The file's text, extracted by GovTribe without its formatting.
Gov't Est
| Attachment F - NISI Exhibit Fabrication Cost Estimate | | | | | |
| | | Labor | Materials | Totals |
| PROJECT MANAGEMENT | | $0.00 | | $0.00 |
| FABRICATION DRAWINGS | | $0.00 | $0.00 | $0.00 |
| SAMPLES | | $0.00 | $0.00 | $0.00 |
| LIGHTING | | $0.00 | $0.00 | $0.00 |
| EXHIBIT STRUCTURES | | $0.00 | $0.00 | $0.00 |
| CUSTOM ELEMENTS | | $0.00 | $0.00 | $0.00 |
| ELECTRICAL/ ELECTRONIC | | $0.00 | $0.00 | $0.00 |
| GRAPHICS | | $0.00 | $0.00 | $0.00 |
| CONSERVATION | | $0.00 | $0.00 | $0.00 |
| PROJECT CLOSEOUT | | $0.00 | $0.00 | $0.00 |
| SHIPPING | | $0.00 | $0.00 | $0.00 |
| INSTALLATION | | $0.00 | $0.00 | $0.00 |
| TRAVEL | | $0.00 | $0.00 | $0.00 |
| | | $0.00 | $0.00 | |
| | Grand Total | | | $0 |
| PROJECT MANAGEMENT (excluding travel) | | | | | |
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Fabrication Drawings | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Miscellaneous | | job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Detailling | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Samples/Mock-ups/Prototypes | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| graphic samples | | job | | $0.00 |
| graphic samples-color proofs | | job | | $0.00 |
| custom elements samples | | job | | $0.00 |
| prototypes | | job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| exhibit spec-fabrication | | hours @ | | $0.00 |
| model maker | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Samples $0.00
| Lighting | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Lighting Type: | | Each | | $0.00 |
| Lighting Type: | | Each | | $0.00 |
| Lighting Type: | | Each | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Scissor Lift rental | | Week | | $0.00 |
| Scissor Lift Delivery | | PU/Ret | | $0.00 |
| SUBTOTAL, AV EQUIPMENT | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Lighting Technician | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Lighting $0.00
| Exhibit Structures | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| 0 | Intro Section | | Job | | $0.00 |
| AD Typical | | Job | | $0.00 |
| EX-02-01-001 | | Job | | $0.00 |
| EX-03-01-001 | | Job | | $0.00 |
| EX-03-01-002 | | Job | | $0.00 |
| 1 | Wall Case 1 Detail Typical | | Job | | $0.00 |
| Wall Case 2 Detail Typical | | Job | | $0.00 |
| EX-08-01-001 | | Job | | $0.00 |
| EX-04-01-001 | | Job | | $0.00 |
| EX-05-01-001 | | Job | | $0.00 |
| EX-08-02-001 | | Job | | $0.00 |
| 2 | EX-07-01-001 | | Job | | $0.00 |
| EX-08-03-001 | | Job | | $0.00 |
| Battleground Table | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| 3 | ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| 4 | ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| 5 | ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| 6 | ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| 7 | ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| 8 | ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| 9 | ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| ST-00.00-000 | | Job | | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | | percent | | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Fabrication Shop Supervisor | | hours @ | | $0.00 |
| Exhibit Specialist (Fabrication) | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Exhibit Structures $0.00
| Custom Elements | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| 01-02-300-CE Tactile Pickaxe | | Job | | $0.00 |
| 02-01-010-CE Dimensional Title Backcountry | | Job | | $0.00 |
| 02-01-501-CE Tactile Deer Pelt (Fur Hide) | | Job | | $0.00 |
| 02-01-502-CE Tactile Untanned Leather | | Job | | $0.00 |
| 02-01-503-CE Tactile Tanned Leather | | Job | | $0.00 |
| 02-01-504-CE Tactile Deer Skin Leather Glove(s) | | Job | | $0.00 |
| 03-01-010-CE Dimensional Title Crossroads | | Job | | $0.00 |
| 03-02-601-CE Tactile Models (Axe Head) | | Job | | $0.00 |
| 03-02-602-CE Tactile Models (Needle & Thread) | | Job | | $0.00 |
| 03-02-603-CE Tactile Models (Scissors) | | Job | | $0.00 |
| 03-02-700-CE Flip book Image (Cherokee Hide Preparation) | | Job | | $0.00 |
| 04-01-010-CE Dimensional Title Lettering Village | | Job | | $0.00 |
| 04-01-910-CE Mechanical Interactive (Growth of Ninety Six Town) | | Job | | $0.00 |
| 05-01-010-CE Dimensional Title Lettering Nations | | Job | | $0.00 |
| 06-01-010-CE Crawl-Through Mine Tunnel | | Job | | $0.00 |
| 06-01-200-CE Tactile Site Model - Material & Style References | | Job | | $0.00 |
| 07-01-010-CE Dimensional Title Lettering Legacy | | Job | | $0.00 |
| 07-01-601-CE Letter with Wax Seal Tactile Model | | Job | | $0.00 |
| 08-01-203-CE Trigger Guard Tactile Model | | Job | | $0.00 |
| 08-02-200-CE Jail Key Tactile Model | | Job | | $0.00 |
| 08-02-201-CE Jail Brick Tactile Model | | Job | | $0.00 |
| 08-03-200-CE Bucket Tactile Model | | | | $0.00 |
| | | | | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | | percent | | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Map model maker | | hours @ | | $0.00 |
| Model maker | | hours @ | | $0.00 |
| Illustrator | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
| TOTAL CE | | | | | $0.00 |
| Electrical/Electronic | | | | | |
| MATERIALS - AV EQUIPMENT: | | qty. | unit | unit cost | amount |
| EP-00.00-000 Audio Description | | | | | |
| Beacons | | each | | $0.00 |
| Headphone cushion sanitary cover, black, 50 pair | | each | | $0.00 |
| Headphone cushion sanitary cover, black, Master carton of (12) 50 pair | | each | | $0.00 |
| Headphones | | each | | $0.00 |
| Induction neckloop | | each | | $0.00 |
| iPhone XR, black, 128GB, unlocked sim-free | | each | | $0.00 |
| Lanyard, 5/8", breakaway, cell phone loop / keyring, dark forest green, NPS text | | each | | $0.00 |
| Lightning to 3.5 mm Headphone Jack Adapter, 2 pack | | each | | $0.00 |
| Refresh Kit, replacement cushion and bag | | each | | $0.00 |
| Ruggedized case for media player | | each | | $0.00 |
| Sreen Protector for media player | | each | | $0.00 |
| USB charging station, 6 ports, 6 Apple cables, white | | each | | $0.00 |
| 01-02-400-EP Audio | | |
| Description Program | each | $0.00 | |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| 04-01-600-EP Jaw Harp | | |
| Audio | each | $0.00 | |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| 05-01-400-EP Voices of | | |
| Ninety Six Interactive | each | $0.00 | |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| 05-01-800-EP Built for | | |
| Battle Digital Interactive | each | $0.00 | |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| 06-01-400-EP Tactile | | |
| Model Audio Clips | each | $0.00 | |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| 07-01-700-EP | | |
| Kosciusko's Mine Tour | each | $0.00 | |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| | each | $0.00 |
| SUBTOTAL, AV EQUIPMENT | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR (Production) | | hours | x | rate | amount |
| Audio Describer | | Hours | | $0.00 |
| AV Producder | | Hours | | $0.00 |
| AV Technician | | Hours | | $0.00 |
| Electrical Technician | | Hours | | $0.00 |
| Videographer | | Hours | | $0.00 |
TOTAL ALL LABOR (see AV Estimate for Detail) $0.00
TOTAL Electrical/Mechanical/AV $0.00
| Graphics | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| GL-01-02-100 | | Job | | $0.00 |
| GL-02-01-001 | | Job | | $0.00 |
| GL-02-01-010 | | Job | | $0.00 |
| GL-02-01-011 | | Job | | $0.00 |
| GL-02-01-100 | | Job | | $0.00 |
| GL-02-01-200 | | Job | | $0.00 |
| GL-02-01-300 | | Job | | $0.00 |
| GL-02-01-400 | | Job | | $0.00 |
| GL-02-01-500 | | Job | | $0.00 |
| GL-03-01-001 | | Job | | $0.00 |
| GL-03-01-010 | | Job | | $0.00 |
| GL-03-01-011 | | Job | | $0.00 |
| GL-03-01-100 | | Job | | $0.00 |
| GL-03-01-200 | | Job | | $0.00 |
| GL-03-01-301 | | Job | | $0.00 |
| GL-03-01-401 | | Job | | $0.00 |
| GL-03-01-600 | | Job | | $0.00 |
| GL-03-01-700 | | Job | | $0.00 |
| GL-03-02-001 | | Job | | $0.00 |
| GL-03-02-010 | | Job | | $0.00 |
| GL-03-02-100 | | Job | | $0.00 |
| GL-03-02-200 | | Job | | $0.00 |
| GL-03-02-300 | | Job | | $0.00 |
| GL-03-02-400 | | Job | | $0.00 |
| GL-03-02-502 | | Job | | $0.00 |
| GL-03-02-600 | | Job | | $0.00 |
| GL-03-02-700-705 flipbook | | Job | | $0.00 |
| GL-04-01-001 | | Job | | $0.00 |
| GL-04-01-010 | | Job | | $0.00 |
| GL-04-01-011 | | Job | | $0.00 |
| GL-04-01-100 | | Job | | $0.00 |
| GL-04-01-200 | | Job | | $0.00 |
| GL-04-01-210 | | Job | | $0.00 |
| GL-04-01-301 | | Job | | $0.00 |
| GL-04-01-401 | | Job | | $0.00 |
| GL-04-01-500 | | Job | | $0.00 |
| GL-04-01-600 | | Job | | $0.00 |
| GL-04-01-700 | | Job | | $0.00 |
| GL-04-01-800 | | Job | | $0.00 |
| GL-04-01-850 | | Job | | $0.00 |
| GL-04-01-900 | | Job | | $0.00 |
| GL-04-01-911 | | Job | | $0.00 |
| GL-04-01-912 | | Job | | $0.00 |
| GL-05-01-001 | | Job | | $0.00 |
| GL-05-01-002 | | Job | | $0.00 |
| GL-05-01-010 | | Job | | $0.00 |
| GL-05-01-011 | | Job | | $0.00 |
| GL-05-01-100 | | Job | | $0.00 |
| GL-05-01-150 | | Job | | $0.00 |
| GL-05-01-200 | | Job | | $0.00 |
| GL-05-01-301 | | Job | | $0.00 |
| GL-05-01-400 | | Job | | $0.00 |
| GL-05-01-500 | | Job | | $0.00 |
| GL-05-01-510 | | Job | | $0.00 |
| GL-05-01-520 | | Job | | $0.00 |
| GL-05-01-530 | | Job | | $0.00 |
| GL-05-01-600 | | Job | | $0.00 |
| GL-05-01-701 | | Job | | $0.00 |
| GL-05-01-800 | | Job | | $0.00 |
| GL-06-01-011 | | Job | | $0.00 |
| GL-06-01-100 | | Job | | $0.00 |
| GL-06-01-101 | | Job | | $0.00 |
| GL-06-01-102 | | Job | | $0.00 |
| GL-06-01-103 | | Job | | $0.00 |
| GL-06-01-104 | | Job | | $0.00 |
| GL-06-01-105 | | Job | | $0.00 |
| GL-06-01-106 | | Job | | $0.00 |
| GL-06-01-107 | | Job | | $0.00 |
| GL-06-01-108 | | Job | | $0.00 |
| GL-06-01-109 | | Job | | $0.00 |
| GL-06-01-110 | | Job | | $0.00 |
| GL-06-01-111 | | Job | | $0.00 |
| GL-06-01-112 | | Job | | $0.00 |
| GL-06-01-113 | | Job | | $0.00 |
| GL-06-01-114 | | Job | | $0.00 |
| GL-06-01-115 | | Job | | $0.00 |
| GL-06-01-116 | | Job | | $0.00 |
| GL-06-01-117 | | Job | | $0.00 |
| GL-07-01-001 | | Job | | $0.00 |
| GL-07-01-010 | | Job | | $0.00 |
| GL-07-01-011 | | Job | | $0.00 |
| GL-07-01-100 | | Job | | $0.00 |
| GL-07-01-200 | | Job | | $0.00 |
| GL-07-01-300-306 | | Job | | $0.00 |
| GL-07-01-305 | | Job | | $0.00 |
| GL-07-01-400 | | Job | | $0.00 |
| GL-07-01-501 | | Job | | $0.00 |
| GL-07-01-600 | | Job | | $0.00 |
| GL-07-01-601 | | Job | | $0.00 |
| GL-07-01-700 | | Job | | $0.00 |
| GL-08-01-001 | | Job | | $0.00 |
| GL-08-01-100 | | Job | | $0.00 |
| GL-08-01-300 | | Job | | $0.00 |
| GL-08-01-310 | | Job | | $0.00 |
| GL-08-01-320 | | Job | | $0.00 |
| GL-08-01-330 | | Job | | $0.00 |
| GL-08-01-340 | | Job | | $0.00 |
| GL-08-02-001 | | Job | | $0.00 |
| GL-08-02-100 | | Job | | $0.00 |
| GL-08-02-300 | | Job | | $0.00 |
| GL-08-02-310 | | Job | | $0.00 |
| GL-08-02-320 | | Job | | $0.00 |
| GL-08-02-330 | | Job | | $0.00 |
| GL-08-02-340 | | Job | | $0.00 |
| GL-08-03-001 | | Job | | $0.00 |
| GL-08-03-100 | | Job | | $0.00 |
| GL-08-03-300 | | Job | | $0.00 |
| GL-08-03-310 | | Job | | $0.00 |
| GL-08-03-320 | | Job | | $0.00 |
| GL-08-03-330 | | Job | | $0.00 |
| GL-08-03-340 | | Job | | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | | percent | | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Graphics Shop Supervisor | | hours @ | | $0.00 |
| Exhibit Specialist (Graphics) | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Conservation (Artifact/Prop Mounting) | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| AO-03-01-301 | | job | | $0.00 |
| AO-03-01-401 | | job | | $0.00 |
| AO-03-01-701 | | job | | $0.00 |
| AO-03-01-702 | | job | | $0.00 |
| AO-03-01-703 | | job | | $0.00 |
| AO-03-01-704 | | job | | $0.00 |
| AO-03-01-705 | | job | | $0.00 |
| AO-03-02-501 | | job | | $0.00 |
| AO-04-01-301 | | job | | $0.00 |
| AO-04-01-401 | | job | | $0.00 |
| AO-04-01-402 | | job | | $0.00 |
| AO-04-01-403 | | job | | $0.00 |
| AO-04-01-501 | | job | | $0.00 |
| AO-04-01-502 | | job | | $0.00 |
| AO-04-01-503 | | job | | $0.00 |
| AO-04-01-504 | | job | | $0.00 |
| AO-04-01-505 | | job | | $0.00 |
| AO-04-01-701 | | job | | $0.00 |
| AO-04-01-702 | | job | | $0.00 |
| AO-04-01-851 | | job | | $0.00 |
| AO-04-01-852 | | job | | $0.00 |
| AO-05-01-301 | | job | | $0.00 |
| AO-05-01-701 | | job | | $0.00 |
| AO-05-01-702 | | job | | $0.00 |
| AO-05-01-703 | | job | | $0.00 |
| AO-05-01-704 | | job | | $0.00 |
| AO-07-01-501 | | job | | $0.00 |
| AO-07-01-601 | | job | | $0.00 |
| AO-07-01-602 | | job | | $0.00 |
| AO-07-01-603 | | job | | $0.00 |
| AO-07-01-604 | | job | | $0.00 |
| AO-08-01-102 | | job | | $0.00 |
| AO-08-02-101 | | job | | $0.00 |
| AO-08-02-102 | | job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Mount maker | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | | | | |
| MATERIALS: | qty. | unit | unit cost | amount |
| | | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Packing | | job @ | | $0.00 |
| Shipping | | job @ | | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Exhibit Spec - Fabrication | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
| INSTALLATION | | | | | |
| Project manager | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Rental Van and Gas | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| Total | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Project Manager (1 Person) | | hours @ | | $0.00 |
| Total Travel and Accomodation for: Project Manager | | | | $0.00 |
| Fabrication Installers | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| Total | | | | $0.00 |
| LABOR | | | | | |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Installer $0.00
| Lighting Specialists | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and Gas | | days @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| Total | | | | $0.00 |
| LABOR | | | | | |
| Lighting Designer | | hours @ | | $0.00 |
| Lighting Technician | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Lighting $0.00
| Exhibit AV Specialist | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and Gas | | days@ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| Total | | | | $0.00 |
| LABOR | | | | | |
| AV Technician | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: AV Specialist $0.00
| Object Mounter and Installer | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and gas | | days @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| Total | | | | $0.00 |
| LABOR | | | | | |
| Object Installer and Mount Maker | | hours @ | | $0.00 |
| Object Installer and Mount Maker | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Object Installer $0.00
TOTAL ALL MATERIALS: INSTALLATION $0.00
TOTAL ALL LABOR: INSTALLATION $0.00
Total Installation $0.00
| OTHER TRAVEL | | | | | |
| Postaward meeting | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| lodging | | days @ | | $0.00 |
| Rental car and gas | | days @ | | $0.00 |
| Misc. | | job @ | | $0.00 |
TOTAL MATERIALS PM $0.00
| Building Prep Site Visit | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| lodging | | days @ | | $0.00 |
| Rental car and gas | | days @ | | $0.00 |
| Misc. | | job @ | | $0.00 |
TOTAL MATERIALS PM $0.00
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
Total Travel $0.00