Attachment_E-2024-04-17_RW_Cert_for_State_Funded_Projects_-D7_-_Signed.pdf
PDF 43 KB Posted
- Solicitation number
- 26-139
- Issued by
- Citrus County, Florida
About this file
This is a Right of Way Certification document executed by Citrus County, Florida and the Florida Department of Transportation (FDOT) for a state-funded roadway resurfacing project. The certification pertains to ITB 26-139, a Small County Outreach Program (SCOP) resurfacing project for W. Mustang Blvd extending from W. Mesa Verde Drive to County Road 491 (Lecanto Highway) in Citrus County. The project involves roadway resurfacing and milling operations on approximately 3,300 feet per lane of a two-lane road. The work scope includes milling 1.5 inches of existing pavement and placing a 2-inch thick lift of FC-12.5 asphalt with PG 76-22 polymer binder at Traffic Level C, in accordance with current FDOT Standard Specifications for Road and Bridge Construction, FY 2025-26. Additional work includes exposing and cleaning pavement edges, paving, temporary and permanent pavement markings, shoulder grading with positive drainage provisions, installation of new reflective pavement markers (R.P.M.s), sodding, and other specified items. The letting date for the project is June 1, 2025, and the project is assigned to FDOT District D7 (Financial Project No. 448502-1).
The certification confirms that all property and easements required for the construction project are vested in FDOT or state or local government entities, with sufficient authority obtained for maintenance of proposed improvements. The document certifies that right of way was acquired in compliance with applicable state law, no persons or businesses required relocation, all structures and improvements have been removed or will be included in the construction contract, and asbestos abatement requirements have been completed or will be included in the construction contract. The certification was executed by Charles G. Leazott, Engineering Operations Manager for Citrus County Board of County Commissioners (BOCC), on April 17, 2024, and approved by FDOT on the same date, indicating readiness to proceed with the advertised project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RIGHT OF WAY CERTIFICATION
FINANCIAL PROJECT NO
STATE / COUNTY ROAD:
DESCRIPTION:
LETTING DATE:
DISTRICT: D7
COUNTY:
The undersigned hereby certifies as follows:
Title to all property and easements needed for the above construction project is vested in the Florida Department of Transportation (Department) or a state or local government. Sufficient authority has been obtained to maintain the proposed improvements on property and easements owned by state or local governments. Further:
Acquisition
Right of way was not acquired for this project.
Right of way was acquired for this project in compliance with applicable state law.
Relocation No persons or businesses were required to move or move personal property from the project right of way.
All persons and businesses that were required to move or move personal property from the project right of way have been provided relocation assistance in compliance with applicable state law.
Demolition No structures or improvements, including encroachments, required removal from the project right of way.
All structures and/or improvements, including encroachments, have been removed from the project right of way in compliance with applicable state law, or will be included in the construction contract.
Asbestos Abatement No structures or improvements requiring asbestos abatement were located on the project right of way.
___ Asbestos abatement of buildings and/or structures, including those to be removed by the construction contractor, has been completed in compliance with applicable state law, or will be included in the construction contract.
Certified by Local Agency:
Title: Date:
Certified by FDOT:
Title: Date:
| Acquisition |
| Relocation |
| Demolition |
| Asbestos Abatement |
| DISTRICT D7: 448502-1 | |
| COUNTY: W Mustang Blvd | |
| undefined: | |
| 1: W Mustang Blvd from Mesa Verde Dr to CR491 | |
| 2: 06/01/2025 | |
| Title: Charles Leazott, Engineering Operations Manager | |
| Date: 04/17/2024 | |
| Certified by FDOT: | |
| Dropdown1: [Citrus] | |
| Check Box2: Yes | |
| Check Box3: Off | |
| Check Box4: Yes | |
| Check Box5: Off | |
| Check Box6: Yes | |
| Check Box7: Off | |
| Check Box8: Yes | |
| Check Box9: Off | |
| Text10: | |
| 352-527-5269 | |
| 2024-04-17T11:28:45-0400 | |
| Citrus County BOCC | |
| Charles G Leazott | |
| I am approving this document |