Attachment_E-_List_of_Potential_Projects.pdf
PDF 320 KB Posted
- Attached to
- Planning Consultant Services (W00567)
- Solicitation number
- 26-139-RFSQ
- Issued by
- Florida
About this file
Attachment E is a Capital Improvement Plan (CIP) document from the Greater Orlando Aviation Authority (GOAA) listing potential projects for Orlando International Airport (MCO) and Orlando Executive Airport (ORL) spanning the 2025-2030 planning period. The document comprises a comprehensive inventory of approximately 100+ projects across multiple infrastructure categories including terminal enhancements, baggage handling systems, security improvements, airfield rehabilitation, ground transportation facilities, and utility infrastructure upgrades. Projects are organized by facility type and include design and construction phases for major initiatives such as Terminal C Phase 2, Airfield Taxiway rehabilitation (Taxiways A, B, E, F, G, and H), Passenger Boarding Bridge replacements, North Terminal renovations, and Runway rehabilitation at Orlando Executive Airport. The list serves as a source document for the Planning Consultant Services solicitation (W00567), with potential future projects derived from updated CIPs or organizational goals as established by GOAA.
The potential projects identified in this attachment support GOAA's capital programming across both airports, with MCO's CIP totaling $5.92 billion for 2025-2030 and ORL's CIP valued at $84.15 million. Funding sources for these projects include Federal Aviation Administration (FAA) grants, Passenger Facility Charges (PFC), Authority Funds, bond financing, and federal discretionary grants. The planning consultant services contract establishes the framework for professional support in developing, managing, and advancing projects from this inventory. Projects range from terminal and airfield improvements to ground transportation enhancements, employee parking facilities, telecommunications infrastructure, and administrative facility expansions, with individual task orders evaluated to maximize small business participation through GOAA's certified small business firm directory.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF POTENTIAL
PROJECTS ATTACHMENT E
The list of potential projects, as identified below, was compiled from the Greater Orlando
Aviation Authority’s 2025-2030 Capital Improvement Plan (CIP). Any future projects may be derived from any future CIP or organizational goals as established by the Authority.
Orlando International Airport
Terminals A & B
Baggage Program Enhancements Baggage Handling System
Baggage Handling System (East Side - Phase 1) CCTV Projects Changing Regulatory Requirements
Airside 2 and 4 Automated People Mover (APM) System Updates Airside 2 and 4 APM System Replacement
Airside 2 and 4 APM System Replacement North Terminal Security Checkpoints Passenger Processing Efficiency Systems
Airline Terminal Improvement Account Security Enhancement Program (incl. Access Control)
Terminal Signage Health & Safety Renovations - General Health & Safety Renovations - Virtual Ramp Control (VRC)
Health & Safety Renovations - Self Service Bag Drop Projects North Terminal Buildings' Roof Replacement
North Terminal Vertical Circulation Improvements North Terminal Renovations North Terminal Building System Upgrade
Passenger Boarding Bridges (PBB) North Terminal Rental Car (RAC) APM Access Improvements
Airside 2 Wing Expansion Utilities Infrastructure Improvements
Checkpoint B & C Improvements East Terminal Passenger Circulation Improvements
Terminal C
Terminal C Phase 2 Terminal C Phase 2 Design Concept Terminal C Phase 2 Site & Apron Projects
Terminal C ASC Gates C250-C253
Terminal C Gates C250-C253 Ramp & Airfield Improvements Terminal C Enhancement Projects
Airfield
Taxiways G & H Rehabilitation - Phases 1 & 2 (Design and Construction) Taxiways E & F Rehabilitation - Phases 1 & 2 (Design and Construction)
Airfield Single Mode Fiber (Design and Construction) New Cat II/III Infrastructure for Runway 36L (Design and Construction)
Select Airside 1, 2, 3 & 4 Apron Rehabilitation Replace 17L/35R In-pavement Lighting w/LED Taxiway C - Phase 1 (Design and Construction)
Taxiway B - Phase 1 & 2 (Design and Construction)
Ground Transportation
RAC Quick Turn Around (QTA) Projects
RAC Terminal Improvements Roadway Improvement Program
RAC & Parking Expansion Program RAC Expansion - Ground Transportation Center, Parking, and Garage
RAC Expansion - Roads and APM Roadway Signage North Employee Parking Lot Improvements
North Employee Parking Lot Improvements South Employee Parking Lot Improvements
North Terminal Parking Garage Rehab Ground Transportation Facility Pedestrian Bridge Roadway Congestion Management Projects
Overall Parking Improvements
Other
Fiber Infrastructure Program
Wildlife Attractant Removal (East Airfield) Building Renovations
Security Detection System Improvement Advanced Budget, Schedule and Scoping Analysis GOAA Office Expansion & Parking
GOAA Infrastructure Development for Tenant Projects Airport Power Systems Upgrades
Executive Lobby/Conference/Office Area Renovations Advanced Air Mobility (AAM) Heintzelman Blvd. Infrastructure & Development
Checkpoint Alpha Improvements New Centralized Receiving & Distribution Cetner (CRDC)
Mud Lake Access Terminal Nomenclature
Orlando Executive Airport
Airfield
Runway 7-25 Rehabilitation (Last Rehabilitation in 2002) Runway 13-31 Rehabilitation (Design and Construction) Taxiway A, B & E4 Rehabilitation
East Ramp Rehabilitation Phase 1a, Design (Western/CBP Area) East Ramp Rehabilitation Phase 1b, Design (Balance of Original Phase 1)
East Ramp Rehabilitation Phase 1, Construction (Combined Phase 1a & 1b) Taxiway A Rehabilitation (Eastern Section - Design and Construction) Taxiway A Connectors (Design & Construction)
Taxiway E Rehabilitation (South of Runway 7-25) NEW East Ramp Rehabilitation, Phase 2
Parallel Taxiway (South of Rwy 7-25) - Environmental & Design NEW Airport Lighting Control and Monitoring System
Terminal
Generator Installation - Administration & Maintenance Bldgs. and CBP
Land Development, Roadway, and Other
ORL Master Plan Update
Colonial Promenade Improvements Stormwater Restoration Project (Phase 1)
Airport Beacon Utilities Infrastructure Improvements (on airport property) Stormwater Assessment, Phase 1
CIP Unallocated