This file contains 14 pages of detailed architectural and mechanical drawings that are part of Addendum 1 for a boiler replacement project at the Fort Thomas VA Medical Center. The drawings include basement plans, penthouse plans, mechanical room layouts, steam boiler schematics, piping diagrams, control diagrams, and electrical power distribution plans.

The drawings provide specific details for replacing existing boilers with a new hot water system, including three new field-erectable steam boilers (designated 64-B1, 64-B2, and 64-B3), each with 2,062 sq ft heating surface and 12,000 lbs/hr capacity. The plans show modifications to the existing boiler room layout, new piping configurations, electrical power distribution, control systems, and mechanical ventilation. Key components detailed include natural gas and fuel oil supply systems, feedwater systems, steam distribution, condensate return, and associated instrumentation and controls. The drawings include both demolition plans showing equipment to be removed and new work plans showing the installation of the replacement systems.

View the file

Other files for this federal contract opportunity

Other files attached to Z2NB--Project No. 539-20-101 - Replace Fort Thomas Boilers., newest first.
File Type Posted
Requirements for Identification and Replacement of A307 Bolts MemO.pdf PDF
36C25024B0075 0012.docx DOCX document
36C25024B0075 0011.docx DOCX document
36C25024B0075 0010.docx DOCX document
Revised and Final Specs.pdf PDF
RFIs and Answers.pdf PDF
36C25024B0075 0009.pdf PDF
36C25024B0075 0008.pdf PDF
36C25024B0075 0007.pdf PDF
36C25024B0075 0006.docx DOCX document
36C25024B0075 0005.docx DOCX document
36C25024B0075 0004.docx DOCX document
36C25024B0075 0003.docx DOCX document
36C25024B0075 0002.docx DOCX document
36C25024B0075 0001.docx DOCX document
Site Visit Sign In .pdf PDF
Attachment II - Specifications.pdf PDF
36C25024B0075_1.docx DOCX document
Attachment VIII - EMR Form.pdf PDF
Attachment VII - RFI Form.pdf PDF
Attachment IV - Drawings II.pdf PDF
Attachment VI - JAs.pdf PDF
Attachment III - Drawings I.pdf PDF
Attachment I - DBA WD.pdf PDF
Attachment V - Limitation on Subcontracting Cert.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

N A

C

J

J

J

J J J

J

J

J

JJ

GF

GF

J J

W P

/G F

J J

J

J

J

J J

M T T

TT

T

T

T

MBFPM

M P

B F

P

F S

STAIR #1

S*B*1

STORAGE

004C

OFFICE

EQUIP. RM

004A

KITCHEN

DINING

ROOM

Stair #2

S*B*2

Stor.

002A

Dietetic Dry Stor.

002B

HAC

004B

Diet. Stor.

Refr.

Elec.

007B

Refr.

H.W. Tank

007A

Dirty Clothes

007E

HCMI

Refr.

010A

Refr.

Hud

011A

Clean Clothes

007D

CORRIDOR

C*B*1

Corridor

C-B-7

Corridor

C-B-7C

Bldg. Manag.

Off.

Linen

Bldg Manag.

Stor.

013A

Hud/Vash

015B

Hud/Vash

015A

Hud/Vash

Elec. Shop

018B

Eng. Off.

018A

Volunteer Service Office

Engineering

Engineering Stor.

Uniform Exchange

Tlt.

Volunteer Service Escort

M. Locker

025A

HAC

F. Locker

Stair #3

S*B*3

Comp.

Network

027C

Eng. Stor.

018C

Eng. Stor.

027B

Soiled Linen

018D

Canteen

Rec. Temp.

Fitness Center

027A

Carpenter Shop

029A

Clos.

029B

Boiler Rm.

Group

Clos.

029C

Clos.

030A

Clerk

Work Rm.

Tele. Service

Stair #4

S*B*4

Oxygen Storage

Group Rm 2

S.T. Off.

Stor.

Media Center

Corridor

C*B*8

S.T. Dr.

S.T. Exam

S.H. Exam

Patient Tlt.

Staff Tlt.

Kiln

038A

Staff

Occ. Therapy

Stair #6

S*B*6

Phys.

Therapy

Mech.

036A

M. Toilet

Storage

009A Hud

Elec.

Elect. Supply

3"

3"

9.01

9.04

9.0210.02 10.02

10.02

3.03

8.25 8.22 8.23 8.22 8.25

4 W1 L1 L1 W1

A. SEE G002 FOR GENERAL PROJECT NOTES

B. SEE G003 FOR PARTITION TYPE

C. COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH

SIGNAGE.

D. PRIOR TO GYPSUM BOARD INSTALLATION AND ELECTRICAL ROUGH-IN

INSPECTION, GENERAL CONTRACTORS, ELECTRICAL/DATA CONTRACTORS,

ARCHITECT, AND CONSTRUCTION MANAGER SHALL REVIEW IN-PLACE LOCATIONS

OF ALL SWITCH BOXES, RECEPTACLE BOXES, FIRE ALARM BOXES, ETC. FINAL

LOCATIONS MAY BE ADJUSTED AT THIS TIME TO ALIGN OR COORDINATE WITH

DESIGN INTENT.

E. ALL DIMENSIONS ARE FROM FINISH FACE UNLESS NOTED OTHERWISE.

F. FOR FURNITURE LAYOUT, SEE FURNITURE PLAN.

/8

3' - 0"

1" INSULATED GLAZING

TO MATCH EXISTING

TINT

W1

/8

3' - 0"

L1

V

IF

V

IF

VIFVIF

8.258.228.248.228.25

EXISTING WALL

PATCH ALL AREAS DISTURBED

NEW LOUVER

CONTINUOUS SEALANT

ANCHOR TO EXISTING WALL

EXISTING WALL

PATCH ALL AREAS DISTURBED

NEW STOREFRONT WINDOW

SYSTEM WITH 1" GLAZING

CONTINUOUS SEALANT ,

EACH SIDE

PROVIDE BACKER ROD IN

EXTERIOR SIDE

ANCHOR TO EXISTING WALL

CONTINUOUS

METAL PAN SILL

FLASHING

ANCHOR TO EXISTING WALL

CONTINUOUS SEALANT ,

EACH SIDE

PROVIDE BACKER ROD IN

EXTERIOR SIDE

ANCHOR TO EXISTING WALL

HEAD/JAMB DETAILHEAD/JAMB DETAIL

SILL DETAIL SILL DETAIL

SILL PAN WITH INTEGRATED

END DAMS

S

T A T

E OF O

H

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2023

P ro je ct

N o

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

Chief Engineer

KRISTINA AMIN

.0

BASEMENT PLANS

10/30/2023 MW/VP VP

REPLACE FTD BOILER WITH HOT

WATER SYSTEM

A100

539-20-201

FORT THOMAS, KENTUCKY

/3

/2

SCALE | 3/32" = 1'-0"

BASEMENT PLAN26

KEYNOTES

3.03 REINFORCED CONCRETE SLAB. ELEVATION MATCH EXITING SLAB GRADE. PROVIDE

COMPACTION AND BACKFILL , SEE STRUCTURAL DRAWINGS

8.22 EXISTING LOUVER TO REMAIN

8.23 NEW LOUVER

8.24 EXISTING WINDOW TO BE REMOVED . REPLACE WITH NEW LOUVER. SEE MECHANICAL

DRAWINGS

8.25 REMOVE EXISTING LOUVER SEE MECHANICAL DRAWINGS, PROVIDE NEW STOREFRONT

WINDOW WITH 1 INCH INSULATED GLASS AFTER ALL MEP WORK IS COMPLETE

9.01 PAINT EXPOSED STRUCTURE AND ALL CEILING COMPONENTS

9.02 EPOXY FLOOR FINISH ON NEW/EXISTING CONCRETE SLAB

9.04 PAINT ALL WALLS

10.02 PROVIDE CLASS B FIRE EXTINGUISHER

NORTH

FULLY SPRINKLERED

SCALE | 1/8" = 1'-0"

GENERAL NOTES

# DESCRIPTION DATE

1 DD1 SUBMITTAL 10/28/2022

2 95% SUBMITTAL 12/12/2022

3 CD SUBMITTAL 10/30/2023

4 ADDENDUM 1 10/25/2024

SCALE | 1/4" = 1'-0"

WINDOW ELEVATIONS9

SCALE | 1 1/2" = 1'-0"

PARTIAL ELEVATION28

SCALE | 1/2" = 1'-0"

HEAD/JAMB DETAIL10

DN

UP

UP

UPUP

UP

UP UP

UP

UP

UP

F

F

SPECIFIED

SEALANT TAPE AS

16 GA. MIN. FRAME

WOOD CURB

FASTENER 8'' O.C.

FASTENED 18'' O.C.

COUNTERFLASHING

SPECIFED BASE

FLASHING ADHERED

TWO-PLY STRIPPING

GRAVEL SURFACING

SPECIFIED BUR

INSULATION

ALTERNATE FRAME

LOCATION FOR

HEAVY UNITS

ROOF DECK AS SPECIFIED

WITH GASKETED

FASTENERS MINIMUM

TWO PER SIDE

SPECIFED BASE

SPECIFIED CANT

MEMBRANE

M

IN

Stair #5

S-R-5

Penthouse

R01

Penthouse

R02

Penthouse

R03

Elevator Penthouse

R04

Elevator Penthouse

R05

A105

A105

2.27

6.136.136.136.13

6.136.13

6.136.13

6.136.13

6.136.13

6.136.13

A104

Sim

A104

Sim

7.037.03

7.017.01

7.04

7.02

A105

Sim

6.136.13

SUBSTRATE

BUILT UP ROOF MEMBRANE

STAINLESS

STEEL

CLAMPING RING

(SEE NOTE #5)

CONTINUOUS BEAD OF

AP SEALANT OR HIGH

GRADE SEALANT

FASTENER AND HD OR HD PLUS

SEAM PLATE AT 12" (305 mm) O.C. MAX.

(SEE NOTE #8)

PRE-MOLDED

PIPE FLASHING

INSULATION

SUBSTRATE

INSULATION

R O

U N

D P

E N

E T

R A

T

IO

N

FIELD SEAM

WELDED

SPLICE

2" (51 mm) MIN.

BONDING ADHESIVE

(ADHERED SYSTEM ONLY)

CONTINUOUS BEAD

OF GP SEALANT

FIELD FABRICATED

METAL HOOD BY

OTHERS (OPTIONAL)

T-JOINT COVER

OR FLASHING

(4" (102 mm) x 4" (102mm) MIN.)

CENTERED OVER INTERSECTION.

PLAN VIEW PIPE

FLASHING OVER

FIELD SEAM

NOTES:

1. REFER TO MANUFACTURE WEBSITE FOR THE

MOST CURRENT INFORMATION.

2. REMOVE ALL EXISTING FLASHING, LEAD, ETC.

PIPE SURFACE MUST BE FREE OF ALL RUST,

GREASE, INSULATION, ETC.

3. PIPE MUST BE ANCHORED TO ENSURE STABILITY.

4. PRE-MOLDED PIPE FLASHING MAY BE CUT TO

HEIGHT, BUT NO LOWER THAN REINFORCING

RING (NO WRINKLES OR FOLDS UNDER

CLAMPING RING).

5. APPLY GP SEALANT BETWEEN PENETRATION

AND PRE-MOLDED PIPE FLASHING PRIOR TO

INSTALLATION OF CLAMPING RING. REFER TO

LS-9 FOR SEAM EDGE TREATMENT.

6. LARGE PRE-MOLDED PIPE FLASHING FITS

4" (102mm) - 8" (203 mm) PENETRATIONS SIZES.

7. DO NOT USE WHEN SERVICE LINE TEMP.

EXCEEDS 160°F. REFER TO UT- P-6 & UT-P-7.

8. FASTENER AND HD SEAM PLATE

REQUIRE FOR MAS ONLY. IF FASTENER CANNOT

BE INSTALLED AS ILLUSTRATED, REFER

TO MANUFACTURE DETAILS

BALLEST AS REQ'D

ROOF REPAIR MUST BE IN

ACCORDANCE WITH ROOF

WARRANTY GUIDELINES.

METAL SLEEVE

POST, SEE STRUCTURAL

BASE PLATE, SEE STRUCTURAL

EXISTING ROOF SLAB.

INSTALL NEW INSULATION

M A

T C

H E

X

IS

T

IN

G T

H

IC

K N

E S

S T

O

STORM COLLAR

CAULK DRAWBAND WITH ELASTOMERIC

SEALANT

MASTIC SEAL AT PERIMETER

TWO PLY STRIPPING

METAL FLANGE MECHANICALLY FASTEN

1/4" COVER BOARD

A. SEE G002 FOR GENERAL PROJECT NOTES

B. WORK TO PROVIDE COMPLETE PLUMBING, MECHANICAL , AND ELECTRICAL

SYSTEM SHALL OCCUR BEYOND EXTEND OF WORK LINE,AS REQUIRED. GENERAL

CONTRACTOR TO REPAIR ANY EXISTING AREAS BEYOND EXTEND OF WORK LINE

DUE TO INSTALLATION OF SUCH SYSTEMS ( SEE ALL PLUMBING, MECHANICAL AND

ELECTRICAL DRAWINGS.

C. PATCH EXISTING ROOF AND MAINTAIN A WATER TIGHT ENVELOPE

D. ALIGN NEW WORK WITH EXISTING

E. FILL ALL SLAB/WALL OPENINGS RESULTING FROM ELECTRICAL, MECHANICAL OR

OTHER REMOVALS. CONTRACTOR TO MAINTAIN ALL EXISTING FIRE AND SMOKE

RATINGS

F. EXISTING ROOF IS TREMCO BUILT UP ROOF INSTALLED IN 2004.

S

T A T

E OF O

H

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2023

P ro je ct

N o

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

Chief Engineer

KRISTINA AMIN

.0

PENTHOUSE PLAN

10/30/2023 VP VP

REPLACE FTD BOILER WITH HOT

WATER SYSTEM

A104

539-20-201

FORT THOMAS, KENTUCKY

/3

/2

SCALE | 3/32" = 1'-0"

PENTHOUSE PLAN26

KEYNOTES

2.27 RELOCATE EXISTING STEP LADDER

6.13 NEW ROOF WALK PAD

7.01 EXISTING BALLASTED BUILT UP ROOF ASSEMBLY . CONTRACTOR TO MAINTAIN WATER

TIGHT ENVELOPE DURING CONSTRUCTION

7.02 PROVIDE ALL ROOF PENETRATION, REPAIR AND REINFORCEMENT IN THE EXISTING

BUILDING FOR INSTALLATION OF THE NEW EXISTING MECHANICAL EQUIPMENT. THE

EXISTING TREMCO ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED, AND

RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB

-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH INSTALLATION TO MAINTAIN

ROOF INTEGRITY

7.03 EXISTING EQUIPMENT POST TO REMAIN , SEE STRUCTURAL DRAWINGS. CONTRACTOR

TO PROTECT EXISTING TREMCO ROOF AND MAINTAIN WATER TIGHT CONDITION .

PROVIDE NEW FLASHING

7.04 NEW EQUIPMENT SUPPORT. SEE STRUCTURAL AND MECHANICAL DRAWINGS. THE

EXISTING TREMCO ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND

RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING

SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR INSTALLATION TO MAINTAIN

THE EXISTING ROOF INTEGRITY

NORTH

SCALE | 6" = 1'-0"

BUILT UP ROOF - LARGE PIPE PENETRATION29 SCALE | 12" = 1'-0" REF | 26/A104

MECHANICAL CURB12SCALE | 1 1/2" = 1'-0"

BUILT UP ROOF - STRUCTURAL POST21

ROOF GENERAL NOTES

# DESCRIPTION DATE

1 DD1 SUBMITTAL 10/28/2022

2 95% SUBMITTAL 12/12/2022

3 CD SUBMITTAL 10/30/2023

4 ADDENDUM 1 10/25/2024

1"

#12 SCREW

FASTENERS

@EA. STUD

14 GA CLOSURE

ANGLE @ 4 1/2"

HIGH

5/16" RAISED

EMBOSSMENT STEEL

FLOOR PLATE DEMOLISH

EXISTING ANGLE

EXISTING

HAND RAIL

EXISTING

STAIRS

COUNTERSINK 1/16: DIAM.

MIN. FASTENERS 2'-0" O.C.

6" MET. STUD KNEE

WALL (TO MATCH

EXTERIOR WALL)

/2

/2

/2

EXISTINGNEW

6' - 4 1/2"

EXISTING LINE OF

STRINGER IN

FOREGROUND

6' - 0"

6' - 0"

EXISTING NEW

A105

Sim

18/A105

17/A105

/A

/A

A105

Sim

6' - 0"

EXISTING ROOF

SLOPED

INSULATION

SLOPED

INSULATION

NEW ROOF

PROVIDE NEW FIRE

TREATED WOOD

BLOCKING, NEW METAL

COPING WITH

CONTINUOUS CLEAT ON

ENTIRE PENTHOUSE

65' - 3"

REMOVE EXISTING MEMBRANE

INSUL. & TOPPING

EXTERIOR CONDITION 1/4"

PL W/ L2X2X1/4" STIFFENER

@ 2'-0" O.C. MAX.

INTERIOR CONDITION: 1/4"

PL W/ L5X3X1/4 LLY

STIFFENER @ 2'-0" O.C. MAX

EXP. BOLT ASSEMBLY TO

UNDERSIDE OF EXISTING

ROOF SLAB

#4 @ 12" O.C. EACH

WAY ONE BAR MIN.

EACH WAY

3" 3"SHORT DIRECTION

START FIRST ANGLE 1'-0"

FROM END OF OPENING

NO ANGLE REQ'D FOR

OPENING LESS THAN

1'-6" MAX OPENINGS

1/2" O HILTI EXP. BOLT

BY 3" EMBEDMENT @

EACH ANGLE & AT

CORNER OF PLATE

2" KEY

NEW CONC FILL TO LVL

NEW INSULATION

PATCH AND SEAL

EXISTING MEMBRANE

BALLAST AS REQ'D

REMOVE EXISTING

CURB AND

ASSOCIATED

CONSTRUCTION.

INTERIOR

CONDITION

EXTERIOR

CONDITION

EXISTING NEW

EFIS

RAISED ACCENT

BAND TYPICAL

COLOR #2

COLOR #1

ROOF T/SLAB

990'-10 1/2"

EXISTING NEW

EFIS

RAISED ACCENT BAND

TYPICAL COLOR #2

COLOR #1

PATCH ALL EXISTING EIFS MATERIAL

PREFINISHED METAL COPING

CJ CJ

EFIS

RAISED

ACCENT

BAND

TYPICAL

COLOR #2

COLOR #1

ROOF T/SLAB

990'-10 1/2"

A105

Sim

16'-0" A.R.D.

TOP OF STUD

VARIES

STEEL BEARING

6' - 4 1/2"

SPRAY-ON FIRE

PROOFING - 2 HR RATED

@ ROOF DECK & BEAMS

STEEL BEAM - SEE

STRUCT DWGS

SPRAY-ON FIRE

PROOFING @

COLUMNS - 2HR

RATED

EXISTING

COLUMN

BEYOND

1" HAT CHANNEL CONT. @ 4'-0"

O.C. - ANCHOR TO EACH STUD

W/ 1X1 14 GA. CLIP ANGLE

SCREWED TO CHANNEL.

6" METAL STUDS -

18 GA. @ 24" O.C.

HORIZ. STUD

PLYWOOD 2'-0" HIGH AT

PERIMETER OF PENTHOUSE

W/ 6" BATT INSULATION R=19

REMOVE EXISTING ROOFING

SYSTEM INCLUDING CONC.

TOPING

ELAST MEMBRANE

(NEW)

EXISTING SLAB

EXISTING

ROOF SYSTEM

20 GA TRACK W/ 1/4" LEG

TOP & BOTTOM ANCHOR

TO SLAB W/ 1/2 O EXP.

BOLT @ 24"O.C.

1/2" GYP. BD.

SHEATHING

E.I.F.S. W/

R=8 MIN.

2"

COLUMN

CENTERLINE

112'-2" A.R.D. @ EAST

WALL TYP. 112'-7" A.R.D. @

WEST WALL- TYP.

FULL DEPTH BRIDGING

MEMBER (CONT.)

SLIP CONNECTION @

EACH STUD

NEW ROOFING MATCH

AND TIE INTO EXISTING

EQ EQ

6' - 0"

NEW EXISTING

METAL COPING

WITH CONTINUOUS

CLEAT SYSTEM

EXISTING

COLUMN GRID

NEW PLATFORM TO MATCH

EXISTING SEE DETAIL

(30/A105)

NEW ROOFING UP AND

OVER PARAPET

TERMINATION BAR

AND

COUNTERFLASHING

A105

Sim

EXISTING DOOR

RE-USE EXISTING

THRESHOLD PLATE

SPECIFIED CANT

EXISTING ROOF DECK

ROOF INSULATION

BUILT UP ROOF

MEMBRANE

GRAVEL SURFACING

TWO-PLY STRIPPING

SPECIFIED BASE

FLASHING ADHERED

WITH ADHESIVE

NEW SURFACE MOUNTED

METAL COUNTERFLASHING

INSULATE INSIDE OF

METAL WORK IN COLD

CLIMATE

GRAVEL SURFACE

FLANGE SET IN SPECIFIED

ASPHALT CEMENT, MECHANICALLY

FASTENED 3" O.C. PRIME METAL

FLANGE BEFORE STRIPPING

WOOD NAILER SECURED TO DECK W/

APPROPRIATE FASTENERS. 2 ROWS

STAGGERED EACH ROW 24" O.C.

ROOF DECK AS

SPECIFIED

INSULATION

SPECIFIED BUILT

UP MEMBRANE

TWO-PLY STRIPPING

ASPHALT CEMENT

SEAL

SLOPE PIPES DOWN

AND AWAY FROM

HOOD

FASTENERS 8" O.C.

SHEET METAL COLLAR

SEAL

SHEET METAL HOOD

CROSS BREAK OR

SLOPE FOR DRAINAGE

METAL SCREW

SEAL

CLOSURE DETAIL

EXISTING ROUND

PENETRATION

FABRICATED ROUND TO SQUARE SHEET

METAL TWO PIECE SOLDERED IN FIELD

TREATED WOOD BLOCKING

SPECIFIED INSULATION

SPECIFIED CANT

EXISTING WOOD CURB

ROUND TO SQUARE

SHEET METAL

CLAMPED STORM COLLAR

BEAD OF TREMOR SEALANT

SPECIFIED BUILT UP MEMBRANE

METAL STUD BOX HEADER

LOUVER, SEE

MECHANICAL DRAWINGS

CONTINOUS METAL

PAN FLASHING

EXISTING EIFS

PATCH ALL AREAS

DISTURBED

CONTINOUS METAL FLASHING

S

T A T

E OF O

H

IO

R E G

IST ERED A RC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2023

P ro je ct

N o

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

100 E. Eighth Street, Ste. 300

Cincinnati, Ohio 45202-2129

Ph 513-241-3222

Fax 513-241-2981 www.thpltd.com

CONSTRUCTION

DOCUMENTS

Chief Engineer

KRISTINA AMIN

.0

PENTHOUSE ENLARGED PLAN

WITH DETAILS

10/30/2023 Approver Designer

REPLACE FTD BOILER WITH HOT

WATER SYSTEM

A105

539-20-201

FORT THOMAS, KENTUCKY

/3

/2

SCALE | 1" = 1'-0"

PENTHOUSE PLATFORM DETAIL30

SCALE | 1/8" = 1'-0"

PENTHOUSE PLAN ENLARGED11SCALE | 1/8" = 1'-0"

PENTHOUSE ROOF PLAN16

SCALE | 1 1/2" = 1'-0"

BUILT UP ROOF - SLAB INFILL DETAIL15

SCALE | 1/8" = 1'-0"

EAST ELEVATION18

SCALE | 1/8" = 1'-0"

WEST ELEVATION17

SCALE | 1/8" = 1'-0"

SOUTH ELEVATION NEW13

SCALE | 1/8" = 1'-0"

NORTH ELEVATION EXSITING12

NORTHNORTH

SCALE | 3/4" = 1'-0"

TYPICAL PENTHOUSE WALL SECTION26

SCALE | 3/8" = 1'-0"

BUILT UP ROOFING HOT/ COLD DOOR THRESHOLD8

SCALE | 1/2" = 1'-0"

BUILT-UP ROOFING PIPING THROUGH ROOF DECK10SCALE | 3/4" = 1'-0"

BUILT-UP ROOFING ROUND TO SQUARE METAL FLASHING14

PAINT ENTIRE EIFS

SCALE | 1" = 1'-0"

LOUVER FLASHING DETAIL19

# DESCRIPTION DATE

1 DD1 SUBMITTAL 10/28/2022

2 95% SUBMITTAL 12/12/2022

3 CD SUBMITTAL 10/30/2023

4 ADDENDUM 1 10/25/2024

PREFINISHED

METAL COPING

SP

dP

H

T

T

T

T

C

PTLT FT

M

TT

A H7

H4

DUCT THERMOSTAT WITH AVERAGING ELEMENT

DUCT STATIC PRESSURE SENSOR

DUCT HUMIDITY SENSOR

ROOM SENSOR: TEMPERATURE, HUMIDITY

LENGTH IN DUCT WHEN SPACE PERMITS)

REMOTE BULB THERMOSTAT

ROOM CONTROL: THERMOSTAT, HUMIDISTAT

DIFFERENTIAL PRESSURE SWITCH

DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT

SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)

DUCT OR PIPE TEMP. SENSOR (SEE NOTE 1 ABOVE)

DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.

AFTER FILTER

CURRENT SENSING RELAY

AIR FOIL WHEEL (FAN)

AIR HANDLING UNIT

ANALOG INPUT

AIR PRESSURE DROP

ANALOG OUTPUT

AUTOMATIC TEMPERATURE CONTROLS

BACKWARD INCLINED WHEEL (FAN)

AIR FLOW MEASURING DEVICE

ABOVE FINISHED FLOOR

DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER

COOLING COIL

CONVERTOR

CONVECTOR

CLEAN OUT

CEILING GRILLE

CENTRIFUGAL FAN

CEILING DIFFUSER

BOTTOM REGISTER (WALL TYPE)

BOTTOM GRILLE (WALL TYPE)

CEILING REGISTER

COLD WATER (POTABLE)

DIGITAL OUTPUT

DIGITAL INPUT

DIRECT DIGITAL CONTROLS

DRY BULB TEMPERATURE, DEG. F

AUTOMATIC CONTROL DAMPER

EXHAUST FAN

ENGINEERING CONTROL CENTER

DOUBLE WIDTH DOUBLE INLET (FAN)

DOOR UNDERCUT

OF LISTED SIZE OF PIPE.

APPROXIMATE ELEVATION FROM FLOOR TO CENTER

MANUAL VOLUME DAMPER

U/C

9'-6"

FIRE DAMPER

BUTTERFLY VALVE

CIRCUIT SETTER

BALL VALVE

COMBINATION BALANCING/SHUT-OFF VALVE

MANUAL AIR VENT

AUTOMATIC FLOW CONTROL VALVE

TEST PLUG (PRESSURE/TEMPERATURE)

SAFETY VALVE OR PRESSURE RELIEF

PRESSURE REDUCING VALVE

STRAIGHT-THRU TWO-POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

STRAIGHT-THRU MODULATING CONTROL VALVE

EX.

EF

EXISTING

DWDI

ECC

DI

DO

dBA

DDC

D

Db

DECIBELS

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

EQUIPMENT ABBREVIATION (SUPPLY FAN)

SUPPLY FAN NO.3 IN BUILDING NO.1

DRAWING NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST DUCT (UP & DOWN)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

EXHAUST OR RETURN TOP REGISTER OR GRILLE,

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

SUPPLY DUCT (UP & DOWN)

INCLINED RISE, IN DIRECTION OF AIR FLOW

NEW DUCT - WIDTH X DEPTH

RECTANGULAR ELBOWS WITH VANES)

VANED ELBOW (PROVIDE ALL SQUARE OR

INCLINED DROP, IN DIRECTION OF AIR FLOW

ACOUSTICAL DUCT LINING

STANDARD RADIUS ELBOW

R

10X8

FC

D

FLEXIBLE CONNECTION

(WALL TYPE)

(WALL TYPE)

1-01

1-SF3

AIR HANDLING UNIT NUMBER

TERMINAL UNIT DESIGNATION

TYPICAL UNIT NO.

SECTION LETTER

DETAIL NUMBER

ECCENTRIC REDUCER

DIRECTION OF FLOW

CAPPED OUTLET

SIDE CONNECTION

EXISTING WORK.

ACCESSORIES (SEE STANDARD DETAIL)

INVERTED BUCKET TRAP SET INCLUDING PIPING

POINT OF CONNECTION BETWEEN NEW AND

RISE OR DROP IN PIPE

BOTTOM CONNECTION, 45 DEG. OR 90 DEG.

TOP CONNECTION, 45 DEG. OR 90 DEG.

REDUCER OR INCREASER

DIRECTION OF PIPE PITCH (DOWN)

THERMOMETER

THERMODYNAMIC TRAP

STRAINER

GATE VALVE

PRESSURE GAGE

CHECK VALVE

GLOBE VALVE

PIPING ACCESSORIES (SEE STANDARD DETAIL)

FLOAT AND THERMOSTATIC TRAP SET INCLUDING

GATE VALVE WITH 3/4" HOSE END ADAPTER

EXISTING PIPE TO BE REMOVED

DRAIN LINE

UNION

D

CONV

CW

CR

CO

CG

CF

CD

CC

C

BR

BIW

BG

ATC

AFW

AI

APD

AO

AHU

AFMD

AFF

AF

VENT LINE

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG & BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

NUMBER INDICATES STEAM PRESSURE

NUMBER INDICATES STEAM PRESSURE

LPR

V

HWS

HWR

LPS (5)

MPS (30)

MPR

HEATING

SPS

S F

T

H

T

T H

VSD VARIABLE SPEED DRIVE

WET BULB TEMPERATURE, DEG. FWb

MAXIMUM

OUTSIDE AIR

(16 PSIG THRU 59 PSIG)

PRE-FILTER

PUMPED CONDENSATE

PREHEAT COIL

RELATIVE HUMIDITY

SUPPLY FAN

STEAM HUMIDIFIER

TRANSFER GRILLE

UNIT HEATER

STATIC PRESSURE (INCHES OF WATER)

POWER OPERATED, PARALLEL BLADE DAMPER

POWER OPERATED, OPPOSED BLADE DAMPER

PRESSURE REDUCING VALVE

MEDIUM PRESSURE STEAM SUPPLY

MEDIUM PRESSURE STEAM CONDENSATE RETURN

PRESSURE DROP (FEET OF WATER)

TOP REGISTER (WALL TYPE)

VARIABLE FREQUENCY DRIVE

STATIC PRESSURE SENSOR

DOOR UNDERCUT

SPS

TR

U/C

VFD

UH

V

TG

VALVE

S.P.

SH

SF

Rh

PD

PF

POD

PH

PRV

PPD

MPR

MAX

O.A.

NOM

MIN

PC

MPS

NOMINAL

MINIMUM

HEATING COIL

HORSEPOWER

FIN TUBE RADIATION

GRAVITY HOOD

MIXING BOX

POUNDS PER HOUR

HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)

LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)

LOW PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM CONDENSATE RETURN

INTEGRAL FACE & BYPASS

LOCAL TEMPERATURE CONTROL PANEL

HPR

HPS

LPR

IFB

LTCP

LBS/HR

MB

LPS

FLR.

FTR

HC

HP

GH

FLOOR

(FOUR WAY

BLOW UNLESS OTHERWISE

CEILING DIFFUSERS

NOTED)

CHILLED WATER RETURN

CHILLED WATER SUPPLYCHS

CHR

AIR CONDITIONING

CONTROL CIRCUIT CONN.H1 N

ETCHED CLEAR LACQUERE.C.L.

WHITE BAKED ENAMELW.B.E.

BRAKE HORSEPOWERBHP

BRITISH THERMAL UNITBTU

BRITISH THERMAL UNIT PER HOURBTUH

CUBIC FEET PER MINUTECFM

CLEAN STEAM GENERATORCSG

DEGREEDEG

DIAMETERDIA

DIFFERENTIAL PRESSURE SENSORDPS

ENTERINGENT

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FPM FEET PER MINUTE

FT FEET

GALLONS PER MINUTEGPM

HEADHD

HEAT RECOVERY COILHRC

CHILLED WATER RETURNCHR

CHILLED WATER SUPPLYCHS

HEATING HOT WATER RETURNHWR

HEATING HOT WATER SUPPLYHWS

INCHESIN

INCHES WATER COLUMNIN WC

INCHES WATER GAUGEIN WG

LEAVING AIR TEMPERATURELAT

LEAVINGLVG

MBH 1000 BTUH

MERV MINIMUM EFFICIENCY REPORTING VALUE

NC NOISE CRITERIA

REVOLUTIONS PER MINUTERPM

SMOKE DAMPER (SUPPLY)SDS

SMOKE DAMPER (RETURN)SDR

STEAM PRESSURE REDUCING VALVESPRV

VARIABLE AIR VOLUMEVAV

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

NUMBER INDICATES STEAM PRESSURE

HPS (125)

HPR

PIPE UP

PIPE DOWN

IN-LINE CENTRIFUGAL FANICF

LAB PLUME EXHAUST FANLPE

REFRIGERANT (LIQUID AND SUCTION)

CONDENSING UNITCU POWER TYPE ROOF VENTILATORRV

RATED WALL ASSEMBLY. REFER TO

ARCHITECTURAL DRAWINGS FOR RATING.

PUMPED CONDENSATE RETURNPC

TREATED WATER MAKEUPMU

EXPANSION TANK INLETET

FBW FLAT BLADE WHEEL (FAN)

R

END OF MAIN DRIPEMD

B.O.D. 10'-2" OF LISTED DUCT.

APPROXIMATE ELEVATION FROM FLOOR TO BOTTOM

1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.

2. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO PROJECT SEQUENCING SHEET G002 IN ARCHITECTURAL DRAWINGS AND

GENERAL REQUIREMENTS SECTION 01 00 00. ADDITIONAL NOTES DESCRIBING SEQUENCING DETAILS ARE INCLUDED THROUGHOUT THE DRAWING SET.

3. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF WORK IN THIS

PROJECT.

4. THE CONTRACTOR SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE

SPACE AND SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE

USED JOINTLY AT ALL TIMES. THE CONTRACTOR SHALL REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS

INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK

AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE VA COR FOR CLARIFICATION BEFORE PROCEEDING.

5. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHERS. HE SHALL KEEP HIMSELF INFORMED OF THE PROGRESS AND DETAIL

DEVELOPMENT OF THE WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING HIS WORK WITH OTHERS SO THAT THE

PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON SCHEDULE.

6. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.

7. EXISTING CONDITIONS SHOWN HAVE BEEN BASED ON VISUAL OBSERVATION AND/OR AVAILABLE DRAWING INFORMATION, AND MAY BE AT VARIANCE

WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING

THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH

MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE COR IN WRITING FOR RESOLUTION BEFORE PROCEEDING

WITH THE WORK.

8. THE CONTRACTOR AND/OR TRADE, FITTING OR PLACING HIS WORK INTO OR ON THE WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE

INSTALLATION OF HIS WORK CONSTITUTES HIS ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT

ACCEPTABLE, HE SHALL NOTIFY THE VA COR AND SUCH WORK SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING WORK

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR

CORRECTING WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.

9. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL

PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE-STOPPED AS REQUIRED TO MAINTAIN FIRE-RATINGS

INDICATED. COORDINATE WITH ALL TRADES TO ENSURE FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.

10. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH 0-HOUR RATED WALLS & FLOORS SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.

11. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS.

12. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

13. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH WALL/FLOOR/ROOF OPENING TO MATCH EXISTING

WHERE OPENING IS NOT RE-USED.

14. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER THIS

WORK TO MATCH EXISTING.

15. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES AND

DISPOSED OF PROPERLY BY THE CONTRACTOR.

16. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE

SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.

17. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND CAPPED; AND CONTROL WIRING AND CONDUIT

SHALL BE REMOVED BACK TO SOURCE.

18. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED ON REMOVAL PLAN(S) SHALL BE REMOVED. THE MAJORITY OF WORK

TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL AND/OR ABANDONED EQUIPMENT, DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS

ASSOCIATED WITH THE REMOVAL WORK.

19. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED

ON WEEKENDS OR WEEK NIGHTS. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED TWENTY-EIGHT (28)

WORKING DAYS IN ADVANCE WITH THE VA COR.

20. APPROXIMATE ELEVATIONS NOTED ARE TO THE CENTER OF THE PIPE.

21. ALL SAFETY DEVICES MUST COMPLY WITH VHA BOILER PLANT SAFETY DEVICE TESTING MANUAL EIGHTH EDITION.

29 ALL ITEMS THAT REQURIE ACCESS, SUCH AS FOR OPERATIONG, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PORTABLE LADDERS OR PERMANENT PLATFORMS.

30 IT IS THE CONTRACTOR'S RESPONSIBILITY TO SUBMIT ONLY EQUIPMENT THAT FULLY COMPLIES WITH THE SPECIFICATIONS, IF AT ANY TIME IT IS

DETERMINED THAT THE EQUIPMENT SUBMITTED DOES NOT FULLY COMPLY WITH THE SPECIFICATIONS THE CONTRACTOR MAY BE REQUIRED TO

REMOVE AND REPLACE THAT EQUIPMENT AT NO ADDITIONAL COST TO THE GOVERNMENT, REGARDLESS OF IF THE SUBMITTAL WAS APPROVED BY THE

GOVERNMENT.

31 IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR

THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY

CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON RESPONSIBILITIES.

32 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.

33 IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL

IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK

MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA

DECLARED SAFE.

34 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE, AND EQUIPMENT SIZES, SERVICES, AND LOCATIONS PRIOR TO PERFORMING WORK.

CARBON DIOXIDE SENSOR FOR SYSTEM ALARM

WELDED STAINLESS STEEL DUCT

GLYCOL HEATING HOT WATER SUPPLYGHS

CONDENSATE TRANSFER PUMP DISCHARGECTPD

DOMESTIC HOT WATER SUPPLY

DOMESTIC HOT WATER RETURN

DOMESTIC COLD WATER

DHWR

DHW

DCW

DP

C

JACKET HEAT RECOVERY WATER SUPPLYJWS

GLYCOL-HYDRONIC SUPPLYGHS

GLYCOL-HYDRONIC RETURNGHR

JACKET HEAT RECOVERY WATER RETURNJWR

AIR COOLER RETURN

AIR COOLER SUPPLY

ACR

ACS

BOTTOM BLOWOFF WATERBO

SURFACE BLOWDOWN WATERBD

CONTINUOUS BLOWDOWN WATERCBD

PUMP RECIRCULATIONPR

CONDENSATE TRANSFER PUMP SUCTIONCTPS

FEED WATER PUMP SUCTIONFWPS

FEED WATER PUMP DISCHARGEFWPD

GLYCOL HEATING HOT WATER RETURNGHR

NATURAL GASNG

CHEMICAL FEEDCF

VTR VENT THROUGH ROOF

LEVEL, PRESSURE, FLOW, OR TEMPERATURE TRANSMITTER

PLUG VALVE

FLOW METER

VALVED LEAK TEST CONNECTION {W/ PRESSURE GAGE}

NON-RETURN STOP CHECK VALVE

EMERGENCY MAKEUP WATEREMU

HEAT RECOVERY STEAM GENERATORHRSG

FEED WATER RETURNFW(R)

CONTRACTING OFFICER'S REPRESENTATIVECOR

SINGLE WIDTH SINGLE INLET (FAN)SWSI

DIGITAL CONTROL PANELDCP

SUPERVISORY CONTROL AND DATA ACQUISITIONSCADA

DRAWING SYMBOLS

DUCTWORK SYMBOLS

VALVES

GENERAL

ABBREVIATIONS

PIPING SYMBOLS

CONTROLS GENERAL NOTES:ABBREVIATIONS

35 WORK ON CHILLERS IS TO BE COMPLETED DURING THE WINTER AND WORK ON BOILERS IS TO BE COMPLETED DURING THE SUMMER.

REDUCED PRESSURE BACK FLOW PREVENTERRPBFP

NON POTABLE WATERNPW

CONTINUOUS BLOWDOWNCBD

P: 937-224-0861 www.heapy.com

P ro je ct

N o

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

Chief Engineer

KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P

ro je c t

N u m b e r

ABBREVIATIONS, SYMBOLS, INDEX

AND GENERAL NOTES

JPR NKS

REPLACE FTD BOILER WITH HOT

WATER SYSTEM

M001

539-20-201

FORT THOMAS, KENTUCKY

/2

/2

2020-05103 2888

CONSTRUCTION

DOCUMENTS

10/30/2023

INDEX OF DRAWINGS

SHEET NUMBER SHEET NAME

M001 ABBREVIATIONS, SYMBOLS, INDEX AND GENERAL NOTES

MD100 PARTIAL BASEMENT FLOOR PLAN - TEMPORARY PLAN REMOVALS

MD100.1 PARTIAL BASEMENT FLOOR PLAN - TEMPORARY WORK

MD400 ENLARGED BASEMENT FLOOR PLAN - REMOVALS

MD403 ENLARGED THIRD FLOOR PLAN - REMOVALS

MD404 ENLARGED ROOF AND PENTHOUSE PLAN - REMOVALS

MH400 ENLARGED BOILER ROOM - NEW WORK

MH400.1 PARTIAL BASEMENT FLOOR PLAN CONTROLS - NEW WORK

MH402 ENLARGED SECOND FLOOR PLAN - NEW WORK

MH403 ENLARGED THIRD FLOOR PLAN - NEW WORK

MH404 ENLARGED PENTHOUSE PLAN - NEW WORK

M201 STEAM BOILER PLANT ELEVATIONS

M501 DETAILS

M502 DETAILS

M503 DETAILS

M504 DETAILS

M505 DETAILS

M506 DETAILS

M507 CHILLED WATER PIPING SCHEMATIC

M508 STEAM BOILER SCHEMATIC - REMOVALS

M509 STEAM BOILER SCHEMATIC - NEW

M601 SCHEDULES

M602 SCHEDULES

M603 SCHEDULES

M604 PIPING SUPPORT SYSTEMS

M701 CONTROL DIAGRAMS AND SEQUENCES

M702 CONTROL DIAGRAMS AND SEQUENCES

M703 CONTROL DIAGRAMS AND SEQUENCES

M704 CONTROLS DIAGRAMS AND SEQUENCES

M901 STEAM BOILER PLANT ISOMETRIC

# DESCRIPTION DATE

1 DD1 SUBMITTAL 10/28/2022

2 95% SUBMITTAL 12/12/2022

3 CD SUBMITTAL 10/30/2023

4 ADDENDUM 1 10/25/2024

N

P

16 17 18 19

HWS

HWS

HWR

HWR

x1

18x18 16x12 x1 x1

H W

R

H W

S

HWS

HWR

H W

R

H W

S

HWR

H W

R

H W

S

HWS

HWR

HWR

LP

R

LPR

VVV

V

V

LPS LPS

LPR

PC

V

V

PC

LPS

LPS

LP

S

LP

S

LPS LPS

H W

S

LP

S

LPS

HWS AHU-11

14x1816x10

10ø x1 x1 8 1

TYP.

TYP.

7 7

V

141516

24 24

M201

M201

HWR

HWR

127 1/2"

LPR

LPS

LPR

LPS

LP

S

LPS

LP

R

HWS

LPS

11 35

CONDENSATE

TANK

V

CP

P: 937-224-0861 www.heapy.com

P ro je ct

N o

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

Chief Engineer

KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P

ro je c t

N u m b e r

ENLARGED BASEMENT FLOOR

PLAN - REMOVALS

JPR NKS

REPLACE FTD BOILER WITH HOT

WATER SYSTEM

MD400

539-20-201

FORT THOMAS, KENTUCKY

/2

/2

2020-05103 2888

CONSTRUCTION

DOCUMENTS

10/30/2023

SCALE | 3/8" = 1'-0"

ENLARGED MECHANICAL ROOM FLOOR PLAN - REMOVALS1

PLAN NOTES

1. EXISTING DUCTWORK TO REMAIN.

2. REMOVE EXISTING DUCTWORK AND ASSOCIATED HANGERS, SUPPORTS, ETC.

3. REMOVE PIPING AND PATCH EXISTING CHIMNEY PENETRATION TO MATCH

EXISTING.

4. REMOVE BOILER FLUE AND FILL IN EXISTING WALL PENETRATION. WALL

CONSTRUCTION SHALL MATCH EXISTING.

5. REMOVE EXISTING DUAL FUEL STEAM BOILER AND ALL ASSOCIATED PIPING,

SPECIALTIES, EQUIPMENT, ETC.

6. EXISTING AHU TO REMAIN.

7. EXISTING PIPING TO REMAIN.

8. REMOVE EXISTING PIPING AND ASSOCIATED HANGERS, SUPPORTS,

SPECIALTIES, ETC.

9. RELOCATE EXISTING FLEXIM ULTRASONIC BTU METER PANEL. SEE NEW WORK

FOR NEW LOCATION.

10. REMOVE EXISTING CONDENSATE PUMP AND ALL ASSOCIATED PIPING,

SPECIALTIES, CONTROLS, WIRING, ETC.

11. EXSITING LOUVER TO REMAIN.

12. EXISTING PNEUMATIC CONTROLS AIR COMPRESSOR AND CONCRETE PAD TO

REMAIN.

13. EXISTING AIR COOLED CONDENSING UNIT TO REMAIN.

14. EXISTING AIR HANDLING UNIT INTAKE LOUVER TO REMAIN.

15. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED SUPPORTS, WIRING,

CONTROLS, ETC. REMOVE GRAVITY BACKDRAFT DAMPERS FOR REPLACEMENT

WITH WINDOW BY OTHERS. PATCH AND REPAIR WALL TO MATCH EXISTING.

REFER TO ARCHITECTURAL DRAWINGS.

16. REMOVE EXISTING STEAM VENT PIPE UP EXTERIOR OF BUILDING TO ROOF.

REMOVE EXISTING WALL SUPPORT BRACKETS AND PATCH IF NOT REUSED BY

OTHER TRADES. PATCH AND REPAIR WALL TO MATCH EXISTING.

17. REMOVE EXISTING BOILER CHEMICAL TREATMENT TANKS AND ASSOCIATED

PUMPS, WIRING, ETC. DISPOSE OF CHEMICALS PER LOCAL AND EPA

REGULATIONS.

18. REMOVE EXISTING PIPING TO THIS POINT FOR RECONNECTION IN NEW WORK.

REFER TO SHEET MH400.

19. REMOVE EXISTING BOILER FEEDWATER DEAERATOR AND ASSOCIATED PUMPS,

PIPING, WIRING, SUPPORTS, SPECIALTIES, CONTROLS, ETC.

20. EXISTING FUEL OIL PUMP SKID TO BE REMOVED BY OTHERS. REFER TO

DIVISION 22 DRAWINGS.

21. REMOVE EXISTING BLOWDOWN SEPARATOR TANK AND ASSOCIATED PIPING,

SUPPORTS, ACCESSORIES, ETC.

22. EXISTING JOHNSON CONTROLS DDC CONTROL PANEL TO REMAIN. MODIFY TO

REMOVE EXISTING POINTS REMOVED UNDER THIS PROJECT.

23. REMOVE AND REPLACE ALL EXISTING CONTROLS, ACTUATORS, AND SENSORS

ON EXISTING COMBUSTION AIR UNIT, REFER TO ATC DIAGRAM.

24. REMOVE EXISTING STEAM METER AND ASSOCIATED ACCESSORIES, WIRING,

PNEUMATIC TUBING, ETC. REMOVE EXISTING PNEUMATIC TUBING BACK TO

POINT OF ACTIVE MAIN AND CAP.

25. REPLACE EXISTING CONTROL PANEL WITH NEW, REFER TO ATC DIAGRAM.

26. REMOVE EXISTING BOILER BLOWDOWN CONTROL PANELS AND ASSOCIATED

WIRING, ETC.

27. REMOVE/RELOCATE EXISTING STORAGE CUBBIE TO PREPARE FOR NEW

EQUIPMENT LOCATION. COORDINATE WITH FACILITY STAFF TO MOVE EXISTING

ITEMS BEING STORED PRIOR TO REMOVAL.

28. REMOVE EXISTING CONCRETE HOUSEKEEPING PAD AND PREPARE SLAB FOR

NEW BOILER LOCATIONS. SEE SHEET MH400 FOR NEW BOILER LOCATION.

29. REMOVE EXISTING CONDENSATE SURGE TANK AND ASSOCIATED PUMPS,

PIPING, WIRING, SUPPORTS, SPECIALTIES, CONTROLS, ETC.

30. EXISTING PAD TO REMAIN FOR NEW BOILER CHEMICAL TREATMENT SYSTEM.

31. REMOVE EXISTING HAZARDOUS GAS DETECTION SYSTEM AND REMOVE

ASSOCIATED SENSOR FROM ABOVE.

32. REMOVE EXITING SHUT-OFF STATION STATION, WIRING, AND ASSOCIATED

CONDUIT.

33. REMOVE EXISTING STORAGE CABINETS TO PREPARE FOR NEW MASTER

CONTROL PANEL LOCATION. COORDINATE WITH FACILITY STAFF TO MOVE

EXISTING ITEMS BEING STORED PRIOR TO REMOVAL.

34. REMOVE/RELOCATE EXISTING METAL CABINET TO PREPARE FOR NEW WORK.

COORDINATE WITH FACILITY STAFF TO MOVE EXISTING ITEMS BEING STORED

PRIOR TO REMOVAL.

35. EXISTING WINDOW TO BE REMOVED AND REPLACED WITH NEW LOUVER BY

OTHERS. REFER TO ARCHITECTURAL SHEETS FOR MORE INFORMATION.

36. EXISTING LOUVER TO BE REMOVED FOR TEMPORARY PIPE ROUTING, REFER

TO ARCHITECTURAL FOR TEMPORARY PATCHING AND OPENING COVER. NEW

WINDOW TO BE INSTALLED UPON REMOVAL OF TEMPORARY PIPING, REFER TO

ARCHITECTURAL FOR MORE INFORMATION.

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, INDEX, AND GENERAL NOTES.

# DESCRIPTION DATE

1 DD1 SUBMITTAL 10/28/2022

2 95% SUBMITTAL 12/12/2022

3 CD SUBMITTAL 10/30/2023

4 ADDENDUM 1 10/25/2024

I J

L

N

O

P

9 10 12 13 15 16 17 18 19 2014 26

J

N

P

9 10 12 13 14 15 16 17 18 19 20

MH400

CO

CH4

CO

CH4

CO

H/S

H/S

ENGINEERING

CARPENTER SHOP

029A

BOILER ROOM

ENG. OFFICE

018A

ELEC. SHOP

018B

ENG. STOR.

018C

Clos.

029B

STAIR #3

S*B*3

64-B1 64-B2 64-B3

13 64-FM-3, 4, 5 14

64-BFW-1

P: 937-224-0861 www.heapy.com

P ro je ct

N o

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

Chief Engineer

KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P

ro je c t

N u m b e r

PARTIAL BASEMENT FLOOR PLAN

CONTROLS - NEW WORK

JPR NKS

REPLACE FTD BOILER WITH HOT

WATER SYSTEM

MH400.1

539-20-201

FORT THOMAS, KENTUCKY

/1

/2

2020-05103 2888

CONSTRUCTION

DOCUMENTS

10/30/2023

SCALE | 1/8" = 1'-0" REF | 1/M201

BASEMENT FLOOR PLAN - CONTROL DEVICE NEW WORK1

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, INDEX, AND GENERAL NOTES.

PLAN NOTES

1. EMERGENCY SHUT-OFF STATION. REFER TO CONTROL SCHEMATIC.

2. CARBON MONOXIDE DETECTOR, REFER TO GAS DETECTION SYSTEM DIAGRAM.

3. COMBUSTIBLE GAS DETECTOR, REFER TO GAS DETECTION SYSTEM DIAGRAM.

4. MASTER BOILER CONTROL PANEL, REFER TO NEWTWORKING DIAGRAM ON M701.

5. REMOTE ALARM HORN/STROBE FROM HAZARDOUS GAS DETECTION SYSTEM.

6. GAS DETECTION SYSTEM CONTROLLER MOUNTED ON COLUMN.

7. BOILER CONTROL PANEL, REFER TO NEWTWORKING DIAGRAM ON M701.

8. BOILER SYSTEM REMOTE ANNUNCIATOR ALARM PANEL WITH HORN AND STROBE THAT

WILL DISPLAY ALARM MESSAGES. LABEL TO CLEARLY IDENTIFY PANEL.

9. REMOTE AUDIBLE ALARM HORN/STROBE FROM HAZARDOUS GAS DETECTION SYSTEM.

LABEL TO CLEARLY IDENTIFY ALARM TYPE.

10. COMBUSTION AIR UNIT DDC PANEL, REFER TO CONTROLS DIAGRAM ON M704. CONNECT

TO JACE CONTROLLER, REFER TO NEWTWORKING DIAGRAM ON M701.

11. JACE CONTROLLER, CONNECT TO ETHERNET, REFER TO NETWORKING DIAGRAM ON

M701.

12. BOILER CONTROL COMPUTER WORKSTATION WITH SCADA SOFTWARE. SUPPORT WITH

NEW DESK/TABLE.

13. REMOTE-MOUNTED STEAM FLOW METER DISPLAY MOUNTED ON COLUMN. REFER TO

DETAIL ON M503.

14. RELOCATED FLEXIUM ULTRASONIC BTU METER PANEL, THAT MONITORS EXISTING

HEATING HOT WATER SYSTEM.

15. FEED WATER SYSTEM CONTROL PANEL.

# DESCRIPTION DATE

1 DD1 SUBMITTAL 10/28/2022

2 95% SUBMITTAL 12/12/2022

16 17 18 19

HWS

HWS

HWR

H W

R

H W

S

HWR

HWS

HWR

HWS

HWR

M201

M201

0.75" - BO

8" - LPS

CD

CD

8" - LPS

ø

8 88

64-FCU-2

64-FCU-1

1.25" - BO

64-CU-1 64-CU-2

3"

V

DP

6" - LPS

6"

LP

S

64-B1 64-B2 64-B3

64-BFW-1

64-BT-1

4"

V

2" - HWS

2.5" - LPS

2.

5"

LP

S

2"

H W

R

1.

1.25"

2" 2"

1.

- FW

- FW

- FW

F

W - F

W

2.

5"

LP

S

CD

CD

C D

4"

LP

S x2

S A

24x18 - SA

12x12

SG-1

x8

S

A

6"

LP

S

14" Minimum

12" Minimum

EXISTING

CONDENSATE

RECIEVER

36x12

SG-1

36x12

SG-1

MD

CARPENTER SHOP

029A

3"

V

3"

V

3"

V

3"

V

3"

V

3"

V

2" - PC

3" - V

4"

LP

S

4"

LP

S

4"

LP

S

1" - D

0.

D

0.

D

64-FM-3 64-FM-4 64-FM-5

64-FM-3

64-FM-4

64-FM-528

0.75" - D

0.75" - D

0.75" - D

2.

5"

LP

S

5/8" RS

3/8" RL

5/8" RS

3/8" RL

ST-2

ST-2

ST-1

ST-1

ST-2

3"

D

0.

D

MD

MD

P: 937-224-0861 www.heapy.com

P ro je ct

N o

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

Chief Engineer

KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P

ro je c t

N u m b e r

ENLARGED BOILER ROOM - NEW

WORK

JPR NKS

REPLACE FTD BOILER WITH HOT

WATER SYSTEM

MH400

539-20-201

FORT THOMAS, KENTUCKY

/2

/2

2020-05103 2888

CONSTRUCTION

DOCUMENTS

10/30/2023

SCALE | 3/8" = 1'-0" REF | 1/MH400.1

ENLARGED MECHANICAL ROOM FLOOR PLAN - NEW WORK1

PLAN NOTES

1. EXISTING JOHNSON CONTROLS DDC PANEL TO REMAIN.

2. EXISTING PIPING TO REMAIN, TYP.

3. EXTEND BOILER FLUE FROM ALL BOILERS INTO EXISTING CHIMNEY STACK AND UP TO

ROOF PER MANUFACTURER'S INSTRUCTIONS. APPROXIMATE SIZE INDICATED (INTERNAL

DIAMETER). COORDINATE EXACT SIZE REQUIRED WITH ACTUAL EQUIPMENT PROVIDED.

APPROXIMATE OFFSETS REQUIRED TO AVOID EXISTING BOILER ROOM CONDITIONS -

VERIFY PRIOR TO INSTALLATION. FLAT HORIZONTAL RUNS ARE NOT PERMITTED. ALL

VERTICAL OFFSETS REQUIRED SHALL BE 45 DEGREES OR LESS.

4. CONNECT TO OUTLET OF SAFETY RELIEF VALVES PROVIDED WITH BOILER. REFER TO

DETAIL ON SHEET M502.

5. VENT PIPE TO BE ROUTED THROUGH EXTERIOR WALL AND UP TO ROOF. APPROXIMATE

SIZE INDICATED, REFER TO DETAIL ON M201 FOR FULL ELEVATION.

6. CONNECT FEEDWATER PIPING TO BOILER, REFER TO PIPING SCHEMATIC.

7. JACE CONTROLLER, CONNECT TO ETHERNET, REFER TO NETWORKING DIAGRAM ON

M701.

8. MAINTAIN BOILER DOOR SWING CLEARANCE FROM ALL OBSTRUCTIONS AS REQUIRED

PER MANUFACTURER.

9. DASHED LINES INDICATE CLEARANCE DISTANCE FROM BOILER. MAINTAIN CLEARANCES

IN ACCORDANCE WITH BOILER MANUFACTURER'S INSTRUCTIONS. MAINTAIN

CLEARANCES TO ELECTRICAL PANELS.

10. CONCRETE HOUSEKEEPING PAD, REFER TO DETAIL ON SHEET M502.

11. CONNECT BOTTOM BLOWOFF PIPING TO BOILER PER MANUFACTURER'S INSTRUCTIONS.

12. STEAM MAIN TO BE CONNECTED TO STEAM HEADER AS SHOWN. IF CONNECTION

CANNOT BE MADE, CONNECT PIPE INTO HEADER AT SAME ELEVATION AND MOVE OFFSET

FURTHER DOWN PIPE WITH CONDENSATE TRAP ASSEMBLY CONNECTED.

13. STEAM TRAP DRIP ASSEMBLY ON LOW PRESSURE STEAM DRIP. REFER TO DETAIL ON

SHEET M502.

14. REBALANCE AND RESHIV EXISTING SUPPLY FANS ON EXISTING MAKEUP AIR UNIT TO 3750

CFM. REFER TO CONTROL DRAWINGS AND SPECIFICATIONS FOR DETAILS.

15. GAS DETECTION SYSTEM CONTROLLER.

16. CONTRACTOR TO FIELD VERIFY EXISTING DUCT CONNECTION SIZE PRIOR TO SHEET

METAL FABRICATION.

17. STEAM METER, REFER TO EQUIPMENT SCHEDULE (TYPICAL). PROVIDE FLOW

CONDITIONER AND MINIMUM STRAIGHT PIPE DIAMETERS UPSTREAM AND DOWNSTREAM

OF METER PER MANUFACTURER'S INSTALLATION REQUIREMENTS. REFER TO DETAIL ON

SHEET M503.

18. BOILER MASTER CONTROL PANEL.

19. BOILER CONTROL PANEL.

20. STEAM EXHAUST LINE FOR BOILER-BURNER TESTING AND ADJUSTING. ROUTED

THROUGH WALL AND UP TO ROOF.

21. SAMPLE COOLERS, REFER TO SEAM PIPING SCHEMATIC ON SHEET M508.

22. STEAM BLOWOFF TANK. ROUTE DRAIN TO NEAREST TRENCH DRAIN AS SHOWN..

23. COMBUSTION AIR DDC CONTROL PANEL.

24. MAINTAIN CLEARANCE ABOVE BOILER CONTROL PANEL.

25. REPLACE ALL EXISTING CONTROLS, ACTUATORS, AND SENSORS ON EXISTING

COMBUSTION AIR UNIT, REFER TO ATC DIAGRAM.

26. SECONDARY COMBUSTION/RELIEF AIR LOUVER THROUGH WALL. SIZE LOUVER TO BE 36"

x 36" WITH A MINIMUM FREE AREA OF 648 SQUARE FEET. REFER TO COMBUSTION AIR

CONTROLS SEQUENCE ON SHEET M704.

27. CONDENSING UNITS TO BE MOUNTED LEVEL ON CONCRETE PAD AT LEAST 5" THICK ON

GRADE.

28. REMOTE-MOUNTED STEAM FLOW METER DISPLAY MOUNTED ON COLUMN. REFER TO

DETAIL ON M503.

29. RELOCATED FLEXIUM ULTRASONIC BTU METER PANEL, THAT MONITORS EXISTING

HEATING HOT WATER SYSTEM.

30. FEED WATER SYSTEM CONTROL PANEL.

31. 0.75" DRAIN FROM BOTTOM OF RISER TO TRENCH DRAIN IN BOILER ROOM, REFER TO

SCHEMATICON SHEET M508.

32. 1" DRAIN FROM CYCLONE EXHUAST HEAD. ROUTE DRAIN LINE BACK TO TRENCH DRAIN IN

BOILER ROOM, REFER TO SCHEMATIC ON SHEET M508.

33. CORDINATE VALVE ORIENTATION TO ALLOW FOR OPERATION USING CHAIN WHEEL

OPERATOR THAT ALLOWS FOR VALVE TO BE OPENED AND CLOSED FROM THE GROUND

FLOOR.

34. CHEMICAL TREATMENT EQUIPMENT.

35. REMOVE CABINETS FOR INSTALLATION OF BOILER MASTER CONTROL PANEL.

36. SIZES SHOWN ARE APPROXIMATE, CONFIRM FINAL SIZES WITH MANUFACTURER OF

ACTUAL EQUIPMENT PURCHASE AND APPROVED SHOP DRAWINGS.

37. PROVIDE NEW 36"x36" TWO-POSITION MOTORIZED DAMPER AND ACTUATOR ON EXISTING

LOUVER OPENING. REFER TO COMBUSTION AI SEQUENCE ON SHEET M704.

GENERAL NOTES

A. REFER TO SHEET M001 FOR LEGEND, INDEX, AND GENERAL NOTES.

# DESCRIPTION DATE

1 DD1 SUBMITTAL 10/28/2022

2 95% SUBMITTAL 12/12/2022

3 CD SUBMITTAL 10/30/2023

V T

R D

3"

V T

R D

3"

D

NOTES

1. STEAM BOILER, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.

2. FLUE GAS RECIRCULATION PIPING.

3. CONCRETE HOUSEKEEPING PAD. REFER TO DETAIL ON SHEET M502.

4. BURNER OBSERVATION PORT.

5. SIGHTFLOW INDICATOR WITH ROTOR (ORIENT WINDOWS TO FACE UP AND DOWN).

6. MANUAL SURFACE BLOWDOWN BYPASS VALVE.

7. STAINLESS STEEL TUBING ROUTED TO SAMPLE COOLER.

8. MAKEUP WATER CONNECTION.

9. ELECTRODE FITTING WITH FOUR PROBES TO FUNCITION AS AUXILIARY LOW WATER

CUTOFF AND HIGH WATER ALARM. PROVIDE SHUNT SWITCH AS SPECIFIED FOR TESTING.

10. NATURAL GAS TRAIN, COMPLETE MAIN AND PILOT, FACTORY MOUNTED AND WIRED.

11. 10" (INTERNAL DIAMETER) BOILER FLUE. CONRIFM SIZES WITH MANUFACTURER OF

ACTUAL EQUIPMENT PURCHASED AND APPROVED ON SHOP DRAWINGS. THE FLUE

MANUFACTURER SHALL CONFIRM FINAL SIZE BY PERFORMING ENGINEERING, PRESSURE,

AND SIZING CALCULATIONS BASED ON THE ACTUAL EQUIPMENT SELECTED TO ENSURE

PROPER SYSTEM VENTING PERFORMANCE.

12. NATURAL GAS PIPING, REFER TO PLUMBING DRAWINGS.

13. AUTOMATIC MOTORIZED SURFACE BLOWDOWN VALVE.

14. MOTORIZED MODULATING BOILER FEEDWATER CONTROL VALVE.

15. CONDUCTIVITY SENSOR.

16. PRESSURE TRANSMITTER.

17. DRIP PAN ELBOW, REFER TO DETAIL ON SHEET M502. ROUTE DRAIN TO TRENCH DRAIN.

18. MULTIPLE SAFETY RELIEF VALVES, QUANTITY AND SIZES PER BOILER MANUFACTURER.

REFER TO DETAIL ON SHEET M502.

19. EACH PRESSURE RELIEF VENT SHALL BE ROUTED SEPARATELY UP TO ROOF. INDICATED

SIZE IS PRELIMINARY, CONFIRM WITH BOILER MANUFACTURER. TERMINATE 6' ABOVE

ROOF LEVEL, REFER TO DETAIL ON SHEET M502.

20. STACK STARTING ADAPTER WITH DRAIN. ROUTE TO TRENCH DRAIN.

21. CONDENSATE PIPING SHALL INCLUDE A WATER TRAP TO PREVENT THE ESCAPE OF FLUE

GAS.

22. ROUTE BOILER GAUGE GLASS AND LEVEL CONTROLLER DRAINS TO BLOWOFF TANK.

23. INLINE SEATLESS, SLIDING PLUNGER, OS&T, DESIGNED FOR BLOWOFF SERVICE.

24. SURFACE BLOWOFF CONNECTION.

25. DRAFT CONTROL DAMPER WITH MODULATING ACTUATOR, PRESSURE TRANSMITTER,

AND PRESSURE SWITCH.

26. FLOW STRAIGHTENER. REFER TO STEAM METER DETAIL ON SHEET M503.

27. CHEMICAL FEED CONNECTION.

28. GAUGE GLASS.

29. PRIMARY LOW WATER CUTOFF. CONTROLER SHALL NOT BE USED AS THE PRIMARY

LEVEL MASTER..

30. STEAM PRESSURE TRANSMITTER.

31. NON RECYCLE MANUAL RESET STEAM HIGH LIMIT SWITCH.

32. NATURAL GAS VENT PIPING UP THROUGH ROOF FOR MAIN VENT VALVE, PILOT VENT

VALVE, PILOT RELIEF, MAIN REGULATOR, PILOT REGULATOR, LOW PRESSURE GAS

SWITCH, HIGH PRESSURE GAS SWITCH, PILOT LOW PRESSURE GAS SWITCH, REFER TO

PLUMBING DRAWING.

33. 0.75" DRAIN VALVE. ROUTE TO TRENCH DRAIN.

34. HIGH WATER OVERFLOW CONNECTION.

35. OS&Y VALVE WITH WARM-UP VALVE.

36. ANGLED SEATLESS, SLIDING PLUNGER, OS&T, DESIGNED FOR BLOWOFF SERVICE.

37. STEAM FLOW/TOTALIZING METER. INSTALL WITH MINIMUM STRAIGHT RUN OF PIPING

BEFORE AND AFTER THE METER PER THE MANUFACTURER'S INSTALLATION

INSTRUCTION; INSTALL FLOW STRAIGHTENER IF REQUIRED. REFER TO STEAM METER

DETAIL ON SHEET M503. REFER TO SCHEDULE ON SHEET M603.

38. FEEDWATER FLOW METER. REFER TO DETAIL ON SHEET M503. REFER TO SCHEDULE ON

SHEET M603.

39. FUEL OIL SUPPLY AND RETURN PIPING, REFER TO PLUMBING DRAWINGS.

40. FUEL OIL PUMP.

41. PROPANE PIPING FOR IGNITER PILOT, REFER TO PLUMBING DRAWINGS.

42. ROUTE PIPING IN TRENCH DRAIN TO BLOW DOWN SEPARATOR.

43. HIGH WATER OVERFLOW STEAM TRAP.

44. EMERGENCY SOFTY COLD WATER MAKEUP LINE, NORMALLY CLOSED. FOR USE WHEN

FEEDWATER SYSTEM IS DOWN FOR INSPECTION OR REPAIR.

45. PROVIDE CHAIN WHEEL ON VALVE.

46. DIFFERENTAL PRESSURE LEVEL TRANSMITTER. PROVIDE SHUNT SWITCH AS SPECIFIED

FOR TESTING.

BO

B D

P

V T

R

V T

R

V T

R

V T

R

V T

R

V T

R

V T

R

V T

R

N G

D

NC

0.375"

NC

D

0.75"

FE

TO STEAM

HEADER FOB FOB

0.75"

B D

BD

FROM LEVEL

CONTROL AND

COLUMN DRAINS

0.75" FROM OPPOSITE SIDE OF

BOILER (LEVEL CONTROLS AND

COLUMN DRAINS)

TO OPPOSITE

SIDE OF BOILER

1.25"0.75"

0.75"

0.75"

6"

6"

1.25"

F O

R F

O S

P

FM

P

F W

P D

1.25"

2' MAX

34 43

LPS (12)

LP

R

0.75"

C B

D

N P

W (S

C W

1.25"

NC

4"

NOTES con't

64-FM-3, 4, 5

64-FM-9, 10, 11

FM

64-FM-6, 7, 8

B D

0.75"

D

4 4

ST-3

GENERAL NOTES

A. DUE TO LIMITED ACCESS INTO BOILER ROOM THE BOILER SHALL BE FIELD-

ERECTABLE ASSEMBLED IN PLACE. CONTRACTOR SHALL REVIEW

PATHWAY AND ACCESS TO BOILER ROOM PRIOR TO ORDERING TO INSURE

THE BOILER CAN BE INSTALLED WITHOUT MODIFYING THE EXISTING

ACCESS.

B. LISTED DIMENSIONS AND CLEARANCES SHALL BE CONSIDERED MAXIMUM.

EQUIPMENT PROVIDED EXCEEDING THESE VALUES SHALL BE REJECTED.

C. MAXIMUM OVERALL BOILER HEIGHT SHALL NOT EXCEED 85".

TYPICAL STEAM BOILER

(NOT INCLUDING CONCRETE PAD)

36" FRONT SERVICE AREA

SERVICE AREA

24" REAR

FUEL OIL

PUMP

GAS TRAIN

41 1/2" 24"

TO EXTENDS OF THE GAS TRAIN AND FUEL OIL PUMP

89 1/2"

EXTENTS OF THE GAS TRAIN

155"

108" OVERALL

TUBE REMOVAL

28"

TUBE REMOVAL

28"

130" TO TOP OUTSIDE DIA. OF FLUE

GAS TRAIN

M A

S O

N R

Y C

H

IM

N E

Y

10' [120 in]

68' [816 in]

64' [768 in]

STACK CLEANOUT

18" DIAMETER CBI

KL CLAMP SUPPORT TYP.

SINGLE WALL CHIMNEY LINER

DOUBLE WALL WITH 1" AIRSPACE

VENTILATED COLLAR

WALL FIRESTOP

VENTILATED FLASHING

CUSTOM CURB CAP

ROOF

DOUBLE WALL WITH 2" INSULATION

TO BOILERS

COMPACTED GRAVEL BASE

24"X24" CONCRETE BLOCK

(LENGTH AS REQUIRED)

NOTES:

1. PROVIDE SUPPORT MINIMUM EVERY 6'-0" AND AT EVERY CHANGE OF DIRECTION.

2. PIPE INSULATION AND PROTECTIVE JACKET SHALL EXTEND THROUGH PIPE CLAMP

TO MAINTAIN VAPOR BARRIER.

3. COORDINATE PIPE AND CONDUIT ARRANGEMENT CLOSELY WITH DIVISION 26.

UNDISTURBED EARTH

STEAM PIPE

CONTROL CONDUIT

(COORDINATE W/

DIVISION 26)

GALVANIZED STEEL CHANNEL

SUPPORT BOLTED TO

CONCRETE BLOCK

UNISTRUT OR EQUAL

CHANNEL SUPPORT CLAMP (TYP)

CONDENSATE PIPE WITH

HEAT TRACE AND INSULATION

WITH PROTECTIVE JACKET

PIPE ROLLER

PIPE ROLLER

P: 937-224-0861 www.heapy.com

P ro je ct

N o

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

32 4 5 6 7 8 9 10

Chief Engineer

KRISTINA AMINPROJECT NO. STATE COA FIRM NO.P

ro je c t

N u m b e r

DETAILS

JPR NKS

REPLACE FTD BOILER WITH HOT

WATER SYSTEM

M504

539-20-201

FORT THOMAS, KENTUCKY

/1

/1

2020-05103 2888

CONSTRUCTION

DOCUMENTS

10/30/2023

SCALE: NONE

TYPICAL STEAM BOILER PIPING

SCALE: NONE

BOILER DIMENSIONS

SCALE: NONE

BOILER STACK

SCALE: NONE

EXTERIOR SUPPORT DETAIL

# DESCRIPTION DATE

1 DD1 SUBMITTAL 10/28/2022

2 95% SUBMITTAL 12/12/2022

3 CD SUBMITTAL 10/30/2023

D

NC

0.375"

C B

D

D

FE

FOB FOB

6"

6"

LPS (12)

BO

D

FE

FOB FOB

6"

6"

D

FE

FOB FOB

6"

6"

LPS (12)

DD D D

0.75"

0.375"

0.375"

0.375"

N P

W

DD D

N P

W

D

NC

0.375"

0.75"

C B

D

BO

LP

R

0.75"

F W

P D

1.25"

NC

0.375"

C B

D

BO

0.75"

PP P

F W

P D

N P

W (S

C W

0.75"

LP

R

F W

P D

1.25"

N P

W (S

C W

0.75"

LP

R

F W

P D

1.25"

N P

W (S

C W

RPBFP

NC NC NC

RPBFP

REFER TO

HVAC

REFER TO

PLUMBING

DRAWINGS

NPW(SCW)

NPW

NPW(SCW)

D

N P

W (S

C W

N

P W

MAIN STEAM HEADER

0.375"

HOSE BIB

N P

W (S

C W

0.75"

FWPD

CBD

CBD

LPR

NPW(SCW)

FWPD

CBD

CBD

LPR

CBD

SAMPLE

SAMPLE

SAMPLE

SAMPLE

SAMPLECHEMICAL TREAT

CHEMICAL TREAT

CHEMICAL TREAT

FM FM

LP

S

(1 2)

0.75"

D

0.375"

0.375"

O F

L

D

T

P

EX. LPC

EX. LPC

E X

. L P

C

P C

NC

SCW

CW

2"

LP

R

LPR

10 D D

V T

R

E X

. V T

R

6"

EXHAUST TO OUTDOORS FOR

BOILER-BURNER TESTING AND

ADJUSTING

D

VTR

D

4"

D

3"4"

2"

EX. LPS(12)

2"

EX. LPS(12)EX. LPS(12)

EX. LPS(12)

4"

4" 4" 4"

8" 8"

0.75"

0.75"

2"

2"

1.25"

2" 1.5"1.5" 2"

1.5"

1.5" 1"1.25"

1.25"

0.75"

1.25"

1"

0.75" 1.25"

3"

1.25"

0.75" (TYP.)

NOTES

1. STEAM BOILER, REFER TO EQUIPMENT SCHEDULE ON SHEET M603 AND TYPICAL BOILER

PIPING SCHEMATIC ON SHEET M504.

2. FEEDWATER SYSTEM, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.

3. FEEDWATER PUMP, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.

4. BLOWOFF TANK, REFER TO EQUIPMENT SCHEDULE ON SHEET M603.

5. CHEMICAL FEED EQUIPMENT, REFER TO SPECIFICATIONS FOR REQUIREMENTS.

COORDINATE CHEMICAL FEED WORK WITH SUPPLIER. PROVIDE UNISTRUT FRAMEWORK

WITH FLOOR SUPPORT FEET TO MOUNT CHEMICAL FEED EQUIPMENT.

6. DOUBLE DUPLEX RECEPTIBLE MOUNTED ON UNISTRUT SUPPORT REFER TO ELECTRICAL

DRAWINGS.

7. CONCRETE HOUSEKEEPING PAD, REFER TO DETAIL M502.

8. STAINLESS STEEL TUBING (TYPICAL).

9. CHEMICAL FEED INJECTION QUILLS (TYPICAL).

10. STEAM LINE DRIP POCKET AND STEAM TRAP ASSEMBLY, REFER TO DETAIL ON SHEET

M502.

11. LONG RADIUS ELBOW.

12. EXTEND AND SPILL INTO TRENCH DRAIN.

13. ROUTE DRAIN TO EXISTING SINK (TYPICAL).

14. ROUTE DRAIN TO FLOOR DRAIN (TYPICAL).

15. ROUTE DRAIN BACK TO TRENCH DRAIN IN BOILER ROOM. LOCATE VALVE WHERE IT IS

ACCESSIBLE FROM FLOOR LEVEL.

16. 1” DRAIN VALVE WITH HOSE THREAD FITTING AND CAP.

17. OS&Y VALVE WITH WARM-UP VALVE WITH DRAIN (TYPICAL).

18. OS&Y VALVE WITH DRAIN (TYPICAL).

19. MAKE-UP WATER METER FOR CHEMICAL TREATMENT SYSTEM.

20. MAKE-UP WATER METER FOR STEAM INSTRUMENTATION AND CONTROL.

21. SAMPLE COOLER, REFER TO DETAIL ON SHEET M502.

22. EACH VENT SHALL BE ROUTED SEPARATELY UP TO ROOF. TERMINATE 6’ ABOVE ROOF

LEVEL.

23. LOW PRESSURE STEAM EXHAUSTED TO OUTDOORS FOR BOILER-BURNER TESTING AND

ADJUSTING. TERMINATE 6’ ABOVE ROOF LEVEL WITH CYCLONE EXHAUST HEAD. ROUTE

DRAIN LINE BACK TO TRENCH DRAIN IN BOILER ROOM.

24. HIGH AND LOW WATER LEVEL ALARMS.

25.…