This file contains 14 pages of detailed architectural and mechanical drawings that are part of Addendum 1 for a boiler replacement project at the Fort Thomas VA Medical Center. The drawings include basement plans, penthouse plans, mechanical room layouts, steam boiler schematics, piping diagrams, control diagrams, and electrical power distribution plans.
The drawings provide specific details for replacing existing boilers with a new hot water system, including three new field-erectable steam boilers (designated 64-B1, 64-B2, and 64-B3), each with 2,062 sq ft heating surface and 12,000 lbs/hr capacity. The plans show modifications to the existing boiler room layout, new piping configurations, electrical power distribution, control systems, and mechanical ventilation. Key components detailed include natural gas and fuel oil supply systems, feedwater systems, steam distribution, condensate return, and associated instrumentation and controls. The drawings include both demolition plans showing equipment to be removed and new work plans showing the installation of the replacement systems.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
N A
C
J
J
J
J J J
J
J
J
JJ
GF
GF
J J
W P
/G F
J J
J
J
J
J J
M T T
TT
T
T
T
MBFPM
M P
B F
P
F S
STAIR #1
S*B*1
STORAGE
004C
OFFICE
EQUIP. RM
004A
KITCHEN
DINING
ROOM
Stair #2
S*B*2
Stor.
002A
Dietetic Dry Stor.
002B
HAC
004B
Diet. Stor.
Refr.
Elec.
007B
Refr.
H.W. Tank
007A
Dirty Clothes
007E
HCMI
Refr.
010A
Refr.
Hud
011A
Clean Clothes
007D
CORRIDOR
C*B*1
Corridor
C-B-7
Corridor
C-B-7C
Bldg. Manag.
Off.
Linen
Bldg Manag.
Stor.
013A
Hud/Vash
015B
Hud/Vash
015A
Hud/Vash
Elec. Shop
018B
Eng. Off.
018A
Volunteer Service Office
Engineering
Engineering Stor.
Uniform Exchange
Tlt.
Volunteer Service Escort
M. Locker
025A
HAC
F. Locker
Stair #3
S*B*3
Comp.
Network
027C
Eng. Stor.
018C
Eng. Stor.
027B
Soiled Linen
018D
Canteen
Rec. Temp.
Fitness Center
027A
Carpenter Shop
029A
Clos.
029B
Boiler Rm.
Group
Clos.
029C
Clos.
030A
Clerk
Work Rm.
Tele. Service
Stair #4
S*B*4
Oxygen Storage
Group Rm 2
S.T. Off.
Stor.
Media Center
Corridor
C*B*8
S.T. Dr.
S.T. Exam
S.H. Exam
Patient Tlt.
Staff Tlt.
Kiln
038A
Staff
Occ. Therapy
Stair #6
S*B*6
Phys.
Therapy
Mech.
036A
M. Toilet
Storage
009A Hud
Elec.
Elect. Supply
3"
3"
9.01
9.04
9.0210.02 10.02
10.02
3.03
8.25 8.22 8.23 8.22 8.25
4 W1 L1 L1 W1
A. SEE G002 FOR GENERAL PROJECT NOTES
B. SEE G003 FOR PARTITION TYPE
C. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH
SIGNAGE.
D. PRIOR TO GYPSUM BOARD INSTALLATION AND ELECTRICAL ROUGH-IN
INSPECTION, GENERAL CONTRACTORS, ELECTRICAL/DATA CONTRACTORS,
ARCHITECT, AND CONSTRUCTION MANAGER SHALL REVIEW IN-PLACE LOCATIONS
OF ALL SWITCH BOXES, RECEPTACLE BOXES, FIRE ALARM BOXES, ETC. FINAL
LOCATIONS MAY BE ADJUSTED AT THIS TIME TO ALIGN OR COORDINATE WITH
DESIGN INTENT.
E. ALL DIMENSIONS ARE FROM FINISH FACE UNLESS NOTED OTHERWISE.
F. FOR FURNITURE LAYOUT, SEE FURNITURE PLAN.
/8
3' - 0"
1" INSULATED GLAZING
TO MATCH EXISTING
TINT
W1
/8
3' - 0"
L1
V
IF
V
IF
VIFVIF
8.258.228.248.228.25
EXISTING WALL
PATCH ALL AREAS DISTURBED
NEW LOUVER
CONTINUOUS SEALANT
ANCHOR TO EXISTING WALL
EXISTING WALL
PATCH ALL AREAS DISTURBED
NEW STOREFRONT WINDOW
SYSTEM WITH 1" GLAZING
CONTINUOUS SEALANT ,
EACH SIDE
PROVIDE BACKER ROD IN
EXTERIOR SIDE
ANCHOR TO EXISTING WALL
CONTINUOUS
METAL PAN SILL
FLASHING
ANCHOR TO EXISTING WALL
CONTINUOUS SEALANT ,
EACH SIDE
PROVIDE BACKER ROD IN
EXTERIOR SIDE
ANCHOR TO EXISTING WALL
HEAD/JAMB DETAILHEAD/JAMB DETAIL
SILL DETAIL SILL DETAIL
SILL PAN WITH INTEGRATED
END DAMS
S
T A T
E OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
BASEMENT PLANS
10/30/2023 MW/VP VP
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
A100
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 3/32" = 1'-0"
BASEMENT PLAN26
KEYNOTES
3.03 REINFORCED CONCRETE SLAB. ELEVATION MATCH EXITING SLAB GRADE. PROVIDE
COMPACTION AND BACKFILL , SEE STRUCTURAL DRAWINGS
8.22 EXISTING LOUVER TO REMAIN
8.23 NEW LOUVER
8.24 EXISTING WINDOW TO BE REMOVED . REPLACE WITH NEW LOUVER. SEE MECHANICAL
DRAWINGS
8.25 REMOVE EXISTING LOUVER SEE MECHANICAL DRAWINGS, PROVIDE NEW STOREFRONT
WINDOW WITH 1 INCH INSULATED GLASS AFTER ALL MEP WORK IS COMPLETE
9.01 PAINT EXPOSED STRUCTURE AND ALL CEILING COMPONENTS
9.02 EPOXY FLOOR FINISH ON NEW/EXISTING CONCRETE SLAB
9.04 PAINT ALL WALLS
10.02 PROVIDE CLASS B FIRE EXTINGUISHER
NORTH
FULLY SPRINKLERED
SCALE | 1/8" = 1'-0"
GENERAL NOTES
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
4 ADDENDUM 1 10/25/2024
SCALE | 1/4" = 1'-0"
WINDOW ELEVATIONS9
SCALE | 1 1/2" = 1'-0"
PARTIAL ELEVATION28
SCALE | 1/2" = 1'-0"
HEAD/JAMB DETAIL10
DN
UP
UP
UPUP
UP
UP UP
UP
UP
UP
F
F
SPECIFIED
SEALANT TAPE AS
16 GA. MIN. FRAME
WOOD CURB
FASTENER 8'' O.C.
FASTENED 18'' O.C.
COUNTERFLASHING
SPECIFED BASE
FLASHING ADHERED
TWO-PLY STRIPPING
GRAVEL SURFACING
SPECIFIED BUR
INSULATION
ALTERNATE FRAME
LOCATION FOR
HEAVY UNITS
ROOF DECK AS SPECIFIED
WITH GASKETED
FASTENERS MINIMUM
TWO PER SIDE
SPECIFED BASE
SPECIFIED CANT
MEMBRANE
M
IN
Stair #5
S-R-5
Penthouse
R01
Penthouse
R02
Penthouse
R03
Elevator Penthouse
R04
Elevator Penthouse
R05
A105
A105
2.27
6.136.136.136.13
6.136.13
6.136.13
6.136.13
6.136.13
6.136.13
A104
Sim
A104
Sim
7.037.03
7.017.01
7.04
7.02
A105
Sim
6.136.13
SUBSTRATE
BUILT UP ROOF MEMBRANE
STAINLESS
STEEL
CLAMPING RING
(SEE NOTE #5)
CONTINUOUS BEAD OF
AP SEALANT OR HIGH
GRADE SEALANT
FASTENER AND HD OR HD PLUS
SEAM PLATE AT 12" (305 mm) O.C. MAX.
(SEE NOTE #8)
PRE-MOLDED
PIPE FLASHING
INSULATION
SUBSTRATE
INSULATION
R O
U N
D P
E N
E T
R A
T
IO
N
FIELD SEAM
WELDED
SPLICE
2" (51 mm) MIN.
BONDING ADHESIVE
(ADHERED SYSTEM ONLY)
CONTINUOUS BEAD
OF GP SEALANT
FIELD FABRICATED
METAL HOOD BY
OTHERS (OPTIONAL)
T-JOINT COVER
OR FLASHING
(4" (102 mm) x 4" (102mm) MIN.)
CENTERED OVER INTERSECTION.
PLAN VIEW PIPE
FLASHING OVER
FIELD SEAM
NOTES:
1. REFER TO MANUFACTURE WEBSITE FOR THE
MOST CURRENT INFORMATION.
2. REMOVE ALL EXISTING FLASHING, LEAD, ETC.
PIPE SURFACE MUST BE FREE OF ALL RUST,
GREASE, INSULATION, ETC.
3. PIPE MUST BE ANCHORED TO ENSURE STABILITY.
4. PRE-MOLDED PIPE FLASHING MAY BE CUT TO
HEIGHT, BUT NO LOWER THAN REINFORCING
RING (NO WRINKLES OR FOLDS UNDER
CLAMPING RING).
5. APPLY GP SEALANT BETWEEN PENETRATION
AND PRE-MOLDED PIPE FLASHING PRIOR TO
INSTALLATION OF CLAMPING RING. REFER TO
LS-9 FOR SEAM EDGE TREATMENT.
6. LARGE PRE-MOLDED PIPE FLASHING FITS
4" (102mm) - 8" (203 mm) PENETRATIONS SIZES.
7. DO NOT USE WHEN SERVICE LINE TEMP.
EXCEEDS 160°F. REFER TO UT- P-6 & UT-P-7.
8. FASTENER AND HD SEAM PLATE
REQUIRE FOR MAS ONLY. IF FASTENER CANNOT
BE INSTALLED AS ILLUSTRATED, REFER
TO MANUFACTURE DETAILS
BALLEST AS REQ'D
ROOF REPAIR MUST BE IN
ACCORDANCE WITH ROOF
WARRANTY GUIDELINES.
METAL SLEEVE
POST, SEE STRUCTURAL
BASE PLATE, SEE STRUCTURAL
EXISTING ROOF SLAB.
INSTALL NEW INSULATION
M A
T C
H E
X
IS
T
IN
G T
H
IC
K N
E S
S T
O
STORM COLLAR
CAULK DRAWBAND WITH ELASTOMERIC
SEALANT
MASTIC SEAL AT PERIMETER
TWO PLY STRIPPING
METAL FLANGE MECHANICALLY FASTEN
1/4" COVER BOARD
A. SEE G002 FOR GENERAL PROJECT NOTES
B. WORK TO PROVIDE COMPLETE PLUMBING, MECHANICAL , AND ELECTRICAL
SYSTEM SHALL OCCUR BEYOND EXTEND OF WORK LINE,AS REQUIRED. GENERAL
CONTRACTOR TO REPAIR ANY EXISTING AREAS BEYOND EXTEND OF WORK LINE
DUE TO INSTALLATION OF SUCH SYSTEMS ( SEE ALL PLUMBING, MECHANICAL AND
ELECTRICAL DRAWINGS.
C. PATCH EXISTING ROOF AND MAINTAIN A WATER TIGHT ENVELOPE
D. ALIGN NEW WORK WITH EXISTING
E. FILL ALL SLAB/WALL OPENINGS RESULTING FROM ELECTRICAL, MECHANICAL OR
OTHER REMOVALS. CONTRACTOR TO MAINTAIN ALL EXISTING FIRE AND SMOKE
RATINGS
F. EXISTING ROOF IS TREMCO BUILT UP ROOF INSTALLED IN 2004.
S
T A T
E OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
PENTHOUSE PLAN
10/30/2023 VP VP
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
A104
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 3/32" = 1'-0"
PENTHOUSE PLAN26
KEYNOTES
2.27 RELOCATE EXISTING STEP LADDER
6.13 NEW ROOF WALK PAD
7.01 EXISTING BALLASTED BUILT UP ROOF ASSEMBLY . CONTRACTOR TO MAINTAIN WATER
TIGHT ENVELOPE DURING CONSTRUCTION
7.02 PROVIDE ALL ROOF PENETRATION, REPAIR AND REINFORCEMENT IN THE EXISTING
BUILDING FOR INSTALLATION OF THE NEW EXISTING MECHANICAL EQUIPMENT. THE
EXISTING TREMCO ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED, AND
RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB
-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH INSTALLATION TO MAINTAIN
ROOF INTEGRITY
7.03 EXISTING EQUIPMENT POST TO REMAIN , SEE STRUCTURAL DRAWINGS. CONTRACTOR
TO PROTECT EXISTING TREMCO ROOF AND MAINTAIN WATER TIGHT CONDITION .
PROVIDE NEW FLASHING
7.04 NEW EQUIPMENT SUPPORT. SEE STRUCTURAL AND MECHANICAL DRAWINGS. THE
EXISTING TREMCO ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND
RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING
SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR INSTALLATION TO MAINTAIN
THE EXISTING ROOF INTEGRITY
NORTH
SCALE | 6" = 1'-0"
BUILT UP ROOF - LARGE PIPE PENETRATION29 SCALE | 12" = 1'-0" REF | 26/A104
MECHANICAL CURB12SCALE | 1 1/2" = 1'-0"
BUILT UP ROOF - STRUCTURAL POST21
ROOF GENERAL NOTES
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
4 ADDENDUM 1 10/25/2024
1"
#12 SCREW
FASTENERS
@EA. STUD
14 GA CLOSURE
ANGLE @ 4 1/2"
HIGH
5/16" RAISED
EMBOSSMENT STEEL
FLOOR PLATE DEMOLISH
EXISTING ANGLE
EXISTING
HAND RAIL
EXISTING
STAIRS
COUNTERSINK 1/16: DIAM.
MIN. FASTENERS 2'-0" O.C.
6" MET. STUD KNEE
WALL (TO MATCH
EXTERIOR WALL)
/2
/2
/2
EXISTINGNEW
6' - 4 1/2"
EXISTING LINE OF
STRINGER IN
FOREGROUND
6' - 0"
6' - 0"
EXISTING NEW
A105
Sim
18/A105
17/A105
/A
/A
A105
Sim
6' - 0"
EXISTING ROOF
SLOPED
INSULATION
SLOPED
INSULATION
NEW ROOF
PROVIDE NEW FIRE
TREATED WOOD
BLOCKING, NEW METAL
COPING WITH
CONTINUOUS CLEAT ON
ENTIRE PENTHOUSE
65' - 3"
REMOVE EXISTING MEMBRANE
INSUL. & TOPPING
EXTERIOR CONDITION 1/4"
PL W/ L2X2X1/4" STIFFENER
@ 2'-0" O.C. MAX.
INTERIOR CONDITION: 1/4"
PL W/ L5X3X1/4 LLY
STIFFENER @ 2'-0" O.C. MAX
EXP. BOLT ASSEMBLY TO
UNDERSIDE OF EXISTING
ROOF SLAB
#4 @ 12" O.C. EACH
WAY ONE BAR MIN.
EACH WAY
3" 3"SHORT DIRECTION
START FIRST ANGLE 1'-0"
FROM END OF OPENING
NO ANGLE REQ'D FOR
OPENING LESS THAN
1'-6" MAX OPENINGS
1/2" O HILTI EXP. BOLT
BY 3" EMBEDMENT @
EACH ANGLE & AT
CORNER OF PLATE
2" KEY
NEW CONC FILL TO LVL
NEW INSULATION
PATCH AND SEAL
EXISTING MEMBRANE
BALLAST AS REQ'D
REMOVE EXISTING
CURB AND
ASSOCIATED
CONSTRUCTION.
INTERIOR
CONDITION
EXTERIOR
CONDITION
EXISTING NEW
EFIS
RAISED ACCENT
BAND TYPICAL
COLOR #2
COLOR #1
ROOF T/SLAB
990'-10 1/2"
EXISTING NEW
EFIS
RAISED ACCENT BAND
TYPICAL COLOR #2
COLOR #1
PATCH ALL EXISTING EIFS MATERIAL
PREFINISHED METAL COPING
CJ CJ
EFIS
RAISED
ACCENT
BAND
TYPICAL
COLOR #2
COLOR #1
ROOF T/SLAB
990'-10 1/2"
A105
Sim
16'-0" A.R.D.
TOP OF STUD
VARIES
STEEL BEARING
6' - 4 1/2"
SPRAY-ON FIRE
PROOFING - 2 HR RATED
@ ROOF DECK & BEAMS
STEEL BEAM - SEE
STRUCT DWGS
SPRAY-ON FIRE
PROOFING @
COLUMNS - 2HR
RATED
EXISTING
COLUMN
BEYOND
1" HAT CHANNEL CONT. @ 4'-0"
O.C. - ANCHOR TO EACH STUD
W/ 1X1 14 GA. CLIP ANGLE
SCREWED TO CHANNEL.
6" METAL STUDS -
18 GA. @ 24" O.C.
HORIZ. STUD
PLYWOOD 2'-0" HIGH AT
PERIMETER OF PENTHOUSE
W/ 6" BATT INSULATION R=19
REMOVE EXISTING ROOFING
SYSTEM INCLUDING CONC.
TOPING
ELAST MEMBRANE
(NEW)
EXISTING SLAB
EXISTING
ROOF SYSTEM
20 GA TRACK W/ 1/4" LEG
TOP & BOTTOM ANCHOR
TO SLAB W/ 1/2 O EXP.
BOLT @ 24"O.C.
1/2" GYP. BD.
SHEATHING
E.I.F.S. W/
R=8 MIN.
2"
COLUMN
CENTERLINE
112'-2" A.R.D. @ EAST
WALL TYP. 112'-7" A.R.D. @
WEST WALL- TYP.
FULL DEPTH BRIDGING
MEMBER (CONT.)
SLIP CONNECTION @
EACH STUD
NEW ROOFING MATCH
AND TIE INTO EXISTING
EQ EQ
6' - 0"
NEW EXISTING
METAL COPING
WITH CONTINUOUS
CLEAT SYSTEM
EXISTING
COLUMN GRID
NEW PLATFORM TO MATCH
EXISTING SEE DETAIL
(30/A105)
NEW ROOFING UP AND
OVER PARAPET
TERMINATION BAR
AND
COUNTERFLASHING
A105
Sim
EXISTING DOOR
RE-USE EXISTING
THRESHOLD PLATE
SPECIFIED CANT
EXISTING ROOF DECK
ROOF INSULATION
BUILT UP ROOF
MEMBRANE
GRAVEL SURFACING
TWO-PLY STRIPPING
SPECIFIED BASE
FLASHING ADHERED
WITH ADHESIVE
NEW SURFACE MOUNTED
METAL COUNTERFLASHING
INSULATE INSIDE OF
METAL WORK IN COLD
CLIMATE
GRAVEL SURFACE
FLANGE SET IN SPECIFIED
ASPHALT CEMENT, MECHANICALLY
FASTENED 3" O.C. PRIME METAL
FLANGE BEFORE STRIPPING
WOOD NAILER SECURED TO DECK W/
APPROPRIATE FASTENERS. 2 ROWS
STAGGERED EACH ROW 24" O.C.
ROOF DECK AS
SPECIFIED
INSULATION
SPECIFIED BUILT
UP MEMBRANE
TWO-PLY STRIPPING
ASPHALT CEMENT
SEAL
SLOPE PIPES DOWN
AND AWAY FROM
HOOD
FASTENERS 8" O.C.
SHEET METAL COLLAR
SEAL
SHEET METAL HOOD
CROSS BREAK OR
SLOPE FOR DRAINAGE
METAL SCREW
SEAL
CLOSURE DETAIL
EXISTING ROUND
PENETRATION
FABRICATED ROUND TO SQUARE SHEET
METAL TWO PIECE SOLDERED IN FIELD
TREATED WOOD BLOCKING
SPECIFIED INSULATION
SPECIFIED CANT
EXISTING WOOD CURB
ROUND TO SQUARE
SHEET METAL
CLAMPED STORM COLLAR
BEAD OF TREMOR SEALANT
SPECIFIED BUILT UP MEMBRANE
METAL STUD BOX HEADER
LOUVER, SEE
MECHANICAL DRAWINGS
CONTINOUS METAL
PAN FLASHING
EXISTING EIFS
PATCH ALL AREAS
DISTURBED
CONTINOUS METAL FLASHING
S
T A T
E OF O
H
IO
R E G
IST ERED A RC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2023
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
100 E. Eighth Street, Ste. 300
Cincinnati, Ohio 45202-2129
Ph 513-241-3222
Fax 513-241-2981 www.thpltd.com
CONSTRUCTION
DOCUMENTS
Chief Engineer
KRISTINA AMIN
.0
PENTHOUSE ENLARGED PLAN
WITH DETAILS
10/30/2023 Approver Designer
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
A105
539-20-201
FORT THOMAS, KENTUCKY
/3
/2
SCALE | 1" = 1'-0"
PENTHOUSE PLATFORM DETAIL30
SCALE | 1/8" = 1'-0"
PENTHOUSE PLAN ENLARGED11SCALE | 1/8" = 1'-0"
PENTHOUSE ROOF PLAN16
SCALE | 1 1/2" = 1'-0"
BUILT UP ROOF - SLAB INFILL DETAIL15
SCALE | 1/8" = 1'-0"
EAST ELEVATION18
SCALE | 1/8" = 1'-0"
WEST ELEVATION17
SCALE | 1/8" = 1'-0"
SOUTH ELEVATION NEW13
SCALE | 1/8" = 1'-0"
NORTH ELEVATION EXSITING12
NORTHNORTH
SCALE | 3/4" = 1'-0"
TYPICAL PENTHOUSE WALL SECTION26
SCALE | 3/8" = 1'-0"
BUILT UP ROOFING HOT/ COLD DOOR THRESHOLD8
SCALE | 1/2" = 1'-0"
BUILT-UP ROOFING PIPING THROUGH ROOF DECK10SCALE | 3/4" = 1'-0"
BUILT-UP ROOFING ROUND TO SQUARE METAL FLASHING14
PAINT ENTIRE EIFS
SCALE | 1" = 1'-0"
LOUVER FLASHING DETAIL19
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
4 ADDENDUM 1 10/25/2024
PREFINISHED
METAL COPING
SP
dP
H
T
T
T
T
C
PTLT FT
M
TT
A H7
H4
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR (SEE NOTE 1 ABOVE)
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
COOLING COIL
CONVERTOR
CONVECTOR
CLEAN OUT
CEILING GRILLE
CENTRIFUGAL FAN
CEILING DIFFUSER
BOTTOM REGISTER (WALL TYPE)
BOTTOM GRILLE (WALL TYPE)
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT
OF LISTED SIZE OF PIPE.
APPROXIMATE ELEVATION FROM FLOOR TO CENTER
MANUAL VOLUME DAMPER
U/C
9'-6"
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
dBA
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
DRAWING NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES)
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10X8
FC
D
FLEXIBLE CONNECTION
(WALL TYPE)
(WALL TYPE)
1-01
1-SF3
AIR HANDLING UNIT NUMBER
TERMINAL UNIT DESIGNATION
TYPICAL UNIT NO.
SECTION LETTER
DETAIL NUMBER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES (SEE STANDARD DETAIL)
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
THERMODYNAMIC TRAP
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES (SEE STANDARD DETAIL)
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CONV
CW
CR
CO
CG
CF
CD
CC
C
BR
BIW
BG
ATC
AFW
AI
APD
AO
AHU
AFMD
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SPS
S F
T
H
T
T H
VSD VARIABLE SPEED DRIVE
WET BULB TEMPERATURE, DEG. FWb
MAXIMUM
OUTSIDE AIR
(16 PSIG THRU 59 PSIG)
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
POWER OPERATED, PARALLEL BLADE DAMPER
POWER OPERATED, OPPOSED BLADE DAMPER
PRESSURE REDUCING VALVE
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
POD
PH
PRV
PPD
MPR
MAX
O.A.
NOM
MIN
PC
MPS
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
FIN TUBE RADIATION
GRAVITY HOOD
MIXING BOX
POUNDS PER HOUR
HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)
LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM CONDENSATE RETURN
INTEGRAL FACE & BYPASS
LOCAL TEMPERATURE CONTROL PANEL
HPR
HPS
LPR
IFB
LTCP
LBS/HR
MB
LPS
FLR.
FTR
HC
HP
GH
FLOOR
(FOUR WAY
BLOW UNLESS OTHERWISE
CEILING DIFFUSERS
NOTED)
CHILLED WATER RETURN
CHILLED WATER SUPPLYCHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.H1 N
ETCHED CLEAR LACQUERE.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITBTU
BRITISH THERMAL UNIT PER HOURBTUH
CUBIC FEET PER MINUTECFM
CLEAN STEAM GENERATORCSG
DEGREEDEG
DIAMETERDIA
DIFFERENTIAL PRESSURE SENSORDPS
ENTERINGENT
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FPM FEET PER MINUTE
FT FEET
GALLONS PER MINUTEGPM
HEADHD
HEAT RECOVERY COILHRC
CHILLED WATER RETURNCHR
CHILLED WATER SUPPLYCHS
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
INCHESIN
INCHES WATER COLUMNIN WC
INCHES WATER GAUGEIN WG
LEAVING AIR TEMPERATURELAT
LEAVINGLVG
MBH 1000 BTUH
MERV MINIMUM EFFICIENCY REPORTING VALUE
NC NOISE CRITERIA
REVOLUTIONS PER MINUTERPM
SMOKE DAMPER (SUPPLY)SDS
SMOKE DAMPER (RETURN)SDR
STEAM PRESSURE REDUCING VALVESPRV
VARIABLE AIR VOLUMEVAV
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FANICF
LAB PLUME EXHAUST FANLPE
REFRIGERANT (LIQUID AND SUCTION)
CONDENSING UNITCU POWER TYPE ROOF VENTILATORRV
RATED WALL ASSEMBLY. REFER TO
ARCHITECTURAL DRAWINGS FOR RATING.
PUMPED CONDENSATE RETURNPC
TREATED WATER MAKEUPMU
EXPANSION TANK INLETET
FBW FLAT BLADE WHEEL (FAN)
R
END OF MAIN DRIPEMD
B.O.D. 10'-2" OF LISTED DUCT.
APPROXIMATE ELEVATION FROM FLOOR TO BOTTOM
1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
2. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO PROJECT SEQUENCING SHEET G002 IN ARCHITECTURAL DRAWINGS AND
GENERAL REQUIREMENTS SECTION 01 00 00. ADDITIONAL NOTES DESCRIBING SEQUENCING DETAILS ARE INCLUDED THROUGHOUT THE DRAWING SET.
3. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF WORK IN THIS
PROJECT.
4. THE CONTRACTOR SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE
SPACE AND SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE
USED JOINTLY AT ALL TIMES. THE CONTRACTOR SHALL REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS
INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK
AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE VA COR FOR CLARIFICATION BEFORE PROCEEDING.
5. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHERS. HE SHALL KEEP HIMSELF INFORMED OF THE PROGRESS AND DETAIL
DEVELOPMENT OF THE WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING HIS WORK WITH OTHERS SO THAT THE
PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON SCHEDULE.
6. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.
7. EXISTING CONDITIONS SHOWN HAVE BEEN BASED ON VISUAL OBSERVATION AND/OR AVAILABLE DRAWING INFORMATION, AND MAY BE AT VARIANCE
WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING
THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH
MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE COR IN WRITING FOR RESOLUTION BEFORE PROCEEDING
WITH THE WORK.
8. THE CONTRACTOR AND/OR TRADE, FITTING OR PLACING HIS WORK INTO OR ON THE WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE
INSTALLATION OF HIS WORK CONSTITUTES HIS ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT
ACCEPTABLE, HE SHALL NOTIFY THE VA COR AND SUCH WORK SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING WORK
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR
CORRECTING WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.
9. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL
PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS REQUIRED TO MAINTAIN FIRE-RATINGS
INDICATED. COORDINATE WITH ALL TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.
10. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS & FLOORS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
11. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS.
12. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
13. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH WALL/FLOOR/ROOF OPENING TO MATCH EXISTING
WHERE OPENING IS NOT RE-USED.
14. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER THIS
WORK TO MATCH EXISTING.
15. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES AND
DISPOSED OF PROPERLY BY THE CONTRACTOR.
16. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE
SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.
17. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND CAPPED; AND CONTROL WIRING AND CONDUIT
SHALL BE REMOVED BACK TO SOURCE.
18. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED ON REMOVAL PLAN(S) SHALL BE REMOVED. THE MAJORITY OF WORK
TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL AND/OR ABANDONED EQUIPMENT, DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS
ASSOCIATED WITH THE REMOVAL WORK.
19. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED
ON WEEKENDS OR WEEK NIGHTS. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED TWENTY-EIGHT (28)
WORKING DAYS IN ADVANCE WITH THE VA COR.
20. APPROXIMATE ELEVATIONS NOTED ARE TO THE CENTER OF THE PIPE.
21. ALL SAFETY DEVICES MUST COMPLY WITH VHA BOILER PLANT SAFETY DEVICE TESTING MANUAL EIGHTH EDITION.
29 ALL ITEMS THAT REQURIE ACCESS, SUCH AS FOR OPERATIONG, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PORTABLE LADDERS OR PERMANENT PLATFORMS.
30 IT IS THE CONTRACTOR'S RESPONSIBILITY TO SUBMIT ONLY EQUIPMENT THAT FULLY COMPLIES WITH THE SPECIFICATIONS, IF AT ANY TIME IT IS
DETERMINED THAT THE EQUIPMENT SUBMITTED DOES NOT FULLY COMPLY WITH THE SPECIFICATIONS THE CONTRACTOR MAY BE REQUIRED TO
REMOVE AND REPLACE THAT EQUIPMENT AT NO ADDITIONAL COST TO THE GOVERNMENT, REGARDLESS OF IF THE SUBMITTAL WAS APPROVED BY THE
GOVERNMENT.
31 IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR
THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON RESPONSIBILITIES.
32 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.
33 IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL
IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK
MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA
DECLARED SAFE.
34 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE, AND EQUIPMENT SIZES, SERVICES, AND LOCATIONS PRIOR TO PERFORMING WORK.
CARBON DIOXIDE SENSOR FOR SYSTEM ALARM
WELDED STAINLESS STEEL DUCT
GLYCOL HEATING HOT WATER SUPPLYGHS
CONDENSATE TRANSFER PUMP DISCHARGECTPD
DOMESTIC HOT WATER SUPPLY
DOMESTIC HOT WATER RETURN
DOMESTIC COLD WATER
DHWR
DHW
DCW
DP
C
JACKET HEAT RECOVERY WATER SUPPLYJWS
GLYCOL-HYDRONIC SUPPLYGHS
GLYCOL-HYDRONIC RETURNGHR
JACKET HEAT RECOVERY WATER RETURNJWR
AIR COOLER RETURN
AIR COOLER SUPPLY
ACR
ACS
BOTTOM BLOWOFF WATERBO
SURFACE BLOWDOWN WATERBD
CONTINUOUS BLOWDOWN WATERCBD
PUMP RECIRCULATIONPR
CONDENSATE TRANSFER PUMP SUCTIONCTPS
FEED WATER PUMP SUCTIONFWPS
FEED WATER PUMP DISCHARGEFWPD
GLYCOL HEATING HOT WATER RETURNGHR
NATURAL GASNG
CHEMICAL FEEDCF
VTR VENT THROUGH ROOF
LEVEL, PRESSURE, FLOW, OR TEMPERATURE TRANSMITTER
PLUG VALVE
FLOW METER
VALVED LEAK TEST CONNECTION {W/ PRESSURE GAGE}
NON-RETURN STOP CHECK VALVE
EMERGENCY MAKEUP WATEREMU
HEAT RECOVERY STEAM GENERATORHRSG
FEED WATER RETURNFW(R)
CONTRACTING OFFICER'S REPRESENTATIVECOR
SINGLE WIDTH SINGLE INLET (FAN)SWSI
DIGITAL CONTROL PANELDCP
SUPERVISORY CONTROL AND DATA ACQUISITIONSCADA
DRAWING SYMBOLS
DUCTWORK SYMBOLS
VALVES
GENERAL
ABBREVIATIONS
PIPING SYMBOLS
CONTROLS GENERAL NOTES:ABBREVIATIONS
35 WORK ON CHILLERS IS TO BE COMPLETED DURING THE WINTER AND WORK ON BOILERS IS TO BE COMPLETED DURING THE SUMMER.
REDUCED PRESSURE BACK FLOW PREVENTERRPBFP
NON POTABLE WATERNPW
CONTINUOUS BLOWDOWNCBD
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P
ro je c t
N u m b e r
ABBREVIATIONS, SYMBOLS, INDEX
AND GENERAL NOTES
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M001
539-20-201
FORT THOMAS, KENTUCKY
/2
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
INDEX OF DRAWINGS
SHEET NUMBER SHEET NAME
M001 ABBREVIATIONS, SYMBOLS, INDEX AND GENERAL NOTES
MD100 PARTIAL BASEMENT FLOOR PLAN - TEMPORARY PLAN REMOVALS
MD100.1 PARTIAL BASEMENT FLOOR PLAN - TEMPORARY WORK
MD400 ENLARGED BASEMENT FLOOR PLAN - REMOVALS
MD403 ENLARGED THIRD FLOOR PLAN - REMOVALS
MD404 ENLARGED ROOF AND PENTHOUSE PLAN - REMOVALS
MH400 ENLARGED BOILER ROOM - NEW WORK
MH400.1 PARTIAL BASEMENT FLOOR PLAN CONTROLS - NEW WORK
MH402 ENLARGED SECOND FLOOR PLAN - NEW WORK
MH403 ENLARGED THIRD FLOOR PLAN - NEW WORK
MH404 ENLARGED PENTHOUSE PLAN - NEW WORK
M201 STEAM BOILER PLANT ELEVATIONS
M501 DETAILS
M502 DETAILS
M503 DETAILS
M504 DETAILS
M505 DETAILS
M506 DETAILS
M507 CHILLED WATER PIPING SCHEMATIC
M508 STEAM BOILER SCHEMATIC - REMOVALS
M509 STEAM BOILER SCHEMATIC - NEW
M601 SCHEDULES
M602 SCHEDULES
M603 SCHEDULES
M604 PIPING SUPPORT SYSTEMS
M701 CONTROL DIAGRAMS AND SEQUENCES
M702 CONTROL DIAGRAMS AND SEQUENCES
M703 CONTROL DIAGRAMS AND SEQUENCES
M704 CONTROLS DIAGRAMS AND SEQUENCES
M901 STEAM BOILER PLANT ISOMETRIC
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
4 ADDENDUM 1 10/25/2024
N
P
16 17 18 19
HWS
HWS
HWR
HWR
x1
18x18 16x12 x1 x1
H W
R
H W
S
HWS
HWR
H W
R
H W
S
HWR
H W
R
H W
S
HWS
HWR
HWR
LP
R
LPR
VVV
V
V
LPS LPS
LPR
PC
V
V
PC
LPS
LPS
LP
S
LP
S
LPS LPS
H W
S
LP
S
LPS
HWS AHU-11
14x1816x10
10ø x1 x1 8 1
TYP.
TYP.
7 7
V
141516
24 24
M201
M201
HWR
HWR
127 1/2"
LPR
LPS
LPR
LPS
LP
S
LPS
LP
R
HWS
LPS
11 35
CONDENSATE
TANK
V
CP
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P
ro je c t
N u m b e r
ENLARGED BASEMENT FLOOR
PLAN - REMOVALS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
MD400
539-20-201
FORT THOMAS, KENTUCKY
/2
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE | 3/8" = 1'-0"
ENLARGED MECHANICAL ROOM FLOOR PLAN - REMOVALS1
PLAN NOTES
1. EXISTING DUCTWORK TO REMAIN.
2. REMOVE EXISTING DUCTWORK AND ASSOCIATED HANGERS, SUPPORTS, ETC.
3. REMOVE PIPING AND PATCH EXISTING CHIMNEY PENETRATION TO MATCH
EXISTING.
4. REMOVE BOILER FLUE AND FILL IN EXISTING WALL PENETRATION. WALL
CONSTRUCTION SHALL MATCH EXISTING.
5. REMOVE EXISTING DUAL FUEL STEAM BOILER AND ALL ASSOCIATED PIPING,
SPECIALTIES, EQUIPMENT, ETC.
6. EXISTING AHU TO REMAIN.
7. EXISTING PIPING TO REMAIN.
8. REMOVE EXISTING PIPING AND ASSOCIATED HANGERS, SUPPORTS,
SPECIALTIES, ETC.
9. RELOCATE EXISTING FLEXIM ULTRASONIC BTU METER PANEL. SEE NEW WORK
FOR NEW LOCATION.
10. REMOVE EXISTING CONDENSATE PUMP AND ALL ASSOCIATED PIPING,
SPECIALTIES, CONTROLS, WIRING, ETC.
11. EXSITING LOUVER TO REMAIN.
12. EXISTING PNEUMATIC CONTROLS AIR COMPRESSOR AND CONCRETE PAD TO
REMAIN.
13. EXISTING AIR COOLED CONDENSING UNIT TO REMAIN.
14. EXISTING AIR HANDLING UNIT INTAKE LOUVER TO REMAIN.
15. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED SUPPORTS, WIRING,
CONTROLS, ETC. REMOVE GRAVITY BACKDRAFT DAMPERS FOR REPLACEMENT
WITH WINDOW BY OTHERS. PATCH AND REPAIR WALL TO MATCH EXISTING.
REFER TO ARCHITECTURAL DRAWINGS.
16. REMOVE EXISTING STEAM VENT PIPE UP EXTERIOR OF BUILDING TO ROOF.
REMOVE EXISTING WALL SUPPORT BRACKETS AND PATCH IF NOT REUSED BY
OTHER TRADES. PATCH AND REPAIR WALL TO MATCH EXISTING.
17. REMOVE EXISTING BOILER CHEMICAL TREATMENT TANKS AND ASSOCIATED
PUMPS, WIRING, ETC. DISPOSE OF CHEMICALS PER LOCAL AND EPA
REGULATIONS.
18. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN NEW WORK.
REFER TO SHEET MH400.
19. REMOVE EXISTING BOILER FEEDWATER DEAERATOR AND ASSOCIATED PUMPS,
PIPING, WIRING, SUPPORTS, SPECIALTIES, CONTROLS, ETC.
20. EXISTING FUEL OIL PUMP SKID TO BE REMOVED BY OTHERS. REFER TO
DIVISION 22 DRAWINGS.
21. REMOVE EXISTING BLOWDOWN SEPARATOR TANK AND ASSOCIATED PIPING,
SUPPORTS, ACCESSORIES, ETC.
22. EXISTING JOHNSON CONTROLS DDC CONTROL PANEL TO REMAIN. MODIFY TO
REMOVE EXISTING POINTS REMOVED UNDER THIS PROJECT.
23. REMOVE AND REPLACE ALL EXISTING CONTROLS, ACTUATORS, AND SENSORS
ON EXISTING COMBUSTION AIR UNIT, REFER TO ATC DIAGRAM.
24. REMOVE EXISTING STEAM METER AND ASSOCIATED ACCESSORIES, WIRING,
PNEUMATIC TUBING, ETC. REMOVE EXISTING PNEUMATIC TUBING BACK TO
POINT OF ACTIVE MAIN AND CAP.
25. REPLACE EXISTING CONTROL PANEL WITH NEW, REFER TO ATC DIAGRAM.
26. REMOVE EXISTING BOILER BLOWDOWN CONTROL PANELS AND ASSOCIATED
WIRING, ETC.
27. REMOVE/RELOCATE EXISTING STORAGE CUBBIE TO PREPARE FOR NEW
EQUIPMENT LOCATION. COORDINATE WITH FACILITY STAFF TO MOVE EXISTING
ITEMS BEING STORED PRIOR TO REMOVAL.
28. REMOVE EXISTING CONCRETE HOUSEKEEPING PAD AND PREPARE SLAB FOR
NEW BOILER LOCATIONS. SEE SHEET MH400 FOR NEW BOILER LOCATION.
29. REMOVE EXISTING CONDENSATE SURGE TANK AND ASSOCIATED PUMPS,
PIPING, WIRING, SUPPORTS, SPECIALTIES, CONTROLS, ETC.
30. EXISTING PAD TO REMAIN FOR NEW BOILER CHEMICAL TREATMENT SYSTEM.
31. REMOVE EXISTING HAZARDOUS GAS DETECTION SYSTEM AND REMOVE
ASSOCIATED SENSOR FROM ABOVE.
32. REMOVE EXITING SHUT-OFF STATION STATION, WIRING, AND ASSOCIATED
CONDUIT.
33. REMOVE EXISTING STORAGE CABINETS TO PREPARE FOR NEW MASTER
CONTROL PANEL LOCATION. COORDINATE WITH FACILITY STAFF TO MOVE
EXISTING ITEMS BEING STORED PRIOR TO REMOVAL.
34. REMOVE/RELOCATE EXISTING METAL CABINET TO PREPARE FOR NEW WORK.
COORDINATE WITH FACILITY STAFF TO MOVE EXISTING ITEMS BEING STORED
PRIOR TO REMOVAL.
35. EXISTING WINDOW TO BE REMOVED AND REPLACED WITH NEW LOUVER BY
OTHERS. REFER TO ARCHITECTURAL SHEETS FOR MORE INFORMATION.
36. EXISTING LOUVER TO BE REMOVED FOR TEMPORARY PIPE ROUTING, REFER
TO ARCHITECTURAL FOR TEMPORARY PATCHING AND OPENING COVER. NEW
WINDOW TO BE INSTALLED UPON REMOVAL OF TEMPORARY PIPING, REFER TO
ARCHITECTURAL FOR MORE INFORMATION.
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, INDEX, AND GENERAL NOTES.
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
4 ADDENDUM 1 10/25/2024
I J
L
N
O
P
9 10 12 13 15 16 17 18 19 2014 26
J
N
P
9 10 12 13 14 15 16 17 18 19 20
MH400
CO
CH4
CO
CH4
CO
H/S
H/S
ENGINEERING
CARPENTER SHOP
029A
BOILER ROOM
ENG. OFFICE
018A
ELEC. SHOP
018B
ENG. STOR.
018C
Clos.
029B
STAIR #3
S*B*3
64-B1 64-B2 64-B3
13 64-FM-3, 4, 5 14
64-BFW-1
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P
ro je c t
N u m b e r
PARTIAL BASEMENT FLOOR PLAN
CONTROLS - NEW WORK
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
MH400.1
539-20-201
FORT THOMAS, KENTUCKY
/1
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE | 1/8" = 1'-0" REF | 1/M201
BASEMENT FLOOR PLAN - CONTROL DEVICE NEW WORK1
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, INDEX, AND GENERAL NOTES.
PLAN NOTES
1. EMERGENCY SHUT-OFF STATION. REFER TO CONTROL SCHEMATIC.
2. CARBON MONOXIDE DETECTOR, REFER TO GAS DETECTION SYSTEM DIAGRAM.
3. COMBUSTIBLE GAS DETECTOR, REFER TO GAS DETECTION SYSTEM DIAGRAM.
4. MASTER BOILER CONTROL PANEL, REFER TO NEWTWORKING DIAGRAM ON M701.
5. REMOTE ALARM HORN/STROBE FROM HAZARDOUS GAS DETECTION SYSTEM.
6. GAS DETECTION SYSTEM CONTROLLER MOUNTED ON COLUMN.
7. BOILER CONTROL PANEL, REFER TO NEWTWORKING DIAGRAM ON M701.
8. BOILER SYSTEM REMOTE ANNUNCIATOR ALARM PANEL WITH HORN AND STROBE THAT
WILL DISPLAY ALARM MESSAGES. LABEL TO CLEARLY IDENTIFY PANEL.
9. REMOTE AUDIBLE ALARM HORN/STROBE FROM HAZARDOUS GAS DETECTION SYSTEM.
LABEL TO CLEARLY IDENTIFY ALARM TYPE.
10. COMBUSTION AIR UNIT DDC PANEL, REFER TO CONTROLS DIAGRAM ON M704. CONNECT
TO JACE CONTROLLER, REFER TO NEWTWORKING DIAGRAM ON M701.
11. JACE CONTROLLER, CONNECT TO ETHERNET, REFER TO NETWORKING DIAGRAM ON
M701.
12. BOILER CONTROL COMPUTER WORKSTATION WITH SCADA SOFTWARE. SUPPORT WITH
NEW DESK/TABLE.
13. REMOTE-MOUNTED STEAM FLOW METER DISPLAY MOUNTED ON COLUMN. REFER TO
DETAIL ON M503.
14. RELOCATED FLEXIUM ULTRASONIC BTU METER PANEL, THAT MONITORS EXISTING
HEATING HOT WATER SYSTEM.
15. FEED WATER SYSTEM CONTROL PANEL.
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
16 17 18 19
HWS
HWS
HWR
H W
R
H W
S
HWR
HWS
HWR
HWS
HWR
M201
M201
0.75" - BO
8" - LPS
CD
CD
8" - LPS
ø
8 88
64-FCU-2
64-FCU-1
1.25" - BO
64-CU-1 64-CU-2
3"
V
DP
6" - LPS
6"
LP
S
64-B1 64-B2 64-B3
64-BFW-1
64-BT-1
4"
V
2" - HWS
2.5" - LPS
2.
5"
LP
S
2"
H W
R
1.
1.25"
2" 2"
1.
- FW
- FW
- FW
F
W - F
W
2.
5"
LP
S
CD
CD
C D
4"
LP
S x2
S A
24x18 - SA
12x12
SG-1
x8
S
A
6"
LP
S
14" Minimum
12" Minimum
EXISTING
CONDENSATE
RECIEVER
36x12
SG-1
36x12
SG-1
MD
CARPENTER SHOP
029A
3"
V
3"
V
3"
V
3"
V
3"
V
3"
V
2" - PC
3" - V
4"
LP
S
4"
LP
S
4"
LP
S
1" - D
0.
D
0.
D
64-FM-3 64-FM-4 64-FM-5
64-FM-3
64-FM-4
64-FM-528
0.75" - D
0.75" - D
0.75" - D
2.
5"
LP
S
5/8" RS
3/8" RL
5/8" RS
3/8" RL
ST-2
ST-2
ST-1
ST-1
ST-2
3"
D
0.
D
MD
MD
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P
ro je c t
N u m b e r
ENLARGED BOILER ROOM - NEW
WORK
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
MH400
539-20-201
FORT THOMAS, KENTUCKY
/2
/2
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE | 3/8" = 1'-0" REF | 1/MH400.1
ENLARGED MECHANICAL ROOM FLOOR PLAN - NEW WORK1
PLAN NOTES
1. EXISTING JOHNSON CONTROLS DDC PANEL TO REMAIN.
2. EXISTING PIPING TO REMAIN, TYP.
3. EXTEND BOILER FLUE FROM ALL BOILERS INTO EXISTING CHIMNEY STACK AND UP TO
ROOF PER MANUFACTURER'S INSTRUCTIONS. APPROXIMATE SIZE INDICATED (INTERNAL
DIAMETER). COORDINATE EXACT SIZE REQUIRED WITH ACTUAL EQUIPMENT PROVIDED.
APPROXIMATE OFFSETS REQUIRED TO AVOID EXISTING BOILER ROOM CONDITIONS -
VERIFY PRIOR TO INSTALLATION. FLAT HORIZONTAL RUNS ARE NOT PERMITTED. ALL
VERTICAL OFFSETS REQUIRED SHALL BE 45 DEGREES OR LESS.
4. CONNECT TO OUTLET OF SAFETY RELIEF VALVES PROVIDED WITH BOILER. REFER TO
DETAIL ON SHEET M502.
5. VENT PIPE TO BE ROUTED THROUGH EXTERIOR WALL AND UP TO ROOF. APPROXIMATE
SIZE INDICATED, REFER TO DETAIL ON M201 FOR FULL ELEVATION.
6. CONNECT FEEDWATER PIPING TO BOILER, REFER TO PIPING SCHEMATIC.
7. JACE CONTROLLER, CONNECT TO ETHERNET, REFER TO NETWORKING DIAGRAM ON
M701.
8. MAINTAIN BOILER DOOR SWING CLEARANCE FROM ALL OBSTRUCTIONS AS REQUIRED
PER MANUFACTURER.
9. DASHED LINES INDICATE CLEARANCE DISTANCE FROM BOILER. MAINTAIN CLEARANCES
IN ACCORDANCE WITH BOILER MANUFACTURER'S INSTRUCTIONS. MAINTAIN
CLEARANCES TO ELECTRICAL PANELS.
10. CONCRETE HOUSEKEEPING PAD, REFER TO DETAIL ON SHEET M502.
11. CONNECT BOTTOM BLOWOFF PIPING TO BOILER PER MANUFACTURER'S INSTRUCTIONS.
12. STEAM MAIN TO BE CONNECTED TO STEAM HEADER AS SHOWN. IF CONNECTION
CANNOT BE MADE, CONNECT PIPE INTO HEADER AT SAME ELEVATION AND MOVE OFFSET
FURTHER DOWN PIPE WITH CONDENSATE TRAP ASSEMBLY CONNECTED.
13. STEAM TRAP DRIP ASSEMBLY ON LOW PRESSURE STEAM DRIP. REFER TO DETAIL ON
SHEET M502.
14. REBALANCE AND RESHIV EXISTING SUPPLY FANS ON EXISTING MAKEUP AIR UNIT TO 3750
CFM. REFER TO CONTROL DRAWINGS AND SPECIFICATIONS FOR DETAILS.
15. GAS DETECTION SYSTEM CONTROLLER.
16. CONTRACTOR TO FIELD VERIFY EXISTING DUCT CONNECTION SIZE PRIOR TO SHEET
METAL FABRICATION.
17. STEAM METER, REFER TO EQUIPMENT SCHEDULE (TYPICAL). PROVIDE FLOW
CONDITIONER AND MINIMUM STRAIGHT PIPE DIAMETERS UPSTREAM AND DOWNSTREAM
OF METER PER MANUFACTURER'S INSTALLATION REQUIREMENTS. REFER TO DETAIL ON
SHEET M503.
18. BOILER MASTER CONTROL PANEL.
19. BOILER CONTROL PANEL.
20. STEAM EXHAUST LINE FOR BOILER-BURNER TESTING AND ADJUSTING. ROUTED
THROUGH WALL AND UP TO ROOF.
21. SAMPLE COOLERS, REFER TO SEAM PIPING SCHEMATIC ON SHEET M508.
22. STEAM BLOWOFF TANK. ROUTE DRAIN TO NEAREST TRENCH DRAIN AS SHOWN..
23. COMBUSTION AIR DDC CONTROL PANEL.
24. MAINTAIN CLEARANCE ABOVE BOILER CONTROL PANEL.
25. REPLACE ALL EXISTING CONTROLS, ACTUATORS, AND SENSORS ON EXISTING
COMBUSTION AIR UNIT, REFER TO ATC DIAGRAM.
26. SECONDARY COMBUSTION/RELIEF AIR LOUVER THROUGH WALL. SIZE LOUVER TO BE 36"
x 36" WITH A MINIMUM FREE AREA OF 648 SQUARE FEET. REFER TO COMBUSTION AIR
CONTROLS SEQUENCE ON SHEET M704.
27. CONDENSING UNITS TO BE MOUNTED LEVEL ON CONCRETE PAD AT LEAST 5" THICK ON
GRADE.
28. REMOTE-MOUNTED STEAM FLOW METER DISPLAY MOUNTED ON COLUMN. REFER TO
DETAIL ON M503.
29. RELOCATED FLEXIUM ULTRASONIC BTU METER PANEL, THAT MONITORS EXISTING
HEATING HOT WATER SYSTEM.
30. FEED WATER SYSTEM CONTROL PANEL.
31. 0.75" DRAIN FROM BOTTOM OF RISER TO TRENCH DRAIN IN BOILER ROOM, REFER TO
SCHEMATICON SHEET M508.
32. 1" DRAIN FROM CYCLONE EXHUAST HEAD. ROUTE DRAIN LINE BACK TO TRENCH DRAIN IN
BOILER ROOM, REFER TO SCHEMATIC ON SHEET M508.
33. CORDINATE VALVE ORIENTATION TO ALLOW FOR OPERATION USING CHAIN WHEEL
OPERATOR THAT ALLOWS FOR VALVE TO BE OPENED AND CLOSED FROM THE GROUND
FLOOR.
34. CHEMICAL TREATMENT EQUIPMENT.
35. REMOVE CABINETS FOR INSTALLATION OF BOILER MASTER CONTROL PANEL.
36. SIZES SHOWN ARE APPROXIMATE, CONFIRM FINAL SIZES WITH MANUFACTURER OF
ACTUAL EQUIPMENT PURCHASE AND APPROVED SHOP DRAWINGS.
37. PROVIDE NEW 36"x36" TWO-POSITION MOTORIZED DAMPER AND ACTUATOR ON EXISTING
LOUVER OPENING. REFER TO COMBUSTION AI SEQUENCE ON SHEET M704.
GENERAL NOTES
A. REFER TO SHEET M001 FOR LEGEND, INDEX, AND GENERAL NOTES.
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
V T
R D
3"
V T
R D
3"
D
NOTES
1. STEAM BOILER, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.
2. FLUE GAS RECIRCULATION PIPING.
3. CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL ON SHEET M502.
4. BURNER OBSERVATION PORT.
5. SIGHTFLOW INDICATOR WITH ROTOR (ORIENT WINDOWS TO FACE UP AND DOWN).
6. MANUAL SURFACE BLOWDOWN BYPASS VALVE.
7. STAINLESS STEEL TUBING ROUTED TO SAMPLE COOLER.
8. MAKEUP WATER CONNECTION.
9. ELECTRODE FITTING WITH FOUR PROBES TO FUNCITION AS AUXILIARY LOW WATER
CUTOFF AND HIGH WATER ALARM. PROVIDE SHUNT SWITCH AS SPECIFIED FOR TESTING.
10. NATURAL GAS TRAIN, COMPLETE MAIN AND PILOT, FACTORY MOUNTED AND WIRED.
11. 10" (INTERNAL DIAMETER) BOILER FLUE. CONRIFM SIZES WITH MANUFACTURER OF
ACTUAL EQUIPMENT PURCHASED AND APPROVED ON SHOP DRAWINGS. THE FLUE
MANUFACTURER SHALL CONFIRM FINAL SIZE BY PERFORMING ENGINEERING, PRESSURE,
AND SIZING CALCULATIONS BASED ON THE ACTUAL EQUIPMENT SELECTED TO ENSURE
PROPER SYSTEM VENTING PERFORMANCE.
12. NATURAL GAS PIPING, REFER TO PLUMBING DRAWINGS.
13. AUTOMATIC MOTORIZED SURFACE BLOWDOWN VALVE.
14. MOTORIZED MODULATING BOILER FEEDWATER CONTROL VALVE.
15. CONDUCTIVITY SENSOR.
16. PRESSURE TRANSMITTER.
17. DRIP PAN ELBOW, REFER TO DETAIL ON SHEET M502. ROUTE DRAIN TO TRENCH DRAIN.
18. MULTIPLE SAFETY RELIEF VALVES, QUANTITY AND SIZES PER BOILER MANUFACTURER.
REFER TO DETAIL ON SHEET M502.
19. EACH PRESSURE RELIEF VENT SHALL BE ROUTED SEPARATELY UP TO ROOF. INDICATED
SIZE IS PRELIMINARY, CONFIRM WITH BOILER MANUFACTURER. TERMINATE 6' ABOVE
ROOF LEVEL, REFER TO DETAIL ON SHEET M502.
20. STACK STARTING ADAPTER WITH DRAIN. ROUTE TO TRENCH DRAIN.
21. CONDENSATE PIPING SHALL INCLUDE A WATER TRAP TO PREVENT THE ESCAPE OF FLUE
GAS.
22. ROUTE BOILER GAUGE GLASS AND LEVEL CONTROLLER DRAINS TO BLOWOFF TANK.
23. INLINE SEATLESS, SLIDING PLUNGER, OS&T, DESIGNED FOR BLOWOFF SERVICE.
24. SURFACE BLOWOFF CONNECTION.
25. DRAFT CONTROL DAMPER WITH MODULATING ACTUATOR, PRESSURE TRANSMITTER,
AND PRESSURE SWITCH.
26. FLOW STRAIGHTENER. REFER TO STEAM METER DETAIL ON SHEET M503.
27. CHEMICAL FEED CONNECTION.
28. GAUGE GLASS.
29. PRIMARY LOW WATER CUTOFF. CONTROLER SHALL NOT BE USED AS THE PRIMARY
LEVEL MASTER..
30. STEAM PRESSURE TRANSMITTER.
31. NON RECYCLE MANUAL RESET STEAM HIGH LIMIT SWITCH.
32. NATURAL GAS VENT PIPING UP THROUGH ROOF FOR MAIN VENT VALVE, PILOT VENT
VALVE, PILOT RELIEF, MAIN REGULATOR, PILOT REGULATOR, LOW PRESSURE GAS
SWITCH, HIGH PRESSURE GAS SWITCH, PILOT LOW PRESSURE GAS SWITCH, REFER TO
PLUMBING DRAWING.
33. 0.75" DRAIN VALVE. ROUTE TO TRENCH DRAIN.
34. HIGH WATER OVERFLOW CONNECTION.
35. OS&Y VALVE WITH WARM-UP VALVE.
36. ANGLED SEATLESS, SLIDING PLUNGER, OS&T, DESIGNED FOR BLOWOFF SERVICE.
37. STEAM FLOW/TOTALIZING METER. INSTALL WITH MINIMUM STRAIGHT RUN OF PIPING
BEFORE AND AFTER THE METER PER THE MANUFACTURER'S INSTALLATION
INSTRUCTION; INSTALL FLOW STRAIGHTENER IF REQUIRED. REFER TO STEAM METER
DETAIL ON SHEET M503. REFER TO SCHEDULE ON SHEET M603.
38. FEEDWATER FLOW METER. REFER TO DETAIL ON SHEET M503. REFER TO SCHEDULE ON
SHEET M603.
39. FUEL OIL SUPPLY AND RETURN PIPING, REFER TO PLUMBING DRAWINGS.
40. FUEL OIL PUMP.
41. PROPANE PIPING FOR IGNITER PILOT, REFER TO PLUMBING DRAWINGS.
42. ROUTE PIPING IN TRENCH DRAIN TO BLOW DOWN SEPARATOR.
43. HIGH WATER OVERFLOW STEAM TRAP.
44. EMERGENCY SOFTY COLD WATER MAKEUP LINE, NORMALLY CLOSED. FOR USE WHEN
FEEDWATER SYSTEM IS DOWN FOR INSPECTION OR REPAIR.
45. PROVIDE CHAIN WHEEL ON VALVE.
46. DIFFERENTAL PRESSURE LEVEL TRANSMITTER. PROVIDE SHUNT SWITCH AS SPECIFIED
FOR TESTING.
BO
B D
P
V T
R
V T
R
V T
R
V T
R
V T
R
V T
R
V T
R
V T
R
N G
D
NC
0.375"
NC
D
0.75"
FE
TO STEAM
HEADER FOB FOB
0.75"
B D
BD
FROM LEVEL
CONTROL AND
COLUMN DRAINS
0.75" FROM OPPOSITE SIDE OF
BOILER (LEVEL CONTROLS AND
COLUMN DRAINS)
TO OPPOSITE
SIDE OF BOILER
1.25"0.75"
0.75"
0.75"
6"
6"
1.25"
F O
R F
O S
P
FM
P
F W
P D
1.25"
2' MAX
34 43
LPS (12)
LP
R
0.75"
C B
D
N P
W (S
C W
1.25"
NC
4"
NOTES con't
64-FM-3, 4, 5
64-FM-9, 10, 11
FM
64-FM-6, 7, 8
B D
0.75"
D
4 4
ST-3
GENERAL NOTES
A. DUE TO LIMITED ACCESS INTO BOILER ROOM THE BOILER SHALL BE FIELD-
ERECTABLE ASSEMBLED IN PLACE. CONTRACTOR SHALL REVIEW
PATHWAY AND ACCESS TO BOILER ROOM PRIOR TO ORDERING TO INSURE
THE BOILER CAN BE INSTALLED WITHOUT MODIFYING THE EXISTING
ACCESS.
B. LISTED DIMENSIONS AND CLEARANCES SHALL BE CONSIDERED MAXIMUM.
EQUIPMENT PROVIDED EXCEEDING THESE VALUES SHALL BE REJECTED.
C. MAXIMUM OVERALL BOILER HEIGHT SHALL NOT EXCEED 85".
TYPICAL STEAM BOILER
(NOT INCLUDING CONCRETE PAD)
36" FRONT SERVICE AREA
SERVICE AREA
24" REAR
FUEL OIL
PUMP
GAS TRAIN
41 1/2" 24"
TO EXTENDS OF THE GAS TRAIN AND FUEL OIL PUMP
89 1/2"
EXTENTS OF THE GAS TRAIN
155"
108" OVERALL
TUBE REMOVAL
28"
TUBE REMOVAL
28"
130" TO TOP OUTSIDE DIA. OF FLUE
GAS TRAIN
M A
S O
N R
Y C
H
IM
N E
Y
10' [120 in]
68' [816 in]
64' [768 in]
STACK CLEANOUT
18" DIAMETER CBI
KL CLAMP SUPPORT TYP.
SINGLE WALL CHIMNEY LINER
DOUBLE WALL WITH 1" AIRSPACE
VENTILATED COLLAR
WALL FIRESTOP
VENTILATED FLASHING
CUSTOM CURB CAP
ROOF
DOUBLE WALL WITH 2" INSULATION
TO BOILERS
COMPACTED GRAVEL BASE
24"X24" CONCRETE BLOCK
(LENGTH AS REQUIRED)
NOTES:
1. PROVIDE SUPPORT MINIMUM EVERY 6'-0" AND AT EVERY CHANGE OF DIRECTION.
2. PIPE INSULATION AND PROTECTIVE JACKET SHALL EXTEND THROUGH PIPE CLAMP
TO MAINTAIN VAPOR BARRIER.
3. COORDINATE PIPE AND CONDUIT ARRANGEMENT CLOSELY WITH DIVISION 26.
UNDISTURBED EARTH
STEAM PIPE
CONTROL CONDUIT
(COORDINATE W/
DIVISION 26)
GALVANIZED STEEL CHANNEL
SUPPORT BOLTED TO
CONCRETE BLOCK
UNISTRUT OR EQUAL
CHANNEL SUPPORT CLAMP (TYP)
CONDENSATE PIPE WITH
HEAT TRACE AND INSULATION
WITH PROTECTIVE JACKET
PIPE ROLLER
PIPE ROLLER
P: 937-224-0861 www.heapy.com
P ro je ct
N o
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
VA FORM 08 - 6231
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
32 4 5 6 7 8 9 10
Chief Engineer
KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P
ro je c t
N u m b e r
DETAILS
JPR NKS
REPLACE FTD BOILER WITH HOT
WATER SYSTEM
M504
539-20-201
FORT THOMAS, KENTUCKY
/1
/1
2020-05103 2888
CONSTRUCTION
DOCUMENTS
10/30/2023
SCALE: NONE
TYPICAL STEAM BOILER PIPING
SCALE: NONE
BOILER DIMENSIONS
SCALE: NONE
BOILER STACK
SCALE: NONE
EXTERIOR SUPPORT DETAIL
# DESCRIPTION DATE
1 DD1 SUBMITTAL 10/28/2022
2 95% SUBMITTAL 12/12/2022
3 CD SUBMITTAL 10/30/2023
D
NC
0.375"
C B
D
D
FE
FOB FOB
6"
6"
LPS (12)
BO
D
FE
FOB FOB
6"
6"
D
FE
FOB FOB
6"
6"
LPS (12)
DD D D
0.75"
0.375"
0.375"
0.375"
N P
W
DD D
N P
W
D
NC
0.375"
0.75"
C B
D
BO
LP
R
0.75"
F W
P D
1.25"
NC
0.375"
C B
D
BO
0.75"
PP P
F W
P D
N P
W (S
C W
0.75"
LP
R
F W
P D
1.25"
N P
W (S
C W
0.75"
LP
R
F W
P D
1.25"
N P
W (S
C W
RPBFP
NC NC NC
RPBFP
REFER TO
HVAC
REFER TO
PLUMBING
DRAWINGS
NPW(SCW)
NPW
NPW(SCW)
D
N P
W (S
C W
N
P W
MAIN STEAM HEADER
0.375"
HOSE BIB
N P
W (S
C W
0.75"
FWPD
CBD
CBD
LPR
NPW(SCW)
FWPD
CBD
CBD
LPR
CBD
SAMPLE
SAMPLE
SAMPLE
SAMPLE
SAMPLECHEMICAL TREAT
CHEMICAL TREAT
CHEMICAL TREAT
FM FM
LP
S
(1 2)
0.75"
D
0.375"
0.375"
O F
L
D
T
P
EX. LPC
EX. LPC
E X
. L P
C
P C
NC
SCW
CW
2"
LP
R
LPR
10 D D
V T
R
E X
. V T
R
6"
EXHAUST TO OUTDOORS FOR
BOILER-BURNER TESTING AND
ADJUSTING
D
VTR
D
4"
D
3"4"
2"
EX. LPS(12)
2"
EX. LPS(12)EX. LPS(12)
EX. LPS(12)
4"
4" 4" 4"
8" 8"
0.75"
0.75"
2"
2"
1.25"
2" 1.5"1.5" 2"
1.5"
1.5" 1"1.25"
1.25"
0.75"
1.25"
1"
0.75" 1.25"
3"
1.25"
0.75" (TYP.)
NOTES
1. STEAM BOILER, REFER TO EQUIPMENT SCHEDULE ON SHEET M603 AND TYPICAL BOILER
PIPING SCHEMATIC ON SHEET M504.
2. FEEDWATER SYSTEM, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.
3. FEEDWATER PUMP, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.
4. BLOWOFF TANK, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.
5. CHEMICAL FEED EQUIPMENT, REFER TO SPECIFICATIONS FOR REQUIREMENTS.
COORDINATE CHEMICAL FEED WORK WITH SUPPLIER. PROVIDE UNISTRUT FRAMEWORK
WITH FLOOR SUPPORT FEET TO MOUNT CHEMICAL FEED EQUIPMENT.
6. DOUBLE DUPLEX RECEPTIBLE MOUNTED ON UNISTRUT SUPPORT REFER TO ELECTRICAL
DRAWINGS.
7. CONCRETE HOUSEKEEPING PAD, REFER TO DETAIL M502.
8. STAINLESS STEEL TUBING (TYPICAL).
9. CHEMICAL FEED INJECTION QUILLS (TYPICAL).
10. STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY, REFER TO DETAIL ON SHEET
M502.
11. LONG RADIUS ELBOW.
12. EXTEND AND SPILL INTO TRENCH DRAIN.
13. ROUTE DRAIN TO EXISTING SINK (TYPICAL).
14. ROUTE DRAIN TO FLOOR DRAIN (TYPICAL).
15. ROUTE DRAIN BACK TO TRENCH DRAIN IN BOILER ROOM. LOCATE VALVE WHERE IT IS
ACCESSIBLE FROM FLOOR LEVEL.
16. 1” DRAIN VALVE WITH HOSE THREAD FITTING AND CAP.
17. OS&Y VALVE WITH WARM-UP VALVE WITH DRAIN (TYPICAL).
18. OS&Y VALVE WITH DRAIN (TYPICAL).
19. MAKE-UP WATER METER FOR CHEMICAL TREATMENT SYSTEM.
20. MAKE-UP WATER METER FOR STEAM INSTRUMENTATION AND CONTROL.
21. SAMPLE COOLER, REFER TO DETAIL ON SHEET M502.
22. EACH VENT SHALL BE ROUTED SEPARATELY UP TO ROOF. TERMINATE 6’ ABOVE ROOF
LEVEL.
23. LOW PRESSURE STEAM EXHAUSTED TO OUTDOORS FOR BOILER-BURNER TESTING AND
ADJUSTING. TERMINATE 6’ ABOVE ROOF LEVEL WITH CYCLONE EXHAUST HEAD. ROUTE
DRAIN LINE BACK TO TRENCH DRAIN IN BOILER ROOM.
24. HIGH AND LOW WATER LEVEL ALARMS.
25.…