Attachment III - Drawings I.pdf
PDF 18 MB Posted
- Attached to
- Z2NB--Project No. 539-20-101 - Replace Fort Thomas Boilers. Federal contract opportunity
- Solicitation number
- 36C25024B0075
About this file
This document appears to be Attachment III - Drawings I.pdf, which is related to Solicitation Number 36C25024B0075 for Project No. 539-20-101 - Replace Fort Thomas Boilers. This solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 to replace the boilers at the Fort Thomas facility. The document contains detailed drawings and specifications for the boiler replacement project. It provides technical information on the design, layout, and requirements for the new boiler system. No additional pricing, set-aside, or award date details are included in this attachment. This appears to be a technical drawing document that supports the overall solicitation requirements.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215
Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
LEVIN PORTER ASSOCIATES
ARCHITECTURE PLANNING INTERIOR DESIGN
3011 NEWMARK DRIVE
MIAMISBURG, OH 45342
937.224.1931 P
937.224.3091 F
HEAPY ENGINEERING
MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY
1400 WEST DOROTHY LANE
DAYTON, OHIO 45409
937.224.0861 P
937.224.5744 F
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
THP LIMITED, INC
STRUCTURAL ENGINEERS
100 EAST EIGHTH ST. CINCINNATI, OHIO 45202
513.241.3222 P
513.241.2981 F
.0
TITLE SHEET
10/30/2023 VP SS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
G001
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
REPLACE FTD BOILER WITH HOT WATER SYSTEM
SHEET INDEX
FT THOMAS VA MEDICAL CENTER BUILDING 64
1000 SOUTH FORTH THOMAS AVENUE, FORT THOMAS, KY 41075
VICINITY MAP FT THOMAS CAMPUS MAP
Sheet List
Sheet Number Sheet Name
G001 TITLE SHEET
G002 GENERAL NOTES AND SITE LOGISTICS
G003 LIFE SAFETY PLANS
AD100 BASEMENT DEMOLITION PLAN
AD104 PENTHOUSE PLAN DEMOLITION
A100 BASEMENT PLANS
A101 TEMPORARY BOILER AND FENCE
A104 PENTHOUSE PLAN
A105 PENTHOUSE ENLARGED PLAN WITH DETAILS
S001 GENERAL STRUCTURAL NOTES
S104 ROOF FRAMING PLAN
S201 DETAILS
S202 SLAB PLAN, DETAILS, AND ELEVATIONS
F001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
FX100 MECHANICAL ROOM PLAN - FIRE SUPPRESSION
FX104 PARTIAL PENTHOUSE PLAN - FIRE SUPPRESSION
P001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
PS100 SITE PLAN
PD100.1A MECHANICAL ROOM PLANS - TEMPORARY PLAN
PD100.2A MECHANICAL ROOM PLANS - REMOVALS
PL100 MECHANICAL ROOM PLANS - DRAINAGE
PP100 MECHANICAL ROOM PLAN - DISTRIBUTION
P501 DETAILS & SCHEDULES
P701 DIAGRAMS
M001 ABBREVIATIONS, SYMBOLS, INDEX AND GENERAL NOTES
MD100 PARTIAL BASEMENT FLOOR PLAN - TEMPORARY PLAN REMOVALS
MD100.1 PARTIAL BASEMENT FLOOR PLAN - TEMPORARY WORK
MD400 ENLARGED BASEMENT FLOOR PLAN- REMOVALS
MD403 ENLARGED THIRD FLOOR PLAN - REMOVALS
MD404 ENLARGED ROOF AND PENTHOUSE PLAN - REMOVALS
MH400 ENLARGED BOILER ROOM - NEW WORK
MH400.1 PARTIAL BASEMENT FLOOR PLAN CONTROLS - NEW WORK
MH402 ENLARGED SECOND FLOOR PLAN - NEW WORK
MH403 ENLARGED THIRD FLOOR PLAN -NEW WORK
MH404 ENLARGED PENTHOUSE PLAN - NEW WORK
M201 STEAM BOILER PLANT ELEVATIONS
M501 DETAILS
M502 DETAILS
M503 DETAILS
M504 DETAILS
M505 DETAILS
M506 DETAILS
M507 CHILLED WALTER PIPING SCHEMATIC
M508 STEAM BOILER SCHEMATIC - REMOVALS
M509 STEAM BOILER SCHEMATIC - NEW
M601 SCHEDULES
M602 SCHEDULES
M603 SCHEDULES
M604 PIPING SUPPORT SYSTEMS
M701 CONTROL DIAGRAMS AND SEQUENCES
M702 CONTROL DIAGRAMS AND SEQUENCES
M703 CONTROL DIAGRAMS AND SEQUENCES
M704 CONTROLS DIAGRAMS AND SEQUENCES
M901 STEAM BOILER PLANT ISOMETRIC
E001 ABBREVIATIONS, SYMBOLS & INDEX OF DRAWINGS
ED100A PARTIAL BASEMENT PLAN - REMOVALS
ED104B PARTIAL ROOF PLAN - REMOVALS
EL100A PARTIAL BASEMENT PLAN - LIGHTING
EL104B PARTIAL ROOF PLAN - LIGHTING
EP100.1A PARTIAL BASEMENT PLAN - TEMPORARY BOILER
EP100A PARTIAL BASEMENT PLANS - POWER
EP104 PARTIAL ROOF PLAN - POWER
E501 DETAILS
E601 ELECTRICAL SINGLE LINE - NORMAL POWER
E602 ELECTRICAL SINGLE LINE - EMERGENCY POWER
E701 PANEL SCHEDULES
Grand total
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
17.1
STRUCTURAL WOOD
FINISHED WOOD
PLYWOOD
STEEL OR METAL
CERAMIC TILE
CEMENT, STUCCO,
PLASTER, OR
STONE
RIGID INSULATION
BATT, BLANKET, OR
LOOSE
FILL INSULATION
SPRAY-
APPLIED
INSULATION
GRANULAR/GRAVEL FILL
FACE BRICK
ACOUSTICAL TILE
CARPET
METAL (GREATER
THAN
1" = 1'-0" SCALE)
METAL (LESS
THAN 1"
= 1'-0" SCALE)
GLASS BLOCK
CONCRETE
MASONRY
UNIT (CMU)
EARTH
CONCRETE
(SECTION)
& AND
ANGLE
@ AT
CENTERLINE
X2 SQUARE
# POUND OR NUMBER
A# AIR WITH NUMBER OF
VALVES INDICATED
A/C AIR CONDITIONING
ABI ADDITIONAL BID ITEM
ACOUS ACOUSTICAL
ACC ACCESSIBLE
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADD'L ADDITIONAL
AED AUTOMATED EXTERNAL DEFIBRILLATOR
ADJ. ADJUSTABLE or ADJACENT
A.F.F. ABOVE FINISHED FLOOR
AGGR AGGREGATE
AL or ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASB ASBESTOS
ASC ACID STORAGE CABINET
ASPH ASPHALT
AUTO AUTOMATIC
BBD BULLETIN BOARD
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLK'G BLOCKING
BM BEAM
BOT BOTTOM
BRG BEARING
BRZ BRONZE
BSMT BASEMENT
BSC BIOSAFETY CABINET
C. COURSES
CAB CABINET
C.B. CATCH BASIN or CHALKBOARD
CEM CEMENT
CER CERAMIC
CG CORNER GUARD
CHAM CHAMFER
CHK. BD. CHALK BOARD
C.I. CAST IRON
C.J. CONTROL JOINT
C.L. CENTER LINE
CLG CEILING
CLKG CAULKING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CLEAN OUT
COL COLUMN
COMB COMBINATION
COMPT COMPARTMENT
CONC CONCRETE
CONF CONFERENCE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
COORD COORDINATE
CORR CORRIDOR
CP CLOSURE PANEL OR FINISHED PANEL
CS CUPSINK, SEE SPECIFICATIONS FOR SIZE
CSMT CASEMENT
CT CERAMIC TILE
CTR CENTER
CTSK COUNTERSUNK
CW COLD WATER
D DATA
D.A. DOOR ACTUATOR
DBL DOUBLE
DEPT DEPARTMENT
DEPART DEPARTURE
DET DETAIL
DF DRINKING FOUNTAIN
DI DIONIZED WATER
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DIV DIVISION
DN DOWN
D.O. DOOR OPENING
DR DRYING RACK or DOOR
DS DOWN SPOUT
DSP DRY STANDPIPE
DW DUMBWAITER
DWR DRAWER
DWG DRAWING (S)
E EAST OR ELECTRIC OUTLET, COORDINATE
WITH ELECTRICAL CONTRACTOR
EA EACH
E.C.C. ENVIRONMENTAL CONTROL CHAMBER
EJ EXPANSION JOINT
EL or ELEV ELEVATION or ELEVATOR
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENLRG'D ENLARGED
EP ELECTRICAL PANEL
EQ EQUAL
EQUIP EQUIPMENT
ES EMERGENCY SHOWER STATION BY PLUMBING CONTRACTOR
EW EMERGENCY EYEWASH BY PLUMBING CONTRACTOR
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EX or EXIST EXISTING
EXPO EXPOSED
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAK FIRST AID KIT
FB FIRE BLANKET or FLAT BAR
FBD FIREBOARD
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FGL FIBERGLASS
FH FUME HOOD
FHC FIRE HOSE CABINET
FHR FIRE HOSE RACK
FHS FIRE HOSE STATION
FIN FINISH
FL or FLR FLOOR
FLASH FLASHING
FLEX FLEXIBLE
FLUOR FLUORESCENT
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY (CMU)
FOS FACE OF STUDS
FP FIREPROOF
FR(T) FIRE RETARDANT (TREATED)
FS FILLER STRIP or FULL SIZE
FSC FLAMMABLE STORAGE CABINET
FT FOOT OR FEET
FTG FOOTING
FURR FURRING
FUT FUTURE
FV FIELD VERIFY
G# GAS COCK WITH NUMBER OF VALVES INDICATED
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GL GLASS or GRID LINE
GND GROUND
GR GUARD RAIL or GROUND
GT GROUT
GYP GYPSUM
HB HOSE BIBB
HBD HARDBOARD
HC HOLLOW CORE
HD HEAVY DUTY
HDR HEADER
HDWD HARDWOOD
HDWE HARDWARE
HEX HEXAGON
HGT HEIGHT
HM HOLLOW METAL
HORZ HORIZONTAL
HR HOUR
HTG HEATING
HVAC HEATING / VENTILATION / AIR CONDITIONING
HW HOT WATER
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER (DIM)
INSUL INSULATION
INT INTERIOR
ISO ISOMETRIC
JAN JANITOR
JC JANITOR'S CLOSET
JT JOINT
KIT KITCHEN
KPL KICKPLATE
KS KNEE SPACE
L LEFT
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LH LEFT HAND
LKR LOCKER
LOC LOCATION
LLD LEAD LINED DOOR
LT LIGHT
LTD LIMITED
LTL LINTEL
LVL LEVEL
LVR LOUVER
M METER
MACHINE
MAINT MAINTENANCE
MACH MACHINE
MAS MASONRY
MAX MAXIMUM
MM MILLIMETER
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MLD MOLDING
MO MASONRY OPENING
MOD MODULAR or MODIFY (IED)
MOV MOVABLE
MT MOUNT
MTL or MET METAL
MTD MOUNTED
MUL MULLION
MWK MILLWORK
N NORTH
NAT NATURAL
NI NICKEL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NON COM NON-COMBUSTABLE
NTS NOT TO SCALE
O/ OVER
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER (DIA)
OFF OFFICE
OH OVERHEAD
OPH OPPOSITE HAND
OPN'S OPENING
OPP OPPOSITE
OPS OPPOSITE SURFACE
PRCST PRE CAST
PB PANIC BAR
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PERF PERFORATE (D)
PERI PERIMETER
PG PLATE GLASS
PL PLATE
PLF POUNDS PER LINEAR FOOT
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PNL PANEL
PORT PORTABLE
PPG POLISHED PLATE GLASS
PR PAIR
PS PULL SCREEN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT or PRESSURE TREATED
PTD/PTR PAPER TOWEL
DISPENSER/RECEPTICAL
PTN PARTITION
R RIGHT
RA RETURN AIR
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RECEP RECEPTACLE
RECEPT RECEPTIONIST
REF REFERENCE
REFL REFLECTED
REFR or REFRIG REFRIGERATOR
REV REVISION
REINF REINFORCED
REQ ('D) REQUIRE (MENT) (S) ('D)
RESIL RESILIENT
RFS ROOM FINISH SCHEDULE
RGTR REGISTER
RH RIGHT HAND
RM ROOM
R.O. ROUGH OPENING
RS REAGENT SHELF or ROUGH SAWN
RWC RAIN WATER CONDUCTOR
RWL RAIN WATER LEADER
S SOUTH
SB SMOKE BARRIER or SINK BASE
SC SOLID CORE
SCHED SCHEDULE
SD STORM DRAIN or SOAP DISPENSER
SECT SECTION
SFRM SPRAY APPLIED FIRE
RESISTIVE MATERIAL
SF GL SAFETY GLASS
SG SHEET GLASS
SH SHELF
SHR SHOWER
SHT SHEET
SIM SIMILAR
SKL SKYLIGHT
SL SLOPE
SND or
SNR
SANITARY NAPKIN
DISPENSER/RECEPTICAL
SP SOUND PROOF
SPEC SPECIFICATION
SPK SPEAKER
SPL SPECIAL
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STD STANDARD
STL STEEL
STOR STORAGE
STRL STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYN SYNTHETIC
SYS SYSTEM
TB TACK BOARD
TEL TELEPHONE
T&G TONGUE & GROOVE
THK THICK
TJ TOOLED JOINT
TO TOP OF
TV TELEVISION
TYP TYPICAL
UNF UNFINISHED
UON or
UNO
UNLESS OTHERWISE NOTED
UR URINAL
V#
VACUUM WITH NUMBER
OF VALVES INDICATED
VAR VARNISH
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VF VINYL FABRIC
VIF VERIFY IN FIELD
VNR VENEER
VT VINYL TILE
VWC VINYL WALL COVERING
W WEST
W/ WITH
WB WOOD BASE
WC WALL CABINET
WD WOOD
WG WIRED GLASS
WM WIRE MESH
W/O WITHOUT
WP WATER PROOF
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
XMFR TRANSFORMER
MACH
CL
FRP FIBERGLASS REINFORCED PLASTIC
WRB WEATHER RESISTIVE BARRIER
WOMEN
1'-7"
RR R
TYP.
CL
3.26
GRID LINE
REFERENCE
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
NEW PARTITION
A. THE COR IS THE VA CONTRACTING OFFICER TECHNICAL REPRESENTATIVE.
B. ALL WORK WILL COMPLY WITH ALL APPLICABLE NATIONAL, STATE OR LOCAL CODES, ORDINANCES AND REGULATIONS INCLUDING THE AMERICAN DISABILITIES ACT (ADA) AND THE AMERICAN NATIONAL
STANDARDS INSTITUTE (ANSI) GUIDELINES.
C. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE COR OF ANY WORK THAT MIGHT REQUIRE INTERRUPTION OF UTILITY SERVICES, CAUSE NOISE, OR CREATE VIBRATION PRIOR TO COMMENCEMENT OF
THIS WORK.
D. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE SPECIFICATIONS INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, MATERIAL AND CONSTRUCTION PROVISIONS
WHICH APPLY TO MATERIALS OR CONSTRUCTION METHODS REQUIRED.
E. DO NOT PAINT ANY SEALANTS OR CAULKING WHICH ARE SUBJECT TO MOVEMENT. CONTROL JOINTS SHALL BE CAULKED AFTER PAINTING AND SPECIAL COATING APPLICATIONS. PROVIDE CAULKING OR SEALANTS WHICH
MATCH ADJACENT FINISHED COLORS UNLESS NOTED OTHERWISE.
F. ALL EXISTING CONSTRUCTION TO REMAIN THAT ARE DAMAGED OR DISTURBED DURING CONSTRUCTION
SHALL BE PATCHED OR REPAIRED TO MATCH EXISTING ADJACENT CONSTRUCTION.
G. ALL SUSPENDED ITEMS SHALL BE ATTACHED DIRECTLY TO STRUCTURE AND NOT ANCHORED TO ANY NON-
STRUCTURAL ITEM, COMPONENT OR SYSTEM.
H. NEW CORE DRILLING THROUGH EXISTING STRUCTURAL ELEMENTS REQUIRED BY CONSTRUCTION SHALL BE COORDINATED BY THE CONTRACTOR TO AVOID DRILLING THROUGH OR INTO ANY STRUCTURAL ELEMENTS.
I. NEW CONSTRUCTION INSTALLED SHALL BE COORDINATED BY THE CONTRACTOR FOR PROPER FIT, DIMENSIONS AND ACCESS TO THE BUILDING PRIOR TO BEGINNING CONSTRUCTION AND DELIVERY OF
COMPONENTS TO THE SITE.
J. INTERIOR DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE.
K. CONTRACTOR'S BID SHALL INCLUDE THE GREATEST QUANTITY AND QUALITY OF ALL ITEMS AND ASSEMBLIES
FOR A COMPLETE AND FULLY OPERATIONAL PROJECT IN ACCORDANCE WITH THE VETERAN
ADMINISTRATION'S REQUIREMENTS
L. UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION, REMOVAL AND REPLACEMENT WORK SPECIFIED AND REQUIRED TO ACCOMMODATE THE
REQUIRED IMPROVEMENTS, AND SHALL ALSO BE RESPONSIBLE FOR ANY AND ALL NECESSARY
REPLACEMENT, REPAIRING, AND PATCHING. WORK TO BE DONE BY WORKMAN SKILLED AND REGULARLY
EMPLOYED IN THE TRADES INVOLVED.
M. CONTRACTOR SHALL PROPERLY PLAN AND EXECUTE ALL WORK. NO EXTRA COSTS FOR LACK OF PROPER
PLANNING AND EXECUTION SHALL BE CONSIDERED.
N. CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS FOR MATERIAL DIFFERENCES PRIOR TO PERFORMING ANY
WORK AND SHALL NOTIFY THE COR OF ANY DISCREPANCIES.
O. CONTRACTORS SHALL REVIEW THE EXISTING CONDITIONS PRIOR TO SUBMITTING PROPOSAL. NOTIFY ARCHITECT PRIOR TO SUBMITTING PROPOSAL IF CONDITIONS EXIST WHICH CONFLICT WITH THE PROPOSED WORK AND FINISHES. IF THIS NOTIFICATION DOES NOT OCCUR, THEN THE CONTRACTOR, WILL BE
RESPONSIBLE FOR ANY ADDITIONAL COSTS.
P. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE SITE ACCESS, MATERIAL STAGING AREAS, AND DEMOLITION WORK FOR THE PROJECT. ALL MATERIALS AND DEBRIS SHALL BE DELIVERED AND REMOVED
FROM THE SITE AS DIRECTED BY THE OWNER.
Q. CONTRACTOR SHALL PROTECT EXISTING FINISHES AND EQUIPMENT REMAINING IN THE PROJECT SITE. IF EXISTING ITEMS ARE DAMAGED DURING THE COURSE OF THE WORK AS A RESULT OF CONTRACTOR ACTIVITIES, THE FINISHES OR EQUIPMENT SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO
THE OWNER.
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
K - FOOD SERVICE
XX-100
SHEET NUMBER WITHIN SERIES
DISCIPLINE MODIFIER
DETAIL NUMBER
DETAIL TITLE
DETAIL SCALE
SECTION I.D. NUMBER
DRAWING TITLE
SHEET WHERE
SECTION IS LOCATED
NOTE (IF
APPLICABLE)
SECTION
DETAIL (ENLARGED)
A101
SIM
AREA TO BE ENLARGED
DETAIL I.D. NUMBER
SHEET WHERE
DETAIL IS LOCATED
ELEVATION ELEVATION I.D.
NUMBER
SHEET WHERE
ELEVATION IS LOCATED
DOOR NUMBER
101 DOOR NUMBER
WINDOW
1t
WINDOW
IDENTIFICATION
FINISH
FINISH
IDENTIFICATION
KEYED NOTES
KEYED NOTE
DESIGNATION
REVISIONS
REVISION AREA
REVISION
DESIGNATION
ELEVATION HEIGHT
ELEVATION
HEIGHT100'-0"
T.O.S.
ELEVATION
REFERENCE
SCALE |1/4" = 1'-0"
floor plan1
NOTE (IF
APPLICABLE)
ROOM NAME
ROOM ROOM NAME
ROOM NUMBER
COLUMN LINE
NEW DOOR
EXISTING DOOR
A101
SIM
A101
SIM
XX-#
SHEET DESIGNATION
MATERIAL INDICATIONS WALL INDICATIONSSYMBOLS
ABBREVIATIONS
GENERAL NOTESSIGNAGE LOCATIONS
WALL
GENERAL NOTES FOR SEQUENCE OF CONSTRUCTION:
A ALL CONTRACTORS SHALL THOROUGHLY STUDY DESIGN DRAWINGS AND ALL EXISTING CONDITIONS PRIOR TO STARTING
PROPOSED SCHEDULE.
B SEQUENCE OF CONSTRUCTION INDICATED BELOW IS ONE POSSIBLE SOLUTION TO MINIMIZE DOWNTIME OF THE BUILDING PLUMBING AND HVAC SYSTEMS. CONTRACTORS ARE REQUIRED TO SUBMIT A DETAILED SEQUENCE OF CONSTRUCTION NARRATIVE TO THE COR AT THE BEGINNING OF THE PROJECT INDICATING ALL DURATION OF OUTAGES FOR TIE-INS TO EXISTING SYSTEMS, SWITCH OVER DATES, AND PROJECT MILESTONES. DEVIATIONS FROM THE FOLLOWING PROPOSED SEQUENCE OF CONSTRUCTION WILL BE REVIEWED BUT WILL NOT BE GROUNDS FOR ADDITIONAL COST TO THE
GOVERNMENT.
C ALL NATURAL GAS, PROPANE, FUEL OIL, SANITARY, DOMESTIC WATER, STEAM AND CHILLED WATERTIE-IN WORK REQUIRING BUILDING PLUMBING SYSTEM OUTAGES AND/OR DOWNTIME SHALL BE PERFORMED OUTSIDE OF NORMAL WORKING HOURS (7AM-7PM MONDAY-FRIDAY), OUTAGES OF ALL TYPES SHALL BE AS MINIMAL AS POSSIBLE.
D THE PHASE DESCRIPTIONS INDICATE A GENERAL FLOW OF WORK AND ARE NOT INTENDED TO CONVEY INSTRUCTIONS
FOR EVERY ASPECT OF THE CONSTRUCTION PROJECT.
E PROVIDE COORDINATION DRAWINGS FOR ALL NEW EQUIPMENT AND PIPING WITH PATHWAYS VERIFIED IN THE FIELD AND
SIGNED-OFF BY THE CONTRACTORS.
F FACILITY CONSISTS OF A FULLY FUNCTIONAL HOSPITAL/HEALTHCARE FACILITY OCCUPIED 24/7 WITH INPATIENT/OUTPATIENT CARE, NURSING, SUBSTANCE ABUSE, RETAIL, CANTEEN, KITCHEN, ETC. INCLUDE LABOR AND MATERIAL TO ACCOMMODATE ACCESS REQUIRED FOR WORK IN THESE VARIOUS SPACES. EXTENSIVE COORDINATION MUST
OCCUR TO MINIMIZE DISRUPTION AS MUCH AS POSSIBLE.
G 28 WORKING DAYS BEFORE ANY SYSTEM OUTAGE/DOWNTIME, CONTRACTORS SHALL SET-UP A MEETING WITH COR, FACILITY MANAGER AND DEPARTMENT MANAGERS (AS REQUIRED) TO REVIEW SPECIFIC AREAS OF OUTAGE, OUTAGE START AND END TIME. EACH DEPARTMENT MUST BE BRIEFLY SURVEYED TO DETERMINE OVERALL IMPACT OF OUTAGE AND
EXPLAINED TO COR AND MANAGERS.
SEQUENCE OF CONSTRUCTION:
1. PRECONSTRUCTION WORK (WORK SHALL BE STARTED END OF MAY BEGINNING OF JUNE)
A. GAS PIPING CONNECTIONS (2 DAY DURATION)
1. ENSURE THAT EXISTING UNDERGROUND FUEL OIL TANK IS FULL.
2. SET EXISTING BOILERS FUEL SELECTOR SWITCH TO FUEL OIL. ENSURE BOILERS ARE OPERATING PROPERLY ON
THE FUEL OIL SYSTEM.
3. INSTALL GAS PIPING AS INDICATED ON “ENLARGED MECHANICAL ROOM – PRECONSTRUCTION PLAN”.
4. AFTER GAS PIPING HAS BEEN TESTED AND INSPECTED, SET EXISTING BOILERS FUEL SELECTOR SWITCH TO
NATURAL GAS. ENSURE BOILERS ARE OPERATING PROPERLY ON THE NATURAL GAS SYSTEM.
B. FUEL OIL PIPING CONNECTIONS (2 DAY DURATION)
1. INSTALL FUEL OIL AND PROPANE PIPING AS INDICATED ON “ENLARGED MECHANICAL ROOM PRECONSTRUCTION
PLAN”.
2. INSTALL TEMPORARY BOILERS AS INDICATED ON HVAC TEMPORARY PLANS (SWITCHOVER TO TEMPORARY
BOILERS MUST BE COMPLETED PRIOR TO END OF AUGUST).
A. INSTALL TEMPORARY CONTAINERIZED BOILER SYSTEM ON NEW PAD AS DESIGNED BY STRUCTURAL ENGINEER.
1. TEMPORARY BOILERS SHALL NOT BE INSTALLED ON TOP OF ANY EXISTING UNDERGROUND UTILITIES.
2. PROVIDE FENCE AROUND TEMPORARY BOILER AND EXTERIOR TEMPORARY PIPING.
3. INSTALL GAS PRESSURE BOOSTER SYSTEM AND ASSOCIATED PIPING.
4. INSTALL TEMPORARY STEAM AND CONDENSATE LINES FROM TEMPORARY CONTAINERIZED BOILER TO TEMPORARY
CONNECTION POINTS IN MECHANICAL ROOM.
5. EXTEND NATURAL GAS, PROPANE, FUEL OIL AND SOFT COLD WATER PIPING TO TEMPORARY BOILERS.
6. ONCE NEW TEMPORARY BOILERS ARE OPERATIONAL AND TESTED, DEMOLISH EXISTING BOILERS AND ALL PIPING AS
REQUIRED FOR NEW WORK. ENSURE THAT ALL EXISTING SYSTEMS REMAIN OPERATIONAL.
7. INSTALL UNDER-SLAB PIPING, SUMP PIT AND PUMPS, FLOOR DRAINS AND TRENCH DRAINS.
8. ASSEMBLE NEW BOILERS AND FEEDWATER TANK/SYSTEM IN NEW MECHANICAL ROOM.
9. INSTALL NEW STEAM HEADER AND NEW CONDENSATE PIPING BACK TO NEW FEEDWATER TANK.
10 INSTALL NEW FUEL OIL PUMP AND PIPING. ENSURE NEW PUMP IS TESTED AND FULLY OPERATIONAL PRIOR TO
DEMOLISHING EXTRANEOUS FUEL OIL PIPING.
11. PROVIDE TEST LINE TO FACILITATE BOILER FUNCTIONAL TESTING AND ADJUSTMENTS.
12. AFTER NEW BOILERS ARE TESTED AND COMMISSIONED.
A. MAKE ALL CONNECTIONS TO EXISTING STEAM AND CONDENSATE LINES. (WORK SHALL BE COMPLETED BETWEEN
MAY AND SEPTEMBER)
B. DEMOLISH ALL PIPING SERVING TEMPORARY BOILERS BACK TO ACTIVE MAINS. NO DEADLEGS ON THE SOFT COLD
WATER PIPING LONGER THAN 2 PIPE DIAMETERS PER VA STANDARDS ARE PERMITTED.
13. CHILLER REPLACEMENT WORK (ALL CHILLER REPLACEMENT WORK TO OCCUR IN THE MONTHS MID OCTOBER THROUGH
MID MARCH WHILE AIR HANDLERS ARE ON AIRSIDE ECONOMIZER).
A. EXPAND PENTHOUSE PRIOR TO START OF ANY CHILLER REPLACEMENT WORK.
B. REMOVE ALL EXISTING CHILLERS, AIR COOLED CONDENSERS CHILLED WATER PIPING, AND CHILLED WATER
ACCESSORIES LOCATED IN PENTHOUSE AND ON ROOF AS INDICATED ON CONSTRUCTION DOCUMENTS.
C. INSTALL NEW MODULAR CHILLERS AND CHILLED WATER PIPING, ACCESSORIES, AND CONTROLS IN EXISTING
PENTHOUSE AS SHOWN ON ENLARGED MECHANICAL ROOF PLAN.
D. INSTALL NEW AIR-COOLED CONDENSERS ON ROOF AND EXTEND REFRIGERANT PIPING FROM NEW INDOOR CHILLER
MODULES TO NEW AIR COOLED CONDENSERS PER MANUFACTURERS WRITTEN RECOMMENDATIONS.
E. TESTING AND COMMISSIONING SHALL BE COMPLETED PRIOR TO MID MARCH AND RECHECKED DURING JUNE
THROUGH AUGUST.FT THOMAS SITE LOGISTICS
INDICATES STAGING AREA LIMITS
TEMPORARY BOILER, SEE
MECHANICAL DRAWINGS
1. CONTRACTOR TO MAINTAIN MEANS OF EGRESS TO BUILDING DURING CONSTRUCTION.
2. NO CONTRACTOR TO PARK IN FT THOMAS CAMPUS PARKING.
3. GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY SIGNAGE.
4. GENERAL CONTRACTOR TO RESPONSIBLE TO PROTECT EXISTING SURFACES AND
RESTORE ANY AREAS TO EXISTING CONDITIONS AT JOB COMPLETION.
5. GENERAL CONTRACTOR IS RESPONSIBLE FOR SECURINGCONSTRUCTION SITE. THIS
INCLUDES FULL HEIGHT WALLS AT INTERIOR AND SECURITY FENCE WITH GATE THAT IS
KEPT CLOSED AND LOCKED DURING NON WORKING HOURS .
6. COORDINATE WITH COR EXTENDS OF STAGING AREA AND SECURE FENCE .
7. SEE PME DRAWINGS FOR UTILITIES IN STAGING AREA AND TEMPORARY BOILER
INFORMATION.
SITE LOGISTICS NOTES
MAINTAIN ACCESS TO SIDEWALK AT ALL TIMES
FOR CLOSURE COORDINATE WITH COR
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
GENERAL NOTES AND SITE
LOGISTICS
10/30/2023 VP SS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
G002
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
TT
TT
T T
T
T
T T
F
F
TT
STAIR #1
S*B*1
STORAGE
004C
OFFICE
EQUIP. RM
004A
KITCHEN
DINING ROOM
Stair #2
S*B*2
Stor.
002A
Dietetic Dry Stor.
002B
HAC
004B
Diet. Stor.
Refr.
Elec.
007B
Refr.
H.W. Tank
007A
Dirty Clothes
007E
HCMI
Refr.
010A
Refr.
Hud
011A
Clean Clothes
007D
CORRIDOR
C*B*1
Corridor
C-B-7
Corridor
C-B-7C
Bldg. Manag. Off.
Linen
Bldg Manag. Stor.
013A
Hud/Vash
015B
Hud/Vash
015A
Hud/Vash
Elec. Shop
018B
Eng. Off.
018A
Volunteer Service Office
Engineering
Engineering Stor.
Uniform Exchange
Tlt.
Volunteer Service Escort
M. Locker
025A
HAC
F. Locker
Stair #3
S*B*3
Comp. Network
027C
Eng. Stor.
018C
Eng. Stor.
027B
Soiled Linen
018D
Canteen
Rec. Temp.
Fitness Center
027A
Carpenter Shop
029A
Clos.
029B
Boiler Rm.
Group
Clos.
029C
Clos.
030A
Clerk
Work Rm.
Tele. Service
Stair #4
S*B*4
Oxygen Storage
Group Rm 2
S.T. Off.
Stor.
Media Center
Corridor
C*B*8
S.T. Dr.
S.T. Exam
S.H. Exam
Patient Tlt.
Staff Tlt.
Kiln
038A
Staff
Occ. Therapy
Stair #6
S*B*6
Phys. Therapy
Mech.
036A
M. Toilet
Storage
009A Hud
Elec.
Elect. Supply
LC
G003
3 Bedroom
3 Bedroom
3 Bedroom
3 Bedroom
Tlt.
5 Bedroom
4 Bedroom
Sick Call
Tlt.
115A
Med.
115B
Exam
115C
South Patio
Tlt.
106B
Day Room
Corridor
C*1*1
Aams
106G
Oxygen Storage
106D
Elevator Lobby
Stair #1
S*1*1
Stair #2
S*1*2
Clos.
104A
Corridor
C*1*2
Supply
106C
Aams
106A
Patient Tlt.
Shower Room
108A
2 Rehab. Tech.
Laundry
Off.
Hac
Pharmacy
4 Bedroom
4 Bedroom
1 Bedroom
Tlt.
125A
Social Worker
Social Worker
Tlt.
131A
Conferance
Storage
Lobby
128A
Off. Chief Dom.
122A
Clos.
122B
Secretary
Agent Cashier
120Clos.
122C
Off.
116A
Off.
116B Psych. Office
M. Tlt.
F. Tlt.
Library
Secretary
Clos.
116D
Off.
Stair #3
S*1*3
Comp. Rm
Laun.
3 Bedroom
4 Bedroom
Corr. Therapist
Social Work Service
Hac
F. Shower
140A
F. Tlt.
Stor.
Classroom
Mailroom
Day Room & Lounge
Mailroom
Off.
145A
Domiciliary Asst.
Station
Tlt.
145B
Supplies
145C
Off.
145D
Elevator Lobby
148A
Stair #4
S*1*4
Corridor
C*1*7
3 Bedroom
Off.
151A
Dental Suite
Copier
Police
Clos.
155B
Clos.
155A
Stor.
Linen Rm.
Office
4 Bedroom
Tlt.
4 Bedroom
4 Bedroom
4 Bedroom
Stair #5
S*1*5
2 Bedroom
Tlt.
158A
M. Tlt.
Shower Room
156A
Clos.
142A Clos.
152A
Closet
106E
1 Bedroom
Clos.
148B
Linen Chute
116E
Entry
148C
Entry
106F
Atrium
128B
EP
EX
EX
EX
LC
EP
EX
EX
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR SMOKE BARRIER
1 HOUR SMOKE BARRIER
30 MINUTE SMOKE BARRIER
SMOKE RESISTIVE HAZARDOUS
AREA
HORIZONTAL EXIT PASSAGEWAYHE
EX EXIT
EP
LC
TC
EXIT PASSAGEWAY
LINEN CHUTE
TRASH CHUTE
SUITE DESIGNATIONS
AREA OPEN TO CORRIDOR -
WITH SMOKE DETECTION
AREA OPEN TO
CORRIDOR - NO SMOKE
DETECTION REQUIRED
Stair #1
S*3*1
Classrm./Conf.
2 Bed Rm.
Tlt.
367A
Signal
367B
2 Bed Rm.
Corridor
C*3*1
Clin. Spec.
02 Stor.
2 Bed Rm.
Tlt.
363A
2 Bed Rm.
2 Bed Rm.
Tlt.
361A
2 Bed Rm.
Tlt.
357A
2 Bed Rm.
Mech.
371A
Office
Elec. Cl.
Equip.
Stair #2
S*3*2
Signal
Bath
Congregate B.
Ward Supply
Clean Util.
Soil. Util.
Tlt.
Hac
Ward Supply
2 Bed Rm.
2 Bed Rm.
Tlt.
349A Mech.
347A
2 Bed Rm.
Tlt.
345A
2 Bed Rm.
Tlt.
306A
2 Bed Rm.
Tlt.
350A
3 Bed Rm.
2 Bed Rm.
Tlt.
346A
2 Bed Rm.
Corridor
C*3*2
Equip.
Head Nurse
Tlt.
308A
1 Bed Rm.
1 Bed Rm.
Tlt.
310A
1 Bed Rm.
Dining Recreation
Tlt.
302B
Nour/Kit
Stor.
302A
Nurses Station
Off.
307A
Work Rm.
Stair #3
S*3*3
Mech.
311B
Tlt.
311A
Lounge/Lockers
311C Nuses Station
Office
Elec. Cl.
Signal
2 Bed Rm.
Tlt.
314A
2 Bed Rm.
Tlt.
316A
1 Bed Rm.
Mech.
318A
2 Bed Rm.
Tlt.
320A
2 Bed Rm.
2 Bed Rm.
Tlt.
317A
2 Bed Rm.
3 Bed Rm.
321 Tlt.
321A
2 Bed Rm.
Tlt.
328A 2 Bed Rm.
Tlt.
332A
2 Bed Rm.
2 Bed Rm.
Tlt.
334A
2 Bed Rm.
2 Bed Rm.
Tlt.
338A
2 Bed Room
Stair #5
S*3*5
Quiet Rm.
Resp. Ther.
Elec.
Equip.
Laun.
Mech.
341A
Signal
Bath
Congregate B.
Stair #4
S*3*4
Linen
Hac
Tlt.
Soil. Util.
Linen Rm.
329 Ice Machine
Stor.
339A
Elect.
368B
Elect.
368A
Linen Chute
368C
Office
313A
Elect.
339B
Elect.
Stair #5
S-R-5
Penthouse
R01
Penthouse
R02
Penthouse
R03
Elevator Penthouse
R04
Elevator Penthouse
R05
Stair S*R*1
Boiler Rm.
Clos.
029B
Group
Carpenter Shop 029A
Corridor C*B*4
Storage 029D
Clos.
030A
70'-0" EGRESS PATH
Clos.
029C
Corridor C*B*4
Storage 029D
Fitness Center
027A
Canteen
Eng. Stor.
027B
Engineering Stor.
Eng. Stor.
018C
Comp.
Network
027C
Soiled Linen 018D
Tele.
Service
Group
63'-0" EGRESS PATH
CLASS B
CLASS B
CLASS B
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
LIFE SAFETY PLANS
10/30/2023 Approver Designer
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
G003
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 1" = 20'-0"
BASEMENT PLAN1
SCALE | 1" = 20'-0"
FIRST FLOOR PLAN2
SCALE | 1" = 20'-0"
SYMBOLS LIST
FULLY SPRINKLERED
SCALE | 1" = 20'-0"
THIRD FLOOR PLAN3
SCALE | 1" = 20'-0"
PENTHOUSE PLAN4
SCALE | 1/8" = 1'-0"
ENLARGED BASEMENT PLAN5
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
T T
TT
T
T
T
STAIR #1
S*B*1
STORAGE
004C
OFFICE
EQUIP. RM
004A
KITCHEN
DINING
ROOM
Stair #2
S*B*2
Stor.
002A
Dietetic Dry Stor.
002B
HAC
004B
Diet. Stor.
Refr.
Elec.
007B
Refr.
H.W. Tank
007A
Dirty Clothes
007E
HCMI
Refr.
010A
Refr.
Hud
011A
Clean Clothes
007D
CORRIDOR
C*B*1
Corridor
C-B-7
Corridor
C-B-7C
Bldg. Manag.
Off.
Linen
Bldg Manag.
Stor.
013A
Hud/Vash
015B
Hud/Vash
015A
Hud/Vash
Elec. Shop
018B
Eng. Off.
018A
Volunteer Service Office
Engineering
Engineering Stor.
Uniform Exchange
Tlt.
Volunteer Service Escort
M. Locker
025A
HAC
F. Locker
Stair #3
S*B*3
Comp.
Network
027C
Eng. Stor.
018C
Eng. Stor.
027B
Soiled Linen
018D
Canteen
Rec. Temp.
Fitness Center
027A
Carpenter Shop
029A
Clos.
029B
Boiler Rm.
Group
Clos.
029C
Clos.
030A
Clerk
Work Rm.
Tele. Service
Stair #4
S*B*4
Oxygen Storage
Group Rm 2
S.T. Off.
Stor.
Media Center
Corridor
C*B*8
S.T. Dr.
S.T. Exam
S.H. Exam
Patient Tlt.
Staff Tlt.
Kiln
038A
Staff
Occ. Therapy
Stair #6
S*B*6
Phys.
Therapy
Mech.
036A
M. Toilet
Storage
009A Hud
Elec.
Elect. Supply
2.12
2.212.21
1.51
A. SEE DRAWING G002 FOR GENERAL NOTES
B. PROTECT EXISTING STRUCTURE, ADJACENT WINDOWS, DOORS AND OTHER
BUILDING ELEMENTS TO REMAIN DURING CONSTRUCTION
C. CONTRACTOR TO MAINTAIN ACCESS TO EXITS DURING CONSTRUCTION
D. INSTALL AND ADJUST DUST BARRIERS AND WALK OFF MATS AT ALL DOORWAYS
ADJACENT TO MAIN CORRIDOR
E. REMOVE EXISTING PARTITIONS SHOWN WITH DASHED LINES. PROVIDE NEW FINISHES
AS SCHEDULED AT ALL AREAS OF REMOVAL AND REPAIRS. WALL, CEILING AND
FLOOR FINISHES TO MATCH ADJACENT SURFACES
F. PATCH/REPAIR SURFACES AS REQUIRED FOR NEW FINISHES AS SCHEDULED,
INCLUDING AREAS THAT WERE PREVIOUSLY OUT OF VIEW THAT ARE EXPOSED BY
THIS PROJECT. MATCH EXISTING FINISHES, THIS INCLUDES WORK BY ALL TRADES.
G. REMOVE ALL EXISTING UNUSED MISC. FASTENERS, HANGERS, STRAPS, BOLTS,
WELDED HOLDERS, AND ANY OTHER ITEMS FROM ALL EXISTING COLUMNS, BEAMS,
AND TRUSSES IN PROJECT AREA. ALL COLUMNS, BEAMS, AND TRUSSES TO BE
PREPPED TO RECEIVE NEW FINISH AS SCHEDULED.
H. DEMOLISH ANY ABANDONED OR UNUSED CONDUIT, PIPING, OR CONTROLS ON ALL
COLUMNS, BEAMS, AND STRUCTURE IN PROJECT AREA. PREP SURFACE TO RECEIVE
NEW FINISH AS SCHEDULED.
I. REMOVE OWNER MOUNTED EQUIPMENT, INCLUDING BUT NOT LIMITED TO, SIGNAGE,
EXISTING LIGHTING FANS, ETC. COORDINATE WITH OWNER FOR SALVAGE OR
DISPOSAL.
J. DURING DEMOLITION AND CONSTRUCTION , LOCATE AND MAINTAIN SMOKE
DETECTION, FIRE EXTINGUISHERS , ILLUMINATION AND LIFE SAFETY SYSTEMS AS
WOULD OTHERWISE BE REQUIRED IN AN OCCUPIED SPACE.
K. COORDINATE SPECIFIC FIELD REQUIREMENTS WITH THE COR PRIOR TO
COMMENCING WORK
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
BASEMENT DEMOLITION PLAN
10/30/2023 Approver Designer
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
AD100
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 3/32" = 1'-0"
BASEMENT DEMOLITION PLAN26
GENERAL DEMOLITION NOTES
KEYNOTES
1.51 EXISTING CONSTRUCTION.
2.12 SAW CUT EXISTING CONCRETE FLOOR SLAB AS REQUIRED FOR NEW TRENCH DRAIN SEE
PLUMBING DRAWINGS , SEE PME DRAWINGS FOR ADDITIONAL INFORMATION. VERIFY
EXTENT REQUIRED WITH PLUMBING DRAWINGS.
2.21 PREPARE EXISTING STRUCTURE TO RECEIVE NEW FINISH. EXISTING STRUCTURE, DECK,
CONDUIT, PIPING, AND DUCTWORK TO BE CLEANED WITH NON-ABRASIVE,
NON-CONDUCTIVE DRY-ICE BLASTING IN ENTIRETY OF ROOM. PROCESS TO MEET
SSPC-SP10 COMMERCIAL BLAST CLEANING (NACE 2). ENTIRETY OF CEILING,
STRUCTURE, AND DECK IS TO BE PAINTED. SEE PAINT SPECIFICATIONS AREA OF
DRY-ICE CLEANING MUST BE FULLY ENCLOSED AND SEPARATED FROM THE REST OF THE
FACILITY PRIOR TO CLEANING
FULLY SPRINKLERED
NORTH
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
DN
UP
UP
UPUP
UP
UP UP
UP
UP
UP
F
F
Stair #5
S-R-5
Penthouse
R01
Penthouse
R02
Penthouse
R03
Elevator Penthouse
R04
Elevator Penthouse
R05
2.23
2.23
2.23
2.23
2.23
23.04
2.24
2.26
23.04
1.04
1.05
2.23
2.23
A. SEE DRAWING G002 FOR GENERAL NOTES
B. PROTECT EXISTING STRUCTURE, ADJACENT WINDOWS, DOORS AND OTHER
BUILDING ELEMENTS TO REMAIN DURING CONSTRUCTION
C. CONTRACTOR TO MAINTAIN ACCESS TO EXITS DURING CONSTRUCTION
D. INSTALL AND ADJUST DUST BARRIERS AND WALK OFF MATS AT ALL DOORWAYS
ADJACENT TO MAIN CORRIDOR
E. REMOVE EXISTING PARTITIONS SHOWN WITH DASHED LINES. PROVIDE NEW FINISHES
AS SCHEDULED AT ALL AREAS OF REMOVAL AND REPAIRS. WALL, CEILING AND
FLOOR FINISHES TO MATCH ADJACENT SURFACES
F. PATCH/REPAIR SURFACES AS REQUIRED FOR NEW FINISHES AS SCHEDULED,
INCLUDING AREAS THAT WERE PREVIOUSLY OUT OF VIEW THAT ARE EXPOSED BY
THIS PROJECT. MATCH EXISTING FINISHES, THIS INCLUDES WORK BY ALL TRADES.
G. REMOVE ALL EXISTING UNUSED MISC. FASTENERS, HANGERS, STRAPS, BOLTS,
WELDED HOLDERS, AND ANY OTHER ITEMS FROM ALL EXISTING COLUMNS, BEAMS,
AND TRUSSES IN PROJECT AREA. ALL COLUMNS, BEAMS, AND TRUSSES TO BE
PREPPED TO RECEIVE NEW FINISH AS SCHEDULED.
H. DEMOLISH ANY ABANDONED OR UNUSED CONDUIT, PIPING, OR CONTROLS ON ALL
COLUMNS, BEAMS, AND STRUCTURE IN PROJECT AREA. PREP SURFACE TO RECEIVE
NEW FINISH AS SCHEDULED.
I. REMOVE OWNER MOUNTED EQUIPMENT, INCLUDING BUT NOT LIMITED TO, SIGNAGE,
EXISTING LIGHTING FANS, ETC. COORDINATE WITH OWNER FOR SALVAGE OR
DISPOSAL.
J. DURING DEMOLITION AND CONSTRUCTION , LOCATE AND MAINTAIN SMOKE
DETECTION, FIRE EXTINGUISHERS , ILLUMINATION AND LIFE SAFETY SYSTEMS AS
WOULD OTHERWISE BE REQUIRED IN AN OCCUPIED SPACE.
K. COORDINATE SPECIFIC FIELD REQUIREMENTS WITH THE COR PRIOR TO
COMMENCING WORK
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
PENTHOUSE PLAN DEMOLITION
10/30/2023 Approver Designer
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
AD104
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
KEYNOTES
1.04 PROVIDE ROOF PROTECTION AT EXTEND OF WORK AREA DURING CONSTRUCTION .
MINIMUM ROOF PROTECTION TO BE : 2 INCHES OF INSULATION AND A 3/4" PLYWOOD
1.05 MAINTAIN ROOF IN A WEATHER TIGHT CONDITION. SEE STRUCTURAL AND MEP
DRAWINGS FOR NEW ROOF PENETRATIONS IN EXISTING ROOF.
2.23 REMOVE EXISTING ROOF WALK PAD TO BE USED IN NEW LOCATIONS
2.24 REMOVE AND RELOCATE EXISTING ROOF LADDER
2.26 DEMOLISH PORTION OF EXISTING EIFS AND METAL STUD PENTHOUSE WALL
23.04 REMOVE ROOFTOP HVAC EQUIPMENT THIS AREA. SEE MECHANICAL DRAWINGS.
NORTH
SCALE | 3/32" = 1'-0"
PENTHOUSE PLAN26
GENERAL DEMOLITION NOTES
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
UP
UP
UP
UP
UP
UP
UP
UP
UP
F A
C P
J
J
J
J J J
J J J
T T
TT
T
T
T
MBFPM
M P
B F
P
F S
STAIR #1
S*B*1
STORAGE
004C
OFFICE
EQUIP. RM
004A
KITCHEN
DINING
ROOM
Stair #2
S*B*2
Stor.
002A
Dietetic Dry Stor.
002B
HAC
004B
Diet. Stor.
Refr.
Elec.
007B
Refr.
H.W. Tank
007A
Dirty Clothes
007E
HCMI
Refr.
010A
Refr.
Hud
011A
Clean Clothes
007D
CORRIDOR
C*B*1
Corridor
C-B-7
Corridor
C-B-7C
Bldg. Manag.
Off.
Linen
Bldg Manag.
Stor.
013A
Hud/Vash
015B
Hud/Vash
015A
Hud/Vash
Elec. Shop
018B
Eng. Off.
018A
Volunteer Service Office
Engineering
Engineering Stor.
Uniform Exchange
Tlt.
Volunteer Service Escort
M. Locker
025A
HAC
F. Locker
Stair #3
S*B*3
Comp.
Network
027C
Eng. Stor.
018C
Eng. Stor.
027B
Soiled Linen
018D
Canteen
Rec. Temp.
Fitness Center
027A
Carpenter Shop
029A
Clos.
029B
Boiler Rm.
Group
Clos.
029C
Clos.
030A
Clerk
Work Rm.
Tele. Service
Stair #4
S*B*4
Oxygen Storage
Group Rm 2
S.T. Off.
Stor.
Media Center
Corridor
C*B*8
S.T. Dr.
S.T. Exam
S.H. Exam
Patient Tlt.
Staff Tlt.
Kiln
038A
Staff
Occ. Therapy
Stair #6
S*B*6
Phys.
Therapy
Mech.
036A
M. Toilet
Storage
009A Hud
Elec.
Elect. Supply
3"
3"
9.01
9.04
9.0210.02 10.02
10.02
3.03
A. SEE G002 FOR GENERAL PROJECT NOTES
B. SEE G003 FOR PARTITION TYPE
C. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH
SIGNAGE.
D. PRIOR TO GYPSUM BOARD INSTALLATION AND ELECTRICAL ROUGH-IN
INSPECTION, GENERAL CONTRACTORS, ELECTRICAL/DATA CONTRACTORS,
ARCHITECT, AND CONSTRUCTION MANAGER SHALL REVIEW IN-PLACE LOCATIONS
OF ALL SWITCH BOXES, RECEPTACLE BOXES, FIRE ALARM BOXES, ETC. FINAL
LOCATIONS MAY BE ADJUSTED AT THIS TIME TO ALIGN OR COORDINATE WITH
DESIGN INTENT.
E. ALL DIMENSIONS ARE FROM FINISH FACE UNLESS NOTED OTHERWISE.
F. FOR FURNITURE LAYOUT, SEE FURNITURE PLAN.
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
BASEMENT PLANS
10/30/2023 MW/VP VP
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
A100
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 3/32" = 1'-0"
BASEMENT PLAN26
KEYNOTES
3.03 REINFORCED CONCRETE SLAB. ELEVATION MATCH EXITING SLAB GRADE. PROVIDE
COMPACTION AND BACKFILL , SEE STRUCTURAL DRAWINGS
9.01 PAINT EXPOSED STRUCTURE AND ALL CEILING COMPONENTS
9.02 EPOXY FLOOR FINISH ON NEW/EXISTING CONCRETE SLAB
9.04 PAINT ALL WALLS
10.02 PROVIDE CLASS B FIRE EXTINGUISHER
NORTH
FULLY SPRINKLERED
SCALE | 1/8" = 1'-0"
GENERAL NOTES
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
CO
M
IN
IM
U
M D
IS
T
A N
C E
T O
B E
F
T F
R O
M B
U
IL
D
IN
G
C O
O R
D
IN
A T
E F
IN
A
L L
O C
A T
IO
N
W
IT
H C
O R
A N
D M
E C
H A
N
IC
A L
90' - 6" +/-
10' - 0"
62' - 0"
23.02
31.02
32.03
32.02
32.04
EXISTING UNDERGROUNG
FUEL STORAGE SEE
PLUMBING.
SEE PLUMBING DRAWINGS FOR
PIPE CONNECTIONS TO
TEMPORARY BOILER'
A. SEE G002 FOR GENERAL PROJECT NOTES
B. SEE G003 FOR PARTITION TYPE
C. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH
SIGNAGE.
D. PRIOR TO GYPSUM BOARD INSTALLATION AND ELECTRICAL ROUGH-IN
INSPECTION, GENERAL CONTRACTORS, ELECTRICAL/DATA CONTRACTORS,
ARCHITECT, AND CONSTRUCTION MANAGER SHALL REVIEW IN-PLACE LOCATIONS
OF ALL SWITCH BOXES, RECEPTACLE BOXES, FIRE ALARM BOXES, ETC. FINAL
LOCATIONS MAY BE ADJUSTED AT THIS TIME TO ALIGN OR COORDINATE WITH
DESIGN INTENT.
E. ALL DIMENSIONS ARE FROM FINISH FACE UNLESS NOTED OTHERWISE.
F. FOR FURNITURE LAYOUT, SEE FURNITURE PLAN.
8' TALL METAL BLACK
CHAINLINK FENCE WITH
3 HORIZONTAL BARS
WITH BLACK
INTERWOVEN PRIVACY
FENCE STRIPS
SECURE CHAINLINK TO
BOTTOM BAR
STAND WITH ANCHOR
FENCE WEIGHT
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
TEMPORARY BOILER AND FENCE
10/30/2023 Approver Designer
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
A101
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 1/4" = 1'-0"
FIRST FLOOR PLAN-TEMPORARY BOILER21
GENERAL NOTES
KEYNOTES
23.02 TEMPORARY BOILER SEE MECHANICAL DRAWINGS
31.02 PROVIDE CONCRETE PAD
32.02 8 FT TALL TEMPORARY CHAIN LINK FENCE
32.03 EXISTING SIDE WALK
32.04 CHAIN LINK GATE
NORTH
KEYPLAN
Scale: N.T.S.
AREA OF WORK
SCALE | 1/2" = 1'-0"
TEMPORARY CHAINLINK FENCE11
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
DN
UP
UP
UPUP
UP
UP UP
UP
UP
UP
F
F
SPECIFIED
SEALANT TAPE AS
16 GA. MIN. FRAME
WOOD CURB
FASTENER 8'' O.C.
FASTENED 18'' O.C.
COUNTERFLASHING
SPECIFED BASE
FLASHING ADHERED
TWO-PLY STRIPPING
GRAVEL SURFACING
SPECIFIED BUR
INSULATION
ALTERNATE FRAME
LOCATION FOR
HEAVY UNITS
ROOF DECK AS SPECIFIED
WITH GASKETED
FASTENERS MINIMUM
TWO PER SIDE
SPECIFED BASE
SPECIFIED CANT
MEMBRANE
M
IN
Stair #5
S-R-5
Penthouse
R01
Penthouse
R02
Penthouse
R03
Elevator Penthouse
R04
Elevator Penthouse
R05
A105
A105
2.27
6.136.136.136.13
6.136.13
6.136.13
6.136.13
6.136.13
6.136.13
A104
Sim
A104
Sim
7.017.01
7.02
A105
Sim
6.136.13
SUBSTRATE
BUILT UP ROOF MEMBRANE
STAINLESS
STEEL
CLAMPING RING
(SEE NOTE #5)
CONTINUOUS BEAD OF
AP SEALANT OR HIGH
GRADE SEALANT
FASTENER AND HD OR HD PLUS
SEAM PLATE AT 12" (305 mm) O.C. MAX.
(SEE NOTE #8)
PRE-MOLDED
PIPE FLASHING
INSULATION
SUBSTRATE
INSULATION
R O
U N
D P
E N
E T
R A
T
IO
N
FIELD SEAM
WELDED
SPLICE
2" (51 mm) MIN.
BONDING ADHESIVE
(ADHERED SYSTEM ONLY)
CONTINUOUS BEAD
OF GP SEALANT
FIELD FABRICATED
METAL HOOD BY
OTHERS (OPTIONAL)
T-JOINT COVER
OR FLASHING
(4" (102 mm) x 4" (102mm) MIN.)
CENTERED OVER INTERSECTION.
PLAN VIEW PIPE
FLASHING OVER
FIELD SEAM
NOTES:
1. REFER TO MANUFACTURE WEBSITE FOR THE
MOST CURRENT INFORMATION.
2. REMOVE ALL EXISTING FLASHING, LEAD, ETC.
PIPE SURFACE MUST BE FREE OF ALL RUST,
GREASE, INSULATION, ETC.
3. PIPE MUST BE ANCHORED TO ENSURE STABILITY.
4. PRE-MOLDED PIPE FLASHING MAY BE CUT TO
HEIGHT, BUT NO LOWER THAN REINFORCING
RING (NO WRINKLES OR FOLDS UNDER
CLAMPING RING).
5. APPLY GP SEALANT BETWEEN PENETRATION
AND PRE-MOLDED PIPE FLASHING PRIOR TO
INSTALLATION OF CLAMPING RING. REFER TO
LS-9 FOR SEAM EDGE TREATMENT.
6. LARGE PRE-MOLDED PIPE FLASHING FITS
4" (102mm) - 8" (203 mm) PENETRATIONS SIZES.
7. DO NOT USE WHEN SERVICE LINE TEMP.
EXCEEDS 160°F. REFER TO UT- P-6 & UT-P-7.
8. FASTENER AND HD SEAM PLATE
REQUIRE FOR MAS ONLY. IF FASTENER CANNOT
BE INSTALLED AS ILLUSTRATED, REFER
TO MANUFACTURE DETAILS
BALLEST AS REQ'D
ROOF REPAIR MUST BE IN
ACCORDANCE WITH ROOF
WARRANTY GUIDELINES.
METAL SLEEVE
POST, SEE STRUCTURAL
BASE PLATE, SEE STRUCTURAL
EXISTING ROOF SLAB.
INSTALL NEW INSULATION
M A
T C
H E
X
IS
T
IN
G T
H
IC
K N
E S
S T
O
STORM COLLAR
CAULK DRAWBAND WITH ELASTOMERIC
SEALANT
MASTIC SEAL AT PERIMETER
TWO PLY STRIPPING
METAL FLANGE MECHANICALLY FASTEN
1/4" COVER BOARD
A. SEE G002 FOR GENERAL PROJECT NOTES
B. WORK TO PROVIDE COMPLETE PLUMBING, MECHANICAL , AND ELECTRICAL
SYSTEM SHALL OCCUR BEYOND EXTEND OF WORK LINE,AS REQUIRED. GENERAL
CONTRACTOR TO REPAIR ANY EXISTING AREAS BEYOND EXTEND OF WORK LINE
DUE TO INSTALLATION OF SUCH SYSTEMS ( SEE ALL PLUMBING, MECHANICAL AND
ELECTRICAL DRAWINGS.
C. PATCH EXISTING ROOF AND MAINTAIN A WATER TIGHT ENVELOPE
D. ALIGN NEW WORK WITH EXISTING
E. FILL ALL SLAB/WALL OPENINGS RESULTING FROM ELECTRICAL, MECHANICAL OR
OTHER REMOVALS. CONTRACTOR TO MAINTAIN ALL EXISTING FIRE AND SMOKE
RATINGS
F. EXISTING ROOF IS TREMCO BUILT UP ROOF INSTALLED IN 2004.
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
PENTHOUSE PLAN
10/30/2023 VP VP
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
A104
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 3/32" = 1'-0"
PENTHOUSE PLAN26
KEYNOTES
2.27 RELOCATE EXISTING STEP LADDER
6.13 NEW ROOF WALK PAD
7.01 EXISTING BALLASTED BUILT UP ROOF ASSEMBLY . CONTRACTOR TO MAINTAIN WATER
TIGHT ENVELOPE DURING CONSTRUCTION
7.02 PROVIDE ALL ROOF PENETRATION, REPAIR AND REINFORCEMENT IN THE EXISTING
BUILDING FOR INSTALLATION OF THE NEW EXISTING MECHANICAL EQUIPMENT. THE
EXISTING TREMCO ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED, AND
RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB
-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH INSTALLATION TO MAINTAIN
ROOF INTEGRITY
7.03 EXISTING EQUIPMENT POST TO REMAIN , SEE STRUCTURAL DRAWINGS. CONTRACTOR
TO PROTECT EXISTING TREMCO ROOF AND MAINTAIN WATER TIGHT CONDITION .
PROVIDE NEW FLASHING
7.04 NEW EQUIPMENT SUPPORT. SEE STRUCTURAL AND MECHANICAL DRAWINGS. THE
EXISTING TREMCO ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND
RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING
SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR INSTALLATION TO MAINTAIN
THE EXISTING ROOF INTEGRITY
FULLY SPRINKLERED
NORTH
SCALE | 6" = 1'-0"
BUILT UP ROOF - LARGE PIPE PENETRATION29 SCALE | 12" = 1'-0" REF | 26/A104
MECHANICAL CURB12SCALE | 1 1/2" = 1'-0"
BUILT UP ROOF - STRUCTURAL POST21
ROOF GENERAL NOTES
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
1"
#12 SCREW
FASTENERS
@EA. STUD
14 GA CLOSURE
ANGLE @ 4 1/2"
HIGH
5/16" RAISED
EMBOSSMENT STEEL
FLOOR PLATE DEMOLISH
EXISTING ANGLE
EXISTING
HAND RAIL
EXISTING
STAIRS
COUNTERSINK 1/16: DIAM.
MIN. FASTENERS 2'-0" O.C.
6" MET. STUD KNEE
WALL (TO MATCH
EXTERIOR WALL)
/2
/2
/2
EXISTINGNEW
6' - 4 1/2"
EXISTING LINE OF
STRINGER IN
FOREGROUND
6' - 0"
6' - 0"
EXISTING NEW
A105
Sim
18/A105
17/A105
/A
/A
A105
Sim
6' - 0"
EXISTING ROOF
SLOPED
INSULATION
SLOPED
INSULATION
NEW ROOF
REMOVE EXISTING MEMBRANE
INSUL. & TOPPING
EXTERIOR CONDITION 1/4"
PL W/ L2X2X1/4" STIFFENER
@ 2'-0" O.C. MAX.
INTERIOR CONDITION: 1/4"
PL W/ L5X3X1/4 LLY
STIFFENER @ 2'-0" O.C. MAX
EXP. BOLT ASSEMBLY TO
UNDERSIDE OF EXISTING
ROOF SLAB
#4 @ 12" O.C. EACH
WAY ONE BAR MIN.
EACH WAY
3" 3"SHORT DIRECTION
START FIRST ANGLE 1'-0"
FROM END OF OPENING
NO ANGLE REQ'D FOR
OPENING LESS THAN
1'-6" MAX OPENINGS
1/2" O HILTI EXP. BOLT
BY 3" EMBEDMENT @
EACH ANGLE & AT
CORNER OF PLATE
2" KEY
NEW CONC FILL TO LVL
NEW INSULATION
PATCH AND SEAL
EXISTING MEMBRANE
BALLAST AS REQ'D
REMOVE EXISTING
CURB AND
ASSOCIATED
CONSTRUCTION.
INTERIOR
CONDITION
EXTERIOR
CONDITION
EXISTING NEW
EFIS
RAISED ACCENT
BAND TYPICAL
COLOR #2
COLOR #1
EXISTING NEW
EFIS
RAISED ACCENT BAND
TYPICAL COLOR #2
COLOR #1
PATCH ALL EXISTING EIFS MATERIAL
CJ CJ
EFIS
RAISED ACCENT BAND
TYPICAL COLOR #2
COLOR #1
16'-0" A.R.D.
TOP OF STUD
VARIES
STEEL BEARING
6' - 4 1/2"
SPRAY-ON FIRE
PROOFING - 2 HR
RATED @ ROOF
DECK & BEAMS
STEEL BEAM - SEE
STRUCT DWGS
SPRAY-ON FIRE
PROOFING @
COLUMNS - 2HR
RATED
EXISTING
COLUMN
BEYOND
1" HAT CHANNEL CONT. @ 4'-0"
O.C. - ANCHOR TO EACH STUD
W/ 1X1 14 GA. CLIP ANGLE
SCREWED TO CHANNEL.
6" METAL STUDS -
18 GA. @ 24" O.C.
HORIZ. STUD
PLYWOOD 2'-0" HIGH AT
PERIMETER OF PENTHOUSE
W/ 6" BATT INSULATION R=19
REMOVE EXISTING ROOFING
SYSTEM INCLUDING CONC.
TOPING
ELAST MEMBRANE
(NEW)
EXISTING SLAB
EXISTING
ROOF SYSTEM
20 GA TRACK W/ 1/4" LEG
TOP & BOTTOM ANCHOR
TO SLAB W/ 1/2 O EXP.
BOLT @ 24"O.C.
1/2" GYP. BD.
SHEATHING
E.I.F.S. W/
R=8 MIN.
2"
COLUMN
CENTERLINE
112'-2" A.R.D. @ EAST
WALL TYP. 112'-7" A.R.D. @
WEST WALL- TYP.
FULL DEPTH BRIDGING
MEMBER (CONT.)
SLIP CONNECTION @
EACH STUD
NEW ROOFING
MATCH AND TIE
INTO EXISTING
EQ EQ
6' - 0"
NEW EXISTING
ALIGN WITH
EXISTING EIFS
ENCLOSURE
EXISTING
COLUMN GRID
NEW PLATFORM TO MATCH
EXISTING SEE DETAIL
(30/A105)
DOUBLE LAYER REINFORCE
MESH
EXISTING DOOR
RE-USE EXISTING
THRESHOLD PLATE
SPECIFIED CANT
EXISTING ROOF DECK
ROOF INSULATION
BUILT UP ROOF
MEMBRANE
GRAVEL SURFACING
TWO-PLY STRIPPING
SPECIFIED BASE
FLASHING ADHERED
WITH ADHESIVE
NEW SURFACE MOUNTED
METAL COUNTERFLASHING
INSULATE INSIDE OF
METAL WORK IN COLD
CLIMATE
GRAVEL SURFACE
FLANGE SET IN SPECIFIED
ASPHALT CEMENT, MECHANICALLY
FASTENED 3" O.C. PRIME METAL
FLANGE BEFORE STRIPPING
WOOD NAILER SECURED TO DECK W/
APPROPRIATE FASTENERS. 2 ROWS
STAGGERED EACH ROW 24" O.C.
ROOF DECK AS
SPECIFIED
INSULATION
SPECIFIED BUILT
UP MEMBRANE
TWO-PLY STRIPPING
ASPHALT CEMENT
SEAL
SLOPE PIPES DOWN
AND AWAY FROM
HOOD
FASTENERS 8" O.C.
SHEET METAL COLLAR
SEAL
SHEET METAL HOOD
CROSS BREAK OR
SLOPE FOR DRAINAGE
METAL SCREW
SEAL
CLOSURE DETAIL
EXISTING ROUND
PENETRATION
FABRICATED ROUND TO SQUARE SHEET
METAL TWO PIECE SOLDERED IN FIELD
TREATED WOOD BLOCKING
SPECIFIED INSULATION
SPECIFIED CANT
EXISTING WOOD CURB
ROUND TO SQUARE
SHEET METAL
CLAMPED STORM COLLAR
BEAD OF TREMOR SEALANT
SPECIFIED BUILT UP MEMBRANE
METAL STUD BOX HEADER
LOUVER, SEE
MECHANICAL DRAWINGS
CONTINOUS METAL
PAN FLASHING
EXISTING EIFS
PATCH ALL AREAS
DISTURBED
CONTINOUS METAL FLASHING
S
T A T E
OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
PENTHOUSE ENLARGED PLAN
WITH DETAILS
10/30/2023 Approver Designer
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
A105
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 1" = 1'-0"
PENTHOUSE PLATFORM DETAIL30
SCALE | 1/8" = 1'-0"
PENTHOUSE PLAN ENLARGED11SCALE | 1/8" = 1'-0"
PENTHOUSE ROOF PLAN16
SCALE | 1 1/2" = 1'-0"
BUILT UP ROOF - SLAB INFILL DETAIL15
SCALE | 1/8" = 1'-0"
EAST ELEVATION18
SCALE | 1/8" = 1'-0"
WEST ELEVATION17
SCALE | 1/8" = 1'-0"
SOUTH ELEVATION NEW13
SCALE | 1/8" = 1'-0"
NORTH ELEVATION EXSITING12
NORTHNORTH
SCALE | 3/4" = 1'-0"
TYPICAL PENTHOUSE WALL SECTION26
SCALE | 3/8" = 1'-0"
BUILT UP ROOFING HOT/ COLD DOOR THRESHOLD8
SCALE | 1/2" = 1'-0"
BUILT-UP ROOFING PIPING THROUGH ROOF DECK10SCALE | 3/4" = 1'-0"
BUILT-UP ROOFING ROUND TO SQUARE METAL FLASHING14
PAINT ENTIRE EIFS
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
SCALE | 1" = 1'-0"
LOUVER FLASHING DETAIL19
A. CODES AND SPECIFICATIONS
1. 2018 INTERNATIONAL BUILDING CODE.
2. ASCE/SEI 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES.
3. ANSI/AISC 303-16, CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES AS MODIFIED BY THE CONSTRUCTION DOCUMENTS.
4. ANSI/AWS D1.1, STRUCTURAL WELDING CODE – STEEL.
5. ADDITIONAL TECHNICAL SPECIFICATIONS IN THE PROJECT MANUAL.
B. DESIGN LOADS
1. ROOF LOAD:
ROOF LIVE LOAD, MINIMUM: 20 PSF - (NR)
CEILING AND MECHANICAL ALLOWANCE
ABOVE TYPICAL FLOOR AREAS: 10 PSF
ROOFING AND BALLAST ALLOWANCE: 20 PSF
CONCENTRATED LOAD ON ROOF: 300 LBS
NEW ROOFTOP EQUIPMENT DEAD LOADS: NOTED ON ROOF FRAMING PLAN
(NR) INDICATES LIVE LOADS ARE NOT REDUCED. OTHERWISE DESIGN LIVE LOADS FOR SLABS, BEAMS, COLUMNS, AND FOUNDATIONS ARE
REDUCED PER CODE.
CONCENTRATED LIVE LOADS DISTRIBUTED OVER 2.5 FT X 2.5 FT IN LIEU OF UNIFORM LIVE LOAD, UNLESS NOTED OTHERWISE, SEE CODE SECTION 1607.
ROOF LIVE LOADS ARE INCREASED FOR SNOW DRIFT AND PONDING PER ASCE-7. WATER DEPTH ON DEFLECTED STRUCTURE 6" MAXIMUM.
2. SNOW LOAD:
GROUND SNOW LOAD: Pg = 20 PSF FLAT ROOF SNOW LOAD: Pf = 16 PSF SNOW EXPOSURE FACTOR: Ce = 0.9 SNOW LOAD IMPORTANCE FACTOR: Is = 1.0 THERMAL FACTOR: Ct = 1.2
3. WIND LOAD:
DESIGN WIND SPEED (3-SECOND GUST): Vult = ___ MPH; [Vasd = ___ MPH]
RISK CATEGORY: II
WIND EXPOSURE: B
INTERNAL PRESSURE COEFFICIENT: ENCLOSED BUILDING, GCpi = +/- 0.18
ROOF HEIGHT H= 65 FT.
COMPONENTS AND CLADDING – ULTIMATE STRENGTH DESIGN:
FACTORED LOADS PSF (ult)
EFFECTIVE WIND AREA: 10SF 50SF
1 ROOF, TYPICAL AREAS +16.0/-25.9 +16.0/-24.3
2 ROOF WITHIN ___ FEET OF EDGES +23.7/-43.4 +21.3/-32.7
3 ROOF WITHIN ___ FEET OF CORNERS +23.7/-43.4 +21.3/-32.7
4 WALLS, TYPICAL AREAS +23.7/-25.7 +21.3/-23.2
5 WALLS WITHIN ___ FT OF CORNERS +23.7/-31.6 +21.3/-26.7
4. NEW STRUCTURAL WORK IS LIMITED TO ROOFTOP EQUIPMENT SUPPORTS AND DOES NOT CHANGE THE EXISTING STRUCTURAL SYSTEMS FOR GRAVITY OF LATERAL LOADS. NEW WORK AND ALTERED ELEMENTS MEET NEW CODE REQUIREMENTS. EXISTING STRUCTURE THAT IS UNALTERED
IS TO REMAIN AND IS IN ACCORDANCE WITH IBC 3404.
C. STRUCTURAL STEEL
1. ALL WORK SHALL CONFORM TO AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) STANDARDS AND THE PROJECT SPECIFICATIONS.
2. FABRICATOR SHALL MEET AISC CERTIFICATION STANDARD FOR STEEL BUILDING STRUCTURES PER THE PROJECT SPECIFICATIONS.
3. MATERIAL:
a. WIDE FLANGE SHAPES: ASTM A992 (Fy 50 KSI).
b. STEEL PIPES: ASTM A53, GRADE B (Fy 35 KSI).
c. OTHER ROLLED SHAPES, PLATES AND BARS: ASTM A36 (Fy 36 KSI).
d. PLATES AND BARS NOTED GRADE 50: ASTM A572 (Fy 50 KSI).
e. BOLTS: ASTM A325, 3/4" MIN. DIA., U.N.O.
4. PROVIDE TENSION CONTROL A325-TC BOLTS OR F1852 ASSEMBLIES, OR F959 SELF INDICATING LOAD INDICATOR WASHERS AND PRETENSION ALL
BOLTS.
5. ALL WELDING MATERIALS, WELDING PROCEDURES AND OPERATORS PERFORMING WELDING TO BE QUALIFIED PER AWS D1.1.
6. CONNECTION CONFIGURATIONS INDICATED ON THE PLANS, NOTES AND DETAILS REPRESENT THE DESIGN INTENT. ITEMS SPECIFICALLY INDICATED, SUCH AS WELDS, STIFFENERS, BRACES, ETC., MUST BE PROVIDED AT MINIMUM AS SHOWN.