Attachment_C-2024-04-17_No_Permits_required_memo_at_100%_submittal.doc_-_Signed.pdf

PDF 194 KB Posted

Attached to
ITB 26-139 Small County Outreach Program (SCOP) Resurfacing Project for W. Mustang Blvd from W. Mesa Verde Drive to County Road (CR) 491 (Lecanto Hwy)
Solicitation number
26-139
Issued by
Citrus County, Florida

About this file

This is a project approval memorandum from Citrus County, Florida's Department of Public Works regarding environmental permits for ITB 26-139, a Small County Outreach Program (SCOP) resurfacing project on W. Mustang Boulevard from W. Mesa Verde Drive to County Road 491 in Lecanto, Florida. The project involves roadway resurfacing and milling work on a two-lane road approximately 3,300 feet per lane, consisting of milling 1.5 inches of existing pavement and placing a 2-inch thick lift of FC-12.5 asphalt with PG 76-22 polymer binder at Traffic Level C per FDOT specifications. The scope includes exposing and cleaning pavement edges, paving, temporary and permanent pavement markings, redressing, installing new reflective pavement markers (R.P.M.s), shoulder grading with positive drainage, sodding, and correcting roadway deficiencies below FDOT and County standards. The memorandum is dated April 17, 2024, and was prepared by Charles Leazott, Engineering Operations Supervisor, for FDOT D7 Local Programs Project Manager Susan Delnegro.

The memorandum confirms that no environmental permits are required for the referenced project, as drainage conditions are not being changed, no wetlands are being impacted, there is no encroachment into the 100-year floodplain, and no additional travel lanes are proposed. The approval was signed by Charles G. Leazott on behalf of the Citrus County Board of County Commissioners. The successful bidder is responsible for furnishing all labor, material, consumables, tools, and equipment necessary to complete the work as specified in the project scope and plans.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H:\engrg_admin\fdot\SCOP_small_county_outreach_program\20-050 W Mustang Blvd fm Mesa Verde Dr to CR491\SCOP Application & Clear Letters\Clear Letters\No Permits required memo at 100% submittal.doc.docx

DATE: April 17, 2024

TO: Susan Delnegro, FDOT D7 Local Programs Project Manager

FROM: Charles Leazott, Engineering Operations Supervisor

SUBJECT: FPN 448502-1 // W Mustang Blvd from W Mesa Verde Dr to CR491 // Citrus

County

100% Design Memo for Environmental Permits

No environmental permits are required for the referenced project as:

1. Drainage is not being changed.

2. No wetlands are being impacted.

3. There is no encroachment into the 100-year floodplain.

4. No additional travel lanes are proposed.

Charles Leazott Date 4/17/24

If NPDES is required, is SWPPP included in plans? N/A

Board of County Commissioners

DEPARTMENT OF PUBLIC WORKS

DIVISION OF TECHNICAL SERVICES

3600 W. Sovereign Path, Suite 241

Lecanto, Florida 34461 Telephone: (352) 527-5446 Fax: (352) 527-5482

Citrus Springs/Dunnellon/Inglis/Yankeetown area - Toll Free (352) 489-2120 TTY Telephone: (352) 527-0825 or (352) 527-5312

Board of County Commissioners

352-527-5269
2024-04-17T11:25:48-0400
Citrus County BOCC
Charles G Leazott
I am approving this document

File details come from the government source that posted it. Updated .