Attachment I - Performance Work Statement (PWS).pdf
PDF 443 KB Posted
- Attached to
- Contractor-Owned, Contractor-Operated (COCO) Fuel Storage Services in the Port of Anchorage, Alaska
- Solicitation number
- SPE603-26-R-0505
- Issued by
-
Defense Logistics Agency Energy
About this file
This Performance Work Statement (PWS) details Defense Logistics Agency (DLA) Energy's requirements for Defense Fuel Support Point (DFSP) services at the Port of Anchorage, Alaska. The solicitation seeks a contractor to provide storage, receiving, protecting, and shipping of U.S. Government-owned aviation turbine fuel for a four-year base period with one five-year option. The facility must have 1,013,000 barrels total storage capacity, including 918,000 barrels of commercial grade Jet A-1 and 95,000 barrels of military grade JP-5, with capability to inject additives to regrade fuel as needed.
Key operational requirements include 24/7 receiving and shipping capabilities via tanker/barge, rail tank car, and tank truck, with connections to the Port of Anchorage dock and a pipeline to Elmendorf AFB. The contractor will be responsible for maintaining fuel quality, performing laboratory testing, managing inventory records, and following strict product quality surveillance procedures. The contract includes detailed training requirements for key personnel such as the Terminal Manager and Inventory Accountant, who must complete specific DLA Energy training courses and obtain appropriate access credentials.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPE603-26-R-0505
Port of Anchorage, Alaska
COCO Storage Services Attachment I - PWS
PERFORMANCE WORK STATEMENT
FOR
DEFENSE FUEL SUPPORT POINT SERVICES
Location
ANCHORAGE, AK
As of 7/5/2024
Performance Work Statement (PWS) For
Defense Fuel Support Point Services Anchorage, AK
1. Description of Required Services
1.1 Requirement
1.2 Area of Consideration
1.3 Storage Capacity/Tank Requirements
1.4 Grade of Service
1.5 Physical System Requirements
1.6 Allowed Throughput
1.7 Inventory Control Records and System of Records (Inventory Data Input) Requirements
1.8 Product Receiving Requirements
1.9 Product Shipping Requirements
1.10 Receiving and Shipping Facilities Requirements
1.11 Additive Injection Requirements
1.12 Product Quality Surveillance
2. General Information
2.1 Billing
2.2 Ancillary Facilities
2.3 Best Commercial Practices
3. Training Requirements
4. Deliverables
4.1 Contractor Detailed Plans
Appendix A Common Access Card (CAC) Procedures
1. DESCRIPTION OF REQUIRED SERVICES
1.1 Requirement: Defense Logistics Agency (DLA) Energy requires Defense Fuel Support Point (DFSP) services in Anchorage, AK, for a four-year period, with one five-year option. The following terms and conditions are applicable to the requirement for contract services and ancillary facilities for receiving, storing, protecting, and shipping U.S. Government-owned aviation turbine fuel.
1.2 Area of Consideration: Within the Port of Anchorage, AK.
1.3 Storage Capacity/Tank Requirements: 1,013,000 barrels total storage (fill) capacity is required. A minimum of two tanks interconnected and segregated from other products handled within the storage facility is required for Jet A-1. A minimum of two tanks is not required for JP-5. All storage must be available upon award at a single facility.
1.4 Grades of Service: Aviation turbine fuel. 918,000 barrels storage (fill) capacity of commercial grade Jet A-1, and 95,000 barrels storage (fill) capacity of military grade JP-5.
Additive injection capability is required for Jet A-1 outbound shipments to regrade to military grade JP-8, and as directed for JP-5 outbound shipments. Refer to 1.11 Additive Injection Requirements.
1.5 Physical System Requirements: Storage and distribution facility capable of receiving, storing, protecting, and shipping U.S. Government-owned aviation turbine fuel. The Contractor shall have the capability to receive and load tankers and barges at the Port of Anchorage dock facility via a connection to the Port of Anchorage valve yard manifold system. The Contractor shall also have the capability of shipping to Elmendorf AFB, AK via a connection to the Government-owned pipeline that supplies Elmendorf AFB.
1.6 Allowed Throughput: The U.S. Government will be entitled to 1,620,000 barrels of total throughput for each year; hereafter referred to as “allowed throughput.” Allowed throughput is defined and calculated by adding the total number of barrels for each product type received and shipped in a twelve consecutive month period, divided by two, starting when inspection and acceptance takes place after receipt of initial fill and resetting on the anniversary date each following year. Allowed throughput does not include initial fill or final shipment.
1.6.1 Initial Fill and Final Shipment: The U.S. Government will be entitled to initial fill beginning at the twelve-month period immediately following inspection and acceptance, and final shipment during the last twelve months of the performance period, at no additional cost.
Initial fill is defined, as all receipts required for filling the storage tanks to 100% of the awarded fill capacity for each product. Final shipment is defined as all shipments required for withdrawing 100% of the awarded fill capacity.
1.7 Inventory Control Records and System of Records (Inventory Data Input) Requirements: The Contractor shall follow the physical inventory management procedures specified in applicable directives and contract texts in accordance with the most current version of Department of Defense Manual 4140.25 and DLA ENERGY Class IIIB Supply Chain Management Interim Policy and Procedural Guidance. The management of fuel inventories involves a full range of actions associated with order, requisition, receipt, transfer, issue, physical inventory, and storage of fuel. The Contractor shall process inventory data of Government-owned product(s) utilizing DLA Energy’s web-based application Accountable Property System of Record (APSR). DLA Energy will provide training to a minimum of two Contractor personnel. See contract text I119.04 INVENTORY CONTROL RECORDS AND SYSTEM OF RECORDS for additional information regarding the Government’s inventory data requirements.
The Contractor shall:
• Ensure that all orders, receipts, transfers, issues sales/credits, losses, gains and adjustments are properly documented daily.
• Maintain control over the physical environment to ensure proper product storage can take place with minimal losses.
• If automated tank gauges (ATG) are used to report inventory volumes, ensure ATGs are calibrated annually and verified for accuracy against manual gauge readings monthly with the results recorded and filed.
• Ensure inventory variations are within allowable limits. Document, investigate, report, and take corrective action, if necessary, on excessive variations.
• Ensure all actions are documented, verified, and annotated on applicable source documents IAW Department of Defense Manual 4140.25 and DLA Energy class IIIB Supply Chain Management Interim Policy and Procedural Guidance. The source documents shall be complete, accurate, and available/provided within 72 hours of request.
Refer to PWS section 3 Training Requirements for the APSR Fuels Manager Defense (FMD 9) and other training requirements.
To process APSR inventory data, the Contractor is required to obtain a Common Access Card (CAC) (see Appendix A, CAC Procedures), or as an alternative, obtain an External Certificate Authority (ECA) no later than sixty days prior to inspection and acceptance. Authorized users who are not eligible for a CAC should refer to https://public.cyber.mil for current information on obtaining ECA provided certificates.
1.7.1 Inventory Access: The Contractor shall ensure DLA Energy has full unrestricted access to its complete inventory. DLA Energy Quality Assurance Representative/Contracting Officer’s Representative (QAR/COR), Property Administrator (PA), and other DLA Energy representatives will be provided access to APSR onsite during Contractor normal working hours.
1.7.2 Computer System: The Contractor-furnished computer system shall meet the current commercial standards for a computer system capable of accomplishing the data reporting and records keeping required by the APSR (FMD), email, maintaining the data collection and records https://public.cyber.mil/ keeping associated with product quality surveillance (product analysis and testing reports), and the document collection and records keeping associated with the Contractor’s preventive maintenance program.
1.8 Product Receiving Requirements:
1.8.1 Tanker/Barge: The Contractor’s facility shall be capable of receiving aviation turbine fuel via tanker/barge on a 24-hour per day, 7-day per week basis at a pumping rate of a minimum of 10,000 barrels per hour (BPH), or a rate compatible with the mode of transportation tendered.
1.8.2 Rail Tank Car: The Contractor’s facility shall be capable of receiving aviation turbine fuel via Government provided rail tank cars on a 24-hour per day, 7-day per week basis. The rail tank car facility shall be capable of receiving up to thirty rail tank cars per day.
1.8.3 Tank Truck: The Contractor’s facility shall be capable of receiving aviation turbine fuel via Government provided tank trucks on a 24-hour per day, 7-day per week basis.
1.9 Product Shipping Requirements:
1.9.1 Pipeline: The Contractor’s facility shall be capable of shipping aviation turbine fuel via a connection to the Government-owned pipeline to Elmendorf AFB, AK on a 24-hour per day, 7-day per week basis.
1.9.2 Tanker/Barge: The Contractor’s facility shall be capable of shipping aviation turbine fuel via tanker/barge on a 24-hour per day, 7-day per week basis at a pumping rate of a minimum of 5,000 barrels per hour (BPH), or a rate compatible with the mode of transportation tendered.
1.9.3 Rail Tank Car: The Contractor’s facility shall be capable of shipping aviation turbine fuel via Government provided rail tank cars on a 24-hour per day, 7-day per week basis. The rail tank car facility shall be capable of loading four rail tank cars at a time at 600 gallons per minute.
Upon 48-hour notification from DLA Energy AMN, and unless directed otherwise, contractor shall load rail tank cars to meet a requirement of up to thirty rail tank cars per day.
1.9.4 Tank Truck: The Contractor’s facility shall be capable of shipping aviation turbine fuel via Government provided tank trucks on a 24-hour per day, 7-day per week basis. The tank truck facility shall be capable of loading two tank trucks at a time at 600 gallons per minute. Upon 48-hour notification from DLA Energy AMN, and unless directed otherwise, contractor shall load tank trucks to meet a requirement of up to 1.2 million gallons per day.
1.10 Receiving and Shipping Facilities Requirements:
1.10.1 Dock Berthing and Mooring Facilities: The Contractor’s dock and berthing facilities shall be capable of receiving and berthing tanker/barge not to exceed 46,000 deadweight tonnage (DWT), 655 feet length overall (LOA), with a minimum draft of 35 feet at the dock. The facilities should be equipped with a turning dolphin capable of accommodating the lateral forces induced when turning a vessel. The Contractor shall provide a detailed description of any port restriction/requirement, along with height restrictions from ships manifold to the waterline during loading, as well as a detailed schematic of the berthing and mooring facilities showing the minimum and maximum capabilities to include current dredging charts for evaluation. The Contractor’s capability shall include all the necessary arrangements, permits, licenses, etc. to receive tankers and barges at the Port of Anchorage dock facility.
1.10.2 Rail Tank Car and Tank Truck Facilities: The rail tank car and tank truck facilities shall be of the type capable of providing rail tank car and tank truck receiving and loading that complies with federal, state, and local environmental laws and regulations based on the type of product being received and loaded. As a minimum, be equipped with a Scully overfill protection system, or compatible, and be equipped with temperature compensating meters to accurately measure the product being loaded.
1.11 Additive Injection Requirements: The Contractor’s facility shall be capable of storing and injecting additives to Jet A-1, to regrade to military grade JP-8 during shipping of product on a 7-day per week 24-hours per day basis. When not required to inject additives, the Contractor will be instructed by DLA Energy QAR/COR or the DLA Energy AMN Region office. All required additive injection will be accomplished in accordance with (IAW) the most current version of
MIL-STD-3004-1, DEPARTMENT OF DEFENSE STANDARD PRACTICE: QUALITY
ASSURANCE FOR BULK FUELS, LUBRICANTS AND RELATED PRODUCTS, and the appropriate contract text(s).
1.11.1 Additives Required: The additives required for injection shall be Contractor provided.
The Contractor shall purchase, receive, store, inject, and maintain additives on specification.
1.11.1.1 Fuel System Icing Inhibitor (FSII): The Contractor shall provide an injection system for FSII. FSII will be injected based on product specification requirements. The injection requirements that apply to Jet A-1 stocks will be IAW contract text F45.03 OPERATION OF
FUEL SYSTEM ICING INHIBITOR ADDITIVE SYSTEM CONTRACTOR-OWNED
CONTRACTOR-OPERATED (COCO).
1.11.1.2 Conductivity Additive (CA): The Contractor shall provide an injection system for CA.
CA will be injected based on product specification requirements. The injection requirements that apply to Jet A-1 stocks will be IAW contract text F45.01 OPERATION OF CONDUCTIVITY
ADDITIVE SYSTEM CONTRACTOR-OWNED CONTRACTOR-OPERATED (COCO).
1.11.1.3 Corrosion Inhibitor/Lubricity Improver Additive (CI/LI): The Contractor shall provide an injection system for CI/LI. CI/LI will be injected based on product specification requirements. The injection requirements that apply to Jet A-1 stocks will be IAW contract text
F45.04 OPERATION OF CORROSION INHIBITOR/LUBRICITY IMPROVER ADDITIVE
SYSTEM, CONTRACTOR- OWNED CONTRACTOR-OPERATED (COCO).
1.11.2 Additive Storage/Injection Plan: The Contractor shall provide a comprehensive and detailed additive plan that clearly demonstrates how they will receive, store, inject, and maintain the required additives to support the allowed throughput. The additive plan may be incorporated into the Quality Control Plan (QCP). See Section 4. Deliverables.
1.12 Product Quality Surveillance: The Contractor shall be responsible for maintaining the quality of the Government-owned aviation turbine fuel stored at the Contractor’s facility IAW the most current version of MIL-STD-3004-1, DEPARTMENT OF DEFENSE STANDARD
PRACTICE: QUALITY ASSURANCE FOR BULK FUELS, LUBRICANTS AND RELATED
PRODUCTS. No petroleum products will be received or shipped without first determining and confirming conformance with product quality requirements. No conveyance/container will be loaded until it is inspected by qualified contractor personnel and deemed suitable to carry the intended product. Products will be shipped on a first-in, first-out basis unless otherwise approved or directed by the QAR/COR or the DLA Energy AMN Region office. Non-conforming product will be reported to the QAR/COR or the DLA Energy AMN Region office immediately, but no later than 15 minutes after discovery. Any time product is received into a tank, the tank’s contents will be suspended from issue pending quality conformance sampling and testing. The Contractor shall ensure that certificates of quality conformance (test reports) are maintained on file for all on-hand fuel stocks.
1.12.1 Contaminated Product Liability: The Contractor is liable to the U.S. Government for the cost of the product and the cost of disposal or remediation for all products that become contaminated while at the Contractor’s facility due to Contractor fault or negligence.
1.12.2 Off Specification Product Reporting: The Contractor shall report immediately, but no later than 15 minutes after discovery, to the QAR/COR or the DLA Energy AMN Region office, and the contracting officer, all receipts or on hand stocks that fail to meet product quality for receipt, storage, or shipment in accordance with the most current version of MIL-STD- 3004-1.
Suspected off-specification product will be isolated and will not be released for shipment until authorized by the QAR/COR or the DLA Energy AMN Region office.
1.12.3 Laboratory Testing Requirements: The Contractor shall perform laboratory testing in accordance with (IAW) the most current version of MIL-STD-3004-1, Table IX Minimum Sampling and Testing Requirements for Petroleum Products, and sampling in accordance with American Society for Testing Materials (ASTM) D4057 Manual of Petroleum Measurement Standards (MPMS), Chapter 8.1 Standard Practice for Manual Sampling of Petroleum and Petroleum Products. At a minimum, the Contractor shall either have Type C level testing capability at its facility, or subcontract to have that level of testing performed offsite. The Contractor must provide detailed information in its proposal when subcontracting for the required testing to allow DLA Energy to evaluate for final approval. Information to include at a minimum: laboratory name, point of contact, location, testing capabilities, employee proficiency, and testing turn-around times.
1.12.3.1 Laboratory Testing Turn-around Times: The contractor shall ensure that laboratory testing is completed within a maximum of 24 hours of obtaining the sample from the source mentioned in paragraph 1.12.4. Turn-around time ends when testing results are delivered to QAR/COR or the DLA Energy AMN Region office. If testing cannot be completed within the turn-around time the contractor will immediately notify the QAR/COR or the DLA Energy AMN Region office, and the contracting officer, with a mediation plan to conduct the testing from another source.
1.12.4 Sampling: The Contractor shall be capable of petroleum product sampling IAW ASTM D4057 of vessels, barges, tank trucks, storage tanks, pipelines as applicable to the location. The Contractor shall maintain a supply of 10 unused epoxy lined fuel sample shipping containers for DLA Energy use or emergency need. Sample containers shall be stored to ensure they are clean and free from all substances that might contaminate the product being sampled. Containers must meet the following specifications: Complies with ASTM D4306 Standard Practice for Aviation Fuel Sample Containers for Tests Affected by Trace Contamination, height not to exceed 9 inches, diameter not to exceed 7 inches, capacity 1 USG, bung plug ¾” with lock-wire hole, carrying handle able to be shipped as hazardous material.
The Contractor shall be responsible for transporting all petroleum samples from job site to its laboratory, or its subcontracted laboratory, and/or to a Government contracted laboratory for higher level testing as directed by the QAR/COR or the DLA Energy AMN Region office in accordance with local, state, or federal laws.
1.12.4.1 Additional Samples: The Contractor shall provide to the QAR/COR samples of any product being stored, shipped, or received under the contract, at the request of, and in the manner designated by the QAR/COR. These samples will be provided in addition to samples required elsewhere in the contract. The total number of these samples to be provided during any 12-month period will not exceed eight times the number of tanks specified in the contract. The packing, marking, shipping, and the associated costs, shall be the responsibility of the Contractor.
Samples shall be shipped within 24 hours of request and arrive to supplied address within three calendar days.
The Contractor shall provide the QAR/COR samples of any product being stored, shipped, or received under the contract IAW ENERGY QAP E28 CONTRACTOR INSPECTION
RESPONSIBILITIES (STORAGE).
2. GENERAL INFORMATION
2.1 Billing: Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading and all necessary documentation required in receipt and/or shipping of product.
Bills of lading, routing instructions, and transportation assistance will be furnished by the DLA Energy AMN Region office.
2.2 Ancillary Facilities: The Contractor’s facilities to be furnished under this requirement will include, at a minimum, the following:
2.2.1 Tanks: All tanks and facilities offered must meet the minimum requirements of the current American Petroleum Institute (API) and Energy Institute (EI) standards, National Fire Protection Association (NFPA) codes, and/or all federal, state, and local laws and/or regulations applicable to tanks and facilities of the type to be provided. The tanks will be interconnected to provide the capability of transfer of product between tanks. Each storage tank will be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s).
2.2.2 Filtration: Contractor furnished fuel filtration/separation system is required. The fuel filtration/separation system must be of the kind that meets the specifications outlined in the current edition of API/EI 1581, “Specifications and Qualification Procedures for Aviation Fuel Filter/Separators.”
2.2.3 Lighting: The facility must be equipped with illumination to allow receipt and shipping operations during hours of darkness.
2.3 Best Commercial Practices: In the absence of any contract provisions or references to a method, specifications or other instruction, the Contractor shall perform all services hereunder in accordance with best commercial practices.
3. TRAINING REQUIREMENTS: The Contractor shall ensure personnel are trained by job classification. The Contractor is responsible to meet the following training requirements and certification:
a. The DLA Energy Account Transaction Processor/Recorder (inventory accountant) shall complete the training as required in DLA Energy P-7, P-26 and P-32, and shall obtain a Common Access Card (CAC) in accordance with Appendix A and 1.7 of the PWS, or, as a minimum, obtain an External Certificate Authority (ECA). The inventory accountant shall first complete the current Base-Level Defense Fuels Management Course. During the six months on the job training period, the inventory accountant must complete the FMD Accounting computer-based training (CBT) and register for a formal course. The inventory accountant will maintain training proficiency by completing the Base Level Support Application (BLSA) CBT every two years. The Contractor shall have a minimum of two inventory accountants, one primary and one alternate.
b. Terminal Manager (TM) shall complete the training as required in DLA Energy P-7, P-
26, and P-32, and shall obtain a CAC in accordance with Appendix A and 1.7 of the PWS, or, as a minimum, obtain an ECA. The TM shall first complete the DLA Energy Responsible Officer, Terminal Manager, and Property Administrator (RO/TM/PA) computer-based training course and then, within 90 days of appointment, attend the Joint Terminal Managers & Responsible Officers Course. The TM must also complete the RO/TM/PA computer-based training course every two years for refresher training.
Additionally, the TM may attend the formal training course after three years in order to remain current on DLA Energy and DoD policy and application changes.
c. DLA Energy provides formal training courses of instruction at a training facility in
Alexandria, VA or via CBT. Prospective eligible applicants shall apply through the online registration tool located at https://www.fuelstraining.com. CBT requirements for DFSP personnel are also located at https://www.fuelstraining.com. The Contractor shall factor in all travel and any other expenses for their personnel to attend the courses in the COCO monthly service price.
https://www.fuelstraining.com/ https://www.fuelstraining.com/
4. DELIVERABLES
4.1 Contractor Detailed Plans: Following contract award, the Contractor will have 60 days, unless otherwise indicated, to submit plans to the Contracting Officer for review and acceptance.
The detailed plans listed below will be reviewed by the DLA Energy QAR/COR prior to submitting to the Contracting Officer. The plans are considered dynamic documents and will be updated, as required, throughout the contract period.
4.1.1 Contract Compliance Plan (CCP): The Contractor is responsible for ensuring compliance with all contract performance requirements. As such, the Contractor shall develop an inspection system acceptable to the Government for monitoring overall contract performance. The inspection system is to include a written CCP developed and used by the Contractor to measure performance on a continuous basis. The CCP, at a minimum, will include performance-based plans.
o General performance criteria will include the Contractor’s ability to provide continuous support capabilities as specified in this PWS.
o Record keeping and reporting procedures pertaining to administrative requirements.
o Bulk storage operations.
o Facility/equipment maintenance.
The CCP will include time specific checklists for evaluation of all operational and preventive maintenance requirements. The CCP will address procedures for corrective actions including the resolution of Corrective Action Report (CAR) and Quality Deficiency Reports (QDR) generated by the QAR/COR.
The CCP will be made available for Government review, upon request, at any time during the contract performance period. The CCP may be used by the QAR/COR for monitoring and assessing contract performance.
4.1.2 Quality Control Plan (QCP): The Contractor shall provide a comprehensive and detailed plan that will ensure that products handled by the Contractor remain on specification. The plan will include all the quality control procedures required in ENERGY QAP E1.11 QUALITY CONTROL PLAN. The plan will describe how product quality surveillance data will be documented and reported. The plan will identify responsible parties for the functions. This plan will be submitted to the QAR/COR, for review and approval, prior to the first receipt of Government-owned product or within 60 days after contract award, whichever occurs first.
4.1.3 Additive Storage/Injection Plan: The Contractor shall provide a comprehensive and detailed additive plan that clearly demonstrates how they will receive, store, inject, and maintain the required additives to support the allowed throughput. The additive plan may be incorporated into the QCP.
APPENDIX A: CONTRACTOR INSTRUCTIONS
Performance under this contract may require the contractor to obtain a Common Access Card (CAC). If CACs are issued under this contract, the contractor will complete and comply with the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish procedures to always control and account for contractor CACs. This process is only for the issuance and accountability of CACs. Contractors may be required to provide additional forms and follow additional procedures for other forms of access and/or background/security checks depending on local site/installation requirements.
Common Access Card (CAC) Procedures
1. The contractor has each contractor employee requiring a CAC complete DLAH Form 1728 in accordance with Enclosure 3; 2a. Note: Contractors do not complete blocks 11, 14, 15.a. or 15.b.; these are completed by the COR.
2. The contractor hand carries the DLAH 1728 form(s) or sends via secure mail, or encrypted email to (NOTE: The contractor may forward these forms individually or as a group to):
a. The Contracting Officer’s Representative (COR) for the contract if a COR was designated.
b. The Contracting Officer (KO) for the contract if no COR was designated.
3. Each contractor employee must verify their account information upon receipt of an email from the Government containing a username and password for the Trusted Associate Sponsorship System (TASS). The web link for TASS is included in the email.
4. Each contractor employee will receive an email via TASS when their account has been approved. The email will notify the employee to obtain a government-issued CAC from the nearest Real-Time Automated Personnel Identification System (RAPIDS) office. The email will also provide a link that identifies the locations of RAPIDS offices.
5. Each contractor employee will obtain their issued CAC from the RAPIDS office.
6. The contractor, within one business day of issuance, provides written notice via email to the COR (or the KO, if no COR was designated) for each contractor CAC issued identifying the contractor employee’s name, the date of issuance, and the date of expiration of the CAC.
This notification may be made individually for each contractor employee or together for a group of contractor employees. Note: This requirement is not applicable when the same is person is performing both COR and TA roles.
7. The contractor always establishes procedures to control and account for Government-issued contractor CACs – to include the following:
a. Ensure contractor CACs issued for this contract are only used for the purpose of performing under this contract.
b. Ensure contractor CACs are secured in a manner that precludes unauthorized use and that recognizes the CAC is the property of the U.S. Government.
c. Ensure contractor employees do not abuse or place holes in their CACs.
d. Ensure contractor employees do not display their CACs in public.
8. If a contractor CAC is lost or stolen:
a. The contractor employee will immediately notify the contractor that the contractor CAC has been lost or stolen.
b. The contractor will immediately notify the COR (or the KO, if no COR was designated), detailing the circumstances regarding the lost or stolen contractor CAC, as follows:
(1) Face-to-face, followed within one business day by a written notice via email, or
(2) In writing, via email, or
(3) By telephone, followed within one business day by a written notice via email.
c. The contractor will report the lost or stolen CAC card to the local DLA Police/host installation police, who will provide the contractor a police report. If there are no local DLA Police/host installation police, or no police report is provided, the contractor will provide information to the COR/KO, as applicable, detailing the circumstances of how the CAC was lost or stolen. The COR/KO will provide a memorandum for the contractor employee to support issuance of new CAC.
d. The contractor has the contractor employee bring the report/memorandum to the nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the report/memorandum to the nearest CAC office for reissue. If the CAC cannot be reissued in 24 hours, follow the steps for a new CAC, beginning at Step 1.
9. If the expiration date for a contractor CAC is before the completion of the contract and the contractor employee is to continue working under the contract and still requires a CAC, the contractor:
a. Notifies the COR as follows:
b. No less than 10 business days before the current CAC’s expiration date, completes and complies with the steps above beginning with Step 2 for issuance of a new contractor CAC for the employee.
c. Brings the expiring CAC to the RAPIDS office for turn-in and receives new CAC.
d. Notifies the COR once a new CAC has been issued.
10. The contractor/contractor employee turns in any found CACs immediately, via hand carry, to the nearest Federal law enforcement office.
11. The contractor immediately collects all contractor CAC(s) from the contractor employee(s) at:
a. Contract completion or termination
b. Termination/Reassignment of an employee (this includes any reason the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC)
12. For contract completion or termination – within one business day after collecting the contractor CAC(s), arranges for turn-in via one of the below methods:
a. If the COR/KO is co-located or near enough that in-person transfer of CACs can be arranged, the contractor:
(1) Arranges to meet the COR (or the KO, if no COR was designated) to turn-in the collected contractor CAC(s).
(2) Hand-carries all collected contractor CACs for turn-in to meet the COR (or the KO, if no COR was designated).
(3) Completes and signs the Government-Issued Contractor CAC Turn-In Receipt with the COR (or the KO if no COR was designated). The contractor is provided a copy of the receipt.
b. If in-person transfer of CAC cannot be arranged, the contractor:
(1) Sends, via certified mail, the CACs to the COR/KO. The contractor includes in the package the Government-Issued Contractor CAC Turn-In Receipt, with signed acknowledgement of contractor turn-in.
(2) Notifies COR/KO that CACs have been sent via certified mail.
(3) Receives a completed copy of the receipt from the COR/KO once the COR/KO has received the CACs.
13. For termination/reassignment of an employee:
a. Immediately notifies the COR (or the KO, if no COR was designated) that the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC, as follows:
b. Follows the turn-in procedures above for contract completion or termination, as applicable.
14. Contractor Reporting Requirements: Every month, validate the contractor CAC log with the contractor for accuracy.
15. The above procedures have been established as a DLA security measure. Contractors are advised that failure to comply with any of the above requirements will be considered a violation of the terms and conditions of the contract and the Contracting Officer may take action to remedy such violations. Specifically, failure to safeguard, follow these procedures, including reporting requirements, or turn-in CACs within the established timeframes may result in the following actions, which are in addition to other actions the Contracting Officer may take under governing law and regulation and the terms and conditions of the contract:
a. Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution of CAC issue
b. Disapproval of invoices and delay of payment
c. Withholding of final payment (in accordance with FAR 52.204-9)
d. Documentation of CAC Non-Compliance in the Contractor Performance Assessment
Reporting System (CPARS)
APPENDIX A: CONTRACTOR INSTRUCTIONS