Attachment D: Furnished Items and Responsibility Matrix Summary

This attachment establishes a furnished items and responsibility matrix for the SMF Pedestrian Walkway - Riparian Public Art Installation Project in California. The document delineates which party—the County or the Contractor—bears responsibility for providing specific items, materials, equipment, and services necessary to complete the project. The matrix serves as a comprehensive allocation tool to clarify ownership, procurement obligations, and accountability for all furnished items throughout the project lifecycle, ensuring clear communication between the County and bidding contractors regarding material and equipment provision responsibilities.

The responsibility matrix defines the contractual obligations for project completion by identifying items the County will furnish versus items the Contractor must provide. This clarification is essential for accurate bid preparation, as contractors must account for all costs associated with procuring items designated as their responsibility while excluding costs for County-furnished materials from their proposals. The matrix supports transparent bidding practices by preventing ambiguity regarding cost allocation and ensuring contractors can submit competitive, accurate bids based on clearly defined scope divisions between County and Contractor responsibilities.

View the file

Other files

File Type Posted
SMF_Pedestrian_Walkway_-_Riparian_Public_Art_Installation_Project.pdf PDF
SD-05_-_SMF_Pedestrian_Walkway_-_Overall_Floor_Plan_-_Sheet_A-110.pdf PDF
SD-02-SMF_Pedestrian_Walkway_-_Riparian_Public_Art_Installation_Project_-_Permit_CCBP2024-00027-DEF02.pdf PDF
SD-04_-_SMF_Pedestrian_Walkway_-_Reference_Plan_-_Sheet_A-010.pdf PDF
Non_AIP_Contracts_(all_other_transactions)_2026.docx DOCX document
SD-03-SMF_Pedestrian_Walkway_-_Riparian_Public_Art_Installation_Project_-_Equipment_Loading_Memo.pdf PDF
SD-06_-_SMF_Pedestrian_Walkway_-_Finish_Floor_Plans_-_Areas_A,_B_and_C_-_Sheets_A-121,_A-122,_A-123_and_A-133.pdf PDF
SD-08-Updated_Ceiling_Art_Heat_Map_8_18_25.pdf PDF
Final_Special_Provisions_SMF_Pedestrian_Walkway_-_Riparian_Public_Art_Installation_Project_10-22-2026.docx DOCX document
SD-07-SMF_Pedestrian_Walkway_Hub_–_Asbestos_Assessment_–_June_26,_2026.pdf PDF
SD-01-SMF_Pedestrian_Walkway_-_Riparian_Public_Art_Installation_Project_-_Public_Artwork_Deferred_Submittal_-_Approved.pdf PDF
Solicitations_Construction_FAA_Language_2026.docx DOCX document
Attachment_E_-_Rondelle_Orientation_Reference_Photographs.docx DOCX document
Attachment_C_-_Bid_Item_Schedule.docx DOCX document
Attachment_B_-_Required_Submittal_Register.docx DOCX document
Attachment_A_-_Minimum_Contractor_Qualifications.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SMF Pedestrian Walkway Riparian Public Art Installation Project Attachment D Sacramento County Department of Airports SMF Pedestrian Walkway Riparian Public Art Installation Project

ATTACHMENT D

Furnished Items and Responsibility Matrix CUPCCAA Informal Bid | Contract No. 41016 | November 2026 This Attachment implements Sections 2-1, 4-1.03, 5-7, 7-1 and 8-2. It does not expand the Contractor’s permanent-design responsibility. All Contractor-assigned work and equipment costs are included in the Base Bid unless an authorized written change provides otherwise.

Item or service
County or others
Installation Contractor
Artwork and spares
Fabricate and deliver approximately 12,000 rondelles and reasonable spare overage to the designated SMF receiving location. Disclose final inventory and spare quantities.
Coordinate onsite receiving; joint condition inspection; record custody; safely uncrate, organize, stage, protect and install.
Artwork rods and hardware
Supply compatible artwork-specific rods, clips, connectors and hanging hardware; presort/label and provide confirmed attachment procedures/tolerances.
Check furnished inventory/compatibility; install the supplied hardware; report missing or incompatible items; no unauthorized alteration.
Registration and orientation
Furnish final Artist registration, placement, component identification, lengths/types and orientation instructions through the County.
Maintain component identification; follow issued registration; record installed conditions and authorized deviations.
Permanent supports
Design, install, inspect and release permanent ceiling suspension, supporting grid, wire-mesh panels and primary structural attachments.
Verify reasonably observable readiness, level, access and interface conditions; protect work by others; report discrepancies.
Artists
Arrange Artist or designated representative participation supporting each installation team and included initial tuning.
Provide installation labor, coordination and safe Artist access under equipment/safety procedures; document initial review and tuning.
Scaffolds lifts and tools
No installation/access equipment or operators furnished.
Supply all movable scaffolding, suitable scissor lift, handling equipment, tools and temporary works; lawful setup, qualified employee operators, delivery, use, inspection, maintenance and removal.
Equipment loading information and protection
Provide available applicable structural, route, joint-cover and finish information. Resolve identified material permanent-capacity questions through the designated design professional when needed under Section 5-7.02. SD-03 is reference-only.
Submit manufacturer data and actual travel, operating, staging and concurrent loads; propose compatible equipment, load distribution and protection. Additional engineering only when required under Section 5-7.02; no automatic new floor-loading study.
Access staging and parking
Identify/release work areas, access routes, staging, laydown, equipment parking, work windows and adjacent-construction interfaces.
Use authorized areas; field-verify observable constraints; control work zones and keep circulation, egress and maintenance access clear.
Security
Provide site-security and airport-access coordination; dedicated security services by others.
Comply with badging, screening and escort requirements; provide work-zone safety controls and protect items in custody. Specific escort arrangements shall be disclosed in County bid information.
Crates and packing
Designate onsite collection location, crates retained for reuse, and disposal arrangement for empty artwork crates/packing.
Consolidate and move crates/packing to designated onsite location; preserve identified reusable crates.
Other Contractor waste
Identify any expressly different written arrangement.
Remove and legally dispose of other Contractor-generated waste; provide applicable waste/diversion records.
Custody and damage
Participate in condition/custody transfer and receive documented handback. Direct resolution of preexisting damage or shortages.
Protect after custody transfer; document damage; correct Contractor-caused damage at no added cost; install approved replacements and update inventory.
Permits and permanent inspections
Administer applicable permanent-design permit actions and arrange required permanent-work inspections; identify actual Riparian inspection requirements.
Coordinate inspections of assigned Work; give notice and safe access; maintain records; correct nonconformance and bear attributable reinspection costs.
Temporary engineering and equipment checks
Review furnished information and submissions within the assigned County role; obtain permanent-design clarification when needed. County review does not approve Contractor means and methods.
Provide equipment inspection and applicable means-and-method testing or engineering. Signed/sealed calculations are required only under the conditional triggers in Section 5-7.02 and other applicable Contract requirements; no automatic separate structural study.
Other permanent work
Brass portal-column artwork, brass floor inlays, terrazzo, electrical, glazing and other excluded permanent work by others.
No such work unless added by authorized change and lawfully performed. Protect these interfaces.
Closeout and handback
Inspect and administer County acceptance; provide available Artist care information; receive spares and records.
Complete installed records, certification, tuning/inspection records, corrections, cleanup, equipment removal and documented onsite spare handback; provide contractual workmanship warranty.

No row authorizes early artwork custody, equipment movement or field installation before NTP-2 or other express written authorization. County review, Artist review and physical handback are distinct from the contractual acceptance milestones.

Before bid issue, the County shall disclose actual receiving arrangements, crate dimensions/weights, access/staging/work windows, applicable loading and joint protection information, Artist availability and other price-critical limitations. Changes to disclosed conditions and assigned responsibilities remain subject to the Contract-change provisions.

Contract No. 41016