Attachment J-4 - Price Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 030ADV25R0046
- Issued by
-
Library of Congress
About this file
Attachment J-4 is a Price Schedule for the Library of Congress Pickford Theater Audio and Visual Upgrades project (Solicitation Number 030ADV25R0046). The document outlines a detailed pricing structure for multiple deliverables across a base period and optional components, with most line items currently showing $0 pricing. Key deliverables include site survey, system design, infrastructure removal services, hardware delivery and installation, lectern design and fabrication, and a one-year warranty, with completion dates ranging from November 2025 to September 2026.
The price schedule covers base period requirements such as kick-off meeting, site survey, system design, infrastructure removal, hardware installation, and lectern-related tasks, as well as optional items including projector screen frame, curtain motor, digital video projectors, and an audio processing unit. The project involves modernizing audiovisual elements in the Mary Pickford Theater within the James Madison Memorial Building, with specific constraints including preserving architectural integrity, maintaining 35mm film projection capabilities, and using existing cable paths and penetrations where possible. The Library of Congress explicitly requires a Q-SYS control system and will not accept Crestron or AMX automation systems.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Price Schedule
| 030ADV24R0046 Attachment J-4 - Price Schedule |
| Offeror shall read the Statement of Work at Section C of the solicitation and provide firm fixed prices for the deliverables listed below. Offeror shall also provide details for how prices were derived for each deliverable, including, but not limited to services, labor categories and required hours. |
| Requirement | Deliverable | Due Date | Price |
| C.4.1 | Kick Off Meeting | Within 5 days of the period of performance (PoP) start date | Not Separately Priced (NSP) |
| C.3.1.A | Site Survey | No later than (NLT) 11/12/2025 | NSP |
| C.3.1.B | System Design | NLT 1/31/2026 | $ - 0 |
| C.3.2 | Infrastructure Removal Services | NLT 3/31/2026 | $ - 0 |
| C.3.3-C.3.12, C.3.14-C.3.24 | Hardware Delivery & Installation, Commissioning | NLT 8/31/2026 | $ - 0 |
| C.3.13 | Lectern Design | NLT 4/31/2026 | $ - 0 |
| C.3.13 | Lectern Fabrication, Delivery and Installation | 8/31/26 | $ - 0 |
| C.3.25 | Diagrams | NLT 9/10/2026 | |
| C.3.26 | One (1) year warranty | 9/10/2026-9/9/2027 | $ - 0 |
| Base Period Sub-Total: | $ - 0 | ||
| C.3.3.B | Option: Projector Screen Frame | NLT 8/31/2026 | $ - 0 |
| C.3.5.B | Option: Curtain Motor | NLT 8/31/2026 | $ - 0 |
| C.3.13 | Option: Digital Video Projector | NLT 8/31/2026 | $ - 0 |
| C.3.13 | Option: DCI Compliant Projector | NLT 8/31/2026 | $ - 0 |
| C.3.25 | Option Audio Processing Unit | NLT 8/31/2026 | $ - 0 |
| Options Sub-Total: | $ - 0 | ||
| Contract Total: | $ - 0 |
2. Price Detail
| Requirement | Deliverable | Labor/Material/Item | Units | Unit Amount/Rate | Total | Deliverable Total |
| C.3.1.B | System Design | $ - 0 |
C.3.2 Infrastructure Removal Services $ - 0
C.3.3.A Projector Screen evaluation $ - 0
C.3.5.A Curtain Motor Evaluation $ - 0
C.3.3 - C.3.12, C.3.14 - C.3.24 Hardware Delivery & Installation, Commissioning $ - 0
C.3.13 Lectern Design $ - 0
C.3.13 Lectern Fabrication, Delivery and Installation $ - 0
C.3.25 Diagrams $ - 0
| C.3.13 | One (1) year warranty | $ - 0 |
| Base Period Sub-Total: | $ - 0 | |
| C.3.3.B | Option: Projector Screen Frame | $ - 0 |
C.3.5.B Option: Curtain Motor $ - 0
C.3.27.1 Option: Digital Video Projector $ - 0
C.3.27.2 Option: DCI Compliant Projector $ - 0
C.3.27.3 Option: Audio Processing Unit $ - 0
| Options Sub-Total: | $ - 0 |
| Total: | $ - 0 |