank Facility T3653 is a 10'-6" diameter, 15'-6" long horizontal tank, UL Listed as a “Closed Type Diked
Aboveground Tank for Flammable Liquids”. The tank has a nominal storage capacity of 10,000 gallons of
Jet fuel (F-24). The tank fabrication date is 1994 (per Facility Personnel), manufactured by Buffalo Tank
Corporation. Because this tank has spill control and a continuous release detection method, it is classified as a Category ‘1’ Tank. Details of tank construction and appurtenances are included in Section
‘B’.
The tank was found to be fully serviceable, with no mandatory repairs noted. However, several items were observed that are not in compliance with applicable federal, state, and local codes and regulations or military criteria. The noted deficiencies are included in more detail in Section ‘C’ along with recommended repairs and rough order of magnitude costs.
It is recommended that the tank owner’s inspector perform periodic inspections of this tank using the
STI monthly and annual checklists, which are included in Appendix ‘2’ of this report. As this tank is classified as Category ‘1’, STI recommends that the next formal external inspection of this tank be performed by a certified STI SP001 inspector before December 2035. This inspection interval will meet all the applicable requirements for federal, state, and local regulations.
Certification Signature:
Bryan Strayer, PE Mechanical Engineer;
STI Inspector No. AST-990220
Table of Contents page ii
TABLE OF CONTENTS
EXECUTIVE SUMMARY ................................................................................................................................... i
A. General Project Information
1. STI SP001 In-Service Inspections
2. Site Information
3. Previous Inspections
4. Proposed Future Projects and Upgrades
B. Tank Construction and Appurtenances
1. Tank Construction
2. Tank Supports and Foundation
3. Secondary Containment
4. Tank Coating System
5. Tank Appurtenances
a. Venting
b. Gauging
c. Stairs and Platforms
d. Grounding and Bonding
e. Other Appurtenances
6. Tank Piping System
7. Fire Protection Systems:
C. Findings and Recommendations
1. Mandatory Repairs
2. Recommended Repairs
a. Access Platform
b. Tank Exterior
c. Level Alarm System
3. Other Noted Tank Items
a. Access Manholes
b. Overfill Protection
c. Water Draw-Off Connection
4. Recommended Site Upgrades
D. Inspection Photographs
E. Tank Configuration Sketch
Appendix ‘1’ – STI Formal External Inspection Checklist
Appendix ‘2’ – STI Monthly and Annual Checklists
General Project Information page 3
A. General Project Information
1. STI SP001 In-Service Inspections
This project will perform in-service tank inspections at various facilities throughout the United
States. The basis of this inspection is a Formal External Inspection recommended in STI SP001
“Standard for the Inspection of Aboveground Storage Tanks”. Additional consideration is given to federal, state, and local regulations as well as applicable military criteria and general industry standards. Unless otherwise noted, all inspections will be conducted while the tanks and associated piping systems remain in service.
For Tank T3653, an STI SP001 Formal External Inspection was performed.
2. Site Information
On November 15, 2015 Brockenbrough performed a site visit to Camp Blanding Joint Training
Facility (JTC) to perform inspections of three aboveground storage tanks. Camp Blanding is located in Clay County, near the city of Starke, Florida. Its 73,000 acre site is the primary military reservation and training facility for the Florida Army National Guard.
3. Previous Inspections
No previous formal inspections of Tank Facility T3653 were found.
4. Proposed Future Projects and Upgrades
There are currently no reported projects planned for this tank site.
Tank Construction and Appurtenances page 4
B. Tank Construction and Appurtenances
1. Tank Construction
The fabrication date of this tank is 1994 (per Facility Personnel), manufactured by Buffalo Tank
Corporation. UL Nameplate was present, but only partially readable. The Tank is UL listed as a
"Closed Type Diked Aboveground Storage Tank for Flammable Liquids". The tank is single wall, carbon steel constructed of three 0.25-inch thick butt-welded shell courses with 0.281-inch thick flat heads butt-welded to the shell. No dents, distortion or mechanical damage was observed. No coating failure or areas of corrosion were noted, but the tank top is covered with dust, light debris and algae. The primary tank measures 10'-6" diameter by 15'-6" long and has a nominal capacity of
10,000 gallons.
2. Tank Supports and Foundation
The tank is supported by steel saddles that bear down on the integral steel containment floor. The skid mounted tank and containment system rests on a concrete tank pad. The condition of the steel tank saddles were not able to be evaluated, as the interior of the integral containment area was not accessible. Concrete tank pad was found to be in good condition.
3. Secondary Containment
Secondary containment is provided by an integral steel containment dike measuring 20'-8" long, 12'-0" wide and 6'-0" tall offering a total capacity of approximately 11,100 gallons. The integral containment system includes an overflow channel from a 24-inch tank-top manhole. Containment dike release is controlled by a series of two ball valves, one of which has the operating handle removed. Containment area features a monitoring hatch to allow visual inspection. The containment dike capacity is in compliance with all applicable regulations and is in generally good condition. No liquid or debris was noted within the containment area when inspected through the monitoring hatch.
4. Tank Coating System
The exterior coating is of unknown type and found to be in fair condition with no areas of coating failure noted. The tank has been provided with some basic labeling but is missing the tank number, facility number, and capacity. The tank top is covered with dust, light debris and algae. The status of the interior coating of the tank is unknown.
Tank Construction and Appurtenances page 5
5. Tank Appurtenances
a. Venting
This tank features a 3-inch updraft style open normal vent of unknown manufacturer. The venting capacity is in compliance with all applicable codes. The normal vent is in good condition and free of obstructions. The tank also features an 8-inch Morrison Brothers Fig 244 emergency vent with a capacity of 453,300 cfh. The emergency venting capacity is adequate for this tank per the requirements of STI SP-001. The emergency vent was found to be fully operable.
b. Gauging
The tank has a 4-inch Veeder Root ATG probe that monitors product and water level. The associated control module and alarm are mounted on a nearby control rack. There is an independent high level alarm probe. The tank also has a clock-style mechanical gauge located on the front head of the tank. The probe was not accessible for inspection, but the gauge appeared to be working properly. The reading was consistent with that of the ATG.
c. Stairs and Platforms
A vertical, painted steel ladder and platform at the rear head of the tank provides access to the top of the tank. Ladder and platform were found to be in fair condition with no signs of coating failure noted.
d. Grounding and Bonding
There is a lug with a grounding cable connected to the integral steel dike that terminates in the ground just off of the concrete tank pad.
e. Other Appurtenances
The tank has a 4-inch manual gauging hatch for sampling and manual gauging, a 24-inch access manhole, 24-inch overflow manhole, and a 4-inch receipt nozzle. A 4-inch issue nozzle and 1-inch water draw-off nozzle are located on the front head of the tank.
6. Tank Piping System
Fuel is received and issued through 4-inch butt-welded carbon steel piping that transitions to stainless steel after leaving the containment dike. Fuel is received from the truck off-loading station and is issued to a refueler fillstand. Carbon steel piping was found to be in fair condition, but was covered with dust, light debris and algae. Stainless steel piping was in good condition.
7. Fire Protection Systems:
There is no fire protection system required or present on this storage tank. Two fire hydrants were noted within 300 feet of this tank.
Tank Construction and Appurtenances page 6
Table B-1: General Tank Construction Data
Item Description
Owner Florida Army National Guard
Tank Identification Facility No. T3653 (Tank 2)
Location Camp Blanding JTC, Starke, Florida
Manufacturer Buffalo Tank Corporation
Design Standard Closed Type Diked Aboveground Tank for Flammable Liquids
Year Built 1994 (per Facility Personnel)
Current Product Stored Jet fuel (F-24): specific gravity: 0.78 to 0.84, vapor pressure: 0.03 psia at 100F, flash point: 100F, Class II combustible liquid
Dimensions 10'-6" diameter, 15'-6" long (horizontal cylindrical)
Storage Capacity 10,000 gallons nominal capacity
Cleaning, Inspection, or Repair
No previous inspection or repair reports were found.
Foundation Skid mounted tank and containment system rests on concrete tank pad.
RPB/Leak Detection Containment area features a monitoring hatch to allow visual inspection.
Shell Construction Single wall, carbon steel constructed of three 0.25-inch thick butt-welded shell courses with 0.281-inch thick flat heads butt-welded to the shell.
Stairs/Ladders Vertical, painted steel ladder and platform at the rear end of the tank provides access to top of tank.
Manholes 24-inch access manhole; 24-inch overflow manhole.
Interior Coating System Status unknown
Exterior Coating System Exterior coating is of unknown type and found to be in fair condition with no areas of coating failure noted.
Level Gauging 4-inch ATG probe that monitors product and water level. A clock-style mechanical gauge is located on the front head of the tank.
Overfill Protection/Level Alarms
Independent high level alarm probe.
Piping 4-inch butt-welded carbon steel issue and receipt at tank transitioning to stainless once outside of containment dike.
Venting/Vapor Emission Controls
3-inch updraft style open vent of unknown manufacturer; 8-inch Morrison Bros Fig 244 emergency vent with a capacity of 453,300 cfh.
Strapping Tables Generic manual strapping tables provided by Tank Manufacturer
Water Draw-Off/Product Recover System
1-inch water draw-off connection
Secondary Containment Secondary containment is provided by an integral steel containment dike measuring 20'-8" long, 12'-0" wide and 6'-0" tall offering a total capacity of approximately 11,100 gallons.
Fire Protection System No fire protection present on tank (none is required); two fire hydrants were found within the general tank vicinity.
Findings and Recommendations page 7
C. Findings and Recommendations
Tank Facility T3653 was found to be in generally fair condition. The tank is fully serviceable, with no mandatory deficiencies noted that require immediate repair. There were several items observed, however, that are not in full compliance with federal, state, and local regulations or military criteria.
These noted deficiencies are listed below, with repair recommendations and order of magnitude repair cost estimates. For basis of the cost estimate, it is assumed that the repairs will be completed by local action such as the Reoccurring Maintenance and Minor Repair program.
1. Mandatory Repairs
Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. If these repairs cannot be completed within a two month period, the tank should be removed from service until the repairs are completed. There are no Mandatory Repairs currently required for this tank.
2. Recommended Repairs
Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by federal, state and local codes or by military criteria.
The total Cost of Recommended Repairs for this tank is $18,500
a. Access Platform
The existing platform provides access to the tank top, but does not provide access to the majority of tank appurtenances. A full length galvanized steel platform with guardrails should be provided to allow personnel safe access to all tank top appurtenances.
Estimated Cost: $14,000
b. Tank Exterior
The tank exterior coating system was found to be in generally fair condition, but algae, dust, and light debris was noted on the tank. The tank should be cleaned and a biocide used to prevent future algae growth. Labels should be provided for the Tank Number, Real Property
Number, and capacity.
Estimated Cost: $3,000
Findings and Recommendations page 8
c. Level Alarm System
This tank is equipped with a Veeder Root TLS 350 ATG System. This system is currently used only to indicate product and water levels within the tank. An independent level alarm system provides a single high level alarm point, but UFC 3-460-01, Table 8-1 item (I) requires a high, high-high, low, and low-low alarm point for this tank. The three additional alarm points (high-high, low, and low-low) should be programmed into the ATG system by a qualified SPAWAR
Contractor in order to meet the requirements of the UFC.
Estimated Cost: $1,500
3. Other Noted Tank Items
Other Noted Items represent minor non-critical deficiencies that are not recommended for repair due to a prohibitive cost to benefit ratio or other reasons. If these repairs are deemed necessary by the stakeholders, replacing the tank should be considered.
a. Access Manholes
UFC 3-460-01, Table 8-1.a requires all tanks of this configuration over 5,000 gallons to have two 36-inch access manholes. One of these manholes is required to include an internal ladder.
This repair is not recommended as the benefit of providing the new manholes and internal ladder does not justify the cost of the repair. The existing 24-inch manhole appears to be adequate for the Activity’s operational needs.
b. Overfill Protection
UFC 3-460-01, Table 8-1, Item ‘x’, requires tank receipt piping to have a hydraulically operated diaphragm control valve to prevent overfilling of the tank. This tank does not have such a valve. This repair is not recommended, as the benefit of providing the new valve and associated float pilot does not justify the cost of the repair. The high level alarm (in conjunction with fully manned off-loading operations) appears to be adequate for the
Activity’s operational needs.
c. Water Draw-Off Connection
UFC 3-460-01, Table 8-1.a requires all tanks of this configuration to have a 2-inch water draw-off connection with a double block-and-bleed valve for isolation. This repair is not recommended as the benefit of providing the larger water drain line with a double block-and-bleed valve does not justify the cost. The existing 1-inch drain line with ball valve appears to be adequate for the Activity’s operational needs.
4. Recommended Site Upgrades
Site Upgrades are recommended upgrades to the site, which would still need to be addressed even if the tank were repaired or replaced. These items may be required by federal, state and local codes or by military criteria. There are no Recommended Site Upgrades currently recommended for this tank.
Inspection Photographs page 9
D. Inspection Photographs
Overview of Tank Facility T3653, Locally Identified as Tank #2
Overview of the Fueling Facility, Showing the Truck Off-Loading and Fillstand Area, the Pumping and Filtration Equipment, and the Tanks
Inspection Photographs page 10
Tank Appurtenances Including the Access Manhole with Emergency Vent and Level Alarm, Receipt
Nozzle, ATG, and Manual Gauging Hatch
Tank Appurtenances Including the Normal Vent, Overflow Manhole, and Access Manhole with Emergency Vent and Level Alarm
Inspection Photographs page 11
The Integral tank Containment Dike (with rain covers), Mechanical Clock Gauge, Grounding Wire, Piping Penetrations and the Associated Concrete Tank Pad.
The Vertical Stair, Access Platform, and Interstitial Drain at the Rear Head of the Tank
Inspection Photographs page 12
Tank Piping is Coated Carbon Steel that transitions to Stainless Steel outside the Containment Dike
The Pumping and Filtration Equipment, Refueler Fillstand, and Tank Truck Off-Loading Station
Tank Configuration Sketch
E. Tank Configuration Sketch
STI External Inspection Checklist
Appendix ‘1’ – STI Formal External Inspection Checklist
UL SWRI
API Other
Protected
Type: Type:
Size: Date Installed:
Carbon steel End Conn: Size: 4-inch Material: Carbon steel End Conn: Size: 4-inch
Issue To:
Interior Coating:
Double Bottom
10,000 gallons
Other:
20'-8" long, 12'-0" wide, 6'-0" tall
Level Alarms:
Butt-welded
Tank truck off-loading station
Butt-welded
Refueler fillstand
N/A
Integral steel containment dike
AST-990220
Secondary Containment, Overfill, and CRDM
Overfill Protection:
Tank Inspector Name:
Buffalo Tank Corporation
1994 (per Facility Personnel)
Inspector Certification Number:
Tank 2
Open Type Dike
Tank Outside Dimensions: Useable Capacity:
Plastic / Fiberglass
Inspection Date:
Design Std
Horizontal Single Wall
N/A
Closed Type Dike
Aboveground Tank for
Flammable Liquids
Steel containment dike
N/A
Visual
N/A
Insulated
Jet fuel (F-24)
Material:
Receipt From:
Bryan Strayer
Vertical
Rectangular
Double Wall
Fire Resistant
Closed Type Dike
Change of Service:
Last Repair:
Tank Coatings:
Exterior Coating:
Unknown coating system
Status unknown
STI SP001 FORMAL EXTERNAL INSPECTION (FEI) CHECKLIST
Camp BlandingProject Site:Project Name:
Project Location:
Brockenbrough Job No.:
SPCC Mandated Shop Built AST Inspections
Starke, Florida
General Inspection Information
15-104.03
Submitted to:
Contract No.:
Omaha District USACE
W9128F-10-D-0006
N/A
Tank Manufacturer:
Tank Construction Date: Nominal Capacity:
Release Prevention Barrier
Overfill Protection / Level Alarms:
Independent high level alarm High level alarm
Receipt Piping Configuration Issue Piping Configuration
Tank Piping
Secondary Containment
None
Tank Specifications
Previous Tank Inspection Date:
Continuous Release Detection Monitoring
Type:
Date Installed:
Current Product:
Tank Facility No.:
Local Tank ID No.:
November 15, 2015
T3653
Tank Construction and Configuration
Coated
10'-6" diameter, 15'-6" long
STI SP001 FORMAL EXTERNAL INSPECTION (FEI) CHECKLIST
Camp BlandingProject Site:Project Name: SPCC Mandated Shop Built AST Inspections
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
The tank is supported by steel saddles that bear down on the integral steel containment floor.
The condition of the steel tank saddles was not able to be assessed, as the interior of the integral containment area was not accessible.
· Degradation
Ground slopes away from tank
Soil resting against/covering side of tank
Cracking or spalling
Skid mounted tank and containment system rests on concrete tank pad.
Concrete tank pad was found to be in good condition.
7.1.6 Tank Foundation
· Pad plates between the supports and shell are in good condition
· Corrosion or coating failure
Review prior inspections, repairs and alterations data No previous inspection or repair reports were found.
UL Nameplate was present, but only partially readable
Tank is assumed to be UL listed as an "Closed Type Diked Aboveground
Storage Tank for Flammable Liquids"
7.1 General
TASK STATUS COMMENTS
Inspect against applicable industry standards
Settlement
Check Supports for :
Welds are in good condition
7.1.5 AST Fabrication
7.1.3 Past Records
7.1.4 AST Nameplate Data
Water drains away from tank
ITEM
Cracking
Record data and check accuracy against actual conditions
Secured properly on foundation or grade
7.1.7 Tank Supports
Exposed rebar
· Wash-out or voids
Check Foundation for :
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Operable and in good condition
Check Containment for :7.1.8.1 Secondary Containment
Liquid or foreign materials present in the area
Good overall condition
Containment dike capacity is in compliance with all applicable regulations and is in generally good condition. No liquid or debris was noted within the containment area when inspected through the monitoring hatch.
The venting capacity is in compliance with all applicable codes. The normal vent is in good condition and free of obstructions.
Receipt and issue piping is a 4-inch butt-welded carbon steel, transitioning to stainless steel just outside the containment dike wall.
Carbon steel piping was found to be in fair condition, but was covered with dust, light debris and algae. Stainless piping was in good condition.
Containment dike release is controlled by a series of two ball valves, one of which has the operating handle removed.
Containment area features a monitoring hatch to allow visual inspection.
Leakage
7.1.8.2 CRDM / Spill Control
Coating failure·
Liner degradation
Corrosion
Check Spill Control for:
ITEM
Operable and in good condition
Locked
Check Piping for :
Stress or leakage
Check Drain Valves for:
Corrosion
Rusted bolted connections
Poppets move freely and passages are unobstructed
Adequate size and capacity
Check Vents For:
TASK STATUS COMMENTS
3-inch updraft style open vent of unknown manufacturer.
Good overall condition
Wash-out
Liquid or foreign materials present in the area
Secondary containment is provided by an integral steel containment dike measuring 20'-8" long, 12'-0" wide and 6'-0" tall offering a total capacity of approximately 11,100 gallons. Integral Containment system includes an overflow channel from a 24-inch tank-top manhole.
Degradation
7.1.8.3 Drain Valves
7.1.9.1 Piping & Connections
7.1.9.2 Normal Vents
Holes or cracks in wall or floor
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A· Corrosion
7.1.10 Tank Grounding & Bonding
Broken welds, Bent Members
7.1.11 Stairways, Handrails, and
Platforms
7.1.9.3 Tank Gauges
(Interstitial Leak Sensor)
· Readout is consistent with mechanical gauge 4-inch ATG probe that monitors product and water level. The Veeder
Root control module and alarm are mounted on a nearby control rack.
Vertical, painted steel ladder and platform at the rear end of the tank provides access to top of tank. Ladder and platform were found to be in fair condition with no signs of coating failure noted.
Operable / in good condition
There is a lug with a grounding cable connected to the integral steel dike that terminates in the ground just off of the concrete tank pad.
The probe was not accessible for inspection, but the gauge appeared to be working properly. The reading was consistent with that of the ATG.
COMMENTS
8-inch Morrison Brothers Fig 244 with a capacity of 453,300 cfh.
A clock-style mechanical gauge is located on the front head of the tank.
Independent high level alarm probe.
The venting capacity is adequate for this tank per the requirements of
STI SP-001. The emergency vent was found to be operating properly.
7.1.9.3 Tank Gauges
(Level Alarm)
STATUS
Check Mechanical Gauge For:
7.1.9.3 Tank Gauges (ATG)
Positive alarm from submersion
Correct length of alarm setting
Check Level Alarm For:
Positive alarm from submersion
Correct length of alarm setting
Floats, guides wiring, and attachments in good condition
Check ATG For:
7.1.9.3 Tank Gauges (Mechanical
Gauge)
Covers move freely and passages are unobstructed
Testing knob engages tape
Grounding element secured and in good condition
Check Stairways and Platforms for :
7.1.9.2 Emergency Vents
TASK
Check Vents For:
· Correct length for tank diameter
· Readout is consistent with ATG
Adequate size and capacity
Check Level Alarm For:
Floats move freely on Probe
ITEM
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Pass Fail N/A
Exterior coating is of unknown type and found to be in fair condition with no areas of coating failure noted. The status of the interior coating is unknown. Tank has been provided with some basic labeling but is missing tank number, facility number, and capacity. Tank top is covered with dust, light debris and algae.
7.3.2 Modifications to the AST
ITEM
Steel is dented, distorted, bulging, or buckled
Changes made post fabrication
Exterior corrosion noted
Cracking or pinholes noted
Check Shell Attachments For :
ITEM TASK STATUS COMMENTS
· Coating of tank heads and shell is in good condition
No post fabrication changes were noted for this tank.·
Tank is single wall, carbon steel constructed of three 0.25-inch thick butt-welded shell courses with 0.281-inch thick flat heads butt-welded to the shell. No dents, distortion or mechanical damage was observed.
No coating failure were noted or areas of corrosion were noted, but tank top is covered with dust, light debris and algae.
Determine nominal shell thickness using one of the following methods:
Check shell plates and Heads For :
TASK
.249inch / 0.248 inch / 0.250 inch
0.284 inch / 0.266 inch
Tank Head (Front):
Tank Head (Rear):
Tank Shell:
7.3.1 Tank Shell and Heads
STATUS COMMENTS
7.3 Horizontal AST
0.273 inch / 0.268 inch
Stress or corrosion noted
Mechanical damage noted
Tank has all required labeling and identification
Tank Head and Shell Thickness
UT Measurements (Horizontal AST)
7.2.1 Review the original tank documentation, such as drawings and packing lists
7.2.2 Consult the tank manufacturer
7.2.4 Measure the tank thickness at various locations and take an average
7.2.3 Exam the tank labels for evidence of a widely accepted tank standard.
Consult the referenced standard to determine the minimum design shell thickness
Head Thickness:
Shell Thickness:
0.281 inch
0.25 inch
7.2 Determine the original shell thickness of the AST
7.1.12 Tank Coatings Check Tank Exterior For:
Additional Findings and Comments:
2) Very limited tank top access due to lack of platform.
1) Tank is covered with dust, light debris, and light algae.
3) Tank does not include labels for Tank Number, Facility Number, or capacity.
STI Monthly and Annual Checklists
Appendix ‘2’ – STI Monthly and Annual Checklists
AST INSPECTION STANDARD 29 SEPTEMBER 2011
STI SP001 Monthly Inspection Checklist
General Inspection Information:
Inspection Date: Retain Until Date: (36 months from inspection date)
Prior Inspection Date: Inspector Name:
Tanks Inspected (ID #’s):
Inspection Guidance:
For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified
Inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.
Upon discovery of water in the primary tank, secondary containment area, interstice, or spill container, remove promptly or take other corrective action. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.
(*) designates an item in a non-conformance status. This indicates that action is required to address a problem.
Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
Retain the completed checklists for 36 months.
In the event of severe weather (snow, ice, wind storms) or maintenance (such as painting) that could affect the operation of critical components
(normal and emergency vents, valves), an inspection of these components is required as soon as the equipment is safely accessible after the event.
Item Task Status Comments
1.0 Tank Containment
1.1 Containment
structure
Check for water, debris, cracks or fire hazard
�Yes* �No �N/A
1.2 Primary tank Check for water �Yes* �No
1.3 Containment
drain valves Operable and in a closed position
�Yes �No* �N/A
1.4 Pathways and
entry
Clear and gates/doors operable
�Yes �No* �N/A
2.0 Leak Detection
2.1 Tank Visible signs of
leakage �Yes* �No
2.2 Secondary
Containment
Visible signs of leakage from tank into secondary containment
�Yes* �No
2.3 Surrounding soil Visible signs of
leakage
�Yes* �No �N/A
2.4 Interstice Visible signs of
leakage
�Yes* �No �N/A
AST INSPECTION STANDARD 30 SEPTEMBER 2011
3.0 Tank Equipment
3.1 Valves a. Check for leaks. �Yes* �No �N/A
b. Tank drain valves must be kept locked.
�Yes* �No �N/A
3.2 Spill
containment boxes on fill pipe
a. Inspect for debris, residue, and water in the box and remove.
�Yes* �No �N/A
b. Drain valves must be operable and closed.
�Yes* �No �N/A
3.3 Liquid level
equipment
a. Both visual and mechanical devices must be inspected for physical damage.
�Yes �No* �N/A
b. Check that the device is easily readable
�Yes �No* �N/A
3.4 Overfill
equipment
a. If equipped with a "test" button, activate the audible horn or light to confirm operation.
This could be battery powered. Replace the battery if needed
�Yes �No* �N/A
b. If overfill valve is equipped with a mechanical test mechanism, actuate the mechanism to confirm operation.
�Yes �No* �N/A
3.5 Piping
connections
Check for leaks, corrosion and damage
�Yes* �No
4.0 Tank Attachments and Appurtenances
4.1 Ladder and
platform structure
Secure with no sign of severe corrosion or damage?
�Yes �No* �N/A
5.0 Other Conditions
5.1 Are there other conditions that should
be addressed for continued safe operation or that may affect the site spill prevention plan?
�Yes* �No
AST INSPECTION STANDARD 31 SEPTEMBER 2011
Additional Comments:
AST INSPECTION STANDARD 32 SEPTEMBER 2011
STI SP001 Annual Inspection Checklist
General Inspection Information:
Inspection Date: Retain Until Date: (36 months from inspection date)
Prior Inspection Date: Inspector Name:
Tanks Inspected (ID #’s):
Inspection Guidance:
For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures.
The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a Certified
Inspector. It shall be performed by an owner’s inspector who is familiar with the site and can identify changes and developing problems.
Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly.
In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v)).
(*) designates an item in a non-conformance status. This indicates that action is required to address a problem.
Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section.
Retain the completed checklists for 36 months.
Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists.
Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation.
1.0 Tank Containment
1.1 Containment
structure
Check for:
• Holes or cracks in containment wall or floor
• Washout
• Liner degradation
• Corrosion
• Leakage
• Paint failure
• Tank settling
�Yes* �No �N/A
2.0 Tank Foundation and Supports
2.1 Foundation Settlement or
foundation washout?
�Yes* �No
2.2 Concrete pad
or ring wall
Cracking or spalling? �Yes* �No �N/A
AST INSPECTION STANDARD 33 SEPTEMBER 2011
2.3 Supports Check for corrosion, paint failure, etc.
�Yes* �No �N/A
2.4 Water
drainage
Water drains away from tank?
�Yes �No* �N/A
2.5 Tank
grounding
Strap secured and in good condition?
�Yes �No* �N/A
3.0 Cathodic Protection
3.1 Gavlvanic
cathodic protection system
Confirm system is functional, includes the wire connections for galvanic systems
�Yes �No* �N/A
3.2 Impressed
current system
a. Inspect the operational components (power switch, meters, and alarms).
�Yes �No* �N/A
b. Record hour meter, ammeter and voltmeter readings.
�Yes �No* �N/A
4.0 Tank Shell, Heads, Roof
4.1 Coating Check for coating
failure �Yes* �No
4.2 Steel
condition
Check for:
• Dents
• Buckling
• Bulging
• Corrosion
• Cracking
�Yes* �No
4.3 Roof slope Check for low points
and standing water
�Yes* �No �N/A
5.0 Tank Equipment
5.1 Vents Verify that
components are moving freely and vent passageways are not obstructed for:
• Emergency vent covers
• Pressure/vacuum vent poppets
• Other moving vent components
�Yes* �No
AST INSPECTION STANDARD 34 SEPTEMBER 2011
5.2 Valves Check the condition of
all valves for leaks, corrosion and damage.
�Yes* �No
5.2.1 Anti-siphon, check and gate valves
Cycle the valve open and closed and check for proper operation.
�Yes �No* �N/A
5.2.2 Pressure
regulator valve
Check for proper operation. (Note that there may be small, 1/4 inch drain plugs in the bottom of the valve that are not visible by looking from above only)
�Yes �No* �N/A
5.2.3 Expansion
relief valve
Check that the valve is in the proper orientation. (Note that fuel must be discharged back to the tank via a separate pipe or tubing.)
�Yes �No* �N/A
5.2.4 Solenoid
valves
Cycle power to valve to check operation.
(Electrical solenoids can be verified by listening to the plunger opening and closing. If no audible confirmation, the valve should be inspected for the presence and operation of the plunger.)
�Yes �No* �N/A
5.2.5 Fire and
shear valves
a. Manually cycle the valve to ensure components are moving freely and that the valve handle or lever has clearance to allow valve to close completely.
�Yes �No* �N/A
b. Valves must not be wired in open position.
�Yes �No* �N/A
AST INSPECTION STANDARD 35 SEPTEMBER 2011
c. Make sure fusible element is in place and correctly positioned.
�Yes �No* �N/A
d. Be sure test ports are sealed with plug after testing is complete and no temporary test fixture or component remains connected to valve.
�Yes �No* �N/A
5.3 Interstitial
leak detection equipment
Check condition of equipment, including:
• The window is clean and clear in sight leak gauges.
• The wire connections of electronic gauges for tightness and corrosion
• Activate the test button, if applicable.
�Yes �No* �N/A
5.4 Spill
containment boxes on fill pipe
a. If corrosion, damage, or wear has compromised the ability of the unit to perform spill containment functions, replace the unit.
�Yes* �No �N/A
b. Inspect the connections to the AST for tightness, as well as the bolts, nuts, washers for condition and replace if necessary.
�Yes* �No �N/A
c. Drain valves must be operable and closed
�Yes* �No �N/A
5.5 Strainer a. Check that the
strainer is clean and in good condition.
AST INSPECTION STANDARD 36 SEPTEMBER 2011
5.5 Strainer b. Access strainer
basket and check cap and gasket seal as well as bolts.
�Yes �No* �N/A
5.6 Filter a. Check that the filter
is in good condition and is within the manufacturer’s expected service life.
Replace, if necessary.
�Yes �No* �N/A
b. Check for leaks and decreased fuel flow
�Yes �No* �N/A
5.7 Flame
arrestors
Follow manufacturer’s instructions. Check for corrosion and blockage of air passages.
�Yes* � No �N/A
5.8 Leak detector
for submersible pump systems
Test according to manufacturer's instructions and authority having jurisdiction (AHJ).
Verify leak detectors are suited and properly installed for aboveground use.
�Yes �No* �N/A
5.9 Liquid level
equipment
a. Has equipment been tested to ensure proper operation?
�Yes �No* �N/A
b. Does equipment operate as required?
�Yes �No* �N/A
c. Follow manufacturer’s instructions
�Yes �No* �N/A
5.10 Overfill
equipment
a. Follow manufacturer’s instructions and regulatory requirements for inspection and functionality verification.
�Yes �No* �N/A
b. Confirm device is suited for above ground use by the manufacturer
AST INSPECTION STANDARD 37 SEPTEMBER 2011
6.0 Insulated Tanks
6.1 Insulation Check condition of
insulation for:
• Missing sections
• Areas of moisture
• Mold
• Damage
�Yes* � No �N/A
6.2 Insulation
cover or jacket
Check for damage that will allow water intrusion
�Yes* No �N/A
7.0 Miscellaneous
7.1 Electrical
wiring and boxes
Are they in good condition?
�Yes �No* �N/A
7.2 Labels and
tags
Ensure that all labels and tags are intact and readable.
Additional Comments:
1011 Boulder Springs Drive, Suite 200 Richmond, Virginia 23225
Phone: 804-592-3900 Fax: 804-592-3901 www.brockenbrough.com
| BLD Tank T3653 STI FEI Report |
| Executive Summary |
| Table of Contents |
| A. General Project Information |
| B. Tank Construction and Appurtenances |
| C. Findings and Recommendations |
| D. Inspection Photos |
| E. Tank Configuration Sketch |
| Appendix '1' - STI FEI Checklist |
| Appendix '2' - STI Monthly and Annual Checklists |