Attachment II - Deliverables List.docx
DOCX document 14 KB Posted
- Solicitation number
- 1305M221QNMAN0082
About this file
This document outlines deliverables required for the FY21 drydock repairs to the NOAA Ship Oscar Dyson. The solicitation requests quotations for work including tank coating and water disinfection quality control, hull plate inspection, hatch and door certification, cable penetration quality control, crane testing, life raft inspection, potable water supply testing, drydock certification, underwater hull inspection, rudder and shaft inspection, coating submissions, preservation and coating quality control reports, weight change reports, and final work reports. Offerors are to contact the identified Contract Specialist and Contracting Officer to request reference documents and drawings applicable to the solicitation due to file size limitations. The NOAA is the issuing agency seeking these repair and maintenance services.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oscar Dyson Deliverables List
11000
| 1 | WW Tank Coating QC |
| 2 | Potable Water Tank Coating QC |
| 3 | Potable Water Disinfection QC |
| 4 | Tank Pressure Test report |
11001
| 1 | Hull plate QC |
| 2 | UT inspection Report |
| 3 | weight report |
11670
| 1 | Hatch CFR |
| 2 | Door CFR |
| 3 | Testing QC reports |
| 4 | Final work report |
| 5 | weight report |
12560
| 1 | CFR |
| 2 | NDT Report |
| 3 | Hydro Test report |
| 4 | Hose test report |
12590
| 1 | joint inspection report |
| 2 | drawing and parts list for new insulation |
| 3 | weight report |
13040
| 1 | Report for each MCT |
| 2 | new cable gland QC reports |
14410 1 cable penitration QC report 14430
| 1 | CFR |
| 2 | Work done report |
15000 1 Pipe test report 15040
| 1 | CFR report |
| 2 | Final report |
15050
| 1 | Hose test report |
| 2 | hose list |
| 3 | red line hose book |
15120
| 1 | CFR |
| 2 | Final Report |
15200
| 1 | Pipe test report |
| 2 | valve test report |
| 3 | CFR |
| 4 | Final work report |
| 5 | weight change report |
15550
| 1 | CFR |
| 2 | Final report |
15561
| 1 | CFR |
| 2 | Final work report |
| 3 | Paint QC |
| 4 | Pull test QC report |
15720
| 1 | Crane test report |
| 2 | CFR |
| 3 | Overhaul CFR |
| 4 | Coating QC |
| 5 | Overhaul work complete report |
| 6 | Test report |
15830
| 1 | Inspection reports |
| 2 | certificates of inspection |
15831
| 1 | Life raft inspection report |
| 2 | Life raft certificates |
15930
| 1 | Tank CFR |
| 2 | Tank Coating QC |
| 3 | Coating submission |
16310
| 1 | Coating Submission |
| 2 | Surface prep QC |
| 3 | Coating QC |
16311
| 1 | Coating Submission |
| 2 | Surface prep QC |
| 3 | Coating QC |
16330
| 1 | Cothodic protection inspection report |
| 2 | Water tight test for each anode |
| 3 | weight change report |
16340
| 1 | Coating Submission |
| 2 | Surface prep QC |
| 3 | Coating QC |
16341
| 1 | Coating Submission |
| 2 | Surface prep QC |
| 3 | Coating QC |
16432
| 1 | CFR |
| 2 | Preservation Plan |
| 3 | Preservation QC reports |
| 4 | Coating QC reports |
| 5 | Termination sheets |
19920
| 1 | Potable Water Supply report |
| 2 | Fire-Fighting water supply test reports |
| 3 | Security round report |
19970
| 1 | Drydock Certification |
| 2 | Completed NOAA pre- drydocking worksheet |
| 3 | Dock master letter and resume |
| 4 | Drydocking and undocking proceedure |
| 5 | Red line dock drawing before docking |
| 6 | Red line dock drawing after docking |
| 7 | Underwater hull inspection report |
| 8 | Sacrifical anode documents |
| 9 | Bow thruster EAL grease document |
| 10 | Post dock Damage inspection CRF/QC report |
| 11 | Joint Under water hul inspection CFR/QC Report |
| 12 | Void inspection CFR |
| 13 | Rudder and Shaft inspection report |
| 14 | NOAA Drydock report Form 2410 |
23240
| 1 | CFR |
| 2 | Final work report |
| 3 | Paint QC |
| 4 | Weight change report |
| 5 | Termination Sheet |
23330
| 1 | CFR |
| 2 | Final work report |
| 3 | penetration QC |
| 4 | Weight change report |
| 5 | Termination Sheet |
24200
| 1 | CFR |
| 2 | Final work report |
| 3 | Weight change report |
| 4 | Termination Sheet |
55140
| 1 | CFR |
| 2 | Final work report |
| 3 | Oil Sample report |
| 4 | NDT report |
55160
| 1 | CFR |
| 2 | Final work report |
| 3 | Oil Sample report |
55560
| 1 | Hose test report |
| 2 | hose list |
| 3 | red line hose book |
| 4 | CFR |
| 5 | Final work report |
55610
| 1 | CFR |
| 2 | Final work report |
56250
| 1 | CFR |
| 2 | Final work report |
56312
| 1 | Preservation Plan |
| 2 | Preservation QC reports |
| 3 | Coating QC reports |
56313
| 1 | Preservation Plan |
| 2 | Preservation QC reports |
| 3 | Coating QC reports |
56710
| 1 | weight change report |
| 2 | Final work report |
66400
| 1 | weight change |
| 2 | Final work report |
File details come from the government source that posted it. Updated .