REV. 1 Attachment VI - Price Schedule.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 1305M221QNMAN0082
About this file
This price schedule attachment to a request for quotation outlines various repair and maintenance items required for the NOAA ship Oscar Dyson. Repair and maintenance needs include tank inspection, steel and hull repairs, weather tight closures, heat exchanger cleaning, intake and uptake work, electrical and communications cable management, navigation systems work, pipe repairs, gauge calibration, flex connections, HVAC cleaning, sea valves, winches, cargo gear, davit maintenance, life raft inspection, tank maintenance, underwater and above-water hull preservation, machinery space preservation, exterior preservation, mess deck joiner work, drydocking, switchboard breaker replacement, and polar code implementation. The schedule also includes additional item requests and option items priced by the unit for potential future growth work. Interested parties should contact the named NOAA contracting personnel to request reference documents and drawings applicable to RFQ 1305M221QNMAN0082 for FY21 drydock repairs.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| REV.1 PRICE SCHEDULE | |||||||
| BASE ITEMS | |||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 10000 | 11000 | Tank Inspection | 1 | JB | |||
| 10000 | 11001 | Steel/Hull Inspection Repairs | 1 | JB | |||
| 10000 | 11670 | Weather Tight Closures | 1 | JB | |||
| 10000 | 12560 | Heat Exchanger Cleaning Repair | 1 | JB | |||
| 10000 | 12590 | Intake Uptake | 1 | JB | |||
| 10000 | 13040 | Electrical Cableways | 1 | JB | |||
| 10000 | 14410 | Radio and Communication Systems Cable Management | 1 | JB | |||
| 10000 | 14430 | Navigation Systems | 1 | JB | |||
| 10000 | 15000 | Pipe Repairs | 1 | JB | |||
| 10000 | 15040 | Gauge Calibration | 1 | JB | |||
| 10000 | 15050 | Flex Connections | 1 | JB | |||
| 10000 | 15120 | HVAC Cleaning | 1 | JB | |||
| 10000 | 15200 | Sea Valve | 1 | JB | |||
| 1000 | 15550 | Fire System Inspection | 1 | JB | |||
| 10000 | 15561 | Winches | 1 | JB | |||
| 10000 | 15720 | Cargo Gear | 1 | JB | |||
| 10000 | 15830 | Davit Maintenance | 1 | JB | |||
| 10000 | 15831 | Life Raft Annual Inspection | 1 | JB | |||
| 10000 | 15930 | Tank Maintenance | 1 | JB | |||
| 10000 | 16310 | Underwater Body Preservation | 1 | JB | |||
| 10000 | 16311 | Freeboard Coating | 1 | JB | |||
| 10000 | 16330 | Hull Protection | 1 | JB | |||
| 10000 | 16340 | Machinery Space Preservation | 1 | JB | |||
| 10000 | 16341 | Exterior Preservation | 1 | JB | |||
| 10000 | 16342 | Mess Deck Joiner | 1 | JB | |||
| 10000 | 19920 | Temporary Services | 1 | JB | |||
| 10000 | 19970 | Drydocking | 1 | JB | |||
| 20000 | 23240 | SWBD Breaker Replacement | 1 | JB | |||
| 20000 | 23330 | Polar Code Implementation | 1 | JB | |||
| 20000 | 24200 | Auto Pilot System | 1 | JB | |||
| Total Base Items | $0.00 | ||||||
| ADDITIONAL ITEMS - GROWTH | |||||||
| ADDITIONAL ITEM REQUESTS (AIRs) These items relate to Growth Work. The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Additional Item Requests (AIRs) are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||||
| CLIN | SPEC WORK ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT PRICE | EXTENDED PRICE | |
| 30000&40000 | 30000& | ||||||
| 40000 | AIRS/Growth (estimated) |
**Provide breakdown, as follows:
AIRs/Growth Labor Rate Unit Price: $________; Quantity: 3,000 ; Unit of Issue: Hour; Extended Price: $____________
| HRS | EST. 3,000 | |
| 30000&40000 | 30000& | |
| 40000 | AIRs/Growth Material Markup/Handling Fee |
Unit Price: $180,000.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$180,000.00 X percentage quoted]: $______________
| % | EST. $180,000.00 | ||||
| N/A | Additional Temp Services (See CAR CLAUSE 1372.271-86) | Day | EST 1 | ||
| N/A | Laydays (See CAR CLAUSE 1372.271-89) | Day | EST 1 | ||
| Total Growth | $0.00 | ||||
| OPTION ITEMS |
CLIN SPEC
WORK
| ITEM | SPECIFICATION WORK ITEM TITLE | UNIT | QTY | UNIT |
| PRICE | EXTENDED |
PRICE
| 50000 | 55140 | Chiller System Groom | 1 | JB | |
| 50000 | 55160 | Refrigerator System Groom | 1 | JB | |
| 50000 | 55560 | Hydraulic Unit Groom | 1 | JB | |
| 50000 | 56710 | Dive Locker Arrangement | 1 | JB | |
| 50000 | 55610 | Service Steering Gear System | 1 | JB | |
| 50000 | 56250 | Bridge Window Service | 1 | JB | |
| 50000 | 56312 | Non-skid Replacement | 1 | JB | |
| 50000 | 56313 | Non-skid Replacement | 1 | JB | |
| 60000 | 66400 | Accommodation Space Update | 1 | JB | |
| Total Options | $0.00 |
| BASE | $0.00 |
| BASE + GROWTH | $0.00 |
| BASE+GROWTH+OPTIONS | $0.00 |