Attachment D - COEFFICIENT SCHEDULE.PDF

PDF 122 KB Posted

Attached to
Job Order Contract in the Kingdom of Bahrain
Solicitation number
N33191-20-R-4003
Issued by

About this file

This document contains a coefficient schedule for a job order contract solicitation for construction services in the Kingdom of Bahrain and United Arab Emirates. The contract consists of a base period of one year and four option periods of one year each, with a maximum value of $75 million over five years. Work will involve renovation, repair, maintenance, replacement, alteration, demolition, and construction category II, III, and IV tasks. The coefficient schedule establishes pricing terms for pre-priced, self-performed, and competitively quoted work across multiple contract line item numbers and locations. Offerors must propose coefficients and calculate prices for each subline item number for evaluation.

View the file

Other files

File Type Posted
Amendment 06.pdf PDF
AMENDMENT_06_PPI Log.pdf PDF
AMENDMENT_05_PPI Log.pdf PDF
Amendment 05.pdf PDF
Amendment 04.pdf PDF
AMENDMENT_04_PPI Log.pdf PDF
Amendment_03_PPI Log.pdf PDF
Amendment 03.pdf PDF
N3319120R4003 Amendment 02.pdf PDF
Amendment_02_PPI Log.pdf PDF
Bahrain JOC PPI Log.xlsx XLSX spreadsheet
Amend 01.pdf PDF
N33191-20-R-4003 - Bahrain JOC Solicitation.pdf PDF
Attachment C - PRE-PROPOSAL INQUIRY.PDF PDF
Attachment A - PAST PERFORMANCE QUESTIONNAIRE (PPQ).pdf PDF
Attachment B - CONSTRUCTION AND DESIGN EXPERIENCE PROJECT DATA SHEET.PDF PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 - Base Period

KINGDOM OF BAHRAIN – NSA BAHRAIN, AV UNIT LOCATED AT BAHRAIN INTERNATIONAL

AIRPORT, MINA SALMAN WATERFRONT AREA, AND JUFFAIR COMPOUND (DOD SCHOOL)

SUBCONTRACT LINE ITEM

NUMBER (SLIN)

PROPOSED

COEFFICIENT

VALUE OF

WORK

(ESTIMATE)

SLIN PRICE

0001 Pre-Priced Work X $200,000.00 = $

0002 Non-Pre-Priced Work – Self- Performance

X

$30,000.00

0003 Non-Pre-Priced Work – Competitive Quotes

$20,000.00

KINGDOM OF BAHRAIN – SHEIK ISA AIR BASE/ISLAND-WIDE (EXCLUDING NSA BAHRAIN, AV UNIT

LOCATED AT BAHRAIN INTERNATIONAL AIRPORT, MINA SALMAN WATERFRONT AREA, AND

JUFFAIR COMPOUND (DOD SCHOOL))

VALUE OF

0004 Pre-Priced Work X $200,000.00 = $

0005 Non-Pre-Priced Work –

0006 Non-Pre-Priced Work –

UNITED ARAB EMIRATES – INCLUDING, BUT NOT LIMITED TO, JEBEL ALI AND FUJAIRAH

VALUE OF

0007 Pre-Priced Work X $200,000.00 = $

0008 Non-Pre-Priced Work –

0009 Non-Pre-Priced Work –

0010 Placeholder for Design Costs for Projects Requiring a Professional Engineer's Stamp

1.0

TOTAL PRICE CLIN 0001 - Base Period [Sum of SLINs 0001-0009] = $

CLIN 0002 - Option Period One

VALUE OF

0011 Pre-Priced Work X $200,000.00 = $

0012 Non-Pre-Priced Work –

0013 Non-Pre-Priced Work –

VALUE OF

0014 Pre-Priced Work X $200,000.00 = $

0015 Non-Pre-Priced Work –

0016 Non-Pre-Priced Work –

VALUE OF

0017 Pre-Priced Work X $200,000.00 = $

0018 Non-Pre-Priced Work –

0019 Non-Pre-Priced Work –

0020 Placeholder for Design Costs

TOTAL PRICE CLIN 0002 - Option Period One [Sum of SLINs 0011-0019] = $

CLIN 0003 - Option Period Two

VALUE OF

0021 Pre-Priced Work X $200,000.00 = $

0022 Non-Pre-Priced Work –

0023 Non-Pre-Priced Work –

VALUE OF

0024 Pre-Priced Work X $200,000.00 = $

0025 Non-Pre-Priced Work –

0026 Non-Pre-Priced Work –

VALUE OF

0027 Pre-Priced Work X $200,000.00 = $

0028 Non-Pre-Priced Work –

0029 Non-Pre-Priced Work –

0030 Placeholder for Design Costs

TOTAL PRICE CLIN 0003 - Option Period Two [Sum of SLINs 0021-0029] = $

CLIN 0004 - Option Period Three

VALUE OF

0031 Pre-Priced Work X $200,000.00 = $

0032 Non-Pre-Priced Work –

0033 Non-Pre-Priced Work –

VALUE OF

0034 Pre-Priced Work X $200,000.00 = $

0035 Non-Pre-Priced Work –

0036 Non-Pre-Priced Work –

VALUE OF

0037 Pre-Priced Work X $200,000.00 = $

0038 Non-Pre-Priced Work –

0039 Non-Pre-Priced Work –

0040 Placeholder for Design Costs

TOTAL PRICE CLIN 0004 - Option Period Three [Sum of SLINs 0031-0039] = $

CLIN 0005 - Option Period Four

VALUE OF

0041 Pre-Priced Work X $200,000.00 = $

0042 Non-Pre-Priced Work –

0043 Non-Pre-Priced Work –

VALUE OF

0044 Pre-Priced Work X $200,000.00 = $

0045 Non-Pre-Priced Work –

0046 Non-Pre-Priced Work –

VALUE OF

0047 Pre-Priced Work X $200,000.00 = $

0048 Non-Pre-Priced Work –

0049 Non-Pre-Priced Work –

0050 Placeholder for Design Costs

TOTAL PRICE CLIN 0005 – Option Period Four [Sum of SLINs 0041-0049] = $

TOTAL PROPOSED PRICE (TPP) [The TPP is the sum of total price for each option period added to the total price for the base period]

NOTES:

(1) The offeror shall provide a proposed coefficient and calculate the SLIN price for each SLIN. In addition the offer shall calculate the total price for each CLIN and the TPP.

(2) The completed Coefficient Schedule is to be submitted with the Price Proposal and will become incorporated into the contract.

(3) The value of work estimated is for price evaluation purposed only. The actual distribution of work may differ significantly from that shown. Therefore, the Contractor should ensure that the coefficient properly reflects its costs for each category.

(4) Coefficients are not to exceed more than two places to the right of the decimal.

(5) In the event there is a difference between a proposed coefficient and the calculated SLIN price, the proposed coefficient will be held to be the intended proposal and the SLIN price will be recalculated accordingly.

Offeror agrees that bid is good and valid for 90 days after proposal receipt.

Offeror Signature

File details come from the government source that posted it. Updated .