Attachment G - Supplemental Price Breakdown.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Z1DA-- Renovate OR for Hybrid Installation
Solicitation number
36C26126R0009
Issued by

About this file

This file is a Pricing Schedule (Attachment G) for Solicitation 36C26126R0009, a VA project to renovate an Operating Room (OR) for a Hybrid Installation at the VA Northern California Health System. The detailed pricing breakdown categorizes costs across multiple construction segments including General Requirements, Foundations, Site Improvements, and other standard construction categories, with line items for material, labor, overhead, profit, and bonds/insurance. The total project cost is $14.00, though this appears to be a template or placeholder pricing document that may be edited.

The related federal contract opportunity involves a site renovation project scheduled for a site visit on December 11, 2025, at 10:00 AM Pacific Time, located at the VA Northern California Health System in Mather, CA. The project is being managed by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21, with the specific goal of renovating an Operating Room for a Hybrid Installation.

View the file

Other files

File Type Posted
36C26126R0009 0007.docx DOCX document
36C26126R0009 0007.docx DOCX document
Wage Determination CA20260007 01.23.2026.pdf PDF
Attachment 169A EP.201T Corrected.pdf PDF
36C26126R0009 0005.docx DOCX document
Site Walk 02.04.26.pdf PDF
Attachment RFI 55 - VA Mather Fire Alarm_AS-BUILT 8-27-2020.pdf PDF
Attachment RFI No. 56.docx DOCX document
Hybrid OR RFIs Amendment 005.xlsx XLSX spreadsheet
Attachment 168C Trailer Drawings combined.pdf PDF
Attachment 169A EP.201T.pdf PDF
Attachment 170B- M-202T.pdf PDF
Attachment 170A -M-201T.pdf PDF
36C26126R0009 0005.docx DOCX document
Attachment RFI 115 A - 700000162 L_Pre-Install CHR F-GenChromoViewVPAUDM_EN.pdf PDF
Attachment RFI 168B 20MFAI560 AIR FILTER HEPA 24 X 24 X 12 AstroCel III_prod_mark_sheet_AFP 1 405F.pdf PDF
Attachment 169B EP.401T.pdf PDF
Attachment 171 M-001T.pdf PDF
36C26126R0009 0004.docx DOCX document
ATTACH RFI No.116 SLDAirFrame_ShopDrawings.pdf PDF
Attachment RFI 150 Physics Report.pdf PDF
Hybrid OR RFIs Amendment 004.xlsx XLSX spreadsheet
Attachment RFI No. 123 Spanos Group_ VA Mather Pneumatic Tube System_ FINAL As-Built Set for VA_ 8.18.2023.pdf PDF
Attachment RFI No. 139.docx DOCX document
SOW Hybrid OR Revised 01.27.2026.pdf PDF
Attachment RFI 006.pdf PDF
Attachment RFI 008.pdf PDF
Attachment RFI No. 009.pdf PDF
Attachment RFI NO. 15.docx DOCX document
Attachment RFI 76-78 Electrical Gear Locations.pdf PDF
IMG_5182.JPG JPG image
IMG_5191.JPG JPG image
IMG_5260.JPG JPG image
36C26126R0009 Amendment 0001.docx DOCX document
IMG_5181.JPG JPG image
IMG_E5226.JPG JPG image
Site Visit Log 36C26126R0009.pdf PDF
IMG_5186.JPG JPG image
IMG_5252.JPG JPG image
IMG_5256.JPG JPG image
612A4-25-004_VA_TRAILER_DRAWINGS_Bid Set_09-30-2025.pdf PDF
36C26126R0009 Solicitation.pdf PDF
Attachment A - Request for Information.docx DOCX document
Attachment C - Key Personnel Evaluation.docx DOCX document
612A4-25-004 _VA_Hybrid-OR_DRAWINGS_Bid Set_09-30-2025.pdf PDF
Wage Determination CA20250007 09.26.2025.pdf PDF
Attachment B - EMR Sheet.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Specifcations 612A4-25-004_VA_Hybrid-OR and Trailer 10.23.2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT G - PRICING SCHEDULE
36C26126R0009 Renovate OR for Hybrid Installation
DESCRIPTIONMATERIALLABORTOTAL
General Requirements
Project Manager$ 1.00$$ 1.00
Superintendent/Safety$ 1.00$$ 1.00
Quality Control Manager$ 1.00$$ 1.00
Temporary Facilities & Controls$$$ - 0
Laborer$$ 1.00$ 1.00
Mobilization$$ 1.00$ 1.00
$$$ - 0
General Requirements Total$ 3.00$ 2.00$ 5.00
Foundations
$$$ - 0
$ 1.00
$$$ 1.00
Foundations Total$ 1.00$ - 0$ 1.00
Superstructure
$$$ - 0
$$$ - 0
Superstructure Total$ - 0$ - 0$ - 0
Exterior Enclosures
$$$ - 0
$$$ - 0
Exterior Enclosures Total$ - 0$ - 0$ - 0
Roofing
$$$ - 0
$$$ - 0
Roofing Total$ - 0$ - 0$ - 0
Interior Construction
$$$ - 0
$$$ - 0
Interior Construction Total$ - 0$ - 0$ - 0
Stairs
$$$ - 0
$$$ - 0
Stairs Total$ - 0$ - 0$ - 0
Interior Finishes
$$$ - 0
$$$ - 0
Interior Finishes Total$ - 0$ - 0$ - 0
Plumbing
$$$ - 0
$$$ - 0
Plumbing Total$ - 0$ - 0$ - 0
Heating, Ventillation & Air Conditioning
$$$ - 0
$$$ - 0
Heating, Ventillation & Air Conditioning Total$ - 0$ - 0$ - 0
Fire Protection
$$$ - 0
$$$ - 0
Fire Protection Total$ - 0$ - 0$ - 0
Electrical
$$$ - 0
$$$ - 0
Electrical Total$ - 0$ - 0$ - 0
Communications
$$$ - 0
$$$ - 0
Communications Total$ - 0$ - 0$ - 0
Equipment
$$$ - 0
$$$ - 0
Equipment Total$ - 0$ - 0$ - 0
Furnishings
$$$ - 0
$$$ - 0
Furnishings Total$ - 0$ - 0$ - 0
Selective Building Demolition
$$$ - 0
$$$ - 0
Selective Building Demolition Total$ - 0$ - 0$ - 0
Site preparation
$$$ - 0
$$$ - 0
Site Preparation Total$ - 0$ - 0$ - 0
Site Improvements
$ 1.00$ 1.00$ 2.00
$$$ - 0
Site Improvements Total$ 1.00$ 1.00$ 2.00
Sub Total$ 5.00$ 3.00$ 8.00
Overhead$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Profit$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Bonds and Insurance$ 1.00$ 1.00$ 2.00
TOTAL$ 8.00$ 6.00$ 14.00
May be edited as needed

File details come from the government source that posted it. Updated .