Attachment I - CDR.pdf

PDF 234 KB Posted

Attached to
L099--On-Site Inscriptions for NCA – Multiple Cemeteries
Solicitation number
36C78625Q0085
Issued by

About this file

This document is a Contract Discrepancy Report (CDR) template designed to formally document and resolve contract performance issues between a government agency and a contractor. The form provides a structured process for identifying, reporting, and addressing discrepancies, with specific sections for detailing the problem, capturing dates, documenting the contractor's response and proposed corrective actions, and recording government evaluation and close-out. The accompanying instructions provide detailed guidance for completing each section of the CDR, emphasizing the importance of clear communication, precise documentation, and collaborative problem resolution in federal contract management.

The template is associated with a Department of Veterans Affairs National Cemetery Administration solicitation (36C78625Q0085) for On-Site Inscription Services for Multiple Cemeteries, suggesting it would be used to track and resolve any performance issues that might arise during the execution of that specific contract. The form includes spaces for contract/agreement number, report tracking, identifying parties involved, describing discrepancies with reference to Performance Work Statement (PWS) sections, capturing contractor and government responses, and ultimately acknowledging resolution through signatures from the contractor representative, Contracting Officer's Representative (COR), and Contracting Officer (CO).

View the file

Other files

File Type Posted
Combined Synopsis Solicitaton - On-Site Inscription Services - Revised 18 July 2025.docx DOCX document
36C78625Q0085 0003.docx DOCX document
Attachment B - SOW - On-Site Inscription Services - Revised - 15 July 2025.pdf PDF
36C78625Q0085 0002.docx DOCX document
36C78625Q0085 0001.docx DOCX document
Combined Synopsis Solicitaton - On-Site Inscription Services - Revised.docx DOCX document
Attachment B - SOW - On-Site Inscription Services - Revised.pdf PDF
Attachment A - Price-Cost Schedules - On-Site Inscription Services - Multiple Cemeteries - Revised.xlsx XLSX spreadsheet
Attachment L - FAR 52.204-20.pdf PDF
Attachment F - Drawings PDF Portfolio.pdf PDF
Attachment G - Wage Determinations - PDF Portfolio.pdf PDF
Attachment D - Appendix B - Transfer of GF Headstones-Markers-NC.pdf PDF
Attachment B - SOW - On-Site Inscription Services.pdf PDF
Attachment K - Past Performance Questionnaire.docx DOCX document
Attachment J Sample Review Forms.pdf PDF
Attachment E - APPENDIX C - Completion of Inscription Services.pdf PDF
Attachment A - Price-Cost Schedules - On-Site Inscription Services - Multiple Cemeteries.xlsx XLSX spreadsheet
Attachment H - Weekly Status Report Sample.pdf PDF
Attachment C - Appendix A - Cemetery Site Specific Info and Maps.pdf PDF
36C78625Q0085.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DISCREPANCY REPORT

1. CONTRACT OR AGREEMENT NUMBER: 2. REPORT NUMBER FOR THIS DISCREPANCY:

3. TO: 4. FROM:

5. DATES

a. DISCREPANCY IDENTIFIED: b. CDR DELIVERED/RECEIVED: c. INITIATE CORRECTIVE ACTION:

6. DISCREPANCY OR PROBLEM: (Describe in detail. Include reference to PWS section; use attached continuation sheet(s) if necessary.)

7. SIGNATURE OF COR: DATE:

8. SIGNATURE OF CONTRACTING OFFICER: DATE:

9a. TO: 9b. TITLE:

10. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable Quality Control Plan procedures or new procedures. Use attached continuation sheet(s) if necessary.)

11. SIGNATURE OF CONTRACTOR REPRESENTATIVE: DATE:

12. GOVERNMENT ACTIONS. (Acceptance, partial acceptance, rebuttal. Use attached continuation sheet(s) if necessary.)

13. GOVERNMENT EVALUATION. (Acceptance, partial acceptance, rebuttal. Use attached continuation sheet(s) if necessary.)

14. CDR CLOSE OUT. (Following successful resolution of contract discrepancy(ies).)

ACKNOWLEDGEMENT: TO THE BEST OF MY KNOWLEDGE AND BELIEF - INITIALS DATE

a. CONTRACTOR: (I accept that appropriate corrective actions and close out remedies where employed.)

b. COR: (I accept that appropriate corrective actions and close out remedies where employed.)

c. CO: (I accept that the parties worked cooperatively to correct the discrepancy(ies).)

Attachment I: Contractor Discrepancy Report

INSTRUCTIONS FOR COMPLETION:

1. State the base contract or agreement number for which task/delivery orders are being issued against.

This includes agency awards which contain either A, C, or D in the numbering convention (e.g. VA118 16 C 0001) as well as VA FSS or NAC BPAs. This also includes MAS, GWACs, and other agency MACs authorized as either assisted acquisition or direct acquisition by another agency.

2. Generate a unique report number to track each CDR, using the current order number which contains F or J; or definitive contract number which contains C, followed by the initials ‘CDR’ and then a sequential number, as the official numbering convention (e.g. [VA118 16 F 0202]CDR 0001).

3. Print name of the Prime Contractor Company.

4. Print name of the division/department/party affected by the discrepancy.

5. Pertinent dates, (a) when was the discrepancy first identified, (b) when was the CDR delivered to the Contractor POC for their review/comment, and (c) after delivery of the CDR when does the Program Office require corrective actions to commence. (Note: The CDR is considered to be received by the Contractor at time of delivery).

6. Provide a concise yet vivid explanation of what the discrepancy is. Cross reference the discrepancy to the corresponding PWS, PRS and/or QASP sections in discrepancy.

7. COR signs, certifying delivery of the CDR.

8. CO signs, certifying notification of CDRs delivery.

9. Responsible Contractor POC name and title (e.g. ProgramManager, CEO, etc.).

10. The Contractor POC narrative explanation as to what, in their view, caused the discrepancy along with the proposed corrective measures.

11. The Contractor POC signs, certifying responsibility for correcting the CDR.

12. In the event there is shared responsibility for causing the discrepancy, the Government must also state actions it will take concurrent with Contractor actions, otherwise this is not applicable. (Note:

Government actions will be initiated commensurate with the date established at block 5(c).)

13. After corrective actions have been taken, evaluate whether actions had an impact in being able to resolve the discrepancy. In the event corrective actions are long term in scope, evaluate whether proposed actions provide adequate assurance of being able to resolve the discrepancy. For any matter that is not able to be resolved, the Program Office shall initiate steps for issuance of a cure notice.

14. Upon successful resolution of the discrepancy, or after determining that either a cure notice or stop work order is required, the CDR shall be acknowledged as a closed action.

File details come from the government source that posted it. Updated .