Attachment J-1502000-09 Fire Suppression System Inventory.xlsx
XLSX spreadsheet 95 KB Posted
- Solicitation number
- N4008522R2684
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG 1
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 1 | ||
| Floor | Area | Device Type |
| 4 | 4-006, Closet, RM C414 | APSW |
| 4 | 4-015, HVAC, RM, C427 | APSW |
| 4 | 4-006, Closet, Rm C414 | WF |
| 4 | 4-015, HVAC, Rm C427 | WF |
| 4 | 4037, 4TH FLOOR, STAIR 1 | WF |
| 3 | 3-025, 3RD FLOOR, STAIR 1 | WF |
| 2 | 2-025, 2ND FLOOR, STAIR 1 | WF |
| 1 | 1-044, 1ST FLOOR, STAIR 1 | WF |
| 4 | 4-025, 4TH FLOOR, STAIR 2 | WF |
| 3 | 3-016, 3RD FLOOR, STAIR 2 | WF |
| 2 | 2-016, 2ND FLOOR, STAIR 2 | WF |
| 1 | 1ST FLOOR, STAIR 2 | WF |
| 6 | 6TH FLOOR, STAIR 3 | WF |
| 6 | 6TH FLOOR, STAIR 4 | WF |
| 4 | 4-010, 4TH FLOOR, STAIR 6 | WF |
| 3 | 3-008, 3RD FLOOR, STAIR 6 | WF |
| 2 | 2-009, 2ND FLOOR, STAIR 6 | WF |
| 1 | 1-020, 1ST FLOOR, STAIR 6 | WF |
| 1 | 1-008, 1ST FL, RM 115 | WF |
| OUTSIDE PUMP RM | PIV | |
| PUMP RM #1 | OS&Y | |
| PUMP RM #2 | OS&Y | |
| PUMP RM #3 | OS&Y | |
| PUMP RM | OS&Y | |
| PUMP RM | OS&Y | |
| PUMP RM | BUTTERFLY | |
| STAIR 1-4TH FL | BUTTERFLY | |
| STAIR 1-3RD FL | BUTTERFLY | |
| STAIR 1-2ND FL | BUTTERFLY | |
| STAIR 1-1ST FL | BUTTERFLY | |
| STAIR 1-1ST FL | BUTTERFLY | |
| STAIR 2-4TH FL | BUTTERFLY | |
| STAIR 2-3RD FL | BUTTERFLY | |
| STAIR 2-2ND FL | BUTTERFLY | |
| STAIR 2-1ST FL | BUTTERFLY | |
| STAIR 2-1ST FL | BUTTERFLY | |
| STAIR 3-6TH FL | BUTTERFLY | |
| STAIR 3-5TH FL | BUTTERFLY | |
| STAIR 3-1ST FL | BUTTERFLY | |
| STAIR 4- 6TH FL | BUTTERFLY | |
| STAIR 4- 5TH FL | BUTTERFLY | |
| STAIR 4-1ST FL | BUTTERFLY | |
| STAIR 6-4TH FL | BUTTERFLY | |
| STAIR 6-3RD FL | BUTTERFLY | |
| STAIR 6-2ND FL | BUTTERFLY | |
| STAIR 6-1ST FL | BUTTERFLY | |
| 4TH FL MH RM 427 | BUTTERFLY | |
| 4TH FL HVAC 414 | BUTTERFLY | |
| 1STFL-OUTELEVRM | BUTTERFLY | |
| Fire Pump Room | Wet System | |
| East Attic | Dry System | |
| West Attic | Dry System | |
| 4th Fl HVAC Rm C414 | Air Compressor | |
| 4th Fl Mech Rm C427 | Air Compressor | |
| Stair 1 4th Floor | Wet Gauge | |
| Stair 1 4th Floor | Wet Gauge | |
| Stair 1 3rd Floor | Wet Gauge | |
| Stair 1 2nd Floor | Wet Gauge | |
| Stair 1 1st Floor | Wet Gauge | |
| Stair 2 4th Floor | Wet Gauge | |
| Stair 2 4th Floor | Wet Gauge | |
| Stair 2 3rd Floor | Wet Gauge | |
| Stair 2 2nd Floor | Wet Gauge | |
| Stair 2 1st Floor | Wet Gauge | |
| Stair 3 5th Floor | Wet Gauge | |
| Stair 4 5th Floor | Wet Gauge | |
| Stair 6 4th Floor | Wet Gauge | |
| Stair 6 4th Floor | Wet Gauge | |
| Stair 6 3rd Floor | Wet Gauge | |
| Stair 6 2nd Floor | Wet Gauge | |
| Stair 6 1st Floor | Wet Gauge | |
| Jockey Pump | Wet Gauge | |
| Control - FP | Wet Gauge | |
| FDHC/Test Header Valve | Wet Gauge | |
| Main Drain | Wet Gauge | |
| 4th Fl HVAC Rm C414 | Dry Gauge | |
| 4th Fl Mech Rm C427 | Dry Gauge | |
| Outside Pump Rm | Hose Connection | |
| Stair 1 4th Floor | Hose Connection | |
| Stair 1 3rd Floor | Hose Connection | |
| Stair 1 2nd Floor | Hose Connection | |
| Stair 1 1st Floor | Hose Connection | |
| Stair 2 4th Floor | Hose Connection | |
| Stair 2 3rd Floor | Hose Connection | |
| Stair 2 2nd Floor | Hose Connection | |
| Stair 2 1st Floor | Hose Connection | |
| Stair 3 5th Floor | Hose Connection | |
| Stair 3 4th Floor | Hose Connection | |
| Stair 3 3rd Floor | Hose Connection | |
| Stair 3 2nd Floor | Hose Connection | |
| Stair 3 1st Floor | Hose Connection | |
| Stair 4 5th Floor | Hose Connection | |
| Stair 4 4th Floor | Hose Connection | |
| Stair 4 3rd Floor | Hose Connection | |
| Stair 4 2nd Floor | Hose Connection | |
| Stair 4 1st Floor | Hose Connection | |
| Stair 6 4th Floor | Hose Connection | |
| Stair 6 3rd Floor | Hose Connection | |
| Stair 6 2nd Floor | Hose Connection | |
| Stair 6 1st Floor | Hose Connection | |
| 1-045 STAIR 1 | STS | |
| 1-043 STAIR 1 | STS | |
| 1-030 STAIR 2 | STS | |
| 1-032 STAIR 2 | STS | |
| 1-047 STAIR 3 | STS | |
| 1-048 STAIR 4 | STS | |
| 1-021 STAIR 6 | STS | |
| 1-009 1ST FL ELEV RM | STS | |
| 1-049 FIRE PUMP RM | STS | |
| 1-050 FIRE PUMP RM | STS | |
| 1-054 FIRE PUMP RM | STS | |
| 1-006 FIRE PUMP RM | STS | |
| 1-007 FIRE PUMP RM | STS | |
| 1-056 OUTSIDE FIRE PUMP RM | STS | |
| 2-026 STAIR 1 | STS | |
| 2-017 STAIR 2 | STS | |
| 2-010 STAIR 6 | STS | |
| 3-026 STAIR 1 | STS | |
| 3-017 STAIR 2 | STS | |
| 3-009 STAIR 6 | STS | |
| 4-038 STAIR 1 | STS | |
| 4-026 STAIR 2 | STS | |
| 4-008 DRY SYS-C414 | STS | |
| 4-011 STAIR 6 | STS | |
| 4-017 DRY SYS-C427 | STS | |
| 4-056 STAIR 3 | STS | |
| 4-055 STAIR 4 | STS | |
| 4-040 STAIR 3 | STS | |
| 4-046 STAIR 4 | STS | |
| 1 | 1-020 Stair 6 | VWF |
| 1 | 1-031 Stair 2 | VWF |
| 1 | 1-044 Stair 1 | VWF |
| 2 | 2-009 Stair 6 | VWF |
| 2 | 2-016 Stair 2 | VWF |
| 2 | 2-025 Stair 1 | VWF |
| 3 | 3-008 Stair 6 | VWF |
| 3 | 3-016 Stair 2 | VWF |
| 3 | 3-025 Stair 1 | VWF |
| 4 | 4-010 Stair 6 | VWF |
| 4 | 4-025 Stair 2 | VWF |
| 4 | 4-037 Stair 1 | VWF |
| 6 | 4-039 Stair 3 | VWF |
| 6 | 4-045 Stair 4 | VWF |
| Fire Pump C113 | ||
| # of sprinkler heads necessary for coverage of 139,500 sq. ft | ||
| BUILDING 1 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 30 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 21 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 4 | DRY GAUGES | WEEKLY, MONTHLY AND REPLACED EVERY 5 YEARS DUE (2025) |
| 2 | AIR COMPRESSOR | WEEKLY,MONTHLY, QUARTERLY |
| 1 | FDC | QUARTERLY |
| 22 | FDHC | QUARTERLY |
| 23 | CHECK VALVES | 5YEAR INSPECTION (DUE 2026) |
| 29 | TAMPER SWITCH | QUARTERLY |
| 14 | VANE TYPE FLOW | QUARTERLY |
| 4 | PRESSURE SWITCH | QUARTERLY PRESSURE SWITCH FLOW, QUARTERLY LOW AIR |
| 3 | VANE TYPE FLOW | ELEVATOR SHUNTS QUARTERLY |
| 3 | MAIN DRAIN | ANNUAL |
| 1 | FIRE PUMP | WEEKLY, ANNUAL |
| 2 | DRY PIPE VALVES | TRIPPED ANNUALLY, FULL FLOW TEST EVERY 3 YEARS DUE JULY 2022 |
| 1 | STANDPIPE | FLOW TEST EVERY 5 YEARS DUE 2022 |
BLDG 2
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 2 | ||
| Floor | Area | Device Type |
| PACS Admin CP Room 13110201 - 1st Floor | Ansul Sapphire | |
| Main Galley | R-102 Ansul Suppression System | |
| Galley Loading Dock JC-A 110301 1-A-2 | Air Compressor | |
| 1B Mech RM MER #12 1-B1-8 | Air Compressor | |
| ER JANITOR CLOSET JC-D 142431 BY 1-D-12 (TELECOM) | Air Compressor | |
| ER JANITOR CLOSET JC-D 141511 1-D-14 | Air Compressor | |
| 4:M2-65 OUT ER | PIV | |
| 4:M2-63 PUMP RM | OS&Y | |
| 4:M2-63 PUMP RM | OS&Y | |
| 4:M1-114 | OS&Y | |
| 4:M1-110 | OS&Y | |
| 5:M1-41 | OS&Y | |
| 4:M1-67 | OS&Y | |
| 5:M1-83 | OS&Y | |
| 4:M1-35 Angio Ent | BUTFLY | |
| 4:M1-48 MRI Ent | BUTFLY | |
| 2:M1-36 | OS&Y | |
| 2:M1-04 | OS&Y | |
| 2:M1-04 | OS&Y | |
| 2:M1-10 | OS&Y | |
| 2:M1-124 | OS&Y | |
| 2:M1-124 | OS&Y | |
| 2:M1-08 | OS&Y | |
| 2:M1-08 | OS&Y | |
| 2:M1-08 | OS&Y | |
| 2:M1-02 | OS&Y | |
| 2:M1-126 | OS&Y | |
| 2:M1-125 | OS&Y | |
| 2:M1-03 | OS&Y | |
| 2:M1-127 | OS&Y | |
| 2:M1-01 | OS&Y | |
| 3:M2-105 | OS&Y | |
| 3:M2-106 | OS&Y | |
| 3:M2-110 | OS&Y | |
| 3:M3-89 | OS&Y | |
| 3:M3-92 | OS&Y | |
| 3:M3-96 | OS&Y | |
| 3:M3-99 | OS&Y | |
| 3:M1-14 | OS&Y | |
| 6:M1-51 | OS&Y | |
| Y-O9/ST 3 4:M2-25 | OS&Y | |
| Z-07 4:M2-32 | OS&Y | |
| Z-04 4:M2-37 | OS&Y | |
| AC-06 4:M2-54 | OS&Y | |
| AB-10 5:M2-31 | OS&Y | |
| AB-11 5:M2-34 | OS&Y | |
| W-13 5:M2-05 | OS&Y | |
| W-13 5:M2-07 | OS&Y | |
| R-12 5:M2-55 | OS&Y | |
| R-12 5:M2-57 | OS&Y | |
| R-10 | OS&Y | |
| Q-10 5:M2-44 | OS&Y | |
| Q-14 5:M2-61 | OS&Y | |
| N-12 1:M2-44 | OS&Y | |
| L-14 1:M2-27 | OS&Y | |
| J-14 1:M2-19 | OS&Y | |
| H-14 1:M2-84 | OS&Y | |
| H-11 1:M2-03 | OS&Y | |
| G-14 1:M2-81 | OS&Y | |
| G-14 1:M1-80 | OS&Y | |
| E-12 1:M2-65 | OS&Y | |
| C-09 2:M2-15 | OS&Y | |
| C-08 2:M2-09 | OS&Y | |
| D-07 2:M2-20 | OS&Y | |
| E-07 2:M2-18 | OS&Y | |
| F-08 2_M2-29 | OS&Y | |
| J-06/07 3:M2-38 | OS&Y | |
| K-07 3:M2-12 | OS&Y | |
| M-06 3:M2-27 | OS&Y | |
| N-07 3:M2-43 | OS&Y | |
| O-05 3:M2-48 | OS&Y | |
| Q-03 3:M2-61 | OS&Y | |
| S-07 3:M2-84 | OS&Y | |
| W-05 4:M2-01 | OS&Y | |
| W-09 5:M2-36 | OS&Y | |
| ST 6 OUTSD 4:M2-56 | OS&Y | |
| 9:M2-94 | OS&Y | |
| 9:M1-48 | OS&Y | |
| 10:M1-36 | OS&Y | |
| 10:M1-38 | OS&Y | |
| 8:M2-123 2C | OS&Y | |
| 8:M1-20 | OS&Y | |
| 11:M1-3 | OS&Y | |
| NO ID# | OS&Y | |
| 7:M2-33 | OS&Y | |
| Q-14 10:M2-87 | OS&Y | |
| Y-15 10:M2-117 | OS&Y | |
| Y-15 10:M2-43 | OS&Y | |
| W-13 10:M2-44 | OS&Y | |
| Y-12 10:M2-22 | OS&Y | |
| Y-11 10:M2-21 | OS&Y | |
| AC-9 10:M2-01 | OS&Y | |
| 15:M1-83 | OS&Y | |
| 15:M1-14 | OS&Y | |
| 14:M2-69 | OS&Y | |
| 14:M2-36 | OS&Y | |
| 12:M2-68 | OS&Y | |
| 12:M2-48 | OS&Y | |
| 12:M1-37 | OS&Y | |
| 13:M1-55 | OS&Y | |
| 16:M1-11 | OS&Y | |
| 13:M1-01 | OS&Y | |
| P4- 13:M2-53 | OS&Y | |
| R 12- 12:M2-92 | OS&Y | |
| 17:M1-81 | OS&Y | |
| 20:M1-01 | OS&Y | |
| 18:M1-62 | OS&Y | |
| 17:M1-26 | OS&Y | |
| 19:M2-117 | OS&Y | |
| 19:M1-02 | OS&Y | |
| 19:M1-74 | OS&Y | |
| 21:M1-03 | OS&Y | |
| 22:M1-51 | OS&Y | |
| 22:M1-76 | OS&Y | |
| 21:M1-82 | OS&Y | |
| 21:M1-61 | OS&Y | |
| 19:M1-91 | OS&Y | |
| 22:M1-49 | OS&Y | |
| 22:M1-25 | OS&Y | |
| 20:M1-51 | OS&Y | |
| 20:M1-48 | OS&Y | |
| 23:M1-33 | OS&Y | |
| 23:M1-40 | OS&Y | |
| 22:M1-85 | OS&Y | |
| 22:M1-85 | OS&Y | |
| 22:M1-105 | OS&Y | |
| 22:M1-108 | OS&Y | |
| 22:M1-53 | OS&Y | |
| 23:M1-54 | OS&Y | |
| 23:M1-59 | OS&Y | |
| 22:M2-80 | OS&Y | |
| 22:M2-80 | OS&Y | |
| 22:M2-90 | OS&Y | |
| RM 110104 | Fire Pump | |
| STAIR 1 | Hose Connection | |
| DR# 11040502 GALLEY BY DRY SYS | Hose Connection | |
| DR# 110607A1-KITCHEN | Hose Connection | |
| DR# 111006A1 GALLEY CORR | Hose Connection | |
| DR# 11202A2 REGISTERS | Hose Connection | |
| DR# 120800 - CORR TO ONC. | Hose Connection | |
| DR# 120912 ONCOLOGY | Hose Connection | |
| STAIR # 4 | Hose Connection | |
| STAIR # 2 | Hose Connection | |
| DR# 134218 RAD - BACK CORRIDOR | Hose Connection | |
| DR# 12110001 MAIN HALL BY NUC MED | Hose Connection | |
| DR# 1340001 RAD - MID CORRIDOR | Hose Connection | |
| DR# 13080101 RAD - FRONT CORRIDOR | Hose Connection | |
| DR# 140601 ER HALL / MRI | Hose Connection | |
| DR# 14010001 MAIN HALL | Hose Connection | |
| DR# 131104 SIDE HALL RAD | Hose Connection | |
| STAIR 6 | Hose Connection | |
| DR# 141301 ER | Hose Connection | |
| DR# 141802 ER HALL XRAY | Hose Connection | |
| DR# 141702 EXAM D | Hose Connection | |
| STAIR 3 | Hose Connection | |
| DR# 152000 HALL BY ER | Hose Connection | |
| DR# 150611 P.T. HALL BACK | Hose Connection | |
| DR# 150514 ORTHO LAB | Hose Connection | |
| DR#160801 ORTHO CAST ROOM (PED) | Hose Connection | |
| DR# 161103 ORTHO HALL BY RM 4 | Hose Connection | |
| DR# 161800 ADMISSIONS | Hose Connection | |
| DR# 160102 AREA DISPATCH | Hose Connection | |
| DR# 171270 LAB BACK HALL | Hose Connection | |
| DR# 17033102 LAB HALL (SIDE) | Hose Connection | |
| STAIR 7 | Hose Connection | |
| DR# 171100 LAB - FRONT DESK | Hose Connection | |
| DR# 18023002 MORGUE | Hose Connection | |
| STAIR 5 - ACCESS FM 4TH FLOOR | Hose Connection | |
| STAIR 8 - ACCESS FM 2ND FLOOR | Hose Connection | |
| LAB 170100 | Hose Connection | |
| Front Entrance | Hose Connection | |
| OUTSIDE FIRE PUMP RM | Hose Connection | |
| OUTSIDE STAIR 7 | Hose Connection | |
| OUTSIDE ER | Hose Connection | |
| OUTSIDE STAIR 8 | Hose Connection | |
| OUTSIDE STAIR 6 | Hose Connection | |
| OUTSIDE STAIR 4 | Hose Connection | |
| G14 | Hose Connection | |
| H11 | Hose Connection | |
| B8 | Hose Connection | |
| H6 | Hose Connection | |
| O5 | Hose Connection | |
| Z7 | Hose Connection | |
| Z4 | Hose Connection | |
| R12 | Hose Connection | |
| Q10 | Hose Connection | |
| Q14 | Hose Connection | |
| N12 | Hose Connection | |
| K9 | Hose Connection | |
| S8 | Hose Connection | |
| V5 | Hose Connection | |
| STAIR 1 | Hose Connection | |
| STAIR 2 | Hose Connection | |
| STAIR 3 | Hose Connection | |
| STAIR 4 | Hose Connection | |
| STAIR 6 | Hose Connection | |
| DR# 210810 GASTRO HALL BY RM 45 | Hose Connection | |
| STAIR 1 | Hose Connection | |
| DR# 22030102 NEPH HALL BY CHECK IN | Hose Connection | |
| DR# 220322 HALL NEPH BY RM 16 | Hose Connection | |
| DR# 221200 HALL TO B.1 | Hose Connection | |
| DR# 221721 UROL. HALL BY RM 73 | Hose Connection | |
| STAIR 4 | Hose Connection | |
| DR# 222316 PULM. HALL BY RM 41 | Hose Connection | |
| STAIR 2 | Hose Connection | |
| DR# 23032102 MED REC BY CHECK IN | Hose Connection | |
| DR# 23030002 BACK CORR MED REC | Hose Connection | |
| DR# 23022101 CLIN ADMIN MECH RM | Hose Connection | |
| DR# 23130002 BACK CORR OF NEURO | Hose Connection | |
| DR# 240402 GEN SURG BY 122 | Hose Connection | |
| DR# 231101A BY RM 42 NEURO | Hose Connection | |
| STAIR 6 | Hose Connection | |
| STAIR 3 | Hose Connection | |
| DR# 241211 DENTAL BY RM 17 | Hose Connection | |
| DR# 241940 DENTAL BY RM 76 | Hose Connection | |
| DR# 250815 Rehab Physical therapy | Hose Connection | |
| DR# 250521 ENT BY RM 60 | Hose Connection | |
| DR# 252000 BACK CORR BY ST 8 | Hose Connection | |
| STAIR 8 | Hose Connection | |
| DR# 261120 OPTHA BY 4M 49 | Hose Connection | |
| DR# 260724 RHEUMA BY RM 21 | Hose Connection | |
| DR# 260600 - ACROSS FM GIFT SHOP | Hose Connection | |
| DR# 261223 CARDIO BY RM 76 | Hose Connection | |
| DR# 260802 CARDIO BY CHECK IN | Hose Connection | |
| DR# 262200 BY Q-DECK | Hose Connection | |
| DR# 271520 PHARMACY COUNSELING | Hose Connection | |
| DR# 27110001 New pharmacy beside INT | Hose Connection | |
| DR# 27090002 INT MED BACK CORR BY 32 | Hose Connection | |
| DR# 27060001 INT MED CORR BY RM 172 | Hose Connection | |
| STAIR 7 | Hose Connection | |
| DR# 280602 PED BY RM 24 | Hose Connection | |
| G14 | Hose Connection | |
| Q3 | Hose Connection | |
| Q10 | Hose Connection | |
| Q14 | Hose Connection | |
| W13 | Hose Connection | |
| Y15 | Hose Connection | |
| Y11 | Hose Connection | |
| Z7 | Hose Connection | |
| Z4 | Hose Connection | |
| V5 | Hose Connection | |
| S8 | Hose Connection | |
| O5 | Hose Connection | |
| J5 | Hose Connection | |
| J13 | Hose Connection | |
| K9 | Hose Connection | |
| F6 | Hose Connection | |
| STAIR 1 | Hose Connection | |
| STAIR 2 | Hose Connection | |
| STAIR 3 | Hose Connection | |
| STAIR 4 | Hose Connection | |
| STAIR 6 | Hose Connection | |
| STAIR 7 | Hose Connection | |
| STAIR 8 | Hose Connection | |
| STAIR 1 | Hose Connection | |
| DR# 320500 OR BACK HALL BY OR 1/2 | Hose Connection | |
| DR# 32060001 MAIN HALL BY SURG WAIT | Hose Connection | |
| DR# 32100001 OR CORR BY ON CALL RM | Hose Connection | |
| DR# 321400 OR CORR BY RM 26 | Hose Connection | |
| STAIR 2 | Hose Connection | |
| DR# 32202204 PRE OP | Hose Connection | |
| DR# 32200402 OR BACK HALL BY PRE OP | Hose Connection | |
| DR# 330700 HALL BY PACU | Hose Connection | |
| DR# 332433 OR BACK HALL / CCU | Hose Connection | |
| STAIR 6 | Hose Connection | |
| DR# 340800 ICU RECOVERY | Hose Connection | |
| DR# 340710 STEP DOWN BY RM 27 | Hose Connection | |
| ENTRANCE TO PICU #350700 | Hose Connection | |
| DR# 350633 CATH HALL BY 68 | Hose Connection | |
| STAIR 8 | Hose Connection | |
| STAIR 3 | Hose Connection | |
| CSSD | Hose Connection | |
| DR# 36060201 CSSR/DE | Hose Connection | |
| MECH RM 36060103 | Hose Connection | |
| DR# 36030103 BY BRIDGE HALL | Hose Connection | |
| MECH RM 36030103 BY BRIDGE | Hose Connection | |
| DR# 36012002 STERILIZATION HALL | Hose Connection | |
| DR# 370210 APU HALL BY RM 2 | Hose Connection | |
| DR# 371110 INFUSION NURSE ST BY 10 | Hose Connection | |
| STAIR 7 | Hose Connection | |
| DR# 370515 APU NURSE STATION BY 26 | Hose Connection | |
| PICU DR# 351620 BY RM 9 | Hose Connection | |
| STAIR 4 (ACCESS FM OTHER FLOOR) | Hose Connection | |
| OR BACK HALL 33261102 | Hose Connection | |
| OR BACK HALL 323400 | Hose Connection | |
| OR BACK HALL 332802 | Hose Connection | |
| CLEAN STERILE DR# 36012002 | Hose Connection | |
| Z7 | Hose Connection | |
| Y11 | Hose Connection | |
| Y15 | Hose Connection | |
| V5 | Hose Connection | |
| S8 | Hose Connection | |
| Q3 | Hose Connection | |
| O5 | Hose Connection | |
| I5 | Hose Connection | |
| I8 | Hose Connection | |
| H11 | Hose Connection | |
| J13 | Hose Connection | |
| N12 | Hose Connection | |
| Q14 | Hose Connection | |
| Q10 | Hose Connection | |
| G14 | Hose Connection | |
| S12 | Hose Connection | |
| STAIR 1 | Hose Connection | |
| STAIR 2 | Hose Connection | |
| STAIR 3 | Hose Connection | |
| STAIR 4 | Hose Connection | |
| STAIR 6 | Hose Connection | |
| STAIR 7 | Hose Connection | |
| STAIR 8 | Hose Connection | |
| STAIR 1 | Hose Connection | |
| MAIN HALL ENT TO 4HJ | Hose Connection | |
| NEAR 4J NURSE STATION | Hose Connection | |
| STAIR 4 | Hose Connection | |
| DR# 420225 4H | Hose Connection | |
| STAIR 2 | Hose Connection | |
| ENTRANCE 4EFG POD | Hose Connection | |
| DR# 431813 4F | Hose Connection | |
| STAIR 5 | Hose Connection | |
| DR# 432204 4E DAY RM | Hose Connection | |
| STAIR 3 | Hose Connection | |
| STAIR 6 | Hose Connection | |
| DR# 44130001 OBGYN BY RM 106 | Hose Connection | |
| DR# 440803 OBGYN BY 4M 7 | Hose Connection | |
| DR# 450200ENTRANCE TO 4AB | Hose Connection | |
| DR# 451021 4B | Hose Connection | |
| STAIR 8 | Hose Connection | |
| DR# 450414 4A | Hose Connection | |
| DR# 460731C1 GLASS HALL BY NICU | Hose Connection | |
| DR# 46080203 NICU BY OR | Hose Connection | |
| DR# 460202 HALL BWTN NICU & L&D | Hose Connection | |
| DR# 470622 4M | Hose Connection | |
| DR# 470321 4L NURSE STATION | Hose Connection | |
| STAIR 7 | Hose Connection | |
| DR# 480114 4K NURSE STATION | Hose Connection | |
| ENTRANCE TO 4KL | Hose Connection | |
| DR# 530301 ENT TO 5 EF&G | Hose Connection | |
| DR# 531403 5G | Hose Connection | |
| STAIR 5 | Hose Connection | |
| DR# 531510 5E | Hose Connection | |
| STAIR 3 | Hose Connection | |
| 5D MECH RM | Hose Connection | |
| STAIR 6 | Hose Connection | |
| 5E MECH RM | Hose Connection | |
| STAIR 8 | Hose Connection | |
| 5G MECH RM | Hose Connection | |
| STAIR 7 | Hose Connection | |
| STAIR 1 | Hose Connection | |
| 6TH FL STAIR 1 | Hose Connection | |
| 5B MECH RM | Hose Connection | |
| STAIR 4 | Hose Connection | |
| STAIR 2 | Hose Connection | |
| 6TH FLOOR STAIR 2 | Hose Connection | |
| NEXT LEVEL UP STAIR 2 | Hose Connection | |
| 7TH FLOOR STAIR 2 | Hose Connection | |
| 6TH FLOOR MECH RM | Hose Connection | |
| 6TH FLOOR MECH RM | Hose Connection | |
| 6TH FLOOR STAIR 3 | Hose Connection | |
| 7TH FLOOR STAIR 3 | Hose Connection | |
| Fire Pump Room 110104 | Wet System MAIN DRAIN | |
| Galley Loading Dock JC-A 110301 1-A-2 | Dry System MAIN DRAIN | |
| 1B Mech Room MER #12 12210101 1-B1-8 | Dry System MAIN DRAIN | |
| ER Janitor Closet JC-D 141511 1-D-12 | Dry System MAIN DRAIN | |
| ER Janitor Closet JC-D 142431 1-D-14 | Dry System MAIN DRAIN | |
| ACF Pump Room 110104 1-A1-13 | Preaction System MAIN DRAIN | |
| 1B Mech Room MER #12 12210101 1-B1-7 | Preaction System MAIN DRAIN | |
| 1C Mech Rm MER #13 13425002 1-C1-10 | Preaction System MAIN DRAIN | |
| ER Janitor Closet JC-D 142431 1-D-13 | Preaction System MAIN DRAIN | |
| Ortho JC-E 150512 1-E-16 | Preaction System MAIN DRAIN | |
| Galley Loading Dock JC-A 110301 1-A-2 | Dry System Gauges | |
| 1B Mech Room MER #12 1-B1-8 | Dry System Gauges | |
| ER Janitor Closet JC-D 142431 1-D-12 | Dry System Gauges | |
| ER Janitor Closet JC-D 141511 1-D-14 | Dry System Gauges | |
| ACF Pump Rm 1-A1-4 | Preaction System Gauges | |
| 1B Mech Rm MER #12 1-B1-7 | Preaction System Gauges | |
| 1C Mech Rm MER #13 1-C1-10 | Preaction System Gauges | |
| ER Janitor Closet JC-D 142431 1-D-13 | Preaction System Gauges | |
| Ortho JC-E 150512 1-E-16 | Preaction System Gauges | |
| 1ST FL C1-9 MECH RM 13 | Wet Gauge | |
| 3RD FL INTERSTITIAL Q3 | Wet Gauge | |
| 3RD FL STAIR 7 | Wet Gauge | |
| 5TH FL STAIR 4 | Wet Gauge | |
| 5TH FL STAIR 5 | Wet Gauge | |
| 5TH FL STAIR 6 | Wet Gauge | |
| 5TH FL MECH RM D | Wet Gauge | |
| 5TH FL MECH RM E | Wet Gauge | |
| 5TH FL MECH RM B | Wet Gauge | |
| 5TH FL MECH RM G | Wet Gauge | |
| 5TH FL POD | Wet Gauge | |
| 5TH FL STAIR 7 | Wet Gauge | |
| 5TH FL STAIR 8 | Wet Gauge | |
| 6TH FL STAIR 1 ELEV RM | Wet Gauge | |
| 6TH FL STAIR 1 ST | Wet Gauge | |
| 7TH FL STAIR 2 | Wet Gauge | |
| 7TH FL STAIR 2 ROOM | Wet Gauge | |
| 6TH FL STAIR 7 | Wet Gauge | |
| 6TH FL STAIR 8 | Wet Gauge | |
| 7TH FL STAIR 3 ELEV RM | Wet Gauge | |
| 7TH FL STAIR 3 ST | Wet Gauge | |
| 6TH FL MECH RM | Wet Gauge | |
| 6TH FL MECH RM | Wet Gauge | |
| 6TH FL STAIR 6 | Wet Gauge | |
| 6TH FL STAIR 4 | Wet Gauge | |
| 1HI, G14, FLOW, INTERSTITIAL, 1HI, 1G01 | Vane-Type Water Flow Switch | |
| 1AI, D7, FLOW, INTERSTITIAL, 1AI, 1A01 | Vane-Type Water Flow Switch | |
| 1AI, C9, FLOW, INTERSTITIAL, 1AI, 1A01 | Vane-Type Water Flow Switch | |
| 1A, FIREPUMPRM, FLOW, RM, 1R, 1A01 | Pressure-Type Water Flow Switch | |
| 1A, LOADDOCJANCLOS, FLOW RM, 1A, 1A01 | Pressure-Type Water Flow Switch | |
| 1B, MECHRM, FLOW, RM, 1S, 1B01 | Vane-Type Water Flow Switch | |
| 1B, RADTHER, STAIR2, FLOW, CORR, 1C2, 1B0 | Vane-Type Water Flow Switch | |
| 1C, MECHRM, FLOW, RM, 1T, 1B01 | Vane-Type Water Flow Switch | |
| 1B, MECHRM, FLOW, RM, 1S, 1B01 | Pressure-Type Water Flow Switch | |
| 1B, MECHRM, PREACTION, RM, 1S, 1B01 | Pressure-Type Water Flow Switch | |
| 1C, MECHRM, FLOW, RM, 1T, 1B01 | Pressure-Type Water Flow Switch | |
| 1D, STAIR 3, FLOW, RM, 1C3, 1D01 | Vane-Type Water Flow Switch | |
| 1D, TELECOMRM, FLOW, RM, 1F, 1D01 | Pressure-Type Water Flow Switch | |
| 1D, TELECOMRM, FLOW, RM, 1F, 1D01 | Pressure-Type Water Flow Switch | |
| 1EI, AB11, FLOW, INTERSTITIAL, 1EI, 1E01 | Vane-Type Water Flow Switch | |
| 1EI, W13, FLOW, INTERSTITIAL, 1EI, 1E01 | Vane-Type Water Flow Switch | |
| 1FI, R12, FLOW, INTERSTITIAL, 1FI, 1E01 | Vane-Type Water Flow Switch | |
| ERJANCLOSET, FLOW, RM, 1Q, 1E01 | Pressure-Type Water Flow Switch | |
| 1E, ORTHO, JANCLOSET, FLOW, RM, 1H, 1E01 | Pressure-Type Water Flow Switch | |
| 1F, MAINENTRYFLKRS, FLOW, RM, 1L, 1F02, LOCKR RM | Vane-Type Water Flow Switch | |
| 2A, GASTROENT, STAIR 1, FLOW, STAIR, 2P | Vane-Type Water Flow Switch | |
| 2B1, PULMONARY, NSTAIR, FLOW, STAIR, 2C, 2B01 | Vane-Type Water Flow Switch | |
| 2C, CLINADMIN, MECHRM, FLOW, RM, 2T, 2B01 | Vane-Type Water Flow Switch | |
| 2D, STAIR 3, FLOW, RM, 2R, 2D01 | Vane-Type Water Flow Switch | |
| 2D1, STAIR 6, FLOW, RM, 2F, 2D01 | Vane-Type Water Flow Switch | |
| 2E1, STAIR 8, FLOW, RM, 2J, 2E01 | Vane-Type Water Flow Switch | |
| 2EI, Y15, FLOW, INTERSTITIAL, 2EI, 2E01 | Vane-Type Water Flow Switch | |
| 2FI, Q14, FLOW, INTERSTITIAL, 2FI, 2E01 | Vane-Type Water Flow Switch | |
| 2G, PEDI, STAIR, FLOW, CORR, 2N, 2G01 | Vane-Type Water Flow Switch | |
| 3F, MECHRM, FLOW, 3M, 3G01 | Vane-Type Water Flow Switch | |
| 3G, MECHRM, FLOW, RM, 3M, 3G01 | Vane-Type Water Flow Switch | |
| 3B, STAIR 2, FLOW, RM, 3F, 3G01 | Vane-Type Water Flow Switch | |
| 3FI, R12, FLOW, INTERSTITIAL, 3FI, 3G01 | Vane-Type Water Flow Switch | |
| 3A, MAINCORR, STAIR 1, FLOW, RM, 3E, 3B11 | Vane-Type Water Flow Switch | |
| 3CI, P4, FLOW, INTERSITIAL, 3CI, 3B11 | Vane-Type Water Flow Switch | |
| 3BI, STAIR 4, FLOW, RM, 3B, 3B11 | Vane-Type Water Flow Switch | |
| 3C1, MECHRM, FLOW, RM, 3T, 3D11 | Vane-Type Water Flow Switch | |
| 3D1, STAIRTOWER, 6, FLOW, RM, 3J, 3D11 | Vane-Type Water Flow Switch | |
| 3D, STAIR, 3, FLOW, RM, 3K, 3E11 | Vane-Type Water Flow Switch | |
| 3D1, STAIRTOWER, 8, FLOW, RM, 3L, 3E11 | Vane-Type Water Flow Switch | |
| 3G1, STAIRTOWER, 7, FLOW, RM, 3N, 3G11 | Vane-Type Water Flow Switch | |
| 4C, NURSING4E/4F/4G, 46, FLOW, CORR, 4D | Vane-Type Water Flow Switch | |
| 4D1, STAIR6, FLOW, RM, 4F, 4D01 | Vane-Type Water Flow Switch | |
| 4F, NICU, LAB, FLOW, RM, 4H, 4G01 | Vane-Type Water Flow Switch | |
| 4B, MAINCORR, STAIR, FLOW, STAIR, 4B, 4B (2) | Vane-Type Water Flow Switch | |
| 4B, NURSING4H/4J, STAIR, FLOW, STAIR, 4A (4) | Vane-Type Water Flow Switch | |
| 4C, NURSING4E/4F/4G, 73, FLOW, CORR, 4C (5) | Vane-Type Water Flow Switch | |
| 5B1, STAIRTOWER, 4, FLOW, RM, 4B01 | Vane-Type Water Flow Switch | |
| 4E1, STAIR, 8, FLOW, RM, 4G, 4E11 | Vane-Type Water Flow Switch | |
| 5E, MECHRM, FLOW, RM, 5F, 4E11 | Vane-Type Water Flow Switch | |
| 5E1, STAIRTOWER8, FLOW, RM, , 4E11 | Vane-Type Water Flow Switch | |
| 4G, NURSIN4K/4L, STAIR, FLOW, STAIR, 4K (7) | Vane-Type Water Flow Switch | |
| 5G, MECHRM, FLOW, RM, 5G, 4G11 | Vane-Type Water Flow Switch | |
| 5G1, STAIRTOWER, 7, FLOW, RM, , 4G11 | Vane-Type Water Flow Switch | |
| 5B, MECHRM, FLOW, RM, 5D, 5B01 | Vane-Type Water Flow Switch | |
| 5C, PSYCHWARD, 98, FLOW, RM, 5A, 5B01 | Vane-Type Water Flow Switch | |
| 5C, PSYCHWARD, 98, FLOW, RM, 5A, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 7TH, STAIR2, FLOW, RM, 5A, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 7TH, ELEVMACHRM, FLOW, CORR, 5A, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 6TH, ELEVMACHRM, FLOW, CORR, 5C, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 6TH, ELEVMACHRM, FLOW, CORR, 5C, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 7TH, ELEVMACHRM, FLOW, CORR, 5A, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 7TH, ELEVMACHRM, FLOW, CORR, 5A, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 6TH, STAIR3, FLOW, CORR, 5A, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 5TH, STAIR1, FLOW, CORR, 5C, 5B01 | Vane-Type Water Flow Switch | |
| ROOF 6TH, STAIR2, FLOW, CORR, 5A, 5B01 | Vane-Type Water Flow Switch | |
| 5D, MECHRM, FLOW, RM, 5E, 5D01 | Vane-Type Water Flow Switch | |
| 5D1, STAIRTOWER6, FLOW, RM, 5D01 | Vane-Type Water Flow Switch | |
| ROOF, 6TH, MECHRM, FLOW, RM, 5B, 5D01 | Vane-Type Water Flow Switch | |
| ST 4, 6TH FLOOR, ELEV FLOW | Vane-Type Water Flow Switch | |
| ST 6, 6TH FLOOR, ELEV FLOW | Vane-Type Water Flow Switch | |
| ST 8, 6TH FLOOR, ELEV FLOW | Vane-Type Water Flow Switch | |
| ST 7, 6TH FLOOR, ELEV FLOW | Vane-Type Water Flow Switch | |
| 1GI,E12,1HI,1G01, 1ST INTERSTITIAL | Tamper/STS | |
| 1GI,G14,1HI,1G01, 1ST INTERSTITIAL | Tamper/STS | |
| 1GI,G14,1HI,1G01, 1ST INTERSTITIAL | Tamper/STS | |
| 1GI,H11,1GI,1G01, 1ST INTERSTITIAL | Tamper/STS | |
| 1GI,J14,1GI,1G01, 1ST INTERSTITIAL | Tamper/STS | |
| 1GI,L14,1GI,1G01, 1ST INTERSTITIAL | Tamper/STS | |
| 1GI,N12,1GI,1G01, 1ST INTERSTITIAL | Tamper/STS | |
| 1HI,H14,1HI,1G01, 1ST INTERSTITIAL | Tamper/STS | |
| 1A,FIREPUMPER,RM,1R,1A01 BACKFLOW | Tamper/STS | |
| 1A,FIREPUMPRM,RM,1R,1A01 BACKFLOW | Tamper/STS | |
| 1A,FIREPUMPRM,RM,1R,1A01 DISCHARGE | Tamper/STS | |
| 1A,FIREPUMPRM,RM,1R,1A01 FLOWLINE | Tamper/STS | |
| 1A,FIREPUMPRM,RM,1R,1A01 JOCKEY | Tamper/STS | |
| 1A,FIREPUMPRM,RM,1R,1A01 PREACTION | Tamper/STS | |
| 1A,FIREPUMPRM,RM,1R,1A01 SUCTION | Tamper/STS | |
| 1A,FIREPUMPRM,RM,1R,1A01 SUCTION | Tamper/STS | |
| 1A,FIREPUMPRM,RM,1R,1A01 TEST HEADER | Tamper/STS | |
| 1A,LOADDOCKJANCLOSET,RM,1A | Tamper/STS | |
| 1A,OUTDOOR,PIV,OXYGEN PAD,1R,1A01 | Tamper/STS | |
| 1A,C8,1AI,1A01, 1ST INTERSTITIAL | Tamper/STS | |
| 1A,C9,1AI,1A01, 1ST INTERSTITIAL | Tamper/STS | |
| 1A,D7,1AI,1A01, 1ST INTERSTITIAL | Tamper/STS | |
| 1A,E7,1AI,1A01, 1ST INTERSTITIAL | Tamper/STS | |
| 1A,F8,1AI,1A01, 1ST INTERSTITIAL | Tamper/STS | |
| 1B,ELEVTOWER,STAIR,1C4,1B01 | Tamper/STS | |
| 1B,MECHRM,RM,1S,1B01 | Tamper/STS | |
| 1B,MECHRM,RM,1S,1B01 | Tamper/STS | |
| 1B,MECHRM,RM,1S,1B01 | Tamper/STS | |
| 1B,RADTHER,STAIR2,CORR,1C2,1 | Tamper/STS | |
| 1C,MECHRM,RM,IT,1B01 | Tamper/STS | |
| 1C,MECHRM,RM,IT,1B01 | Tamper/STS | |
| 1C,PUMPRM,RM,1T,1B01 | Tamper/STS | |
| 1B1,K7,1BI,1B01, 1ST INTERSTITIAL | Tamper/STS | |
| 1BI,J7,1BI,1B01, 1ST INTERSTITIAL | Tamper/STS | |
| 1BI,L6,1BI,1B01, 1ST INTERSTITIAL | Tamper/STS | |
| 1BI,N7,1BI,1B01, 1ST INTERSTITIAL | Tamper/STS | |
| 1CI,N12,1CI,1B01, 1ST INTERSTITIAL | Tamper/STS | |
| 1CI,O5,1CI,1B01, 1ST INTERSTITIAL | Tamper/STS | |
| 1CI,Q3,1CI,1B01, 1ST INTERSTITIAL | Tamper/STS | |
| 1CI,S7,1CI,1B01, 1ST INTERSTITIAL | Tamper/STS | |
| 1C,RADIOLOGY,CORR,1E,1D01 | Tamper/STS | |
| 1D,RADIOLOGY,CORR,1E,1D01 | Tamper/STS | |
| 1D,STAIR3,ROOM,1C3,1D01 | Tamper/STS | |
| 1D,TELECOMROOM,RM,1F,1D01 | Tamper/STS | |
| 1D,TELECOMROOM,RM,1F,1D01 | Tamper/STS | |
| 1D1,OUTSIDE PIV MECHRM,1U,1D01 | Tamper/STS | |
| 1D1,PUMPRM,RM,1C3,1D01 | Tamper/STS | |
| 1D1,PUMPRM,RM,1C3,1D01 | Tamper/STS | |
| 1DI,STAIRTOWER6,STAIR1C3,1D01 | Tamper/STS | |
| 1DI, AC6, 1DI, 1D01, 1ST INTERSTITIAL | Tamper/STS | |
| 1DI, W5, 1DJ, 1D01, 1ST INTERSTITIAL | Tamper/STS | |
| 1DI, Y9, 1DI, 1D01, 1ST INTERSTITIAL | Tamper/STS | |
| 1DI, Z4, 1D8, 1D01, 1ST INTERSTITIAL | Tamper/STS | |
| 1DI, Z7, 1DI, 1D01, 1ST INTERSTITIAL | Tamper/STS | |
| 1D,PEDJANCLOSET,RM,1Q,1E01 | Tamper/STS | |
| 1E,ORTHO,JANCLOSET,RM,1H,1E01 | Tamper/STS | |
| 1E1, W9, 1E1, 1E01, 1ST INTERSTITIAL | Tamper/STS | |
| 1EI, AB10, 1EI, 1E, 1ST INTERSTITIAL | Tamper/STS | |
| 1EI, AB11, 1EI, 1E, 1ST INTERSTITIAL | Tamper/STS | |
| 1EI, W13, 1EI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1EI, W13, 1EI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, E12, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, G14, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, G14, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, H11, 1FI, 1E0,1ST INTERSTITIAL | Tamper/STS | |
| 1FI, H14, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, J14, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, L14, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, M6, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, Q10, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, Q14, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, R12, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1FI, R12, 1FI, 1E0, 1ST INTERSTITIAL | Tamper/STS | |
| 1F,MAINENTRYFLKRS,RM,1L,1F02 | Tamper/STS | |
| 2A, GASTROENT, STAIR, 2P | Tamper/STS | |
| 2B1,PULMUNARY,NSTAIR,ST,2C | Tamper/STS | |
| 2C,CLINICADMIN,MECHRM,RM,2T | Tamper/STS | |
| 2D,STAIR3,RM,2R,2D01 | Tamper/STS | |
| 2D1,STAIR,6,RM,2F,2D01 | Tamper/STS | |
| 2E1,STAIR8,RM,2J,2E01 | Tamper/STS | |
| 2EI,STAIR8,RM,2J,2E01 | Tamper/STS | |
| 2EI, AC9, 2EI, 2E0, 2ND INTERSTITIAL | Tamper/STS | |
| 2EI, W13, 2EI, 2E0, 2ND INTERSTITIAL | Tamper/STS | |
| 2EI, Y11, 2EI, 2E0, 2ND INTERSTITIAL | Tamper/STS | |
| 2EI, Y12, 2EI, 2E0, 2ND INTERSTITIAL | Tamper/STS | |
| 2EI, Y15, 2EI, 2E0, 2ND INTERSTITIAL | Tamper/STS | |
| 2EI, Y15, 2EI, 2E0, 2ND INTERSTITIAL | Tamper/STS | |
| 2G,PEDI,STAIR,CORR,2N,2G01 | Tamper/STS | |
| 3B,STAIR2,RM,3F,3G01 | Tamper/STS | |
| 3F,MECHRM,3M,3G01 | Tamper/STS | |
| 3FI,R12,3FI,3G01 | Tamper/STS | |
| 3G,MECHROOM,RM,3M,3G01 | Tamper/STS | |
| 3A,MAINCORR,STAIR3,RM,3E,3E | Tamper/STS | |
| 3B1,STAIRTOWER,4,ER,RM,3B,3B11 | Tamper/STS | |
| 3CI,P4,3CI,3B11, 3RD INTERSTITIAL | Tamper/STS | |
| 3C1,MECHRM,RM,3T,3D11 | Tamper/STS | |
| 3D1,STAIRTOWER,6,RM,3J,3D11 | Tamper/STS | |
| 3D,STAIR,3, RM,3K,3E11 | Tamper/STS | |
| 3D1,STAIRTOWER,8,RM,3L,3E11 | Tamper/STS | |
| 3G1,STAIRTOWER7,RM,3N,3G11 | Tamper/STS | |
| 4C,NURSING4E/4F/4G,46,CORR,4 | Tamper/STS | |
| 4D1,STAIR6,RM,4F,4D01 | Tamper/STS | |
| 4F, NICU, LAB | Tamper/STS | |
| 4B,MAINCORR,STAIR,4B | Tamper/STS | |
| 4B,NURSING4H/4J,STAIR,4 | Tamper/STS | |
| 4C,NURSING4E/4F/4G,73,CORR,4 | Tamper/STS | |
| 5B1,STAIRTOWER,4,RM,4B01 | Tamper/STS | |
| 4E1,STAIR8,RM,4G,4E11 | Tamper/STS | |
| 5E,MECHRM,RM,5F,4E11 | Tamper/STS | |
| 5E1,STAIRTOWER8,RM,4E11 | Tamper/STS | |
| 4G,NURSING4K/4L,STAIR | Tamper/STS | |
| 5G,MECHRM,RM,5G,4G11 | Tamper/STS | |
| 5G1,STAIRTOWER,7,RM,4G11 | Tamper/STS | |
| 5B,MECHRM,RM,5D,5B01 | Tamper/STS | |
| 5C,PSYCHWARD,98,RM,5A,5B01 | Tamper/STS | |
| 5C,PSYCHWARD,98,RM,5A,5B01 | Tamper/STS | |
| ROOF5TH,STAIR1,CORR,5C,5B01 | Tamper/STS | |
| ROOF6TH,ELEVMACHRM,CORR,5C | Tamper/STS | |
| ROOF6TH,ELEVMACHRM,CORR,5C | Tamper/STS | |
| ROOF6TH,STAIR2,CORR,5A,5B01 | Tamper/STS | |
| ROOF6TH,STAIR3,CORR,5A,5B01 | Tamper/STS | |
| ROOF7TH,ELEVMACHRM,CORR,5A,5 | Tamper/STS | |
| ROOF7TH,ELEVMACHRM,CORR,5A,5 | Tamper/STS | |
| ROOF7TH,ELEVMACHRM,CORR,5A,5 | Tamper/STS | |
| ROOF7TH,STAIR2,RM,5A,5B01 | Tamper/STS | |
| 5D,MECHRM,RM 5E,5D01 | Tamper/STS | |
| 5D1,STAIRTOWER6,RM 5D01 | Tamper/STS | |
| ROOF6TH,MECHRM,RM 5B,5D01 | Tamper/STS | |
| # of sprinkler heads necessary for coverage of 1,016,000 sq.ft. | ||
| BUILDING 2 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 126 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 25 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 25 | DRY GAUGES | WEEKLY, MONTHLY AND REPLACED EVERY 5 YEARS DUE (2025) |
| 4 | AIR COMPRESSOR | WEEKLY,MONTHLY, QUARTERLY |
| 7 | FDC | QUARTERLY |
| 218 | FDHC | QUARTERLY |
| 7 | CHECK VALVES | 5YEAR INSPECTION (DUE 2026) |
| 121 | TAMPER SWITCH | QUARTERLY |
| 57 | VANE TYPE FLOW | QUARTERLY |
| 18 | PRESSURE SWITCH | QUARTERLY PRESSURE SWITCH FLOW, QUARTERLY LOW AIR |
| 8 | VANE TYPE FLOW | ELEVATOR SHUNTS QUARTERLY |
| 10 | MAIN DRAIN | ANNUAL |
| 1 | FIRE PUMP | WEEKLY, ANNUAL |
| 4 | DRY PIPE VALVES | TRIPPED ANNUALY, FULL FLOW TEST EVERY 3 YEARS DUE JULY 2022 |
| 5 | PREACTION VALVE | TRIPPED ANNUALY, FULL FLOW TEST EVERY 3 YEARS DUE JULY 2022 |
| 1 | STANDPIPE | FLOW TEST EVERY 5 YEARS DUE 2022 |
BLDG 3
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 3 | ||
| Floor | Area | Device Type |
| 2 | R-102 Ansul Suppression System | |
| STAIR 2 17TH FL | BUTTERFLY | |
| STAIR 2 17TH FL | BUTTERFLY | |
| STAIR 2 16TH FL | BUTTERFLY | |
| STAIR 2 15TH FL | BUTTERFLY | |
| STAIR 2 14TH FL | BUTTERFLY | |
| STAIR 2 13TH FL | BUTTERFLY | |
| STAIR 2 12TH FL | BUTTERFLY | |
| STAIR 2 11TH FL | BUTTERFLY | |
| STAIR 2 10TH FL | BUTTERFLY | |
| STAIR 2 9TH FL | BUTTERFLY | |
| STAIR 2 8TH FL | BUTTERFLY | |
| STAIR 2 7TH FL | BUTTERFLY | |
| STAIR 2 6TH FL | BUTTERFLY | |
| STAIR 2 5TH FL | BUTTERFLY | |
| STAIR 2 4TH FL | BUTTERFLY | |
| STAIR 2 3RD FL | BUTTERFLY | |
| STAIR 2 2ND FL | BUTTERFLY | |
| STAIR 2 1ST FL | BUTTERFLY | |
| STAIR 5 11TH FL | BUTTERFLY | |
| STAIR 5 10TH FL | BUTTERFLY | |
| STAIR 5 9TH FL | BUTTERFLY | |
| STAIR 5 8TH FL | BUTTERFLY | |
| STAIR 5 7TH FL | BUTTERFLY | |
| STAIR 5 6TH FL | BUTTERFLY | |
| STAIR 5 5TH FL | BUTTERFLY | |
| STAIR 5 4TH FL | BUTTERFLY | |
| STAIR 5 3RD FL | BUTTERFLY | |
| STAIR 5 2ND FL | BUTTERFLY | |
| STAIR 5 1ST FL | BUTTERFLY | |
| STAIR 1 2ND FL | BUTTERFLY | |
| STAIR 1 1ST FL | BUTTERFLY | |
| STAIR 3 2ND FL | BUTTERFLY | |
| STAIR 3 1ST FL | BUTTERFLY | |
| STAIR 6 2ND FL | BUTTERFLY | |
| STAIR 6 1ST FL | BUTTERFLY | |
| STAIR 4 2ND FL | BUTTERFLY | |
| STAIR 4 1ST FL | BUTTERFLY | |
| BASEMENT | BUTTERFLY | |
| BASEMENT | BUTTERFLY | |
| BASEMENT | BUTTERFLY | |
| PUMP RM | OS&Y | |
| PUMP RM | OS&Y | |
| PUMP RM | OS&Y | |
| PUMP RM | OS&Y | |
| PUMP RM | OS&Y | |
| PUMP RM | BUTTERFLY | |
| SUB BASEMENT | OS&Y | |
| SUB BASEMENT | OS&Y | |
| SUB BASEMENT | BUTTERFLY | |
| SUB BASEMENT | BUTTERFLY | |
| SUB BASEMENT | BUTTERFLY | |
| 1st FL CEILING- ENT BY HOUSEKEEPING | BUTTERFLY | |
| 1st FL CEILING- ENT BY HOUSEKEEPING | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 3 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 3 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 3 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 2 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 2 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 2 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 5 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 5 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 5 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 6 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 6 | BUTTERFLY | |
| 1ST FL CEILING - BY STAIR 6 | BUTTERFLY | |
| 1ST FL BLOOD BANK, MOBILE STORAGE, RM 1.1-121 | BUTTERFLY | |
| 1ST FL BLOOD BANK, MOBILE STORAGE, RM 1.1-121 | BUTTERFLY | |
| 1ST FL BLOOD BANK, MOBILE STORAGE, RM 1.1-121 | BUTTERFLY | |
| 1ST FL PSYCH, BACK HALL, RM 16, 1.3-112 | BUTTERFLY | |
| 1ST FL PSYCH, BACK HALL, RM 16, 1.3-112 | BUTTERFLY | |
| 1ST FL PSYCH, BACK HALL, RM 16, 1.3-112 | BUTTERFLY | |
| BASEMENT | FIRE PUMP | |
| 11TH FLOOR STAIR 1 | HOSE CONNECTION | |
| 10TH FLOOR STAIR 1 | HOSE CONNECTION | |
| 9TH FLOOR STAIR 1 | HOSE CONNECTION | |
| 8TH FLOOR STAIR 1 | HOSE CONNECTION | |
| 7TH FLOOR STAIR 1 | HOSE CONNECTION | |
| 6TH FLOOR STAIR 1 | HOSE CONNECTION | |
| 5TH FLOOR STAIR 1 | HOSE CONNECTION | |
| 4TH FLOOR STAIR 1 | HOSE CONNECTION | |
| 3RD FLOOR STAIR 1 | HOSE CONNECTION | |
| 2ND FLOOR STAIR 1 | HOSE CONNECTION | |
| 1ST FLOOR STAIR 1 | HOSE CONNECTION | |
| 17TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 16TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 15TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 14TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 13TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 12TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 11TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 10TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 9TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 8TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 7TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 6TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 5TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 4TH FLOOR STAIR 2 | HOSE CONNECTION | |
| 3RD FLOOR STAIR 2 | HOSE CONNECTION | |
| 2ND FLOOR STAIR 2 | HOSE CONNECTION | |
| 1ST FLOOR STAIR 2 | HOSE CONNECTION | |
| 11TH FLOOR STAIR 3 | HOSE CONNECTION | |
| 10TH FLOOR STAIR 3 | HOSE CONNECTION | |
| 9TH FLOOR STAIR 3 | HOSE CONNECTION | |
| 8TH FLOOR STAIR 3 | HOSE CONNECTION | |
| 7TH FLOOR STAIR 3 | HOSE CONNECTION | |
| 6TH FLOOR STAIR 3 | HOSE CONNECTION | |
| 5TH FLOOR STAIR 3 | HOSE CONNECTION | |
| 4TH FLOOR STAIR 3 | HOSE CONNECTION | |
| 3RD FLOOR STAIR 3 | HOSE CONNECTION | |
| 2ND FLOOR STAIR 3 | HOSE CONNECTION | |
| 1ST FLOOR STAIR 3 | HOSE CONNECTION | |
| 2ND FLOOR STAIR 4 | HOSE CONNECTION | |
| 1ST FLOOR STAIR 4 | HOSE CONNECTION | |
| 15TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 14TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 13TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 12TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 11TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 10TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 9TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 8TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 7TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 6TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 5TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 4TH FLOOR STAIR 5 | HOSE CONNECTION | |
| 3RD FLOOR STAIR 5 | HOSE CONNECTION | |
| 2ND FLOOR STAIR 5 | HOSE CONNECTION | |
| 1ST FLOOR STAIR 5 | HOSE CONNECTION | |
| 2ND FLOOR STAIR 6 | HOSE CONNECTION | |
| 1ST FLOOR STAIR 6 | HOSE CONNECTION | |
| POLICE ENT NE CORNER | HOSE CONNECTION | |
| CONTRACTOR PARKING SE CORNER | HOSE CONNECTION | |
| RIGHT SIDE LOADING DOCK SW CORNER | HOSE CONNECTION | |
| LEFT SIDE LOADING DOCK SE CORNER | HOSE CONNECTION | |
| Fire Pump Room | Wet System MAIN DRAIN | |
| 17th Floor Stair 2 | Wet System gauge | |
| 17th Floor Stair 2 | Wet System gauge | |
| 17th Floor Stair 2 | Wet System gauge | |
| 16th Floor Stair 2 | Wet System gauge | |
| 15th Floor Stair 2 | Wet System gauge | |
| 14th Floor Stair 2 | Wet System gauge | |
| 13th Floor Stair 2 | Wet System gauge | |
| 12th Floor Stair 2 | Wet System gauge | |
| 11th Floor Stair 2 | Wet System gauge | |
| 10th Floor Stair 2 | Wet System gauge | |
| 9th Floor Stair 2 | Wet System gauge | |
| 8th Floor Stair 2 | Wet System gauge | |
| 7th Floor Stair 2 | Wet System gauge | |
| 6th Floor Stair 2 | Wet System gauge | |
| 5th Floor Stair 2 | Wet System gauge | |
| 4th Floor Stair 2 | Wet System gauge | |
| 3rd Floor Stair 2 | Wet System gauge | |
| 2nd Floor Stair 2 | Wet System gauge | |
| 1st Floor Stair 2 | Wet System gauge | |
| 15th Floor Stair 5 | Wet System gauge | |
| 11th Floor Stair 5 | Wet System gauge | |
| 10th Floor Stair 5 | Wet System gauge | |
| 9th Floor Stair 5 | Wet System gauge | |
| 8th Floor Stair 5 | Wet System gauge | |
| 7th Floor Stair 5 | Wet System gauge | |
| 6th Floor Stair 5 | Wet System gauge | |
| 5th Floor Stair 5 | Wet System gauge | |
| 4th Floor Stair 5 | Wet System gauge | |
| 3rd Floor Stair 5 | Wet System gauge | |
| 2nd Floor Stair 5 | Wet System gauge | |
| 1st Floor Stair 5 | Wet System gauge | |
| 2nd Floor Stair 4 | Wet System gauge | |
| 1st Floor stair 4 | Wet System gauge | |
| 11th Floor Stair 3 | Wet System gauge | |
| 2nd Floor Stair 3 | Wet System gauge | |
| 1st Floor Stair 3 | Wet System gauge | |
| 2nd Floor Stair 6 | Wet System gauge | |
| 1st Floor Stair 6 | Wet System gauge | |
| 2nd Floor Stair 1 | Wet System gauge | |
| 1st Floor Stair 1 | Wet System gauge | |
| 11th Floor Stair 1 | Wet System gauge | |
| Fire Pump Basement | Wet System gauge | |
| Fire Pump Basement | Wet System gauge | |
| Controller Basement | Wet System gauge | |
| Jockey Pump Basement | Wet System gauge | |
| Subbasement | Wet System gauge | |
| 1 | 1-010 MECH RM | Tamper |
| 1 | 1-010 MECH RM | Tamper |
| 1 | 1-010 MECH RM | Tamper |
| 1 | 1-013, FP ROOM, TANK | Tamper |
| 1 | 1-013, FP ROOM, BYPASS | Tamper |
| 1 | 1-013, FP ROOM, BYPASS | Tamper |
| 1 | 1-013, FP ROOM, DISCHARGE | Tamper |
| 1 | 1-013, FP ROOM, SUCTION | Tamper |
| 1 | 1-022 STAIR 1 | Tamper |
| 1 | 1-043 STAIR 4 | Tamper |
| 1 | 2-007 STAIR 5 | Tamper |
| 1 | 2-012 STAIR 6 | Tamper |
| 1 | 2-012 STAIR 3 | Tamper |
| 1 | 2-023 STAIR 2 | Tamper |
| 1 | ABOVE CEILING BY EXIT BY 1.1-124 | Tamper |
| 1 | BLOOD BANK,MOBILE STORAGE, RM1.1-121 | Tamper |
| 1 | BLOOD BANK,MOBILE STORAGE, RM1.1-121 | Tamper |
| 1 | CEILING BY STAIR 2 | Tamper |
| 1 | CEILING BY STAIR 2 | Tamper |
| 1 | CEILING BY STAIR 3 | Tamper |
| 1 | CEILING BY STAIR 3 | Tamper |
| 1 | CEILING BY STAIR 5 | Tamper |
| 1 | CEILING BY STAIR 5 | Tamper |
| 1 | CEILING BY STAIR 6 | Tamper |
| 1 | CEILING BY STAIR 6 | Tamper |
| 1 | PSYCH,BACK HALL,RM16,1.3-112 | Tamper |
| 1 | PSYCH,BACK HALL,RM16,1.3-112 | Tamper |
| 2 | 3-007 STAIR 5 | Tamper |
| 2 | 3-038 STAIR 4 | Tamper |
| 2 | 4-011 STAIR 1 | Tamper |
| 2 | 4-017 STAIR 2 | Tamper |
| 2 | 4-029 STAIR 3 | Tamper |
| 2 | 4-033 STAIR 6 | Tamper |
| 3 | 5-012 STAIR 2 | Tamper |
| 3 | 5-024 STAIR 5 | Tamper |
| 4 | 5-037 STAIR 2 | Tamper |
| 4 | 5-053 STAIR 5 | Tamper |
| 5 | 6-012 STAIR 2 | Tamper |
| 5 | 6-024 STAIR 5 | Tamper |
| 6 | 7-012 STAIR 2 | Tamper |
| 6 | 7-031 STAIR 5 | Tamper |
| 7 | 8-012 STAIR 2 | Tamper |
| 7 | 8-023 STAIR 5 | Tamper |
| 8 | 8-037 STAIR 2 | Tamper |
| 8 | 8-048 STAIR 5 | Tamper |
| 9 | 9-012 STAIR 2 | Tamper |
| 9 | 9-023 STAIR 5 | Tamper |
| 10 | 10-012 STAIR 2 | Tamper |
| 10 | 10-023 STAIR 5 | Tamper |
| 11 | 10-037 STAIR 2 | Tamper |
| 11 | 10-048 STAIR 5 | Tamper |
| 12 | 11-012 STAIR 2 | Tamper |
| 13 | 11-027 STAIR 2 | Tamper |
| 14 | 11-047 STAIR 2 | Tamper |
| 15 | 12-012 STAIR 2 | Tamper |
| 16 | 12-021 STAIR 2 | Tamper |
| 17 | 12-036 STAIR 2 | Tamper |
| 17 | 12-038 STAIR 2 (ELEV) | Tamper |
| SB | 1-007 SUBBASEMENT (MAIN SUPPLY) | Tamper |
| SB | 1-007 SUBBASEMENT (MAIN SUPPLY) | Tamper |
| SB | SUBBASEMENT (SYS VALVO) | Tamper |
| SB | 1-007 BEFORE BACKFLOW | Tamper |
| SB | 1-007 AFTER BACKFLOW | Tamper |
| 1 | 1-021 Stair 1 | VWF |
| 1 | 2-006 Stair 5 | VWF |
| 1 | 2-016 Stair 3 | VWF |
| 1 | 2-022 Stair 2 | VWF |
| 1 | Stair 4 | VWF |
| 1 | Stair 6 | VWF |
| 2 | 3-006 Stair 5 | VWF |
| 2 | 4-010 Stair 1 | VWF |
| 2 | 4-016 Stair 2 | VWF |
| 2 | 4-028 Stair 3 | VWF |
| 2 | Stair 4 | VWF |
| 2 | Stair 6 | VWF |
| 3 | 5-011 Stair 2 | VWF |
| 3 | 5-023 Stair 5 | VWF |
| 4 | 5-036 Stair 2 | VWF |
| 4 | 5-052 Stair 5 | VWF |
| 5 | 6-011 Stair 2 | VWF |
| 5 | 6-023 Stair 5 | VWF |
| 6 | 5-052 Stair 5 | VWF |
| 6 | 6-011 Stair 2 | VWF |
| 7 | 8-011 Stair 2 | VWF |
| 7 | 8-022 Stair 5 | VWF |
| 8 | 8-036 Stair 2 | VWF |
| 8 | 8-047 Stair 5 | VWF |
| 9 | 9-011 Stair 2 | VWF |
| 9 | 9-022 Stair 5 | VWF |
| 10 | 10-011 Stair 2 | VWF |
| 10 | 10-022 Stair 5 | VWF |
| 11 | 10-036 Stair 2 | VWF |
| 11 | 10-047 Stair 5 | VWF |
| 12 | 11-011 Stair 2 | VWF |
| 13 | 11-026 Stair 2 | VWF |
| 14 | 11-046 Stair 2 | VWF |
| 15 | 12-011 Stair 2 | VWF |
| 16 | 12-020 Stair 2 | VWF |
| 17 | 12-035 Stair 2 | VWF |
| SB | 1-045 Sub-Basement | VWF |
| # of sprinkler heads necessary for coverage of 497,500 sq. ft. | ||
| BUILDING 3 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 70 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 46 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 4 | FDC | QUARTERLY |
| 62 | FDHC | QUARTERLY |
| 37 | CHECK VALVES | 5 YEAR INSPECTIONS (DUE 2026) |
| 63 | TAMPER SWITCH | QUARTERLY |
| 37 | VANE TYPE FLOW | QUARTERLY |
| 2 | VANE TYPE FLOW | ELEVATOR SHUNTS QUARTERLY |
| 1 | MAIN DRAIN | ANNUAL |
| 1 | FIRE PUMP | WEEKLY, ANNUAL |
| 1 | STANDPIPE | FLOW TEST EVERY 5 YEARS DUE 2022 |
BLDG 20
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 20 | ||
| Floor | Area | Device Type |
| FRONT WALL | PIV | |
| 1ST FL MAIN RM | GATE VALVE | |
| 1ST FL MAIN RM | OS&Y | |
| 1ST FL MAIN RM | OS&Y | |
| Outside Wall Facing Bldg. 273 | Hose Connection | |
| Near Main Entrance of Boiler Room | Preaction System Main Drain | |
| Near Main Entrance of Boiler Room | Wet Sys Main Drain | |
| Energy Plant back Mech. Rm. | Preaction gauge | |
| Energy Plant back corner of Mech. Rm. | Wet system gauge | |
| NW Corner in Generator Rm | VWF | |
| NW Corner in Hot Water Rm | VWF | |
| NW Corner | WPSW | |
| Outside NW Corner | SWG | |
| MAIN CONTOL VALVE - PREACTION | Tamper | |
| MAIN CONTOL VALVE - WET | Tamper | |
| # of sprinkler heads necessary for coverage of 13,500 sq. ft. | ||
| BUILDING 20 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 4 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 5 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2022) |
| 1 | FDC | QUARTERLY |
| 2 | MAIN DRAIN | ANNUAL, QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTIONS |
| 2 | PRESSURE SWITCH | QUARTERLY WATER PRESSURE & LOW AIR |
| 1 | WATER GONG | QUARTERLY |
| 2 | TAMPER SWITCH | QUARTERLY |
| 2 | VANE TYPE FLOW | QUARTERLY |
| 1 | PREACTION | TRIPPED ANNUALY, FULL FLOW TEST EVERY 3 YEARS DUE JULY 2024 |
BLDG 104
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 104 | ||
| Floor | Area | Device Type |
| Outside Pump Room | PIV | |
| Riser Supply/Pump Room | Butterfly | |
| Firepump Discharge | Butterfly | |
| Test Header/Pump Room | Butterfly | |
| Jockey Discharge/ Pump Room | Butterfly | |
| Jockey Supply/ Pump Room | Butterfly | |
| Firepump Supply/Pump Room | OS&Y | |
| Pump Bypass Discharge/Pump Rm | Butterfly | |
| Pump Bypass Supply/ Pump Room | Butterfly | |
| Backflow Discharge/ Pump Room | OS&Y | |
| Backflow Supply/ Pump Room | OS&Y | |
| Stairwell Riser #2/ Pump Room | Butterfly | |
| Stairwell Riser #1/ Pump Room | Butterfly | |
| 1st Floor Stairwell #2 | Butterfly | |
| 2nd Floor Stairwell #2 | Butterfly | |
| 3rd Floor Stairwell #2 | Butterfly | |
| 1st Floor Stairwell #1 | Butterfly | |
| 2nd Floor Stairwell #1 | Butterfly | |
| 3rd Floor Stairwell #1 | Butterfly | |
| Fire Pump Room | Wet Sys Main Drain | |
| 1st Flr. Backflow Supply | STS | |
| 1st Flr. Backflow Discharge | STS | |
| 1st Flr. Fire Pump Bypass Supply | STS | |
| 1st Flr. Bypass Discharge | STS | |
| 1st Flr. FP Supply | STS | |
| 1st Flr. Jockey Supply | STS | |
| 1st Flr. Pump room isolation valve | STS | |
| 1st Flr. Jockey Discharge | STS | |
| 1st Flr. FP Discharge | STS | |
| 1st Flr. Pump Room Main Riser | STS | |
| 1st Flr. Base of Riser pump room | STS | |
| 1st Flr. Stair 1 | STS | |
| 2nd Flr. Stair 2 | STS | |
| 3rd flr. Stair 2 | STS | |
| 3rd flr. Stair 1 | STS | |
| 1st Flr. Stair 2 | STS | |
| 2nd Flr. Stair 1 | STS | |
| Outside Fire Pump Rm | Fire Dept. Hose Connection | |
| Inside Fire Pump Rm | Fire Dept. Hose Connection | |
| Inside Fire Pump Rm | Fire Dept. Hose Connection | |
| Inside Fire Pump Rm | Fire Pump | |
| 1st Flr. Stairwell 1 | VWF | |
| 2nd Flr. Stairwell 2 | VWF | |
| 2nd Flr. Stairwell 1 | VWF | |
| 3rd Flr. Stairwell 2 | VWF | |
| 3rd Flr. Stairwell 1 | VWF | |
| 1st Flr. Stairwell 2 | VWF | |
| 1st Flr. Pump Rm. | VWF | |
| Fire Pump Supply | Wet Gauge | |
| Fire Pump Discharge | Wet Gauge | |
| Riser Supply | Wet Gauge | |
| Riser System | Wet Gauge | |
| Pump Pressure Drop | Wet Gauge | |
| Jockey Pressure Drop | Wet Gauge | |
| 1st Floor Stairwell #2 | Wet Gauge | |
| 2nd Floor Stairell #2 | Wet Gauge | |
| 3rd Floor Stairwell #2 | Wet Gauge | |
| 1st Floor Stairwell #1 | Wet Gauge | |
| 2nd Floor Stairwell #1 | Wet Gauge | |
| 3rd Floor Stairwell #1 | Wet Gauge | |
| UNDER STAIRS BY GROUNDS | VWF | |
| # of sprinkler heads necessary for coverage of 56,115 sq. ft. | ||
| BUILDING 104 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 19 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 12 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2022) |
| 1 | FDC | QUARTERLY |
| 2 | FDHC | QUARTERLY |
| 7 | CHECK VALVES | 5 YEAR INSPECTIONS (DUE 2026) |
| 17 | TAMPER SWITCH | QUARTERLY |
| 7 | VANE TYPE FLOW | QUARTERLY |
| 1 | MAIN DRAIN | ANNUAL |
| 1 | FIRE PUMP | WEEKLY, ANNUAL |
BLDG 107
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 107 | ||
| Floor | Area | Device Type |
| UNDER STAIRWELL BY AUTO BAY | WF | |
| SPRINKLER CAGE UNDER STAIRS | OS&Y | |
| Out side wall facing 250 | Hose Connection | |
| Under Stairwell | Wet System Main Drain | |
| Sprinkler Cage under stairs | Wet system gauge | |
| BY FD HOSE CONN/STAIRS | SWG | |
| UNDER STAIRS BY GROUNDS | WF | |
| # of sprinkler heads necessary for coverage of 28,500 sq. ft. | ||
| BUILDING 107 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 1 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 2 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2022) |
| 1 | FDC | QUARTERLY |
| 1 | MAIN DRAIN | ANNUAL, QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTIONS |
| 1 | PRESSURE SWITCH | QUARTERLY WATER PRESSURE & LOW AIR |
| 1 | WATER GONG | QUARTERLY |
BLDG 247
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 247 | ||
| Floor | Area | Device Type |
| Outside mech rm | PIV | |
| laundry rm | OS&Y | |
| laundry rm | OS&Y | |
| Outside wall facing Bldg. 20 | Fire Dept. Hose Connection | |
| Outside Laundry/Mech. Rm. | Electric Bell | |
| Laundry Rm. /Mech. Rm. | Vane Type Flow Switch | |
| Warehouse | Control Valve-OS & Y Valve | |
| Supply side of backflow | Tamper Swich for OS& Y Vlv. | |
| Discharge side of backflow | Tamper Switch for OS&Y Vlv. | |
| Laundry Rm. /Mech. Rm. | Wet Sprinkler Gauge-System | |
| Laundry Rm. /Mech. Rm. | Wet sprinkler Gauge-Supply | |
| Laundry Rm. /Mech. Rm. | Electric Bell | |
| BUILDING 247 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 3 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 2 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 1 | FDC | QUARTERLY |
| 2 | FDHC | QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTIONS |
| 2 | TAMPER SWITCH | QUARTERLY |
| 1 | VANE TYPE FLOW | QUARTERLY |
| 1 | ELECTRIC BELL | QUARTERLY |
BLDG 249
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 249 | ||
| Floor | Area | Device Type |
| FRONT WALL | PIV | |
| 1ST FLR MAIN RM | GATE VALVE | |
| 1ST FLR MAIN RM | OS&Y | |
| 1ST FLR MAIN RM | OS&Y | |
| OUTSIDE WALL FACING BUILDING 20 | Hose Connection | |
| Warehouse | Wet System Main Drain | |
| WAREHOUSE | Wet System Gauge | |
| COMP STORAGE | Wet System Gauge | |
| OUTSIDE WALL FACING BUILDING 20 | VWF | |
| OUTSIDE WALL FACING BUILDING 20 | SWG | |
| # of sprinkler heads necessary for coverage of 32,200 sq. ft. | ||
| BUILDING 249 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
BLDG 250
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 250 | ||
| Floor | Area | Device Type |
| 250 Loading Dock | Air Compressor | |
| 249 Loading Dock | Air Compressor | |
| 250 Loading Dock | Dry Gauge | |
| 249 Loading Dock | Dry Gauge | |
| WET - 1st FL MECH RM | WF | |
| DRY - 249 LOADING DOCK | WF | |
| DRY - 250 LOADING DOCK | WF | |
| 249 Loading Dock | STS | |
| 250 Loading Dock | STS | |
| Purchase P-Way | STS | |
| OUTSIDE WALL FACING BLDG 239 | Hose Connection | |
| OUTSIDE WALL OF MECH RM | PIV | |
| LOADING DOCK | OS&Y | |
| LOADING DOCK249 | OS&Y | |
| PURCHASE PWAY | OS&Y | |
| Cage inside front warehouse | Wet System Main Drain | |
| Bldg. 250 loading dock | Dry System Main Drain | |
| Bldg. 249 loading dock | Dry System Main Drain | |
| OUTSIDE MECH RM | Wet System GAUGE | |
| OUTSIDE MECH RM | SWG | |
| 249 LOADING DOCK | APSW | |
| 250 LOADING DOCK | APSW | |
| # of sprinkler heads necessary for coverage of 64,800 sq. ft. | ||
| BUILDING 250 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 4 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 2 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 5 | DRY GAUGES | WEEKLY, MONTHLY AND REPLACED EVERY 5 YEARS DUE (2025) |
| 1 | FDC | QUARTERLY |
| 3 | MAIN DRAIN | ANNUALLY, QUARTERLY |
| 1 | VANETYPE FLOW | QUARTERLY |
| 3 | TAMPER SWITCH | QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTION |
| 2 | DRY PIPE VALVE | TRIPPED ANNUALLY, FULL FLOW TEST EVERY 3 YEARS |
| 2 | PRESSURE SWITCH | QUARTERLY PRESSURE SWITCH FLOW & QUARTERLY LOW AIR |
| 2 | AIR COMPRESSOR | WEEKLY, MONTHLY, QUARTERLY |
BLDG 256
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 256 | ||
| Floor | Area | Device Type |
| OUTSIDE WALL FACING BLDG 282 | PIV | |
| BACK KITCHEN | OS&Y | |
| BACK KITCHEN | OS&Y | |
| Outside Wall Facing Bldg. 282 | Hose Connection | |
| Back of Kitchen | Wet Main Drain | |
| NEX BACK KITCHEN | Wet Sys GAUGE | |
| SWG | ||
| REAR WALL FACING BLDG 282 | STS | |
| BACK OF SWITCH | STS | |
| BACK OF SWITCH | WF | |
| BACK OF KITCHEN-INSP IN BK WRHSE | R-102 Ansul Supression System | |
| # of sprinkler heads necessary for coverage of 18,000 sq. ft. | ||
| BUILDING 256 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 3 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 2 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 1 | FDC | QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTION |
| 1 | MAIN DRAIN | ANNUALLY, QUARTERLY |
| 1 | VANETYPE FLOW | QUARTERLY |
| 2 | TAMPER SWITCH | QUARTERLY |
| 1 | WATER GONG | QUARTERLY |
BLDG 271
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 271 | ||
| Floor | Area | Device Type |
| Forms Control | Air compressor | |
| OUTSIDE WALL FACING BLDG 274 | PIV | |
| WRHSE-CAGE-DRY | OS&Y | |
| WRHSE-CAGE-WET | OS&Y | |
| OUTSIDE WALL FACING BLDG 274 | Hose Connection | |
| Front warehouse inside cage | Wet System Main Drain | |
| Front warehouse inside cage | Dry System Main Drain | |
| FORMS CONTROL | Wet Sys Gauge | |
| Front warehouse inside cage | Dry System Gauge | |
| SPRINKLER CAGE - WET | WF | |
| SPRINKLER CAGE | APSW | |
| SPRINKLER CAGE - DRY | WF | |
| OUTSIDE SPRINKLER CAGE - PAPER WHSE | SWG | |
| # of sprinkler heads necessary for coverage of 25,000 sq. ft. | ||
| BUILDING 271 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 3 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 4 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 1 | FDC | QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTION |
| 1 | MAIN DRAIN | ANNUALLY, QUARTERLY |
| 1 | VANETYPE FLOW | QUARTERLY |
| 2 | PRESSURE SWITCH | QUARTERLY PRESSURE SWITCH FLOW, QUARTERLY LOW AIR |
| 1 | WATER GONG | QUARTERLY |
| 1 | AIR COMPRESSOR | WEEKLY, MONTHLY, QUARTERLY |
| 1 | DRY PIPE VALVE | TRIPPED ANNUALLY, FULL FLOW TEST EVERY 3 YEARS |
BLDG 272
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 272 | ||
| Floor | Area | Device Type |
| OUTSIDE FRONT WALL | PIV | |
| OUTSIDE FRONT WALL | Hose Connection | |
| Closet in Simplex Office | Wet System Main Drain | |
| COLLEGE CLOSET | Wet System GAUGE | |
| RM 176 | Wet System GAUGE | |
| FRONT OUTSIDE WALL | SWG | |
| Closet Room 176 | WF | |
| # of sprinkler heads necessary for coverage of 29,600 sq. ft. | ||
| BUILDING 272 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 1 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 2 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 1 | FDC | QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTION |
| 1 | MAIN DRAIN | ANNUALLY, QUARTERLY |
| 1 | PRESSURE SWITCH | QUARTERLY |
| 1 | WATER GONG | QUARTERLY |
BLDG 273
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 273 | ||
| Floor | Area | Device Type |
| OUTSIDE WALL FACING FIRE DEPT | PIV | |
| OUTSIDE WALL FACING FIRE DEPT | Hose Connection | |
| Mech. Room | Wet Sys Main Drain | |
| OUTSIDE BACK | Wet Sys Main GAUGE | |
| MECH RM | Wet Sys Main GAUGE | |
| BACK MECH RM | SWG | |
| BACK MECH RM | WF | |
| # of sprinkler heads necessary for coverage of 30,800 sq. ft. | ||
| BUILDING 273 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 1 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 2 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2025) |
| 1 | FDC | QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTION |
| 1 | MAIN DRAIN | ANNUALLY, QUARTERLY |
| 1 | PRESSURE SWITCH | QUARTERLY |
| 1 | WATER GONG | QUARTERLY |
BLDG 274
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 274 | ||
| Floor | Area | Device Type |
| OUTSIDE MECH RM | PIV | |
| OUTSIDE WALL NEXT TO REAR MECHANICAL ROOM | Hose Connection | |
| Mech Room | Wet Main Drain | |
| OUTSIDE MECH RM | Wet Sys GAUGE | |
| BACK MECH RM | SWG | |
| BACK MECH RM | WF | |
| # of sprinkler heads necessary for coverage of 21,600 sq. ft. | ||
| BUILDING 274 INVENTORY SPREADSHEET | ||
| QUANTITY | DEVICE TYPE | INPSECTIONS PERFORMED |
| 1 | CONTROL VALVES | ANNUAL FULL CYCLE AND LUBE & MONTHLY |
| 2 | WET GAUGES | MONTHLY INSPECTION AND REPLACE EVERY 5YEARS DUE (2022) |
| 1 | FDC | QUARTERLY |
| 1 | MAIN DRAIN | ANNUAL, QUARTERLY |
| 1 | CHECK VALVES | 5 YEAR INSPECTIONS (DUE 2026) |
| 1 | PRESSURE SWITCH | QUARTERLY |
| 1 | WATER GONG | QUARTERLY |
BLDG 275
| ATTACHMENT J-1502000-09 | ||
| FIRE SUPPRESSION SYSTEM | ||
| BUILDING 275 | ||
| Floor | Area | Device Type |
| OUTSIDE BY STAIR 8, 3 HEAD STANDPIPE Ground level | Hose Connection | |
| STAIR 1 ELEV LOBBY Ground level | Hose Connection | |
| STAIR 8 AUX DRAIN Ground level | Hose Connection | |
| MIDDLE AISLE C AUX DRAIN Ground level | Hose Connection | |
| BETWEEN ST 6 & 7 Ground level | Hose Connection | |
| STAIR 7 AUX DRAIN Ground level | Hose Connection | |
| MIDDLE OF AISLE F Ground level | Hose Connection | |
| STAIR 6 Ground level | Hose Connection | |
| STAIR 5 Ground level | Hose Connection | |
| MIDDLE OF AISLE K Ground level | Hose Connection | |
| OUTSIDE BY STAIR 6, 3 HEAD STANDPIPE Ground level | Hose Connection | |
| STAIR 3 AUX DRAIN Ground level | Hose Connection | |
| STAIR 4 Ground level | Hose Connection | |
| STAIR 2 Ground level | Hose Connection | |
| OUTSIDE STAIR 1 Ground level | Hose Connection | |
| OUTSIDE BY STAIR 4,3 HEAD STANDPIPE Ground level | Hose Connection | |
| OUTSIDE BY STAIR 3, 3 HEAD STANDPIPE Ground level | Hose Connection | |
| STAIR 2 1st level | Hose Connection | |
| STAIR 8 1st level | Hose Connection | |
| MIDDLE OF AISLE C 1st level | Hose Connection | |
| BETWEEN ST 6 & 7 1st level | Hose Connection | |
| STAIR 7 1st level | Hose Connection | |
| MIDDLE OF AISLE F 1st level | Hose Connection | |
| STAIR 6 1st level | Hose Connection | |
| MIDDLE OF AISLE K 1st level | Hose Connection | |
| STAIR 5 1st level | Hose Connection | |
| STAIR 4 1st level | Hose Connection | |
| STAIR 3 1st level | Hose Connection | |
| STAIR 1 ELEV LOBBY 1st level | Hose Connection | |
| OUTSIDE STAIR 1 1st level | Hose Connection | |
| STAIR 1 2nd level | Hose Connection | |
| STAIR 8 2nd level | Hose Connection | |
| MIDDLE OF AISLE C 2nd level | Hose Connection | |
| BETWEEN ST 6 & 7 2nd level | Hose Connection | |
| STAIR 7 2nd level | Hose Connection | |
| MIDDLE OF AISLE F 2nd level | Hose Connection | |
| STAIR 6 2nd level | Hose Connection | |
| MIDDLE OF AISLE K 2nd level | Hose Connection | |
| STAIR 5 2nd level | Hose Connection | |
| STAIR 4 2nd level | Hose Connection | |
| STAIR 3 2nd level | Hose Connection | |
| STAIR 1 ELEV LOBBY 2nd level | Hose Connection | |
| OUTSIDE STAIR 1 2nd level | Hose Connection | |
| STAIR 2 3rd level | Hose Connection | |
| STAIR 8 3rd level | Hose Connection | |
| MIDDLE OF AISLE C 3rd level | Hose Connection | |
| BETWEEN ST 6 & 7 3rd level | Hose Connection | |
| STAIR 7 3rd level | Hose Connection | |
| MIDDLE OF AISLE F 3rd level | Hose Connection | |
| STAIR 6 | Hose Connection | |
| MIDDLE OF AISLE K 3rd level | Hose Connection | |
| STAIR 5 3rd level | Hose Connection | |
| STAIR 4 3rd level | Hose Connection | |
| STAIR 3 3rd level | Hose Connection | |
| STAIR 1 ELEV LOBBY 3rd level | Hose Connection | |
| OUTSIDE STAIR 1 3rd level | Hose Connection | |
| STAIR 2 4th level | Hose Connection | |
| STAIR 8 4th level | Hose Connection | |
| MIDDLE OF AISLE C 4th level | Hose Connection | |
| BETWEEN ST 6 & 7 4th level | Hose Connection | |
| STAIR 7 4th level | Hose Connection | |
| MIDDLE OF AISLE F 4th level | Hose Connection | |
| STAIR 6 4th level | Hose Connection | |
| MIDDLE OF AISLE K 4th level | Hose Connection | |
| STAIR 5 4th level | Hose Connection | |
| STAIR 4 4th level | Hose Connection | |
| STAIR 3 4th level | Hose Connection | |
| STAIR 1 ELEV LOBBY 4th level | Hose Connection | |
| OUTSIDE STAIR 1 4th level | Hose Connection | |
| STAIR 2 5th level | Hose Connection | |
| STAIR 8 5th level | Hose Connection | |
| TOP MIDDLE OF AISLE C 5th level | Hose Connection | |
| BOTTOM MIDDLE OF AISLE C 5th level | Hose Connection | |
| BETWEEN ST 6 & 7 5th level | Hose Connection | |
| STAIR 7 5th level | Hose Connection | |
| TOP MIDDLE OF AISLE F 5th level | Hose Connection | |
| BOTTOM MIDDLE OF AISLE F 5th level | Hose Connection | |
| STAIR 6 5th level | Hose Connection | |
| TOP MIDDLE OF AISLE K 5th level | Hose Connection |
This is the start of the file's text. The full file is on GovTribe.