This is a List of Potential Projects document from the Greater Orlando Aviation Authority (GOAA) that identifies capital improvement initiatives for Orlando International Airport (MCO) and Orlando Executive Airport (ORL) derived from the 2025-2030 Capital Improvement Plan. The document outlines over 100 potential projects spanning multiple categories including terminal enhancements, baggage handling systems, security upgrades, airfield rehabilitation, ground transportation improvements, parking facilities, utilities infrastructure, and administrative building renovations. Projects at MCO include Terminal A & B baggage program enhancements, Automated People Mover system replacement, North Terminal roof replacement and renovations, Terminal C phase 2 development, airfield taxiway rehabilitation on phases 1 and 2, parking garage rehabilitation, and advanced air mobility infrastructure. Projects at ORL encompass runway and taxiway rehabilitation, ramp improvements, airport lighting systems, and stormwater management initiatives. The list serves as a resource for the Planning Consultant Services solicitation (W00567), which seeks to establish professional services agreements with planning consultants to support these current and future capital projects through master planning, feasibility studies, preliminary engineering, and stakeholder engagement.
The Planning Consultant Services procurement operates under a non-exclusive model with an estimated annual project value ranging from $1 million to $2 million, funded through multiple sources including FAA grants, Passenger Facility Charges, Authority Funds, bonds, and federal discretionary grants. MCO's total 2025-2030 CIP is valued at $5.92 billion while ORL's CIP totals $84.15 million. The solicitation requires respondents to hold a Professional Engineer license in Florida, provide references from similar contracts within the past five years, and demonstrate good faith efforts to engage certified small business firms through the Office of Business Opportunity & Exchange program. Consultant insurance requirements include Commercial General Liability coverage of $5 million per occurrence, Automobile Liability, Workers' Compensation, and Professional Liability. Respondents must comply with E-Verify participation, drug-free workplace certification, and scrutinized companies certifications. The non-mandatory pre-submittal conference is scheduled for December 12, 2025, with questions due by December 23, 2025, and proposals due January 15, 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF POTENTIAL
PROJECTS ATTACHMENT E
The list of potential projects, as identified below, was compiled from the Greater Orlando
Aviation Authority’s 2025-2030 Capital Improvement Plan (CIP). Any future projects may be derived from any future CIP or organizational goals as established by the Authority.
Orlando International Airport
Terminals A & B
Baggage Program Enhancements Baggage Handling System
Baggage Handling System (East Side - Phase 1) CCTV Projects Changing Regulatory Requirements
Airside 2 and 4 Automated People Mover (APM) System Updates Airside 2 and 4 APM System Replacement
Airside 2 and 4 APM System Replacement North Terminal Security Checkpoints Passenger Processing Efficiency Systems
Airline Terminal Improvement Account Security Enhancement Program (incl. Access Control)
Terminal Signage Health & Safety Renovations - General Health & Safety Renovations - Virtual Ramp Control (VRC)
Health & Safety Renovations - Self Service Bag Drop Projects North Terminal Buildings' Roof Replacement
North Terminal Vertical Circulation Improvements North Terminal Renovations North Terminal Building System Upgrade
Passenger Boarding Bridges (PBB) North Terminal Rental Car (RAC) APM Access Improvements
Airside 2 Wing Expansion Utilities Infrastructure Improvements
Checkpoint B & C Improvements East Terminal Passenger Circulation Improvements
Terminal C
Terminal C Phase 2 Terminal C Phase 2 Design Concept Terminal C Phase 2 Site & Apron Projects
Terminal C ASC Gates C250-C253
Terminal C Gates C250-C253 Ramp & Airfield Improvements Terminal C Enhancement Projects
Airfield
Taxiways G & H Rehabilitation - Phases 1 & 2 (Design and Construction) Taxiways E & F Rehabilitation - Phases 1 & 2 (Design and Construction)
Airfield Single Mode Fiber (Design and Construction) New Cat II/III Infrastructure for Runway 36L (Design and Construction)
Select Airside 1, 2, 3 & 4 Apron Rehabilitation Replace 17L/35R In-pavement Lighting w/LED Taxiway C - Phase 1 (Design and Construction)
Taxiway B - Phase 1 & 2 (Design and Construction)
Ground Transportation
RAC Quick Turn Around (QTA) Projects
RAC Terminal Improvements Roadway Improvement Program
RAC & Parking Expansion Program RAC Expansion - Ground Transportation Center, Parking, and Garage
RAC Expansion - Roads and APM Roadway Signage North Employee Parking Lot Improvements
North Employee Parking Lot Improvements South Employee Parking Lot Improvements
North Terminal Parking Garage Rehab Ground Transportation Facility Pedestrian Bridge Roadway Congestion Management Projects
Overall Parking Improvements
Other
Fiber Infrastructure Program
Wildlife Attractant Removal (East Airfield) Building Renovations
Security Detection System Improvement Advanced Budget, Schedule and Scoping Analysis GOAA Office Expansion & Parking
GOAA Infrastructure Development for Tenant Projects Airport Power Systems Upgrades
Executive Lobby/Conference/Office Area Renovations Advanced Air Mobility (AAM) Heintzelman Blvd. Infrastructure & Development
Checkpoint Alpha Improvements New Centralized Receiving & Distribution Cetner (CRDC)
Mud Lake Access Terminal Nomenclature
Orlando Executive Airport
Airfield
Runway 7-25 Rehabilitation (Last Rehabilitation in 2002) Runway 13-31 Rehabilitation (Design and Construction) Taxiway A, B & E4 Rehabilitation
East Ramp Rehabilitation Phase 1a, Design (Western/CBP Area) East Ramp Rehabilitation Phase 1b, Design (Balance of Original Phase 1)
East Ramp Rehabilitation Phase 1, Construction (Combined Phase 1a & 1b) Taxiway A Rehabilitation (Eastern Section - Design and Construction) Taxiway A Connectors (Design & Construction)
Taxiway E Rehabilitation (South of Runway 7-25) NEW East Ramp Rehabilitation, Phase 2
Parallel Taxiway (South of Rwy 7-25) - Environmental & Design NEW Airport Lighting Control and Monitoring System
Terminal
Generator Installation - Administration & Maintenance Bldgs. and CBP
Land Development, Roadway, and Other
ORL Master Plan Update
Colonial Promenade Improvements Stormwater Restoration Project (Phase 1)
Airport Beacon Utilities Infrastructure Improvements (on airport property) Stormwater Assessment, Phase 1
CIP Unallocated