Attachment IV - Drawings II.pdf
PDF 19 MB Posted
- Attached to
- Z2NB--Project No. 539-20-101 - Replace Fort Thomas Boilers. Federal contract opportunity
- Solicitation number
- 36C25024B0075
About this file
This document appears to be Attachment IV - Drawings II, which is related to Solicitation Number 36C25024B0075 for Project No. 539-20-101 - Replace Fort Thomas Boilers, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
The solicitation is for a project to replace the boilers at the Fort Thomas VA facility. The attachment provides technical drawings and specifications for the boiler replacement work. Key details include the requirement to remove and replace existing boilers, associated piping, controls, and other related equipment. The drawings provide the specifications and details for the new boiler system configuration and installation. No additional details on pricing, set-asides, award dates, or other salient information are provided in this attachment.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B64-FIRST FLOOR
956' - 6"
B64-SECOND
FLOOR
967' - 11 1/2"
B64 - MECH
BASEMENT
943' - 0"
B64 - BASEMENT
946' - 0"
B64 - ROOF
990' - 10 1/2"
B64 - THIRD
FLOOR
979' - 5"
M201
3"
V
4"
V
3"
V
3"
V
3"
V
3"
V
3"
V
3"
V
1.5" - LPR
18ø - EA
2" - HWR
0.75" - PC2" - LPS
1.25" - ET 1.25" - ET
2" - F
2"
E T
1.25" - BO
2" - ET
2.
5"
LP
S
0.75" - PC
6"
LP
S
FLU STACK
TYPICAL PIPE
SUPPORT IN VERTICAL
1" - D
B64-FIRST FLOOR
956' - 6"
B64-SECOND
FLOOR
967' - 11 1/2"
B64 - MECH
BASEMENT
943' - 0"
B64 - BASEMENT
946' - 0"
B64 - ROOF
990' - 10 1/2"
B64 - THIRD
FLOOR
979' - 5"
P
M201
FIRST FLOOR T/SLAB
956'-6"
SECOND FLOOR T/SLAB
967'-11 1/2"
THIRD FLOOR T/SLAB
979'-5"
ROOF T/SLAB
990'-10 1/2"
BASEMENT T/SLAB
946'-0"
O P
AHU FRAME T/STEEL
993'-4 1/2"
0.75" - PC
4" - LPS
2" - HWR
3"
V 3"
V
10ø - EA
1.
E T
1.25" - BO
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
STEAM BOILER PLANT
ELEVATIONS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M201
539-20-201
FORT THOMAS, KENTUCKY
/1
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE | 3/8" = 1'-0" REF | 2/M201
STEAM BOILER PLANT ELEVATION1 SCALE | 3/8" = 1'-0" REF | 1/M201
TYPICAL BOILER ELEVATION2
# DESCRIPTION DATE
POWER ROOF VENTILATOR
BRANCH DUCT
AIR SPLIT DUCT TAKE-OFF
PLAN VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
AIR
FLOW
AIR
FLOW
A
IR
F L O
W
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
DAMPER
MANUAL VOLUME
DAMPER
1/4 W OR
4" MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
W
A
IR
F L O
W
SQUARE ELBOW SHOWN.
PROVIDE ROUND ELBOW
WHEN SHOWN ON PLANS
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW AIR FLOW
W
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" MIN.
BRANCH DUCT
45 DEG.
SPACE BETWEEN VANES AND A 3/4" TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20", VANES SHALL BE DOUBLE
NOTES:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY
SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1 1/2" MAXIMUM
VANE TYPE.
W
W1
VANE
VANE
NOTES:
1.
2.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS
ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
R SHALL
EQUAL
OR BE
GREATER
THAN W.
R SHALL
EQUAL
OR BE
GREATER
THAN
1/3W.
W
R
R
2/3W
/3
W R SHALL
EQUAL
OR BE
GREATER
THAN
1/6W.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
W W
1/2W 1 /3
W
1/6W
R
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
M A
X.
M A
X
E Q
U
IP
M E
N T
AIR
FLOW
AIR
FLOW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEWTYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
M A X.
M A
X
M A
X
M A
X
SMACNA FIGURE 4-6.
45° LEED IN
MAIN SUPPLY
PLAN VIEW
FLOW
F L O
W
RIGID DUCT TO AIR TERMINAL UNIT INLET/FAN COIL UNIT RETURN
AIR PLENUM BOX. REFER TO AIR TERMINAL UNIT/FAN COIL UNIT
DUCT CONNECTION DETAILS FOR CONTINUATION.
ROUND SHEET METAL
DUCT.
MAIN SUPPLY
"D
°M
A X
PLAN VIEW
THE BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15% OF THE MAIN DUCT CFM
ANYTIME,
AND UP TO 40% WHEN THE MAIN DUCT VELOCITY IS 1000 FPM OR LESS. THE AIR SPLIT DUCT
TAKE-OFF SHALL BE USED IN ALL OTHER CASES
MANUAL VOLUME
RIGID DUCT TO AIR TERMINAL UNIT INLET/FAN COIL UNIT RETURN
AIR PLENUM BOX. REFER TO AIR TERMINAL UNIT/FAN COIL UNIT
DUCT CONNECTION DETAILS FOR CONTINUATION.
NOTES:
1.
2.
3.
SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" CADMIUM PLATED LAG BOLTS NOT OVER
12" ON CENTER.
SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION BOLTS (CONCRETE
ROOF) OR RUST RESISTANT BOLTS (METAL DECK AND BAR JOIST ROOF).
SIZE OF DUCT THROUGH ROOF SHALL NOT BE LARGER THAN CURB SUPPLIED WITH ROOF
VENTILATOR.
RUN ELECTRICAL LINES THROUGH CLEARANCE HOLE PROVIDED IN GRAVITY DAMPER, THEN
THROUGH VENTILATOR ELECTRICAL CONDUIT GUIDE.
GRAVITY OR MOTORIZED BACKDRAFT
DAMPER, REFER TO SPECIFICATIONS.
RIGID CONDUIT TO
ACCOMMODATE
ELECTRICAL
WIRES
SEE NOTE 2
PREFABRICATED ROOF CURB
WOOD NAILING
STRIP
ELECTRICAL
CONDUIT GUIDE
MOTOR HOUSING
DUCT
TRANSITION DUCT TO
FULL SIZE OF DAMPER
SUPPLIED WITH ROOF
VENTILATOR
ROOF
SEE NOTE 2
SEE NOTE 1
CURB CAP
ALTERNATE SUPPLY DUCT TAKEOFF - AIR
TERMINAL UNITS/FAN COIL UNIT
OUTSIDE AIR
DUCTWORK TRANSITIONS
SUPPLY DUCTWORK TAKE-OFFS
DUCTWORK SQUARE VANE ELBOWS
DUCTWORK RADIUS ELBOWS
EXHAUST OR RETURN BRANCH DUCTWORK
SUPPLY DUCT TAKEOFF-AIR TERMINAL UNITS/
FAN COIL UNIT OUTSIDE AIR
7 6
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
2' -0
2 2 2
EXHAUST FAN
EXHAUST FAN
ROOF
ROOF
DRAIN BAFFLE
LIGHTNING PROTECTION
NOTES
1. STACK MINIMUM HEIGHT SHALL NOT BE LESS THAN 10'-0".
2. ROOF SUPPORT CURBS, 24" HIGH. FLASH INTO ROOFING SYSTEM.
3. EXHAUST STACK, SAME MATERIAL AS SYSTEM DUCTWORK. PRIME AND PAINT.
4. FLEX CONNECTION.
5. BLIND FLANGE CONNECTION, SLOPED TO DRAIN OUTLET.
6. 3/4" PVC DRAIN OUTLET TO SPILL ONTO CONCRETE SPLASH BLOCK OR NEARBY ROOF DRAIN.
7. GUY WIRES PER SMACNA.
8. DUCT MOUNTED ISOLATION DAMPER AT BUILDING WALL.
UTILITY EXHAUST FAN
SCALE: NONE
PENTHOUSE WALL
PIPE HANGERS - PROVIDE DOUBLE
DEFLECTION NEOPRENE (TYPE HN)
FOR FIRST TWO ON EACH SIDE OF
PUMP (SEE NOTE NO. 1)
PRESSURE GAGE
1/2"
FLEXIBLE
CONNECTION
BALL OR BUTTERFLY TYP. - REFER TO SPECS
NOTES:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
STRAINER
IN-LINE PUMPS - CONNECTIONS
TYPICAL MANUAL AIR VENT
TYPICAL CHILLED AND HOT WATER PIPING DRAIN VALVE CONNECTIONS
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" BALL VALVE
ADAPTER TO 3/4" HOSE
THREAD-PROVIDE HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS, LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
AIR VENT
1/2" BALL VALVE
1/4" COPPER TUBING
1/2" x 4" NIPPLE
CIRCULATING WATER PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS AS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO NEAREST DRAIN.
MV
OR
AV
DRAIN VALVE AND AIR VENT
CONNECTIONS (HYDRONIC SYSTEMS)
SCALE: NONE
SCALE: NONE
SCALE: NONE
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
DETAILS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M501
539-20-201
FORT THOMAS, KENTUCKY
/2
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
ROOFING
LAG SCREW
FIBERGLASS INSULATION
ROOF
INSULATION
ROOF DECK
2x6 WOOD NAILER
18 GAUGE GALVANIZED STEEL COUNTER-FLASHING.
WELDED 14 GAUGE EQUIPMENT SUPPORT CURB, MEETING ASTM A-446, 525, 526 AND 527
REQUIREMENTS, WITH WELDED CORNERS WITH SEAMS JOINED BY CONTINUOUS WELDS. CURB
SHALL BE INTERNALLY REINFORCED WITH BULKHEADS AND SPREADERS, 24" ON CENTER TO
MEET LOAD RATING OF EQUIPMENT. CURB TO EXTEND 6" BEYOND EQUIPMENT. REFER TO
FLOOR PLANS FOR HEIGHT.
SECURE CURB TO ROOF WITH EXPANSION BOLTS (CONCRETE ROOF) OR RUST RESISTANT BOLTS
(METAL DECK AND BAR JOIST ROOF), 12" O.C.
4"x4"x1/4"
STEEL PLATE
5 FT
6 8 10
9 1110 12
-1312 14 -16 -
1614 17 2219 23
2725 28 3230
20 241814 16128 1064 532 2 1/21 1/21 1 1/4THRU 3/4
7 7
7 98
SECTION "A-A"
"B" "B"
RISER CLAMP
RISER CLAMP
PIPE SLEEVE WHERE
ANCHOR POINTS ONLY
CLAMP REQUIRED AT
RISER CLAMP. BOTTOM
BOLT (TYPICAL)
INSULATION
FIRE-STOPPING
FLOOR SLAB
MATERIAL
BOLT
ELEVATION
PLAN
RISER
SPECIFIED
BOLT
WHERE SPECIFIED
PIPE SLEEVEPIPE
420ONE 1 x 18 GA. STRAP36
TWO 1/2 DIA. RODS
TWO 3/8 DIA. RODS
ONE 1 x 16 GA. STRAP
50 700
ONE 1 x 22 GA. STRAP
QUANTITY/SIZEMAX. DUCT
HANGER STRAPS OR RODS
MAX. LOAD
LBS.
MAX.
IN.
SPACING
DIA. - IN. IN.
50" DIA. &
UNDER
LOAD RATED
FASTENERS
BAND OF SAME
SIZE AS HANGER
STRAP
HANGER RODS
OVER 50" DIA.
BAND
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.
1/8" CLEARANCE
ALL AROUND
"A"
"A"
INSULATION
INSULATION
GASKET
DUCT
INSULATION
SECTION "B-B" FACTORY
FABRICATED
LATCH
FLEXIBLE
WASHER
HANDLE INSIDE
GASKET
CASING
ACCESS DOOR
ACCESS PANEL
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
SECTIONSIDE ELEVATION
STIFFEN BLADE
AS REQUIRED
DUCT
1/2" ROUND ROD PIN
INSULATION
STAND-OFF
HANDLE WITH
LOCKING
QUADRANT
INSIDE END BEARING
OUTSIDE END BEARING
DAMPER BLADE
INSULATION SEE
SPECIFICATION
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR
FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
NOTES:
1.
2.
3/8" MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
3/8" MIN DIA
HANGER RODS
TURNBUCKLE
FOR PIPES UNDER 2" IN SIZE USE
1-1/2"x1-1/2"x1/4" ANGLE. ALL PIPES
2" & LARGER USE 3"x3"x1/4" ANGLE
3/8" MIN DIA
HANGER RODS
NUTS & WASHERS
CLIP
ANGLE
CONCRETE
FLOOR SLAB
3/8" MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
STEEL EXPANSION SHIELD FOR EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRICTION. THIS TYPE SHALL BE
USED ONLY IN SLABS OR BEAMS OF 4" MIN DEPTH
NOTE: SEE SPECIFICATIONS FOR
DETAILED HANGER REQUIREMENTS
M A
X
FT.
FT.
IN.
TUBING
PIPE
NOM. SIZE
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
PROVIDE HIGH
COMPRESSIVE STRENGTH
INSULATION (9 PSF MIN.
DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD
AT HANGER
SADDLE
WELD
1/2" DIA. HANGER
RODS WITH 36"
MAX. SPACING ON
EACH CHANNEL
1-5/8" 12 GAUGE CHANNEL
OR 2"x2"x1/4" ANGLE
BAND
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN.)
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
SIDE VIEW TRAPEZE HANGER FOR UP TO
1000 LB. UNIFORM LOAD
SECTION A-A (BASE NOT POURED WITH SLAB)
SECTION A-A (BASE POURED WITH FLOOR SLAB)
PLAN
TYPICAL ANCHOR
BOLT NUT & WASHER
SECTION B-B
EQUIPMENT BASE
PLATE
PROVIDE #3 BARS 12" O.C. EACH
WAY IN THE BASE & DOWEL
BASE TO FLOOR
EQUIPMENT BASE PLATE
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
WELD HEAD TO PLATE
OR BEND OVER END 5D
FLOOR
PIPE SLEEVE (5D, 3" MIN.)
ANCHOR
BOLT (TYP)
CONCRETE BASE
NOTE:
L & W DIMENSIONS
SHALL BE 6" GREATER
THAN THE EQUIPMENT
BASE PLATE.
L
W
A
A
D
2D
16"
M
IN
L
M
D
TYPICAL ANCHOR
BOLT NUT & WASHER
5D
B B
ABOVE 2" DIA. PIPE 2" DIA. & SMALLER
VERTICAL
2 1/2" DIA.
ABOVE 2" DIA. PIPE 2" DIA. & SMALLER
HORIZONTAL
2 1/2" DIA.
SUPPORT/ANCHOR FOR PIPE RISERS
ROUND DUCT HANGERS
ACCESS PANEL AND DOOR DETAIL
VOLUME DAMPER DETAIL
SECURING HANGER RODS IN CONCRETE
PIPE HANGERS
CONCRETE EQUIPMENT BASES
EQUIPMENT/DUCT/PIPE SUPPORT ROOF CURB
INSTALLATION OF THERMOMETER WELLS
WATER SAMPLE COOLERS - BOILER WATER
STEAM SAFETY VALVE
STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY
610mm
76mm m m
[1
[24"
MAX]
[3"]
D
PROVIDE UNION UNLESS
SAFETY
VALVE HAS FLANGED
OUTLET
SAFETY VALVE
OPEN
DRAIN
(NOTE 3)
CONNECTION TO
PRESSURE
VESSEL OR PIPE
VENT PIPE THROUGH ROOF
SUPPORT AS INDICATED ON
DWGS. (NOTES 1, 2, 5)
PIPE THREADED INTO ELBOW
(SAME SIZE AS ELBOW)
DRIP PAN ELBOW
(SECTIONAL VIEW)
20mm [3/4"] DRAIN TO
TRENCH DRAIN (NOTE 4)
ELEVATION
FLEXIBLE
CONNECTOR
FINISHED ROOF LINE TERMINATE A MINIMUM OF 6 FEET
ABOVE FINISHED ROOF WITH 45
DEGREE MITERED CUT.
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT
BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED
IN ANSI B31.1. POWER PIPING CODE, APPENDIX II, BUT MINIMUM 1 PIPE SIZE LARGER THAN
DRIP PAN ELBOW SIZE.
2. VENT PIPE SHALL TERMINATE 1829mm [6'] MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHICH
PERSONNEL MAY OCCUPY.
4. NO OTHER DRAIN SHALL BE CONNECTED TO THE DRIP PAN ELBOW DRAIN PIPE.
5. THE MAXIMUM DEGREE OF DIRECTIONAL CHANGE AFTER THE DRIP ELBOW IS LIMITED TO 180
DEGREES. ALL DIRECTIONAL CHANGES SHALL BE DONE WITH 45° OR LONG RADIUS SWEEPING
90° ELBOWS.
9101112
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
D
C W
F W
P D
10mm [0.375"]
STAINLESS STEEL
TUBING FROM EACH
BOILER/FEEDWATER
SYSTEM.
20mm [3/4"]
COOLING
WATER
8mm [1/4"]
SAMPLE
OUTLET
20mm [3/4"]
ANTI-SYPHON
VACUUM BREAKER
0-83°C [30-180°F]
SAMPLE COOLER
PROVIDE SEPARATE COOLERS FOR EACH
BOILER. MOUNT COOLER 1.2M [4'] ABOVE
FINISHED FLOOR ON WALL, COLUMN, OR
FACTORY MOUNTED ON BOILER.
15mm [1/2"]
ELEVATION
TD
C W
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
DRIP LEG (TYP.)
20mm [3/4"] DRAIN
(ALTERNATE
LOCATIONS)
(TYPICAL)
STEAM LINE
(TYPICAL)
CAP (TYPICAL)
PIPE T0 STEAM
TRAP (TYPICAL)
NOTE:
DRIP POCKET PIPE SIZE SAME AS
STEAM MAIN UNLESS OTHERWISE
NOTED.
PIPE SIZE SHALL BE SAME SIZE AS
TRAP CONNECTION - 20mm [3/4"]
MIN.
FROM DRIP
CONNECTION
DRIP
RETURN
10mm [3/8"] TEST
CONNECTION
GLOBE VALVE
STAINLESS STEEL
UNIVERSAL TRAP STATION
BYPASS - INSTALL IN
HORIZONTAL PLANE LEVEL
WITH
TRAP OR IN VERTICAL PLANE
AND BELOW TRAP.
m m [6
M m m
[1 m m [6
M
IN
[1
M
IN
m m
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
DETAILS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M502
539-20-201
FORT THOMAS, KENTUCKY
/2
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
NOTES:
GENERAL NOTES:
A. THIS DETAIL IS GENERIC IN NATURE. THE COMPLETED INSTALLATION SHALL BE IN STRICT
ACCORDANCE WITH THE METER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND ANY
ADDITIONAL REQUIREMENTS SHOWN HEREIN.
B. THE FLOW METER MANUFACTURER'S INSTALLATION REQUIREMENTS MUST BE MET. THE
REQUIREMENTS SHOWN IN THIS DETAIL SHALL BE CONSIDERED THE MINIMUM ACCEPTABLE
INSTALLATION. THIS IS ESPECIALLY MEANT TO APPLY TO UPSTREAM/DOWNSTREAM
DISTANCES, PIPE OBSTRUCTIONS, AND ACTUAL INSTALLED PIPING CONFIGURATION REQUIRED
BY THE FLOW METER MANUFACTURER IN ORDER TO OBTAIN THE ACCURACIES REQUIRED BY
THE SPECIFICATIONS AND METER TYPE. ALL CHANGES TO THE PIPING CONFIGURATION
DEPICTED IN THESE PLANS SHALL BE APPROVED BY THE ENGINEER PRIOR TO
IMPLEMENTATION.
C. PROVIDE SERVICE CLEARANCE ALL AROUND METER PER MANUFACTURER'S INSTRUCTIONS,
MINIMUM 12".
1. METER HEAD OR JUNCTION BOX FOR REMOTE METER HEAD MOUNTING. THE METER HEAD FOR
THE INLINE STEAM METER INCLUDES THE INPUT POWER TERMINALS AND A LOCAL READOUT OF
DATA AND/OR DIAGNOSTIC MESSAGES. WHEN REMOTE METER HEAD MOUNTING IS SPECIFIED
THE JUNCTION BOX INCLUDES THE INPUT POWER TERMINALS AND TERMINALS FOR CONNECTING
THE REMOTE METER HEAD. SEE THE SPECIFICATIONS AND DRAWING SCHEDULE FOR ADDITIONAL INFORMATION ON SPECIFIC MODEL METER HEAD CAPABILITIES AND CONFIGURATIONS. SEE THE
PLANS AND/OR SPECIFICATIONS FOR MORE INFORMATION ON REMOTE MOUNTING.
2. PROVIDE MINIMUM 12" CLEARANCE ALL AROUND THE METER FOR SERVICING AND REMOVAL.
REFER TO THE SPECIFIC METER INSTALLATION GUIDE FOR THE MANUFACTURER'S REQUIRED
CLEARANCE FOR METER REMOVAL AND SERVICING. PROVIDE THE CLEARANCE AS DIRECTED
THEREIN IF IT EXCEEDS THE MINIMUM REQUIRED 12". PROVIDE ADEQUATE SPACE IN FRONT OF
THE METER FOR ACCESS.
3. CONNECT FACTORY WIRES TO FIELD WIRES IN AN APPROPRIATE JUNCTION BOX. PROVIDE EXTRA
COMPARTMENT FOR TRANSFORMER (WHEN REQUIRED) IN COMPLIANCE WITH NATIONAL
ELECTRICAL CODE REQUIREMENTS.
4. LOCAL DISPLAY UNIT. MOUNT AT 5'-6" ABOVE FINISHED FLOOR TO THE CENTERLINE OF THE
DISPLAY SCREEN. PANEL MAY BE WALL MOUNTED AS LONG AS IT IS EASILY READABLE AND
READILY ACCESSIBLE. OTHERWISE, IT SHALL BE MOUNTED ON A WELDED ANGLE IRON, OR
BOLTED STRUT, RIGID FLOOR STAND.
5. OUTPUT SIGNALS TO THE BAS.
6. INCOMING POWER CIRCUIT TERMINATING IN A JUNCTION BOX.
7. THE FLOW METER MANUFACTURER'S INSTALLATION REQUIREMENTS MUST BE MET. THE
REQUIREMENTS SHOWN IN THIS DETAIL SHALL BE CONSIDERED THE MINIMUM ACCEPTABLE
INSTALLATION. THIS IS ESPECIALLY MEANT TO APPLY TO UPSTREAM/DOWNSTREAM DISTANCES, PIPE OBSTRUCTIONS, AND ACTUAL INSTALLED PIPING CONFIGURATION REQUIRED BY THE FLOW
METER MANUFACTURER IN ORDER TO OBTAIN THE ACCURACIES REQUIRED BY THE
SPECIFICATIONS AND METER TYPE. ALL CHANGES TO THE PIPING CONFIGURATION DEPICTED IN
THESE PLANS SHALL BE APPROVED BY THE ENGINEER AND METER MANUFACTURER PRIOR TO
IMPLEMENTATION.
8. THIS DISTANCE VARIES BY PRESSURE CLASS OF THE FLANGES AND FLOW CONDITIONER
THICKNESS. IN THE 2" IPS - 12" IPS LINE SIZES, EXPECT THIS DISTANCE TO VARY
BETWEEN 3" AND 7". VERIFY IF SPACE IS TIGHT.
9. PROVIDE ECCENTRIC INCREASER AND REDUCER IF METER LINE SIZE DIFFERS FROM MAIN LINE
SIZE (THE UPSTREAM REDUCER AND DOWNSTREAM INCREASER ARE NOT ALWAYS REQUIRED
BUT THE LOCATIONS ARE SHOWN HEREIN IN CASE THE METER SIZE HAS BEEN REDUCED FROM
MAIN LINE SIZE TO INCREASE METER PERFORMANCE).
10. PROVIDE ADEQUATE SLACK IN THE CABLE BETWEEN THE FLOW METER HEAD AND THE
JUNCTION BOX SHOWN TO FACILITATE METER REMOVAL AND ACCOMMODATE PIPING
EXPANSION/CONTRACTION.
11. AN APPROXIMATION OF THE METER BODY LENGTH FOR METERS IN THE BODY SIZE RANGE
2" TO 12" IS AS FOLLOWS: 2" METER IS ABOUT 4 PIPE DIAMETERS IN LENGTH; 3" AND 4"
METERS ARE ABOUT 2.5 PIPE DIAMETERS; 6" METERS IS ABOUT 2 PIPE DIAMETERS; 8", 10", AND 12" METER ARE ABOUT 1.5 PIPE DIAMETERS. COORDINATE EXACT LENGTHS WITH
ACTUAL METER SELECTED.
12. FLOW CONDITIONER.
13. INSTALL THE FLOW CONDITIONER BETWEEN A PAIR OF WELD NECK FLANGES OF THE
APPROPRIATE LINE SIZE AND PRESSURE CLASS FOR THE APPLICATION, PER THE
MANUFACTURER'S INSTRUCTIONS.
FLOW
MINIMUM 8 STRAIGHT PIPE DIAMETERS (UPSTREAM).
2 STRAIGHT PIPE DIAMETERSMINIMUM 5 STRAIGHT PIPE DIAMETERS (DOWNSTREAM)
FLOW
3 DIAMETERS MINIMUM
UPSTREAM STRAIGHT PIPE
RUN
2 DIAMETERS MINIMUM
DOWNSTREAM STRAIGHT
PIPE RUN
1. METER HEAD. THE METER HEAD FOR THE INLINE ELECTRO/MAGNETIC METER SHALL
INCLUDE THE INPUT POWER TERMINALS AND A LOCAL READOUT OF DATA AND/OR
DIAGNOSTIC MESSAGES. REFER TO SPECIFICATIONS AND METER SCHEDULE FOR
ADDITIONAL INFORMATION. THE METER HEAD IS SHOWN MOUNTED ON THE METER BODY
BUT MAY BE REMOTE MOUNTED. REFER TO PLANS AND SPECIFICATIONS FOR MORE
INFORMATION.
2. LOCAL DISPLAY UNIT OR BTU METER (WHEN SPECIFIED). MOUNT AT 5'-6" A.F.F. TO THE
CENTERLINE OF THE DISPLAY SCREEN. PANEL MAY BE WALL-MOUNTED AS LONG AS IT IS
EASILY ACCESSIBLE AND READABLE. OTHERWISE, IT SHALL BE MOUNTED ON A WELDED
ANGLE IRON, OR BOLTED STRUT, RIGID FLOOR STAND. REFER TO SPECIFICATIONS TO
DETERMINE IF A LOCAL DISPLAY UNIT IS TO BE FURNISHED. REFER TO THE FLOW METER
SCHEDULE TO DETERMINE IF A BTU METER IS TO BE PROVIDED. A BTU METER REQUIRES
THE INSTALLATION OF THE FLOW METER AND TWO THERMOWELLS (ONE IN THE SUPPLY
LINE AND ONE IN THE RETURN LINE) FOR INSTALLATION OF THE ADDITIONAL SENSORS
REQUIRED WHEN MEASURING BTU'S. REFER TO BTU METER SENSOR DIAGRAM.
3. OUTPUT SIGNALS TO THE B.A.S.
4. POWER CIRCUIT TERMINATING IN A JUNCTION BOX.
5. FLOW SENSORS IMBEDDED IN THE INLINE FLOW METER BODY AT THE 3 O'CLOCK AND 9
O'CLOCK POSITIONS TO PREVENT SEDIMENT FROM IMPACTING THEM.
6. PROVIDE INCREASER AND REDUCER IF METER LINE SIZE DIFFERS FROM MAIN LINE SIZE (THE
UPSTREAM REDUCER AND DOWNSTREAM INCREASER ARE NOT ALWAYS REQUIRED BUT
THE LOCATIONS ARE SHOWN HEREIN IN CASE THE METER SIZE HAS BEEN REDUCED FROM
MAIN LINE SIZE TO INCREASE METER PERFORMANCE).
7. DRAIN/AIR RELEASE VALVES. 0.5" SIZE WITH HOSE CONNECTION THREADS AND SCREW ON
CAP AT THE TERMINUS. INSTALL THESES VALVES BETWEEN THE ISOLATION VALVES BUT
OUTSIDE THE MINIMUM REQUIRED STRAIGHT PIPE DIAMETERS UPSTREAM. DRILL OUT THE
OPENING FOR THE INSTALLATION OF THE THREAD-O-LETS TO MINIMIZE ANY IMPACT ON
FLOW TURBULENCE. DO NOT CUT THE THREAD-O-LET HOLES WITH A TORCH.
8. PROVIDE ADEQUATE SLACK IN THE CABLE BETWEEN THE FLOW METER HEAD AND THE
JUNCTION BOX TO FACILITATE METER REMOVAL.
9. WORK WITH THE DIVISION 26 CONTRACTOR TO PROVIDE PROPER GROUNDING FOR THE
METER BODY AND THE PIPING SYSTEM PER INSTALLATION INSTRUCTIONS FOR THE METER
MANUFACTURER'S EXACT REQUIREMENTS. AT A MINIMUM EXPECT TO PROVIDE A GROUND
ROD AND A PROPERLY SIZED GROUNDING CONDUCTOR CONNECTED TO THE METER BODY,
THE PIPING SYSTEM ON BOTH SIDES OF THE METER BODY, AND THE GROUND ROD. THE
GROUND ROD SOLUTION IS THE PREFERRED METHOD OF GROUNDING. AN ACCEPTABLE
ALTERNATIVE MAY BE TO EXTEND THE GROUNDING CONDUCTOR FROM THE METER BODY
AND THE PIPING SYSTEM BACK TO THE BUILDING ELECTRICAL SERVICE PANEL. MEET THE
GROUNDING REQUIREMENTS OF THE METER MANUFACTURER.
10. PROVIDE MINIMUM 12" CLEARANCE ALL AROUND THE METER FOR SERVICING AND REMOVAL.
REFER TO THE SPECIFIC METER INSTALLATION GUIDE FOR THE MANUFACTURER'S
REQUIRED CLEARANCE FOR METER REMOVAL AND SERVICING. PROVIDE THE CLEARANCE
AS DIRECTED THEREIN IF IT EXCEEDS THE MINIMUM REQUIRED 12". PROVIDE ADEQUATE
SPACE IN FRONT OF THE METER FOR ACCESS.
NOTES:
A. THIS DETAIL IS GENERIC IN NATURE. THE COMPLETED INSTALLATION SHALL BE IN
STRICT ACCORDANCE WITH THE METER MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND ANY ADDITIONAL REQUIREMENTS SHOWN HEREIN.
B. THE FLOW METER MANUFACTURER'S INSTALLATION REQUIREMENTS MUST BE MET.
THE REQUIREMENTS SHOWN IN THIS DETAIL SHALL BE CONSIDERED THE MINIMUM
ACCEPTABLE INSTALLATION. THIS IS ESPECIALLY MEANT TO APPLY TO
UPSTREAM/DOWNSTREAM DISTANCES, PIPE OBSTRUCTIONS, AND ACTUAL INSTALLED
PIPING CONFIGURATION REQUIRED BY THE FLOW METER MANUFACTURER IN ORDER
TO OBTAIN THE ACCURACIES REQUIRED BY THE SPECIFICATIONS AND METER TYPE.
ALL CHANGES TO THE PIPING CONFIGURATION DEPICTED IN THESE PLANS SHALL BE
APPROVED BY THE ENGINEER PRIOR TO IMPLEMENTATION.
C. PROVIDE SERVICE CLEARANCE ALL AROUND METER PER MANUFACTURER'S
INSTRUCTIONS, MINIMUM 12".
GENERAL NOTES:
11FLOW
FLOW
NEAREST DOWN STREAM
PIPE FITTING, VALVE, OR
PIPING SPECIALTY
PIPE CROSS SECTION
NEAREST UPSTREAM
PIPE FITTING, VALVE,
OR PIPING SPECIALTY
1. THREAD-O-LET BRANCH OUTLET FITTING (SIZE AS REQUIRED BY FLOW METER
MANUFACTURER, FLOW METER TYPE, AND APPLICATION PER METER MANUFACTURER'S
INSTRUCTIONS).
2. CLOSE NIPPLE (SIZE AS REQUIRED BY FLOW METER MANUFACTURER AND APPLICATION).
3. FULL PORT ISOLATION BALL VALVE (SIZE AS REQUIRED BY FLOW METER MANUFACTURER
AND APPLICATION).
4. METER RETRACTION WELL OR HOT TAP ADAPTER BASED UPON FLOW METER
MANUFACTURER AND APPLICATION REQUIREMENTS.
5. CLAMPING NUT BASED UPON FLOW METER MANUFACTURER AND APPLICATION
REQUIREMENTS.
6. STEM.
7. METER HEAD.
8. INSERTION DEPTH GAUGE FURNISHED WITH EACH INSERTION METER BY THE FLOW METER
MANUFACTURER.
9. THE FLOW METER LOCATION (AS SHOWN ON THE DRAWINGS), THE
UPSTREAM/DOWNSTREAM PIPING ARRANGEMENT, AND THE LOCATIONS OF ANY
UPSTREAM/DOWNSTREAM PIPING OBSTRUCTIONS, HAVE BEEN DESIGNED TO ASSURE THE
SPECIFIED FLOW METER ACCURACY AND PERFORMANCE ARE ACHIEVED. THE CONTRACTOR
SHALL VERIFY THAT THE UPSTREAM/DOWNSTREAM REQUIRED STRAIGHT PIPE DISTANCES
ARE PROVIDED IN THE ACTUAL FIELD INSTALLATION. THE CONTRACTOR SHALL REFER TO
THE MANUFACTURER'S LITERATURE FOR EXACT REQUIREMENTS AND SHALL INSURE THE
MANUFACTURER'S FLOW METER INSTALLATION INSTRUCTIONS AND CLEARANCES ARE MET.
ANY DEVIATIONS FROM THE FLOW METER MANUFACTURER'S INSTALLATION REQUIREMENTS
SHALL BE BROUGHT TO THE ENGINEER'S AND MANUFACTURER'S ATTENTION FOR
ACCEPTANCE PRIOR TO INSTALLING PIPING SYSTEM IN THE METER AREA.
10. PROVIDE ENOUGH SLACK IN THE FLEXIBLE CONDUIT AND CABLES TO PERMIT METER
REMOVAL FOR INSPECTION AND SERVICING AS WELL AS ANY PIPE
EXPANSION/CONTRACTION MOVEMENT.
11. REFER TO SPECIFIC METER INSTALLATION INSTRUCTIONS FOR REQUIRED CLEARANCES.
(NOTE THAT CLEARANCES ARE GENERALLY 30" - 36" ABOVE THE TOP OF THE PIPE RANGE,
BUT CAN REQUIRE EVEN MORE IN CERTAIN APPLICATIONS).
12. CONNECT FACTORY WIRES TO FIELD WIRES IN AN APPROPRIATE JUNCTION BOX. PROVIDE
EXTRA COMPARTMENT FOR TRANSFORMER (WHEN REQUIRED) IN COMPLIANCE WITH
NATIONAL ELECTRICAL CODE REQUIREMENTS.
13. LOCAL DISPLAY UNIT OR BTU METER (WHEN SPECIFIED). MOUNT AT 5'6" A.F.F. TO THE
CENTERLINE OF THE DISPLAY SCREEN. PANEL MAY BE WALL-MOUNTED AS LONG AS IT IS
EASILY READABLE AND ACCESSIBLE. OTHERWISE, IT SHALL BE MOUNTED ON A WELDED
ANGLE IRON, OR BOLTED STRUT, RIGID FLOOR STAND. REFER TO SPECIFICATIONS TO
DETERMINE IF A LOCAL DISPLAY UNIT IS TO BE FURNISHED. REFER TO SPECIFICATIONS
AND/OR FLOW METER SCHEDULE TO DETERMINE IF A BTU METER IS TO BE PROVIDED. A BTU
METER REQUIRES THE INSTALLATION OF THE FLOW METER AND TWO THERMOWELLS (ONE
IN THE SUPPLY LINE AND ONE IN THE RETURN LINE) FOR INSTALLATION OF THE ADDITIONAL
SENSORS REQUIRED TO MEASURE BTU'S.
14. OUTPUT SIGNALS TO THE B.A.S.
15. INCOMING POWER CIRCUIT TERMINATING IN A JUNCTION BOX.
16. FLOW SENSOR.
17. PRESSURE AND TEMPERATURE TEST PLUG INSTALLED BETWEEN THE ISOLATION VALVES
BUT OUTSIDE THE REQUIRED MINIMUM STRAIGHT PIPE DIAMETERS ZONE.
18. MAKE SURE THAT ALL LINES ARE FILLED WITH WATER BEFORE INSERTING THE TURBINE
ASSEMBLY INTO THE PIPING SYSTEM. IF THE LINES ARE NOT FILLED, AIR MAY INTERRUPT
THE FLOWING STREAM AND DAMAGE THE TURBINE ASSEMBLY. AN EVEN GREATER DANGER
IS THAT IF THIS IS A HOT WATER SYSTEM, SOME WATER MAY FLASH INTO STEAM AND
EXCEED THE HIGH TEMPERATURE LIMIT FOR THE TURBINE AND ITS MECHANICAL ASSEMBLY.
THIS FLASH OVER COULD EXCEED THE PRESSURE RATINGS OF THE METER AND THE
ASSEMBLY COULD FAIL ALLOWING STEAM AND HOT WATER TO ESCAPE CAUSING SERIOUS
INJURY.
NOTES:
A. THIS DETAIL IS GENERIC IN NATURE. THE COMPLETED INSTALLATION SHALL BE IN
STRICT ACCORDANCE WITH THE METER MANUFACTURER'S INSTALLATION
INSTRUCTIONS AND ANY ADDITIONAL REQUIREMENTS SHOWN HEREIN.
B. THE FLOW METER MANUFACTURER'S INSTALLATION REQUIREMENTS MUST BE MET. THE
REQUIREMENTS SHOWN IN THIS DETAIL SHALL BE CONSIDERED THE MINIMUM
ACCEPTABLE INSTALLATION. THIS IS ESPECIALLY MEANT TO APPLY TO
UPSTREAM/DOWNSTREAM DISTANCES, PIPE OBSTRUCTIONS, AND ACTUAL INSTALLED
PIPING CONFIGURATION REQUIRED BY THE FLOW METER MANUFACTURER IN ORDER TO
OBTAIN THE ACCURACIES REQUIRED BY THE SPECIFICATIONS AND METER TYPE. ALL
CHANGES TO THE PIPING CONFIGURATION DEPICTED IN THESE PLANS SHALL BE
APPROVED BY THE ENGINEER PRIOR TO IMPLEMENTATION.
C. PROVIDE SERVICE CLEARANCE ALL AROUND METER PER MANUFACTURER'S
INSTRUCTIONS, MINIMUM 12".
GENERAL NOTES:
180.00°
FOR INSTALLATION IN A HORIZONTAL PIPE
POSITION THE METER IN THE UPPER 180°
POSITION.
17 17
MINIMUM 5 STRAIGHT PIPE DIAMETERS (DOWNSTREAM)MINIMUM _ STRAIGHT PIPE DIAMETERS (UPSTREAM)
R E
Q U
IR
E
D F
O R
C
LE
A R
A N
C E
F O
R
IN
S E
R T
IO
N
O R
R E
M O
V A
L
BTU
METER
INPUT POWER
SIGNAL CONNECTIONS TO
BUILDING AUTOMATION SYSTEM
FLOW
METER
FLOW
SUPPLY
FLOW RETURN
5 6
1 7
1. SUPPLY TEMPERATURE SENSOR SUPPLIED WITH THE BTU METER AND INSTALLED IN A
THERMOWELL FOR PIPE SIZES 1.25" AND LARGER, DIRECT INSERTION FOR PIPE SIZES 1" AND
SMALLER.
2. RETURN TEMPERATURE SENSOR SUPPLIED WITH THE BTU METER AND INSTALLED IN A
THERMOWELL FOR PIPE SIZES 1.25" AND LARGER, DIRECT INSERTION FOR PIPE 1" AND
SMALLER.
3. THE TEMPERATURE SENSORS FOR THE BTU METER SHALL NOT BE MOUNTED WITHIN THE
FLOW METER REQUIRED UPSTREAM/DOWNSTREAM STRAIGHT PIPE DIAMETERS ZONE.
4. THREAD-O-LET FITTING FOR THERMOWELL INSTALLATION.
5. BTU METER SHALL BE WALL-MOUNTED / FLOW-METER-HEAD-MOUNTED, INSTALLED PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
6. IF WALL-MOUNTED, THE LOCATION MUST BE BOTH ACCESSIBLE AND EASILY READABLE. IF
NO WALL MOUNTING APPLICATION MEETS THE "ACCESSIBLE/EASILY READABLE" CRITERIA
THEN THE PANEL SHALL BE MOUNTED ON A WELDED ANGLE IRON, OR BOLTED STRUT, RIGID
FLOOR STAND. MOUNTING HEIGHT TO THE CENTERLINE OF THE DISPLAY SCREEN SHALL BE
5’-6” A.F.F.
7. IN SOME INSTANCES THE SUPPLY SENSOR IS INTEGRAL TO THE METER BODY AND DOES
NOT HAVE TO BE FIELD MOUNTED. VERIFY WITH THE METER MANUFACTURER FOR EXACT
SUPPLY SENSOR FIELD INSTALLATION REQUIREMENTS.
8. PROVIDE ADEQUATE SLACK IN THESE CABLES BETWEEN THE FLOW METER HEAD AND THE
BTU METER AND BETWEEN THE TEMPERATURE SENSORS AND THE BTU METER TO
FACILITATE METER AND SENSOR REMOVAL FOR INSPECTION AND MAINTENANCE.
NOTES:
A. THIS DETAIL IS GENERIC IN NATURE. THE COMPLETED INSTALLATION SHALL BE IN STRICT
ACCORDANCE WITH THE METER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND
ANY ADDITIONAL REQUIREMENTS SHOWN HEREIN.
GENERAL NOTES:
DOWNSTREAM
UPSTREAM
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
DETAILS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M503
539-20-201
FORT THOMAS, KENTUCKY
/0
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE: NONE
INLINE TYPE VORTEX FLOW METER (SATURATED STEAM)
SCALE: NONE
INLINE ELECTRO-MAGNETIC TYPE FLOW METER (FEEDWATER)
SCALE: NONE
INSERTION TYPE TURBINE FLOW METER (HYDRONIC)
SCALE: NONE
BTU METER SENSOR DIAGRAM
V T
R D
3"
V T
R D
3"
D
NOTES
1. STEAM BOILER, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.
2. FLUE GAS RECIRCULATION PIPING.
3. CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL ON SHEET M502.
4. BURNER OBSERVATION PORT.
5. SIGHTFLOW INDICATOR WITH ROTOR (ORIENT WINDOWS TO FACE UP AND DOWN).
6. MANUAL SURFACE BLOWDOWN BYPASS VALVE.
7. STAINLESS STEEL TUBING ROUTED TO SAMPLE COOLER.
8. MAKEUP WATER CONNECTION.
9. AUXILIARY LOW WATER CUTOFF. PROVIDE SHUNT SWITCH AS SPECIFIED FOR TESTING.
10. NATURAL GAS TRAIN, COMPLETE MAIN AND PILOT, FACTORY MOUNTED AND WIRED.
11. 10" (INTERNAL DIAMETER) BOILER FLUE. THE FLUE MANUFACTURER SHALL CONFIRM FINAL
SIZE BY PERFORMING ENGINEERING, PRESSURE, AND SIZING CALCULATIONS BASED ON
THE ACTUAL EQUIPMENT SELECTED TO ENSURE PROPER SYSTEM VENTING
PERFORMANCE.
12. NATURAL GAS PIPING, REFER TO PLUMBING DRAWINGS.
13. AUTOMATIC MOTORIZED SURFACE BLOWDOWN VALVE.
14. MOTORIZED MODULATING BOILER FEEDWATER CONTROL VALVE.
15. CONDUCTIVITY SENSOR.
16. PRESSURE TRANSMITTER.
17. DRIP PAN ELBOW, REFER TO DETAIL ON SHEET M502. ROUTE DRAIN TO TRENCH DRAIN.
18. MULTIPLE SAFETY RELIEF VALVES, QUANTITY AND SIZES PER BOILER MANUFACTURER.
REFER TO DETAIL ON SHEET M502.
19. EACH PRESSURE RELIEF VENT SHALL BE ROUTED SEPARATELY UP TO ROOF. INDICATED
SIZE IS PRELIMINARY, CONFIRM WITH BOILER MANUFACTURER. TERMINATE 6' ABOVE
ROOF LEVEL, REFER TO DETAIL ON SHEET M502.
20. STACK STARTING ADAPTER WITH DRAIN. ROUTE TO TRENCH DRAIN.
21. CONDENSATE PIPING SHALL INCLUDE A WATER TRAP TO PREVENT THE ESCAPE OF FLUE
GAS.
22. ROUTE BOILER GAUGE GLASS AND LEVEL CONTROLLER DRAINS TO BLOWOFF TANK.
23. INLINE SEATLESS, SLIDING PLUNGER, OS&T, DESIGNED FOR BLOWOFF SERVICE.
24. SURFACE BLOWOFF CONNECTION.
25. DRAFT CONTROL DAMPER WITH MODULATING ACTUATOR, PRESSURE TRANSMITTER,
AND PRESSURE SWITCH.
26. FLOW STRAIGHTENER. REFER TO STEAM METER DETAIL ON SHEET M503.
27. CHEMICAL FEED CONNECTION.
28. GAUGE GLASS.
29. MAIN LOW WATER CUTOFF - LEVEL MASTER CONTROL. PROVIDE SHUNT SWITCH AS
SPECIFIED FOR TESTING.
30. STEAM PRESSURE TRANSMITTER.
31. NON RECYCLE MANUAL RESET STEAM HIGH LIMIT SWITCH.
32. NATURAL GAS VENT PIPING UP THROUGH ROOF FOR MAIN VENT VALVE, PILOT VENT
VALVE, PILOT RELIEF, MAIN REGULATOR, PILOT REGULATOR, LOW PRESSURE GAS
SWITCH, HIGH PRESSURE GAS SWITCH, PILOT LOW PRESSURE GAS SWITCH, REFER TO
PLUMBING DRAWING.
33. 0.75" DRAIN VALVE. ROUTE TO TRENCH DRAIN.
34. HIGH WATER OVERFLOW CONNECTION.
35. OS&Y VALVE WITH WARM-UP VALVE.
36. ANGLED SEATLESS, SLIDING PLUNGER, OS&T, DESIGNED FOR BLOWOFF SERVICE.
37. STEAM FLOW/TOTALIZING METER. INSTALL WITH MINIMUM STRAIGHT RUN OF PIPING
BEFORE AND AFTER THE METER PER THE MANUFACTURER'S INSTALLATION
INSTRUCTION; INSTALL FLOW STRAIGHTENER IF REQUIRED. REFER TO STEAM METER
DETAIL ON SHEET M503. REFER TO SCHEDULE ON SHEET M603.
38. FEEDWATER FLOW METER. REFER TO DETAIL ON SHEET M503. REFER TO SCHEDULE ON
SHEET M603.
39. FUEL OIL SUPPLY AND RETURN PIPING, REFER TO PLUMBING DRAWINGS.
40. FUEL OIL PUMP.
41. PROPANE PIPING FOR IGNITER PILOT, REFER TO PLUMBING DRAWINGS.
42. ROUTE PIPING IN TRENCH DRAIN TO BLOW DOWN SEPARATOR.
43. HIGH WATER OVERFLOW STEAM TRAP.
44. EMERGENCY SOFTY COLD WATER MAKEUP LINE, NORMALLY CLOSED. FOR USE WHEN
FEEDWATER SYSTEM IS DOWN FOR INSPECTION OR REPAIR.
45. PROVIDE CHAIN WHEEL ON VALVE.BO
B D
P
V T
R
V T
R
V T
R
V T
R
V T
R
V T
R
V T
R
V T
R
N G
D
NC
0.375"
NC
D
0.75"
FE
TO STEAM
HEADER
FOB FOB
0.75"
B D
BD
FROM MAIN LOW
WATER CUTOFF
ASSEMBLY
0.75" FROM OPPOSITE SIDE OF
BOILER (MAIN LOW WATER CUTOFF
ASSEMBLY)
TO OPPOSITE
SIDE OF BOILER
1.25"0.75"
0.75"
0.75"
6"
6"
1.25"
F O
R F
O S
P
FM
P
F W
P D
1.25"
2' MAX
34 43
LPS (12)
LP
R
0.75"
C B
D
N P
W (S
C W
1.25"
NC
4"
NOTES con't
D
64-FM-3, 4, 5
64-FM-9, 10, 11
FM
64-FM-6, 7, 8
B D
0.75"
GENERAL NOTES
A. DUE TO LIMITED ACCESS INTO BOILER ROOM THE BOILER SHALL BE FIELD-
ERECTABLE ASSEMBLED IN PLACE. CONTRACTOR SHALL REVIEW
PATHWAY AND ACCESS TO BOILER ROOM PRIOR TO ORDERING TO INSURE
THE BOILER CAN BE INSTALLED WITHOUT MODIFYING THE EXISTING
ACCESS.
B. LISTED DIMENSIONS AND CLEARANCES SHALL BE CONSIDERED MAXIMUM.
EQUIPMENT PROVIDED EXCEEDING THESE VALUES SHALL BE REJECTED.
C. MAXIMUM OVERALL BOILER HEIGHT SHALL NOT EXCEED 85".
TYPICAL STEAM BOILER
(NOT INCLUDING CONCRETE PAD)
130" TO TOP OUTSIDE DIA. OF FLUE
86"
TO EXTENTS OF THE GAS TRAIN
70" FROM EXTENTS OF THE FUEL OIL PUMP
108" OVERALL
36" FRONT SERVICE AREA
SERVICE AREA
24" REAR
TUBE REMOVEAL
28"
TUBE REMOVEAL
28"
STACK
FLANGE
FUEL OIL
PUMP
GAS TRAIN
B D
0.75"
M A
S O
N R
Y C
H
IM
N E
Y
10' [120 in]
68' [816 in]
64' [768 in]
STACK CLEANOUT
18" DIAMETER CBI
KL CLAMP SUPPORT TYP.
SINGLE WALL CHIMNEY LINER
DOUBLE WALL WITH 1" AIRSPACE
VENTILATED COLLAR
WALL FIRESTOP
VENTILATED FLASHING
CUSTOM CURB CAP
ROOF
DOUBLE WALL WITH 2" INSULATION
TO BOILERS
COMPACTED GRAVEL BASE
24"X24" CONCRETE BLOCK
(LENGTH AS REQUIRED)
NOTES:
1. PROVIDE SUPPORT MINIMUM EVERY 6'-0" AND AT EVERY CHANGE OF DIRECTION.
2. PIPE INSULATION AND PROTECTIVE JACKET SHALL EXTEND THROUGH PIPE CLAMP
TO MAINTAIN VAPOR BARRIER.
3. COORDINATE PIPE AND CONDUIT ARRANGEMENT CLOSELY WITH DIVISION 26.
UNDISTURBED EARTH
STEAM PIPE
CONTROL CONDUIT
(COORDINATE W/
DIVISION 26)
GALVANIZED STEEL CHANNEL
SUPPORT BOLTED TO
CONCRETE BLOCK
UNISTRUT OR EQUAL
CHANNEL SUPPORT CLAMP (TYP)
CONDENSATE PIPE WITH
HEAT TRACE AND INSULATION
WITH PROTECTIVE JACKET
PIPE ROLLER
PIPE ROLLER
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
DETAILS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M504
539-20-201
FORT THOMAS, KENTUCKY
/1
/1
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE: NONE
TYPICAL STEAM BOILER PIPING
SCALE: NONE
BOILER DIMENSIONS
SCALE: NONE
BOILER STACK
SCALE: NONE
EXTERIOR SUPPORT DETAIL
179.17 [4551mm]
36" MINIMUM CLEARANCE
AROUND EXTERIOR OF CONTAINER
30.00 [762mm]
17.70 [450mm]
42.00 [1067mm]
42.00 [1067mm]
30.00 [762mm]BOILER CONTAINER
MAIN POWER ENCLOSURE
BOILER #2
M5-200-3500
BLOW DOWN
SEPARATOR
A20B
BRINE TANK
300# STRG
WATER SOFTENER
FMR-30
FEEDWATER TANK
FSH-86
CHEMICAL FEED
CTS-20
CONTROL PANEL
BOILER #1
M5-200-3500
BOILER STACK
BOILER STACK
540.00" [13716 mm]
96.00 [2438.5 mm]
EMERGENCY SHUT-OFF STATION
EMERGENCY SHUT-OFF STATION
EMERGENCY
SHUT-OFF
STATION
S
LIGHT SWITCH CONVINIENCE OUTLET
A
L
K E
D
A
F G
48 X 24 AIR INTAKE LOUVER
UNIT
HEATEREXHAUST FAN
LED LIGHT
LED LIGHT LED LIGHT
LED LIGHT
LED LIGHTLED LIGHT
B H C J I
EMERGENCY SHUT-OFF CONTACTS (TYPICAL)
1. TEMP. BOILER B1 (CSD SAFETY CONTACT)
2. TEMP. BOILER B2 (CSD SAFETY CONTACT)
NOTE: COORDINATE POWER WITH CIRCUIT FOR GAS
VALVE. PROVIDE CONTACT BLOCKS, WIRING, AND/OR
RELAYS NECESSARY TO PROVIDE SHUT DOWN OF
ABOVE DEVICES. COORDINATE WIRING AND VOLTAGE
REQUIREMENTS WITH DEVICES.
C
C
(TYP.)
EMERGENCY
SHUT-OFF
STATION
(BOILER
CONTAINER)
1. REUSE EXISTING ALARM PANEL STATION LOCATED IN ENGINEERING ROOM 018 FOR THE
TEMPORARY BOILER SYSTEM.
2. WIRE THE TEMPORARY BOILER #1 FAILURE ALARM CONTACT TO THE EXISTING ALARM
PANEL AND CONNECT TO "BOILER #1 FAILURE" RELAY.
3. WIRE THE TEMPORARY BOILER #2 FAILURE ALARM CONTACT TO THE EXISTING ALARM
PANEL AND CONNECT TO "BOILER #2 FAILURE" RELAY.
4. WIRE THE TEMPORARY BOILER SYSTEM FEEDWATER LOW WATER ALARM CONTACT TO THE
EXISTING ALARM PANEL AND CONNECT TO "DEAERATOR LEVEL" RELAY. RELABEL THE LIGHT
ON THE ALARM PANEL DOOR TO INDICATE "FEEDWATER LOW WATER LEVEL".
5. WIRE THE TEMPORARY BOILER SYSTEM FEEDWATER HIGH WATER ALARM CONTACT TO THE
EXISTING ALARM PANEL AND CONNECT TO "SURGE LEVEL" RELAY. RELABEL THE LIGHT ON
THE ALARM PANEL DOOR TO INDICATE "FEEDWATER HIGH WATER LEVEL".
6. WIRE THE EMERGENCY SHUT-OFF STATION LOCATED IN ENGINEERING ROOM 018 TO THE
TEMPORARY BOILER SYSTEM. IF THE EXISTING EMEGN ECY SHUT-OFF STATION IS NOT
COMPATIBLE WITH THE TEMPORARY BOILER SYSTEM THEN IT SHALL BE REPLACED.
NOTES:
4 5
2 3
EMERGENCY
SHUT-OFF
STATION
(ENGINEERING
018)
EMERGENCY
SHUT-OFF
STATION
(BOILER
CONTAINER)
EMERGENCY
SHUT-OFF
STATION
(BOILER
CONTAINER)
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
DETAILS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M505
539-20-201
FORT THOMAS, KENTUCKY
/2
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE: 1/2" = 1'-0"
TEMP BOILER
EQUIPMENT DATA
BOILER STEAM BOILER - 2 REQUIRED
BASIS OF DESIGN: CLEAVER BROOKS MODEL M5-200-3500-15ST
DUAL FUEL BURNER (NATURAL GAS/FUEL OIL)
84 BHP STEAM BOILER
PRESSURE: 12 PSIG OPERATING WITH 15 PSIG SAFETY RELIEF VALVE
POWER CONNECTION: 208-60-3
REFER TO SPECS FOR MORE INFORMATION
PROVIDE CONTACT FOR REMOTE MONITORING OF BOILER FAILURE
CHEMICAL FEEDER CHEMICAL FEEDER EQUIPMENT (REFER TO SPECS)
BASIS OF DESIGN: CLEAVER BROOKS CTS-20-P-LC04
STORAGE TANK SIZE: 20-GAL, 18" x 18" x 24"
MAX DISCHARGE PRESSURE: 80 PSI
FLOW RATE: 24 GAL/DAY
FEEDWATER TANK FEEDWATER TANK (REFER TO SPECS)
BASIS OF DESIGN: CLEAVER BROOKS FEED SYSTEM - VERTICAL
TANK SIZE: 86-GAL (14.5 MINUTES OF STORAGE)
PRIMARY WATER SOURCE: MAKE-UP AT 50 PSIG
PROVIDE CONTACTS FOR REMOTE MONITORING OF HIGH AND LOW WATER LEVEL ALARMS
WATER SOFTENER WATER SOFTENER (REFER TO SPECS)
BASIS OF DESIGN: CLEAVER BROOKS WS-FMR-30-0.75-METERED-TWIN ALTERNATING
EVAPORATION RATE: 6.9 GPM
MAKE UP RATE: 100%
MAKE UP RETURN: 6.9 GPM
TOTAL GRAIN CAPACITY: 25000 GRAINS
OPERATING PRESSURE: 50 PSI
OPERATING TEMPERATURE: 50 F
BRINE TANK BRINE TANK 18x36 WITH MOLDED COVER
LIQUID CAPACITY 33 GALLONS, SALT CAPACITY 300 LBS.
BLOWDOWN SEPARATOR BLOWDOWN SEPARATOR (REFER TO SPECS)
BASIS OF DESIGN: CLEAVER BROOKS BDS-A20B-150PSI-3/8"PT-A16DS-STD/CFG
SEPARATOR DIMENSIONS: 14" OUTER DIAMETER, 22" HEIGHT
11.45 GAL FLOODED CAPACITY
SCALE: NONE
SAFETY SHUTDOWN STATION AND ALARMS
GENERAL NOTES
1. THE TEMPORARY BOILER SYSTEM SHALL BE MOUNTED ON A STEEL BASE INCLUDING ALL NECESSARY PIPING WIRING
AND CONTROLS.
2. THE SKID IS TO BE PRE-PIPED PRIOR TO SHIPMENT TO THE JOB SITE. THE STEAM LINE TO FEEDWATER SYSTEM SHALL BE PIPED BY MANUFACTURER. ALL PIPING SHALL BE PAINTED WITH HIGH TEMPERATURE BLACK PAINT. ALL PIPING NOT FACTORY INSULATED SHALL BE FIELD INSULATED IN ACCORDANCE WITH 23 07 11 HVAC AND BOILER PLANT
INSULATION.
3. THE SKID IS TO BE PRE-WIRED PRIOR TO SHIPMENT TO THE JOB SITE. ALL WIRING SHALL BE RAN AND WIRED.
4. FRAME SHALL BE 3/16" STEEL DIAMOND-PLATE OVER CONTAINER HARDWOOD FLOOR. ENCLOSURE SHALL BE 45’
LONG X 8’ WIDE X 9’ HIGH CUBE CONTAINER.
5. ELECTRIC SERVICE - SINGLE POINT POWER SERVICE CONNECTION TO UNIT. ADEQUACY OF LISTED CIRCUIT SIZE MUST BE VERIFIED BY H.C. AND UNIT SUPPLIER. COST FOR INCREASE OR CHANGE OF ELECTRIC SERVICE FOR EQUIPMENT
SELECTED SHALL BE BORNE BY H.C.
CUSTOMER CONNECTION LIST
CONNECTION
A
B
C
D
E
F
G
H
I
J
K
L
DESCRIPTION SIZE
BOILER STACK
GAS INLET
WATER INLET
BLOWDOWN VENT
MAIN SKID DRAIN
STEAM CONNECTION
CONDENSATE
PROPANE
FUEL OIL SUPPLY
FUEL OIL RETURN
WATER SOFTENER BACKWASH DRAIN
SINGLE POINT POWER FEED
12"
4 NPT"
1" NPT
4" FLANGED 150lb R.F.
3" NPT
6" FLANGED 150lb R.F.
2" NPT
208/3/60 110 MOCP
0.5" NPT
1" NPT
1.5" NPT
WEIGHT (LBS)
NAME
BOILER CONTAINER
TOTAL
QTY
SHIPPING WEIGHT
15980
15980
OPERATING WEIGHT
16499
16499
UNIT HEATER CEILING HUNG UNIT HEATER
HEATING CAPACITY: 15 KW
ELECTRICAL LOAD: 208V-3PH
BOILER COMBUSTION AIR PRESSURE PROVING SWITCH
FURNACE PRESSURE INTERLOCK
PURGE AIRFLOW PROVING SWITCH
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
DETAILS
Approver Designer
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M506
539-20-201
FORT THOMAS, KENTUCKY
/2
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE: NONE
BOILER PLUMBING TEST CONFIGURATIONS
1. AIR COOLED CHILLER. REFER TO EQUIPMENT DATA.
2. REMOTE AIR COOLED CONDENSER. REFER TO EQUIPMENT DAT.
3. CHILLED WATER PUMP, REFER TO EQUIPMENT SCHEDULE.
4. HORIZONTAL BLADDER STYLE EXPANSION TANK HUNG FROM STRUCTURE ABOVE. REFER TO
EQUIPMENT DATA. CHARGE TO SPECIFIED AIR PRESSURE.
5. CHEMICAL SHOT FEEDER, VALVES ON INLET AND OUTLET NORMALLY CLOSED.
6. MANUAL FILL AIR VENT (BALL VALVE), NORMALLY CLOSED.
7. 0.75" DRAIN VALVE WITH HOSE THREAD FITTING.
8. 1" DRAIN VALVE WITH HOSE THREAD FITTING.
9. LARGE CAPACITY AUTOMATIC AIR VENT. PIPE DISCHARGE TO FLOOR DRAIN.
10. DIRT AND AIR SEPARATOR. REFER TO EQUIPMENT DATA.
11. AUTOMATIC MAKE-UP ASSEMBLY. REFER TO EQUIPMENT DATA.
12. SAFETY RELIEF VALVE SET AT 50 PSIG. PIPE DISCHARGE TO FLOOR DRAIN.
13. WATER METER WITH REMOTE "GALLON" READOUT MOUNTED ON WALL..
14. MANUAL FILL VALVE.
15. BRAIDED FLEX CONNECTION.
16. START-UP STRAINER WITH BLOW DOWN VALVE. PERMANENT 20 MESH OR FINER IF
EVAPORATOR IS PLATE-AND-FRAME TYPE, ONE PIPE SIZE LARGER THAN LINE SIZE.
17. MANUAL AIR VENT AT HIGH POINTS OF SYSTEM (LOCATIONS SHOWN ARE ARBITRARY. ADJUST
LOCATIONS PER ACTUAL INSTALLATION).
18. STRUCTURAL PLATFORM, REFER TO STRUCTURAL DRAWINGS.
19. STRUCTURAL STEEL SUPPORT, REFER TO STRUCTURAL DRAWINGS. COORDINATE SUPPORT
FRAMING DIMENSIONS WITH THE APPROVED EQUIPMENT SHOP DRAWINGS PRIOR TO
FABRICATION.
20. MAKE-UP WATER CONNECTION SHALL BE MINIMUM 36" FROM INLET TO SEPARATOR.
21. 3" AUTOMATIC PRESSURE INDEPENDENT CONTROL VALVE, NORMALLY OPEN (MAX NOMINAL
FLOW 150 GPM). VALVE SHALL BE MODULATED TO MAINTAIN MINIMUM CHILLED FLOW,
COORDINATE WITH CHILLER MANUFACTURER.
22. PIPE REDUCERS AS REQUIRED..
23. FLOW METER. REFER TO SCHEDULE AND DETAIL. MAINTAIN MINIMUM UPSTREAM AND
DOWNSTREAM STRAIGHT LENGTHS.
24. BTU METER AND ASSOCIATED FLOW METER AND TEMPERATURE SENSORS. REFER TO
SCHEDULE, DETAIL AND CONTROLS SCHEMATIC.
25. VERTICAL CHILLED WATER BUFFER TANK, REFER TO EQUIPMENT DATA.
26. MANUAL AIR VENT.
27. REMOVE EXISTING THREE-WAY VALVE AND ASSOCIATED BYPASS PIPING. SEE NEW WORK FOR
NE VALVE TYPE.
28. REMOVE EXISTING TWO-WAY VALVE AND ASSOCIATED. SEE NEW WORK FOR NE VALVE TYPE.
29. REMOVE ALL CHILLED WATER PIPING AND ASSOCIATED ACCESSORIES , REFER TO MD404 FOR
MORE DETAIL.
30. 3" AUTOMATIC PRESSURE INDEPENDENT CONTROL VALVE, NORMALLY OPEN (MAX NOMINAL
FLOW 150 GPM). BALANCE FLOW TO FLOW INDICATED. VALVE SHALL BE INTEGRATED INTO
EXISTING AIR HANDLER CONTROL WHICH HAS JONSON CONTROLS METASYS CONTROLLERS.
31. 2.5" AUTOMATIC PRESSURE INDEPENDENT CONTROL VALVE, NORMALLY OPEN (MAX NOMINAL FLOW 110 GPM). BALANCE FLOW AS INDICATED. VALVE SHALL BE INTEGRATED INTO EXISTING
AIR HANDLER CONTROL PANEL WHICH HAS JONSON CONTROLS METASYS CONTROLLERS.
32. REFRIGERANT PIPING VERIFY ALL REFRIGERANT SIZES WITH MANUFACTURER AND INSTALL
PER MANUFACTURE'S WRITTEN INSTRUCTIONS.
33. TO/FROM CORROSION COUPON RACK, REFER TO WATER TREATMENT SPECIFICATION 23 25 00.
NOTES
CENTER PENTHOUSE NORTH PENTHOUSESOUTH PENTHOUSE
EXISTING AH-1EXISTING AH-3
115 GPM115 GPM
M M30 30
GENERAL NOTES
A. REFER TO FLOOR PLANS FOR PHASING.
B. REFER TO M703 CHILLED WATER CONTROL SCHEMATICS FOR PIPE-MOUNTED SENSORS AND
THERMAL WELLS. COORDINATE INSTALLATION LOCATION IN NEW AND EXISTING PIPING SYSTEM
WITH THE MANUFACTURER'S INSTALLATION REQUIREMENTS AND RECOMMENDATIONS.
3"3"
3" 3" 3"3"
64-CHP1
EXTERIOR
BUILDING WALL
6"
REFER TO INLINE PUMP DETAIL ON
SHEET M501.
WALL SLEEVE
(TYP.)
A
FLOOR
6"
64-CH1
MODULE-1MODULE-2MODULE-3MODULE-4MODULE-5
64-RC3 64-RC4 64-RC5
64-BT1
64-AS1
T
BTU
F T
EXISTING AH-2
76 GPM
M31
4"
64-RC1 64-RC2
ROOF
ROOF
4"
TT
PLATFORM
64-CHP2
6"
N.C.
EXISTING
RPBFP
N.C.N.C.
P
0.75"0.75"
P
E P
464-ET1
6"
6"
0.75"
0.75"
M
2" CAPPED
FOR FUTURE
FAN COILS
2.5"2.5"
6"
6"2.5"
2.5"
CHS
CHR
CHR
CHR
CHS
CHR
CHS
CHR
C H
S
C H
R
C H
R
C H
S
C H
R
C H
S
C H
S
C H
S
C H
R
C H
R
1"
64-CH264-CH364-CH464-CH5
1 (TYP.)
2 (TYP.)
(TYP.) 8 7
17(TYP.)
32(TYP.)
22 (TYP.)
64-MU1
64-CPF1
64-FM-12
0.75"
CENTER PENTHOUSE NORTH PENTHOUSESOUTH PENTHOUSE
EXISTING AH-1EXISTING AH-3
M M27 27
3"3"
3" 3" 3"3"
EXISTING AH-2
M
4"
2.5"2.5"
2.5"
2.5"
CHS
CHR
CHS
CHR
C H
S
C H
R
C H
R
C H
S
C H
R
C H
S
C H
S
C H
S
C H
R
C H
R
4"
29(TYP.)
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
CHILLED WATER PIPING
SCHEMATIC
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M507
539-20-201
FORT THOMAS, KENTUCKY
/2
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE: NONE
CHILLED WATER PIPING SCHEMATIC
SCALE: NONE
CHILLED WATER PIPING SCHEMATIC - REMOVALS
HPS (100)
12"
V G
64-B2
V G
64-B1
6"
3"
2.5"
0.75" 0.75"
A
A
M P
C
S -1
STORAGE
TANK BYPASS
MPS
SOFT WATER
BYPASS
S W
C T
P D
NC
EXISTING
FEEDWATER
DEAERATOR
OVERFLOW (OFL)
DEAERATOR
DRAIN
A
A
CW
FW(R)
FWPD-2
FWPD-1
3"
3"
2.5"
F W
P S
EXISTING BOILER FEEDWATER PUMPS
EXISTING
CONDENSATE
STORAGE TANK
EXISTING CONDENSATE TRANSFER PUMPS
CW
FW(R)
FWPD-2
LPS
NC
F W
P D
F W
(R
F W
P D
F W
(R
MAIN STEAM HEADER
F W
P S
CTPS
CTPD
OSD (OPEN SIGHT DRAIN)
O F
L
PC
CTPD
PUMP RECIRC.
3"
4"
STORAGE
TANK BYPASS
PC
NC4"
TO DISTRIBUTION
SYSTEM
FROM
CONDENSATE
RETURN UNIT
CW
CW
EXISTING DUPLEX WATER SOFTENER
NC
NC
C W
S W
SOFT WATER
BYPASS
FROM EXISTING
RPBFP
V T
R
3"3"
TO FEEDWATER
PUMPS
FROM
DEAERATOR
FLOOR
FWPD
NOTES
1. REMOVE EXISTING TRANSFER PUMPS AND ALL ASSOCIATED PIPING TO REMAIN.
2. REMOVE EXISTING CONDENSATE RECEIVER AND ALL ASSOCIATED PIPING IN FULL.
3. REMOVE EXISTING BOILER AND ALL ASSOCIATED COMPONENTS, CONTROLS, PIPING, AND
ELECTRICAL CONNECTIONS. ASSOCIATED STRUCTURAL PAD IS TO BE REMOVED.
4. REMOVE EXISTING CONDENSATE SURGE TANK AND ALL ASSOCIATED CONTROLS AND
PIPING AS INDICATED.
5. REMOVE EXISTING FEEDWATER DEAERATOR TANK AND ALL ASSOCIATED CONTROLS AND
PIPING AS INDICATED.
6. REMOVE EXISTING FEEDWATER PUMPS AND ALL ASSOCIATED CONTROLS AND PIPING AS
INDICATED.
7. REMOVE EXISTING SOFT COLD WATER PIPING, REFER TO PLUMBING DRAWINGS FOR
FULL EXTENT OF WORK.
8. REMOVE EXISTING CHEMICAL TREATMENT TANKS AND ALL ASSOCIATED CONTROLS AND
PIPING.
9. REMOVE EXISTING PIPE AS SHOWN, TYP.
3"
6"
3"
6"
3"
4"
2"
6"
MM
NC
NC
DP
DP
M
1.25"
PC
TO EXISTING
BLOWDOWN
SEPARATOR
CBD
CBD
1.5"1.5"
1.25"1.25"
M
GENERAL NOTES
A. REFER TO FLOOR PLANS FOR PHASING AND LOCATIONS.
NO
NO
NC
FM
NC
FM
8"
D
8"
D
1.25"1.25"
NC
REFER TO CONTROL SCHEMATICS FOR PIPE-MOUNTED SENSORS AND THERMAL WELLS.
COORDINATE INSTALLATION LOCATION IN NEW AND EXISTING PIPING SYSTEM WITH THE
MANUFACTURER'S INSTALLATION REQUIREMENTS AND RECOMMENDATIONS.
PC
1.25"
1.5"
HD HD HDHD
FWPD-1
3"
EXISTING
CONDENSATE
RECEIVER
EXISTING
CONDENSATE
RECEIVER
1" 1"
EXISTING
CONDENSATE
RECEIVER
0.75"
FROM BOILER
DRAIN
FROM BOILER
DRAIN
.75" .75"
FROM BOILER
SYSTEM
.75"
CP-1 CP-2
2 2
3 3
6 66
FP-1 FP-2 FP-3 CP-1 CP-2
9 9
9 99
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
DD1 SUBMITTAL 10/28/20221
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.
95% SUBMITTAL 12/12/20222
CD SUBMITTAL 10/30/20233 P
ro je c t
N u m b e r
STEAM BOILER SCHEMATIC -
REMOVALS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M508
539-20-201
FORT THOMAS, KENTUCKY
/0
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE: NONE
STEAM BOILER PIPING SCHEMATIC - REMOVALS
B D
P
0.75"
D
NC
0.375"
C B
D
D
FE
FOB FOB
6"
6"
LPS (12)
BO
D
FE
FOB FOB
6"
6"
D
FE
FOB FOB
6"
6"
LPS (12)
DD D D
0.75"
0.375" 0.375"0.375"
N P
W
DD D
T
T P
N P
W
B D
P
0.75"
D
NC
0.375"
0.75"
C B
D
BO
LP
R
0.75"
F W
P D
1.25"
B D
P
0.75"
D
NC
0.375"
C B
D
BO
0.75"
PP P
F W
P D
N P
W (S
C W
0.75"
LP
R
F W
P D
1.25"
N P
W (S
C W
0.75"
LP
R
F W
P D
1.25"
N P
W (S
C W
RPBFP
NC
NC NC NC
RPBFP
REFER TO
HVAC
REFER TO
PLUMBING
DRAWINGS
NPW(SCW)
NPW
NPW(SCW)
D
N P
W (S
C W
)N P
W
MAIN STEAM HEADER
0.375"
HOSE BIB
N P
W (S
C W
0.75"
FWPD
CBD
CBD
LPR
NPW(SCW)
FWPD
CBD
CBD
LPR
CBD
SAMPLE
SAMPLE
SAMPLE
SAMPLE
SAMPLECHEMICAL TREAT
CHEMICAL TREAT
CHEMICAL TREAT
FM FM
LP
S
(1 2)
0.75"
D
0.375"
0.375"
O F
L
D
T
P
EX. LPC
EX. LPC
E X
. L P
C
P C
NC
SCW
CW
2"
LP
R
LPR
10 D D
V T
R
V T
R
E X
. V T
R
6"
EXHAUST TO OUTDOORS FOR
BOILER-BURNER TESTING AND
ADJUSTING
D
VTR
D
4"
D
3"4"
2"
EX. LPS(12)
2"
EX. LPS(12)EX. LPS(12)
EX. LPS(12)
4"
EX. LPS(12)
4" 4" 4"
8" 8"
0.75"
0.75"
2"
2"
1.25"
2"
1.25"
1.5"1.5" 2"
1.5"
1.5" 1"1.25"
1.25"
3"
0.75"
1.25"
4"1" 0.75"
1.25"
3"
1.25"
0.75" (TYP.)
NOTES
1. STEAM BOILER, REFER TO EQUIPMENT SCHEDULE ON SHEET M603 AND TYPICAL BOILER
PIPING SCHEMATIC ON SHEET M504.
2. FEEDWATER SYSTEM, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.
3. FEEDWATER PUMP, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.
4. BLOWDOWN SEPARATOR, REFER TO EQUIPMENT SCHEDULE ON…