This document is an attachment for key personnel evaluation for a VA renovation project (Solicitation 36C26126R0009) at the VA Northern California Health System in Mather, CA. The attachment requires offerors to provide detailed resumes and project histories for five key personnel roles: Elevator Design Project Manager, Elevator Project Superintendent, Elevator Project Engineer, Elevator Safety Officer, and Elevator QC Manager.

The evaluation template mandates comprehensive documentation for each key personnel, including employment history, educational background, professional registrations, training courses, and a detailed project history. Candidates must list up to five projects completed within the past six years, providing specifics such as contract numbers, project titles, contract amounts, dates, roles, and work descriptions. The document emphasizes clear differentiation between roles and years of experience, specifically noting that combined experience descriptions are not acceptable.

View the file

Other files

File Type Posted
36C26126R0009 0007.docx DOCX document
36C26126R0009 0007.docx DOCX document
Wage Determination CA20260007 01.23.2026.pdf PDF
36C26126R0009 0006.docx DOCX document
36C26126R0009 0005.docx DOCX document
36C26126R0009 0005.docx DOCX document
Attachment RFI 115 A - 700000162 L_Pre-Install CHR F-GenChromoViewVPAUDM_EN.pdf PDF
Attachment RFI 168B 20MFAI560 AIR FILTER HEPA 24 X 24 X 12 AstroCel III_prod_mark_sheet_AFP 1 405F.pdf PDF
Attachment 169B EP.401T.pdf PDF
Attachment 171 M-001T.pdf PDF
Site Walk 02.04.26.pdf PDF
Attachment RFI 55 - VA Mather Fire Alarm_AS-BUILT 8-27-2020.pdf PDF
Attachment RFI No. 56.docx DOCX document
Attachmetn RFI 115B - Hybrid Drawings 5-4-15.pdf PDF
Attachment RFI 168A -0062457 T0240DXWM VA 1248 NAS Submittal.pdf PDF
Attachment RFI No. 123 Spanos Group_ VA Mather Pneumatic Tube System_ FINAL As-Built Set for VA_ 8.18.2023.pdf PDF
Attachment RFI No. 139.docx DOCX document
36C26126R0009 0004.docx DOCX document
ATTACH RFI No.116 SLDAirFrame_ShopDrawings.pdf PDF
Attachment RFI 150 Physics Report.pdf PDF
Attachment RFI No. 009.pdf PDF
Attachment RFI NO. 15.docx DOCX document
Attachment RFI 76-78 Electrical Gear Locations.pdf PDF
36C26126R0009 0003.docx DOCX document
Hybrid OR RFIs Amendment 003.xlsx XLSX spreadsheet
Attachment RFI No. 17.docx DOCX document
Attachment RFI 104.pdf PDF
Attachment RFI 135 OR Laydown Area.pdf PDF
36C26126R0009 0002.docx DOCX document
Site Visit Log 36C26126R0009.pdf PDF
IMG_5186.JPG JPG image
IMG_5252.JPG JPG image
IMG_5256.JPG JPG image
IMG_5182.JPG JPG image
IMG_5191.JPG JPG image
IMG_5260.JPG JPG image
IMG_5187.JPG JPG image
IMG_E5223.JPG JPG image
IMG_E5224.JPG JPG image
IMG_E5225.JPG JPG image
IMG_5250.JPG JPG image
IMG_5254 .JPG JPG image
Wage Determination CA20250007 09.26.2025.pdf PDF
Attachment G - Supplemental Price Breakdown.xlsx XLSX spreadsheet
612A4-25-004_VA_TRAILER_DRAWINGS_Bid Set_09-30-2025.pdf PDF
Attachment B - EMR Sheet.docx DOCX document
Attachment D - Construction Experience Project Data Sheet.pdf PDF
Attachment E - Past Performance Questionnaire.docx DOCX document
Specifcations 612A4-25-004_VA_Hybrid-OR and Trailer 10.23.2025.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0009

ATTACHMENT: PERSONNEL RESUMES EVALUATION

OFFERORS’s NAME: ________________________________

OFFEROR’S KEY PERSONNEL

EXPERIENCE/QUALIFICATIONS

Renovation OR for Hybrid Installation 612A4-25-004

Provide the following information, on separate sheets, to demonstrate the key personnel's experience (one for each: Elevator Design Project Manager, Elevator Project Superintendent, Elevator Project Engineer, Elevator Safety Officer, and Elevator QC Manager).

Name:

Proposed Assignment to this Project:

Name of Firm, Position held, Dates of Employment:

Number of Years with other Firms, Position held, dates of employment:

Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)

Professional Registration (if any): (Year, State, Discipline)

Training Course Completed: (COE construction quality management, Safety, etc.)

Familiar with Safety Compliance and Sustainability:

Provide a list of projects on a maximum of five projects that were completed by the key personnel within the past six years:

PROJECT 1:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 2:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 3:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 4:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety): .

PROJECT 5:

Title:

Contract Amount:

Contract Start/Completion Date:

IF it is not clear from the information provided on the five projects described above, the proposal shall clearly indicate the number of years of Project Manager and Project Superintendent experience and shall NOT show combined experience, for example, Project Manager/Project Engineer for three years.

File details come from the government source that posted it. Updated .