Attachment D - Bid Drawings - 33 pages.pdf

PDF 9 MB Posted

Attached to
Y1DZ--437-25-103, 3 Year Electrical Testing & Maintenance Federal contract opportunity
Solicitation number
36C26325B0012
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

About this file

These are detailed electrical system testing and maintenance bid drawings for the Fargo VA Medical Center, comprising 33 pages of technical diagrams and specifications for a comprehensive electrical infrastructure assessment and maintenance project. The drawings cover multiple buildings (Buildings 1, 9, 10, 11, 12, 13, 30, 40, 46, 51, 52, 54, and 56) and include detailed one-line electrical plans, transformer plans, power and data floor plans, and electrical details. The drawings document existing electrical infrastructure, including transformers, switchgear, distribution panels, emergency power systems, and specific electrical equipment locations across the VA campus. Key technical elements include electrical system layouts, circuit details, conduit routing, grounding specifications, and installation requirements for various electrical components, with emphasis on maintaining minimal disruption to VA healthcare services during the electrical testing and maintenance work.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

BLDG. NO.

1 MEDICAL CENTER

3 ADMINISTRATION OFFICE

8 FLAGPOLE

9 MEDICAL CENTER

10 BOILER PLANT

11 MAINTENANCE GARAGE

12 WAREHOUSE

13 LAUNDRY

30 ADMINISTRATION OFFICE

39 HIGH VOLTAGE SWITCHGEAR BLDG

42 UND SCHOOL OF MEDICINE

46 MEDICAL CENTER

MC- MOTORCYCLE PARKING

CP- CAR/VAN POOL PARKING

- HANDICAPPED PARKING

40 VBA REGIONAL OFFICE

41 OXYGEN STORAGE TANK

43 PICNIC SHELTER AND PATIO

44 XCEL ENERGY BLDG (NATURAL GAS)

20 GATE WELL

50 COLD STORAGE BUILDING

51 HRMS

52 ADMINISTRATION OFFICE

53 HAZMAT STORAGE BUILDING

54 PANDEMIC FLU STORAGE BUILDING

RE

D

RI

VE

R

OF

TH

E

NO

RT

H

19th AVE. N.

21st AVE. N.

EL

M

S

TR

EE

T

MC

EL

M

S

TR

EE

T

30W 30E

12 13

CITY

LIFT

STATION

(STORM

SEWER)

DIKE

DIKE

BOTTOM O

F D

IKE SLO

PE

BO

TT

O M

O F

D

IK

E

SL

O

PE

DIKE

DIKE

DIKE

DIKE

TOP O

F EARTHEN DIKE

TO

P

O F

EA

R

TH

EN

D

IK

E

MAIN HOSPITAL

BUILDING

BO

TT

O M

O F

D

IK

E

SL

O

PE

1-9-46

56 CHILLER PLANT

MC

UND

UND

N

FF

E N

FF

E

AFGE

AFGE

AFGE

AFGE

RO EOM

HCHV

C P

C

PC

PC

PC

P

C

PC

P

C P

VA

N

VA

N

R

MC

R- RESERVED PARKING

R

R R

UND- UNIVERSITY OF NORTH DAKOTA

AFGE- AMERICAN FEDERATION GOVERNMENT EMPLOYEE

RO EOM- REGIONAL OFFICE EMPLOYEE OF THE MONTH

HCHV- HEALTH CARE HOMELESS VETERANS

NFFE- NATIONAL FEDERATION FEDERAL EMPLOYEE

VAMC AND ROC

2101 ELM ST. N

FARGO, ND 58102

701-239-3760

FILE PATH: S:\ENGINEERING\05 PROJECTS FILES\437-25-103 3-YEAR ELECTRICAL\CONTRACTING SOP - CONSTRUCTION INFO\DRAWINGS FILE NAME: 437-25-103 05-20-25

PAGE

X 0.0

DWG.

PROJECT NUMBER

437-25-103

Perform 3 Year Electrical Testing And Maintenance 2025

PROJECT NUMBER

GENERAL CONSTRUCTION NOTES

1. VA WILL BE NOTIFIED OF ANY ACTIVITIES THAT ARE KNOWN TO OR COULD POTENTIALLY MEET ANY OF THE

FOLLOWING CRITERIA:

1.1. COMPROMISE LIFE SAFETY

1.2. CAUSE FUMES OR NOXIOUS ODORS

1.3. GENERATE LARGE QUANTITIES OF DUST

1.4. INTERFERE WITH THE OPERATION OF THE FIXED FIRE DETECTION OR SUPPRESSION SYSTEMS

2. CONTRACTOR WILL AT ALL TIMES ENSURE ALL MEANS OF EGRESS MEET THE FOLLOWING REQUIREMENTS

2.1. FIRE/SMOKE DOORS ARE UNLOCKED AND FREE OF OBSTRUCTIONS

2.2. SUFFICIENT MEANS OF EGRESS AND IS FREE OF OBSTRUCTIONS

2.3. ALL EGRESS ROUTES PROPERLY MARKED

2.4. TRASH AND DEBRIS IS REMOVED WITHIN A REASONABLE TIMEFRAME. DEBRIS IS COVERED AND

DAMPENED PRIOR TO BEING TRANSPORTED THROUGH THE FACILITY.

2.5. TOOLS AND MATERIALS WILL BE STORED NEATLY AND IN AN ORDERLY MANNER.

3. THE CONTRACTOR WILL ENSURE THE FIRE ALARM, FIRE DETECTION, AND FIRE SUPPRESSION SYSTEMS

COMPLY WITH THE FOLLOWING CONDITIONS:

3.1. FIRE ALARM PULL STATIONS ARE UNOBSTRUCTED

3.2. MEASURES USED TO PROTECT FIRE ALARM, FIRE DETECTION AND FIRE SUPPRESSION SYSTEMS ARE

REMOVED WHEN CONTRACTOR IS NOT ACTIVELY WORKING

3.3. HOT WORK PERMITS ARE UTILIZED AND ARE CURRENT ANY TIME AN ACTIVITY COULD CAUSE A FIRE.

3.4. SPRINKLER HEADS WILL NEVER BE OBSTRUCTED

3.5. INTERIM LIFE SAFETY MEASURES ARE IN PLACE AND ARE BEING EFFECTIVELY MANAGED

4. THE CONTRACTOR WILL MAINTAIN A CLEAN WORK SPACE IN ORDER TO PROVIDE A SAFE WORKING ENVIRONMENT AND MINIMIZE THE SPREAD OF DUST THROUGH THE FACILITY. WORKS SITES WILL BE

INSPECTED DAILY TO ENSURE THEY MEET THE FOLLOWING REQUIREMENTS:

4.1. FLOOR MATS AND DUST TACK MATS ARE LOCATED AT ACCESS POINTS TO THE CONSTRUCTION AREA AND

REPLACED WHEN NEEDED.

4.2. SIGNS AND BARRIERS WILL BE UTILIZED TO RESTRICT UNAUTHORIZED ACCESS TO THE CONSTRUCTION

AREAS. SIGNS AND BARRIERS WILL BE CLEANED PRIOR TO THEIR REMOVAL.

4.3. DRY SWEEPING WILL NOT BE PERFORMED WITHOUT THE USE OF APPROVED SWEEPING COMPOUNDS.

4.4. NEGATIVE PRESSURE IS USED AND MAINTAINED AS REQUIRED BY THE VA. THE CONTRACTOR IS

EXPECTED TO ENSURE EXHAUST DUCTING IS NOT LOCATED NEAR ANY OTHER AIR INTAKE ASSEMBLY OR

POSE A REASONABLE HAZARD TO INDIVIDUALS OUTSIDE.

4.5. ALL HVAC DUCTING WILL BE COVERED DURING ACTIVITIES THAT COULD POTENTIALLY GENERATE DUST OR NOXIOUS FUMES UNLESS THE DUCTING IS BEING USED TO GENERATE NEGATIVE AIR AND WILL NOT

AFFECT OTHER HVAC SYSTEMS. .

5. HAZARDOUS MATERIALS WILL BE STORED IN ACCORDANCE WITH OSHA AND THEIR MANUFACTURERS RECOMMENDATIONS. CONTRACTOR WILL PROVIDE SDS INFORMATION FOR ALL CHEMICALS ON SITE UPON REQUEST. SDS SHEETS MUST BE AVAILABLE IN THE EVENT OF A FIRE IN ORDER TO ALLOW THE FIRE

DEPARTMENT ACCESS TO NECESSARY SAFETY INFORMATION.

6. OSHA DEFINED CONFINED SPACES WILL NOT BE ENTERED WITHOUT PRIOR APPROVAL BY THE VA.

7. CONTRACTORS ARE EXPECTED TO OBSERVE AND MAINTAIN A LOCKOUT AND TAGOUT POLICY.

HAZARDOUS MATERIALS WHICH INCLUDE BUT ARE NOT LIMITED TO ASBESTOS ARE CLEARLY IDENTIFIED TO

ALL INDIVIDUALS WORKING WITHIN THE CONSTRUCTION ZONE. HAZARDOUS WILL BE QUICKLY MITIGATED AND ELIMINATED AS SOON AS REASONABLY POSSIBLE. ASBESTOS IS KNOWN TO BE PRESENT IN ALL AREAS WITHIN THE CONSTRUCTION LIMITS. THE VA WILL BE PROVIDED A COPY OF ALL DISPOSAL PAPER WORK FOR RECORD

KEEPING. CONTRACTOR WILL PROVIDE A COPY OF ALL TESTING REPORTS.

8. ALL CONSTRUCTION MATERIALS MUST BE NON-COMBUSTABLE OR CARRY A NFPA FIRE RATING. SPRAY FOAM IS NOT ACCEPTABLE UNLESS IT IS SPECIFICALLY APPROVED BY THE VA.ALL NEW OR EXISTING PENETRATIONS

WILL BE FIRE CAULKED.

9. A MINIMUM OF 21 DAYS NOTIFICATION WILL BE PROVIDED PRIOR TO THE SHUT DOWN OF ANY UTILITY.

10. RECORDS OF EXISTING CONDITIONS MAY BE AVAILABLE BUT THE CONTRACTOR IS RESPONSIBLE FOR

VERIFYING ALL SITE CONDITIONS. ALL UTILITY LOCATES WILL BE BY THE CONTRACTOR.

13. CONTRACTOR PARKING IS LOCATED ON THE NORTH EAST SIDE OF CAMPUS AND SHARED WITH OTHER

CONTRACTORS. CONTRACTORS ARE EXPECTED TO LOCK OR SECURE THEIR EQUIPMENT AND CONSTRUCTION MATERIALS. PARKING OUTSIDE THE DESIGNATED PARKING AREA MUST BE COORDINATED WITH POLICE SERVICES OR THE CONTRACTORS VEHICLE MAY BE TOWED AT THE CONTRACTORS EXPENSE. ALL WORKERS SHALL BE INFORMED THIS IS A FEDERAL FACILITY AND WEAPONS OF ANY KIND OF EXPLOSIVES ARE NOT ALLOWED. EACH WORKER AND/OR THEIR VEHICLE IS SUBJECT TO BEING SEARCHED. SECURITY CAMERAS ARE IN USE ON THE FACILITY AND IS REASONABLE THAT A CONTRACTOR MAY INCIDENTALLY BE RECORDED WHILE

WORKING IN THE FACILITY.

14. THE PRIME CONTRACTOR WILL PROVIDE A JOB SITE FOREMAN WHO IS OSHA 30 HOUR SAFETY QUALIFIED

WHO MUST BE CAPABLE OF MAKING DECISIONS FOR THE PRIME CONTRACTOR. FAILURE OF THE

CONTRACTOR TO HAVE A COMPETENT SUPERINTENDENT ON THE JOB SITE AT ALL TIMES WILL RESULT IN HAVING THE JOB SITE SHUT DOWN. ALL CONTRACTORS WILL BE A MINIMUM OF OSHA 10 HOUR SAFETY QUALIFIED. CONTRACTOR WILL PROVIDE A COMPETENT PERSON FOR ALL CONSTRUCTION ACTIVITY.

PROFESSIONAL CERTIFICATIONS MUST BE CURRENT AND DOCUMENTATION MAY BE REQUESTED BY THE VA AT ANY TIME. ATTIRE AND DEMEANOR OF ALL CONTRACT EMPLOYEES MUST BE DECENT AND RESPECTFUL AND FAILURE TO BE RESPECTFUL COULD RESULT IN THE REMOVAL OF THE INDIVIDUAL FROM THE WORK

SITE.

15. VHA DIRECTIVE 1192, SEASONAL INFLUENZA PREVENTION MEMORANDUM APPLIES TO ANY INDIVIDUAL WORKING AT THE VA AND DOES INCLUDE CONTRACTORS. THE DIRECTIVE DICTATES THAT ALL PERSONNEL WORKING AT THE VA WILL HAVE A CURRENT INFLUENZA VACCINE OR ACCEPTABLE WAIVER. PROOF OF VACCINATION OR AN ACCEPTABLE WAIVER MUST BE PROVIDED UPON REQUEST BY THE VA. ADDITIONAL HEALTH PROTECTION MEASURES MAY BE IMPLIMENTED BEFORE OR DURING CONSTRUCTION IN RESPONSE

TO THE COVID PANDEMIC AND THE CONTRACTOR IS EXPECTED TO MAKE EVERY REASONABLE

ACCOMMODATION TO THESE POLICIES.

16. THE FARGO VA IS A NON-SMOKING FACILITY.

17. ALL CHANGES IN CONTRACT WORK AND EXTENSIONS OF TIME MUST BE AUTHORIZED BY THE CONTRACTING

OFFICER PRIOR TO BEGINNING THE CHANGE. CHANGES TO THE CONTRACT THAT ARE PERFORMED WITHOUT AUTHORIZATION BY THE CONTRACTING OFFICER ARE PERFORMED AT THE RISK OF THE CONTRACTOR.

18. WORK IS EXPECTED TO BE DONE IN PHASES TO ENSURE THAT VA PRIORITIES ARE ADDRESSED FIRST.

PHASED CONSTRUCTION IS ALSO REQUIRED TO ENSURE THAT FUNCTIONAL AREAS OF THE HOSPITAL REMAIN

OPERATIONAL AT ALL TIMES.

19. THE CONTRACTOR IS EXPECTED TO WORK AFTER NORMAL BUSINESS HOURS TO ENSURE THE

CONSTRUCTION IS COMPLETED ON THE CONSTRUCTION COMPLETION DATE ESTABLISHED AT THE AWARD OF THE CONTRACT. ACTIVITIES THAT DISRUPT NORMAL HOSPITAL FUNCTIONS WHICH INCLUDE BUT ARE NOT LIMITED TO FLOOR REMOVAL, ASBESTOS ABATEMENT, AND UTILITY SHUT DOWNS MAY BE REQUIRED TO BE

DONE DURING EVENINGS, OR WEEKENDS IN ORDER TO REDUCE DISRUPTION.

SHEET LIST TABLE

SHEET

NUMBER

SHEET

TITLE

SHEET

DESCRIPTION

1 X 0.0 COVER PAGE

2 A 0.1 TERMINOLOGY

3 A 0.3 LIFE SAFETY PLANS

4 E 0.0 ELECTRICAL TERMINOLOGY

5 E 0.1 ELECTRICAL SYMBOLOGY

6 E 2.20 BASEMENT POWER AND DATA PLAN

7 E 2.21 FIRST FLOOR POWER AND DATA

PLAN

8 E 2.22 SECOND FLOOR POWER AND DATA

PLAN

9 E2.23 THIRD FLOOR POWER AND DATA

PLAN

10 E 2.24 FOURTH FLOOR POWER AND DATA

PLAN

11 E 2.25 FIFTH FLOOR POWER AND DATA

PLAN

12 E 2.27 T1-E AND T1-W TRANSFORMER PLAN

13 E 2.28 T1-C TRANSFORMER PLAN

14 E 2.29 T56-1 TRANSFORMER PLAN

15 E 2.30 T9-E, T9-W, T-9 XRAY TRANSFORMER

PLAN

16 E 2.31 T11 TRANSFORMER PLAN

17 E 2.40 BLDG 40 SITE PLAN

18 E 5.00A SITE MEDIUM VOLTAGE ONE-LINE

PLAN A

19 E 5.00B SITE MEDIUM VOLTAGE ONE-LINE

PLAN B

20 E 5.00C SITE MEDIUM VOLTAGE ONE-LINE

PLAN C

21 E 5.01A BLDG 01 ONE-LINE PLAN A

22 E 5.01B BLDG 01 ONE-LINE PLAN B

23 E 5.09A BLDG 09 ONE-LINE PLAN A

24 E 5.09B BLDG 09 ONE-LINE PLAN B

25 E 5.09C BLDG 09 ONE-LINE PLAN C

26 E 5.09D BLDG 09 ONE-LINE PLAN D

27 E 5.10 BLDG 10 ONE-LINE PLAN

28 E 5.11 BLDG 11-12-13-30-51-52-54 ONE-LINE

PLAN

29 E 5.40 BLDG 40 ONE-LINE PLAN

30 E 5.46A BLDG 46 ONE-LINE PLAN A

31 E 5.46B BLDG 46 ONE-LINE PLAN B

32 E 5.56 BLDG 56 ONE-LINE PLAN

33 E 7.0 ELECTRICAL DETAILS

BID DOCUMENTS

94N1

ES464C1

464C3

464C3

EC94N2

4C

EC

4C

4C

EC92W2 94N1

A R C H

F u l l

B l e e d

E

X

I n c h e s

PA

G

E

SI

ZE

VA

M

C A

N D

R O

C

E

LM

S

T.

N

FA

R

G O

, N D

1-

9-

FI

LE

P

A

TH

: S :\E

N G

IN

EE

R

IN

G \0

PR

O

JE

C

TS

F

IL

ES

\4

-2

5-

3-

YE

A

R E

LE

C

TR

IC

A L\

C O

N

TR

A C

TI

N

G S

O P

- C O

N

ST

R U

C

TI

O N

IN

FO

\D R

A W

IN

G

S

FI

LE

N

A M

E:

-2

5-

-2 0-

M ay

0, Ja nu ar y

TE

R

M

IN

O

LO

G Y

PA

PH

PR

O

JE

C

T N

U M

B

ER

7-

-1

Pe rf or m

Y ea r E le ct ric al

T es tin g

A nd

M ai nt en an ce

D R

A W

IN

G

D

ES

C R

IP

TI

O N

PR

O

JE

C

T N

A M

E R

EV

IE

W

ED

B Y

R

EV

IS

ED

C R

EA

TE

D

C R

EA

TE

D B

Y

PR

IN

TE

D

O N

M ay

0, R

EV

IS

ED

B Y

B

ID

D O

C U

M

EN

TS

PA

G

E

A

.1

D W

G

O

F

CG

PRE-CONSTRUCTION RISK ASSESSMENT (PCRA)

Project #

Project Title:

Area of Construction:

Contractor/Supervisor:

PCRA Completed by:

SAFETY/ENGINEERING

Y N

Will exits or exit egress routes from occupied areas change?

Will the construction area have less than two remote exits?

Will there be excessive distance to exit?

Will access to Emergency Services become blocked or obstructed?

Will any part of the fire protection systems (detection, notification or suppression) be shut down or impaired for >4 hours in a 24-hour period?

Will smoke or firewalls be breached?

Will any temporary construction partitions be built?

Will the project result in the accumulation of construction debris?

Will construction affect grounds safety (pits, storage, equipment, etc.)?

Will construction present other life safety hazards?

Will protection of hazardous areas be compromised?

INTERVENTION

A. Ensure Alternate Egress Routes B. Ensure Alternate Emergency Access C. Fire Department Notification D. Ensure Smoke-Tight Temporary Construction

NY

E. Additional Fire Fighting Equipment F. Control Combustible Loads G. Conduct 2 Fire Drills Per Shift in All Areas H. Increase Hazard Surveillance Rounds

CONSTRUCTION ACTIVITY

Will there be any anticipated utility shutdowns? (Communications, electrical, heating/cooling, HVAC, medical gases, vacuum, water, server)

Will noise levels be excessive?

Will vibration levels be excessive?

Will additional security measures be implemented?

Will work require Hot Works Permit?

Will work require Above Ceiling Work Permit?

1.

PATIENT SAFETY COORDINATOR

Y N CONSTRUCTION ACTIVITY

Does this project involve a patient care area either directly or adjacent to?

List:

Do areas involved have knowledge of construction?

List:

Does this project alter patient access to building/patient care area, either temporarily or permanently?

If YES, indicate intervention:

The new/temporary access path should be intuitive, i.e. easy to follow.

Access

Construction Area/

Materials

Critical Alarms

Signage should be adequate for decreased visual acuity and at appropriate viewing levels for both ambulating and w/c bound individuals.

Construction areas should not be accessible by unauthorized personnel.

Construction areas should be visually identified.

c. Wander guard technology d.

The access path should be smooth, without tripping hazards.

The access path should be handicap accessible.

Construction materials and tools should be moved and stored appropriately to preclude unauthorized access?

Critical clinical alarms shall be functional and audible within and adjacent to the construction zone? Including but not limited to:

a. Emergency CODE Systems

b. Medical Gas Alarms (Oxygen, Air, Suction) Vital Sign Monitoring/Telemetry Systems

Additional Requirements:

1.

2.

e. Medication/Nutrition Pumps

f. Nurse Call Systems

Loud, sudden or unexpected noises must be avoided; if any noise louder than ambient noise is going to occur, occupants of surrounding rooms must be notified immediately prior to commencement of noise. If excessive noise is unavoidable, work must be coordinated with the AOD.

I. Additional Training of Emergency Personnel J.

K.

L.

Ensure Additional Employee Education Institute a Fire Watch w/documentation Post temporary signage

If YES, describe intervention:

Est. Start Date:

Est. Duration:

If YES, select ILSM from list below or describe other intervention:

A

A A

A

C

A

D

E

H

H H

E

E E

B

E

E

F

J

H

H H

I

H

G

G

J

J J

J

I

H

H

L

L L

L

K

INFECTION CONTROL RISK ASSESSMENT

INFECTION CONTROL COORDINATOR

Y N CONSTRUCTION ACTIVITY TYPE

A: Inspection, non-invasive activity-includes, not limited to removal of ceiling tiles for inspection (1/50 sq ft), painting (not sanding), wall covering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.

B: Small scale, short duration, moderate to high levels-includes but not limited to installation of telephone/computer cabling, access to chase spaces, cutting of walls or ceiling where dust migration can be controlled.

C: Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes but not limited to sanding of walls for painting or wall covering; removal of floor coverings, ceiling tiles, and casework; new wall construction; minor duct work or electrical work above the ceilings; major cabling activity; any activity which cannot be completed in a single work shift.

D: Major duration and construction activities-Includes, but not limited to:

activities that require consecutive work shifts; requires heavy demolition or removal of a complete cabling system; new construction.

Patient Risk Group LOW Risk

Project Class

Class:

CLASS I

MEDIUM Risk HIGH Risk HIGHEST Risk

1.

2.

1.

2.

CLASS II

TYPE A

I I I

II

During Construction Project:

Execute work by methods to minimize raising dust from construction operations.

Immediately replace any ceiling tile displaced for visual inspection.

Include all items from Class I above Provides active means to prevent air-borne dust from dispersing into atmosphere

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Place dust mat at access points of work area.

7. Contain construction waste before transport in tightly covered containers.

8.

1.

2.

3.

CLASS III

Include all items from Class I/II above Involve Infection Control in design/planning before construction begins.

Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

1.

2.

CLASS IV

Include all items from Class I/II/III above Involve Infection Control in design/planning before construction begins.

3. Seal holes, pipes, conduits, and punctures appropriately.

4. If exiting to a patient care area, construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.

5. Walk-off mats are required to minimize tracking of heavy dirt and dust from construction areas. Shoe covers may be considered in certain areas.

ICRA PROJECT CLASS:

Could there be a risk of TB Exposure?

Could water quality be compromised?

Y

Y

N If yes, describe type of risk and Intervention:

N If yes, Explain:

1. Include all items from Class I/II/III above

Isolate HVAC system in areas where work is being performed to prevent contamination of duct system.

1.

1. Wipe surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

4. Remove isolation of HVAC system in areas where work is being performed.

Include all items from Class I/II above

2. Do not remove barriers from work area until completed project is thoroughly cleaned as required by Chief, EMS and Infection Control Coordinator.

3.

4.

Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

TYPE B

II

II

II

III/IV

Y N PATIENT RISK GROUP (may modify as appropriate))

Low Risk- (ex Office Areas)

Medium Risk-(ex Cardiology, ECHO, Endoscopy, Nuclear Medicine, Physical Therapy, Radiology/MRI, Respiratory Therapy)

High Risk-(ex CCU, ER, Labor & Delivery, Laboratories (specimen), Newborn Nursery, Outpatient Surgery, Pediatrics, Pharmacy, Post Anesthesia care, Surgical Units)

Highest Risk-(ex Any area caring for Immunocompromised patients, Burn Unit, Cardiac Cath Lab, Central Sterile Supply, ICU, Medical Unit, Negative pressure isolation rooms, Oncology, Operating rooms including C-section)

TYPE C

II

TYPE D

III/IV

III

III/IV

III/IV

IV

IV

IV

Upon Completion of Project:

Additional Requirements:

Patient Safety Coordinator/Date Infection Control Coordinator/Date

IH/Safety Date Project Engineer/Date

INFECTION CONTROL

1. INFECTION CONTROL IS CRITICAL IN ALL MEDICAL CENTER FACILITIES. INTERIOR CONSTRUCTION ACTIVITIES CAUSING DISTURBANCE OF EXISTING DUST, OR CREATING NEW DUST, MUST BE CONDUCTED WITHIN VENTILATION-CONTROLLED AREAS THAT MINIMIZE THE FLOW OF AIRBORNE PARTICLES INTO PATIENT AREAS. EXTERIOR CONSTRUCTION ACTIVITIES CAUSING DISTURBANCE OF SOIL OR CREATES DUST IN SOME OTHER MANNER MUST BE CONTROLLED.

2. AN AHA ASSOCIATED WITH INFECTION CONTROL WILL BE PERFORMED BY VA PERSONNEL IN ACCORDANCE WITH FGI GUIDELINES (I.E. INFECTION CONTROL RISK ASSESSMENT (ICRA)). THE ICRA PROCEDURE FOUND ON THE AMERICAN SOCIETY FOR HEALTHCARE ENGINEERING (ASHE) WEBSITE WILL BE UTILIZED. RISK CLASSIFICATIONS OF CLASS II OR LOWER WILL REQUIRE APPROVAL BY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY BEFORE BEGINNING ANY CONSTRUCTION WORK. RISK CLASSIFICATIONS OF CLASS III OR HIGHER WILL REQUIRE A PERMIT BEFORE BEGINNING ANY CONSTRUCTION WORK. INFECTION CONTROL PERMITS WILL BE ISSUED BY THE SAFETY OFFICE. THE INFECTION CONTROL PERMITS WILL BE POSTED OUTSIDE THE APPROPRIATE CONSTRUCTION AREA. MORE THAN ONE PERMIT MAY BE ISSUED FOR A CONSTRUCTION PROJECT IF THE WORK IS LOCATED IN SEPARATE AREAS REQUIRING SEPARATE CLASSES. THE PRIMARY PROJECT SCOPE AREA FOR THIS PROJECT IS: CLASS [____}, HOWEVER, WORK OUTSIDE THE PRIMARY PROJECT SCOPE AREA MAY VARY. THE REQUIRED INFECTION CONTROL PRECAUTIONS WITH EACH CLASS

ARE AS FOLLOWS:

2.1. CLASS I REQUIREMENTS:

2.1.1. DURING CONSTRUCTION WORK:

2.1.1.1. NOTIFY THE COR

2.1.1.2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.

2.1.1.3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.

2.1.2. UPON COMPLETION:

2.1.2.1. CLEAN WORK AREA UPON COMPLETION OF TASK

2.1.2.2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY

2.2. CLASS II REQUIREMENTS:

2.2.1. DURING CONSTRUCTION WORK:

2.2.1.1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY

2.2.1.2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS

WHERE POSSIBLE.

2.2.1.3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

2.2.1.4. SEAL UNUSED DOORS WITH DUCT TAPE.

2.2.1.5. BLOCK OFF AND SEAL AIR VENTS.

2.2.1.6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

2.2.2. UPON COMPLETION:

2.2.2.1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.

2.2.2.2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

2.2.2.3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.

2.2.2.4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED

2.2.2.5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY

2.3. CLASS III REQUIREMENTS:

2.3.1. DURING CONSTRUCTION WORK:

2.3.1.1. OBTAIN PERMIT FROM THE // RESIDENT ENGINEER // PROJECT MANAGER // AND FACILITY SAFETY // MANAGER // OFFICER // OR CONTRACTING OFFICER

REPRESENTATIVE // OR GOVERNMENT DESIGNATED AUTHORITY //

2.3.1.2. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2.3.1.3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART

WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS.

2.3.1.4. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC

CALIBRATION AND MONITORED BY THE CONTRACTOR.

2.3.1.5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

2.3.1.6. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

2.3.2. UPON COMPLETION:

2.3.2.1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT

DESIGNATED AUTHORITY AND THOROUGHLY CLEANED BY THE VA ENVIRONMENTAL SERVICES DEPARTMENT.

2.3.2.2. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS.

2.3.2.3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

2.3.2.4. WET MOP AREA WITH CLEANER/DISINFECTANT.

2.3.2.5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

2.3.2.6. RETURN PERMIT TO THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY

2.4. CLASS IV REQUIREMENTS:

2.4.1. DURING CONSTRUCTION WORK:

2.4.1.1. OBTAIN PERMIT FROM THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY.

2.4.1.2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2.4.1.3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART

WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS.

2.4.1.4. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE CONTRACTOR.5) SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

2.4.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.

2.4.1.6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK

AREA.

2.4.2. UPON COMPLETION:

2.4.2.1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT

DESIGNATED AUTHORITY WITH THOROUGH CLEANING BY THE VA ENVIRONMENTAL SERVICES DEPT.

2.4.2.2. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS.

2.4.2.3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

2.4.2.4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

2.4.2.5. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

2.4.2.6. WET MOP AREA WITH CLEANER/DISINFECTANT.

2.4.2.7. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.

2.4.2.8. RETURN PERMIT TO THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY.

2.5. BARRIERS SHALL BE ERECTED AS REQUIRED BASED UPON CLASSIFICATION (CLASS III & IV REQUIRES BARRIERS). FOR ADDITIONAL DETAILS ON BARRIERS REFER TO

SPECIFICATION 01 35 26-25.

1 SCALE: 1

32" = 1'

FLOOR 4 LIFE SAFETY PLAN

AutoCAD SHX Text 4A-36

AutoCAD SHX Text

TESTING

AutoCAD SHX Text

STAIR #14

AutoCAD SHX Text

STAIR #15

AutoCAD SHX Text

STAIR #9

AutoCAD SHX Text

STAIR #13

AutoCAD SHX Text

STAIR #10

AutoCAD SHX Text

STAIR #7

AutoCAD SHX Text

STAIR #2

AutoCAD SHX Text

STAIR #1

AutoCAD SHX Text

LIBERTY ELEV (1,2,3)

AutoCAD SHX Text

INDEPENDENCE ELEV (4,5)

AutoCAD SHX Text

VICTORY ELEV (7,8)

AutoCAD SHX Text

STAIR #3

AutoCAD SHX Text

STAIR #21

AutoCAD SHX Text 4B-58

AutoCAD SHX Text 4B-58A

AutoCAD SHX Text 4B-64

AutoCAD SHX Text 4B-60

AutoCAD SHX Text 4B-60A

AutoCAD SHX Text

4B-55 LNDY

AutoCAD SHX Text 4B-64A

AutoCAD SHX Text 4B-62

AutoCAD SHX Text 4B-70 Nrse-St

AutoCAD SHX Text 4B-70A

AutoCAD SHX Text 4B-55A

AutoCAD SHX Text 4B-57

AutoCAD SHX Text 4B-57A

AutoCAD SHX Text 4B-59

AutoCAD SHX Text 4B-59A

AutoCAD SHX Text 4B-63

AutoCAD SHX Text 4B-63A

AutoCAD SHX Text 4B-65 Dining

AutoCAD SHX Text 4B-66

AutoCAD SHX Text 4B-67

AutoCAD SHX Text

4B-50 HSKP

AutoCAD SHX Text 4B-48 Interdis.

AutoCAD SHX Text 4B-46 In-Pt Psych

AutoCAD SHX Text 4B-44 WK-Rm

AutoCAD SHX Text 4B-42 Nutn

AutoCAD SHX Text 4B-40 Dayroom

AutoCAD SHX Text 4B-26

AutoCAD SHX Text 4B-24 Psych

AutoCAD SHX Text

4B-49 CLN

AutoCAD SHX Text 4B-47 Soiled

AutoCAD SHX Text 4B-45 Nrse Mngr

AutoCAD SHX Text

4B-43 CLNL S.W.

AutoCAD SHX Text

4B-36 MHICM

AutoCAD SHX Text 4B-20 GRP-Rm

AutoCAD SHX Text 4A-20 GRP-Rm

AutoCAD SHX Text 4A-22 MH Nurse

AutoCAD SHX Text 4A-24 Nurse

AutoCAD SHX Text 4A-26 Psych

AutoCAD SHX Text 4A-28 Psych

AutoCAD SHX Text 4A-30 Pysch office

AutoCAD SHX Text 4A-32 Nurse

AutoCAD SHX Text 4A-34 Nurse

AutoCAD SHX Text 4A-67 Psych

AutoCAD SHX Text 4A-63 S.W.

AutoCAD SHX Text 4A-61 S.W

AutoCAD SHX Text 4A-59 S.W.

AutoCAD SHX Text 4A-57 S.W.

AutoCAD SHX Text 4A-55 S.W.

AutoCAD SHX Text 4A-70 Storage

AutoCAD SHX Text 4A-68 S.W.

AutoCAD SHX Text 4A-64 Copier

AutoCAD SHX Text 4A-62 S.W.

AutoCAD SHX Text 4A-60 Suicide Prevent

AutoCAD SHX Text 4A-58 S.W.

AutoCAD SHX Text 4A-56 Psych

AutoCAD SHX Text 4A-54 Break

AutoCAD SHX Text 4A-52 C&P

AutoCAD SHX Text

4A-50 HCHV

AutoCAD SHX Text 4A-48 Psych

AutoCAD SHX Text 4A-46 Psych

AutoCAD SHX Text 4A-44 Psych

AutoCAD SHX Text 4A-42 Psych

AutoCAD SHX Text 4A-47 Psych

AutoCAD SHX Text 4A-45 Psych

AutoCAD SHX Text 4A-43 Psych

AutoCAD SHX Text 4A-40 Mech

AutoCAD SHX Text 4A-35 Psych

AutoCAD SHX Text 4A-33 Psych

AutoCAD SHX Text 4A-31 Nurse

AutoCAD SHX Text 4A-29 Psych

AutoCAD SHX Text 4A-27 Psych

AutoCAD SHX Text

4A-23 GRP-RM

AutoCAD SHX Text 4A-23A

AutoCAD SHX Text 4A-07 M-Tlt

AutoCAD SHX Text 4A-05 FM-Tlt

AutoCAD SHX Text 4A-03

AutoCAD SHX Text 4A-01

AutoCAD SHX Text 4A-15 Waiting Rm

AutoCAD SHX Text

4A-16 TR

AutoCAD SHX Text 4A-17

AutoCAD SHX Text 4A-19M&E

AutoCAD SHX Text 4E-19 Mech

AutoCAD SHX Text

4E-19A ELEV #6 EQ ROOM

AutoCAD SHX Text 4D-05 Mech

AutoCAD SHX Text 4D-07

AutoCAD SHX Text

4D-07A ELEV #5 EQ-ROOM

AutoCAD SHX Text 4E-22

AutoCAD SHX Text 4E-23

AutoCAD SHX Text 4E-24 Med Libn

AutoCAD SHX Text 4E-09 Storage

AutoCAD SHX Text 4E-10 Library

AutoCAD SHX Text 4E-21

AutoCAD SHX Text 4E-20

AutoCAD SHX Text 4E-18

AutoCAD SHX Text 4E-17 Conf/Class

AutoCAD SHX Text 4E-16

AutoCAD SHX Text 4E-14

AutoCAD SHX Text 4E-15 Computer Training

AutoCAD SHX Text 4E-15A

AutoCAD SHX Text 4D-06 Mech

AutoCAD SHX Text 4D-08 Elev #4 EQ-Room

AutoCAD SHX Text 4C-05 Brk-Rm

AutoCAD SHX Text 4C-08

AutoCAD SHX Text 4C-06

AutoCAD SHX Text 4C-48

AutoCAD SHX Text 4C-49 DERM Ex

AutoCAD SHX Text 4C-50 DERM Ex

AutoCAD SHX Text 4C-51 DERM Ex

AutoCAD SHX Text

4C-52 INT

AutoCAD SHX Text 4C-40 Waiting

AutoCAD SHX Text 4C-44 Fitting

AutoCAD SHX Text

4C-47 CLN

AutoCAD SHX Text 4C-46 Soiled

AutoCAD SHX Text 4C-45 Derm Ste

AutoCAD SHX Text 4C-39 Aud/Eye Recp

AutoCAD SHX Text 4B-76

AutoCAD SHX Text 4B-74

AutoCAD SHX Text 4B-72

AutoCAD SHX Text

4B-70B LNGE

AutoCAD SHX Text 4B-74A

AutoCAD SHX Text 4B-72A

AutoCAD SHX Text 4B-76A

AutoCAD SHX Text 4B-71 M & E

AutoCAD SHX Text 4B-73

AutoCAD SHX Text 4B-73A

AutoCAD SHX Text 4B-75

AutoCAD SHX Text 4B-75A

AutoCAD SHX Text 4C-28

AutoCAD SHX Text 4C-29

AutoCAD SHX Text 4C-27 Elec

AutoCAD SHX Text 4C-25

AutoCAD SHX Text 4C-26

AutoCAD SHX Text 4C-23

AutoCAD SHX Text 4C-23A Mod RM

AutoCAD SHX Text 4C-17 Eye-Ex

AutoCAD SHX Text 4C-11 Eye-Ex

AutoCAD SHX Text 4C-10 Eye-Ex

AutoCAD SHX Text

4B-35 SATP

AutoCAD SHX Text 4B-34 Admin

AutoCAD SHX Text 4B-33 Admin

AutoCAD SHX Text 4B-32 Admin

AutoCAD SHX Text 4B-28 Pharm

AutoCAD SHX Text 4B-29 Pharm

AutoCAD SHX Text 4B-30 Admin

AutoCAD SHX Text 4B-31 Admin

AutoCAD SHX Text 4B-27 H.W.

AutoCAD SHX Text

4B-23 TR

AutoCAD SHX Text 4C-22 Eye Int.

AutoCAD SHX Text 4C-21 Eye Int.

AutoCAD SHX Text 4C-20 Laser

AutoCAD SHX Text 4B-16 Recp

AutoCAD SHX Text 4B-14 Admin

AutoCAD SHX Text 4B-12 C&P

AutoCAD SHX Text 4B-10 Exam

AutoCAD SHX Text 4B-19 Proc Rm

AutoCAD SHX Text 4B-06

AutoCAD SHX Text 4B-04

AutoCAD SHX Text 4B-02

AutoCAD SHX Text 4C-18 Flour. Ang.

AutoCAD SHX Text 4C-07 Eye

AutoCAD SHX Text

4D-02 TR

AutoCAD SHX Text 4D-04

AutoCAD SHX Text 4C-03

AutoCAD SHX Text 4C-02 Meds

AutoCAD SHX Text 4C-01

AutoCAD SHX Text 4C-31 Aud Ex

AutoCAD SHX Text 4C-32 Aud Ex

AutoCAD SHX Text 4C-24

AutoCAD SHX Text 4C-16 Eye Ex

AutoCAD SHX Text 4C-14 Eye Ex

AutoCAD SHX Text 4C-13 Eye Ex

AutoCAD SHX Text 4C-12 Eye Ex

AutoCAD SHX Text 4C-15 Waiting

AutoCAD SHX Text 4C-34 Audio

AutoCAD SHX Text 4C-35 Audio

AutoCAD SHX Text 4C-54 Cerumen

AutoCAD SHX Text

4C-33 AUD EX

AutoCAD SHX Text 4C-31 Men

AutoCAD SHX Text 4C-55 Women

AutoCAD SHX Text 4C-30 Audlgy Ste.

AutoCAD SHX Text 4A-51 M&E

AutoCAD SHX Text 4A-38

AutoCAD SHX Text

4A-53 TLT

AutoCAD SHX Text

TV

AutoCAD SHX Text

CONTRACT LIMIT LINE

AutoCAD SHX Text

DEMOLITION LINE

AutoCAD SHX Text

ELEVATION INDICATOR

AutoCAD SHX Text

CENTER LINE INDICATOR

AutoCAD SHX Text

EXISTING TO REMAIN LINE

AutoCAD SHX Text

FEATURES ABOVE LINE INDICATOR

AutoCAD SHX Text

PROPERTY LINE

AutoCAD SHX Text

BREAK, ROUND (USER DEFINES SIZE)

AutoCAD SHX Text

BREAK, STRAIGHT (SEE SECTION INDICATORS, BUILDING, WITH BREAK STANDARDS)

AutoCAD SHX Text

DETAIL INDICATOR

AutoCAD SHX Text

DETAIL INDICATOR

AutoCAD SHX Text

DETAIL INDICATOR FOR SMALL CONDITIONS

AutoCAD SHX Text

DIMENSION LINE

AutoCAD SHX Text

DOOR OPENING/BORROWED LIGHT IDENTIFIER

AutoCAD SHX Text

DRAWING BLOCK TITLE, TYPICAL

AutoCAD SHX Text

ELEVATION INDICATOR, EXTERIOR

AutoCAD SHX Text

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

AutoCAD SHX Text

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

AutoCAD SHX Text

ARCHITECTURAL SYMBOLS

AutoCAD SHX Text

CENTER LINE

AutoCAD SHX Text

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

AutoCAD SHX Text

GRAPHIC SCALE, "=1'-0"18"=1'-0"

AutoCAD SHX Text

DRAWING BLOCK TITLE

AutoCAD SHX Text 1 1/2" = 1'-0"

AutoCAD SHX Text C4

AutoCAD SHX Text 1 1/2'

AutoCAD SHX Text 1/2'

AutoCAD SHX Text

AutoCAD SHX Text 1'

AutoCAD SHX Text A-201

AutoCAD SHX Text A4

AutoCAD SHX Text

AutoCAD SHX Text 16'

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

AutoCAD SHX Text A2

AutoCAD SHX Text A-202

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text A-202

AutoCAD SHX Text A2

AutoCAD SHX Text A-201

AutoCAD SHX Text A4

AutoCAD SHX Text A-512

AutoCAD SHX Text D2

AutoCAD SHX Text A-512

AutoCAD SHX Text D2

AutoCAD SHX Text A-512

AutoCAD SHX Text D2

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

AutoCAD SHX Text C2

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

ROOM NAME AND NUMBER

AutoCAD SHX Text

FEC

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AA

AutoCAD SHX Text

COLUMN GRID

AutoCAD SHX Text

KEYNOTE

AutoCAD SHX Text

WALL OR PARTITION TYPE

AutoCAD SHX Text

FIRE EXTINGUISHER CABINET

AutoCAD SHX Text

CORNER GUARD

AutoCAD SHX Text

NORTH ARROW

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

MATERIALS LEGEND

AutoCAD SHX Text

EXISTING CONSTRUCTION TO REMAIN

AutoCAD SHX Text

EXISTING CONSTRUCTION TO BE REMOVED

AutoCAD SHX Text

NEW CONSTRUCTION

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

EARTH

AutoCAD SHX Text

BASE COURSE

AutoCAD SHX Text

RIGID INSULATION

AutoCAD SHX Text

BATT INSULATION

AutoCAD SHX Text V V ITEM - VA SUPPLIED & INSTALLED VC ITEM - VA SUPPLIED & CONTRACTOR INSTALLED CC ITEM - CONTRACTOR SUPPLIED & INSTALLED

AutoCAD SHX Text A4

AutoCAD SHX Text A-201

AutoCAD SHX Text

DETAIL NUMBER

AutoCAD SHX Text

SHEET WHERE REF.

AutoCAD SHX Text

SHEET WHERE DRAWN

AutoCAD SHX Text

AutoCAD SHX Text A3.1

AutoCAD SHX Text A4.3

AutoCAD SHX Text

BUILDING SECTION INDICATOR

AutoCAD SHX Text

DETAIL INDICATOR

AutoCAD SHX Text GENERAL NOTES 1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING. 2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS. 3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED. 4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING. 5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS. 6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. 7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR. 8. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM ELEVATION OF WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 175MM [7"] ABOVE FINISHED FLOOR. 9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES. 10. STEAM HEADER SET PRESSURE: ___ KPA [PSIG] NORMAL STEAM HEADER SET PRESSURE: ___ KPA [PSIG] NORMAL ___ KPA [PSIG] NORMAL ___ KPA [PSIG] LOW DEMAND PERIODS 11. ALTITUDE-BOILER ROOM FLOOR: ___ M [FT.] ABOVE SEA LEVEL ALTITUDE-BOILER ROOM FLOOR: ___ M [FT.] ABOVE SEA LEVEL ___ M [FT.] ABOVE SEA LEVEL 12. SEISMIC PROVISIONS NOT REQUIRED SEISMIC PROVISIONS NOT REQUIRED 13. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTEDALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED

EC460W2-23

460W1

ES460C1

460C2

EC460W2

11S2-43 11S2-28

EC11N1-21

91N5-26

EC91N2-2

EC11E1-21

91S1-14

91S3-69

EC91S2

91S3 91S4

91C4

461C2-29

EC91N2

91N5

91N5-25

91N4-40

EC461N1

EB11S1

11S4

EC11S1-13

91S1-26 91S1-24

91S1-24

91S1-26

ES461C1-16

461N2

461N2

EC11E1

11S7-1

11S8-44

11S2-14

VERIFY

EC11E1-21

91S1

EC461N1

EB11S1-26

11S7-1

461C1A

461C3

EC461C1

ES461C1

461C1

461C2

461N1

ES461N1

EC

1N

1N

EB

1N

EC11S1

EC11S2

ES11S1

11S1

11S2

11S8

11S9

11S5

11S6

11S7

Xref ..\^Base Maps\FL_01.dwg

EC463C1-17

93S1-47

EC93S1-30

463C3-34 463C3-36

463C2-41

EC92N2-23

EC

3C

3C

ES

3C

3C

EC

3C

EB463C1

3C

3C

EC

3C

EC

3C 5 463C3

93N1

93N1

EC93N1

EC93S1

93S1

93S1

93S1-49

93N1-50

Xref ..\^Base Maps\FL_03.dwg

EC462N1-25

EC12S2-40

12S3-50

12C1-VERIFY

462N1-15

EC92N2-23

S4

S3

EC12S2

C

EC462C1

EC92N2

EC92N1

462N2

N

462N1

N

EC462N1-25

462C1-10

462C1-33

EC92W1-9

EC462C1-21462C1

EC462C1-21

EC462N1-25

92W1

92W1

92W3

92W4

92W5

92W6

EC92W3

EC92W4

EC92W3

EC92W2

EC92W4

EC92W5

EC92W6

EC92W5

EC92W6

92W7

Xref ..\^Base Maps\FL_02.dwg

A R C H

F u l l

B l e e d

E

X

I n c h e s

PA

G

E

SI

ZE

VA

M

C A

N D

R O

C

E

LM

S

T.

N

FA

R

G O

, N D

1-

9-

FI

LE

P

A

TH

: S :\E

N G

IN

EE

R

IN

G \0

PR

O

JE

C

TS

F

IL

ES

\4

-2

5-

3-

YE

A

R E

LE

C

TR

IC

A L\

C O

N

TR

A C

TI

N

G S

O P

- C O

N

ST

R U

C

TI

O N

IN

FO

\D R

A W

IN

G

S

FI

LE

N

A M

E:

-2

5-

-2 0-

M ay

0, Ja nu ar y

LI

FE

S A

FE

TY

P

LA

N S

PA

PH

PR

O

JE

C

T N

U M

B

ER

7-

-1

Pe rf or m

Y ea r E le ct ric al

T es tin g

A nd

M ai nt en an ce

D R

A W

IN

G

D

ES

C R

IP

TI

O N

PR

O

JE

C

T N

A M

E R

EV

IE

W

ED

B Y

R

EV

IS

ED

C R

EA

TE

D

C R

EA

TE

D B

Y

PR

IN

TE

D

O N

M ay

0, R

EV

IS

ED

B Y

4 SCALE: 1

32" = 1'

FLOOR 3 LIFE SAFETY PLAN

B

ID

D O

C U

M

EN

TS

PA

G

E

A

.3

D W

G

O

F

3 SCALE: 1

32" = 1'

FLOOR 2 LIFE SAFETY PLAN

1 SCALE: 1

32" = 1'

FLOOR 0 LIFE SAFETY PLAN 2 SCALE: 1

32" = 1'

FLOOR 1 LIFE SAFETY PLAN

1. WING A - CERNER

2. WING B - PHARMACY, STERILE PROCESSING

3. WING C - SOCIAL SERVICES, CANTINA, PATRIOT CAFE

4. WING D - ENGINEERING, ENVIRONMENTAL MANAGEMENT

5. WING E - SUPPLY CHAIN MANAGEMENT

1. WING A - DIRECTORS SUITE

2. WING B - IMAGING/EMERGENCY DEPARTMENT

3. WING C - LOBBY/WOMENS HEALTH

4. WING D - PRIMARY CARE/SPECIALITY CARE

5. WING E - PROSTHETICS/OCCUPATION AND PHYSICAL THERAPY

1. WING A - SURGICAL OFFICES

2. WING B - OPERATING AND RECOVERY ROOMS

3. WING C - GASTRO-INTESTINAL PROCEDURE ROOMS

4. WING D - COMMUNITY LIVING CENTER

5. WING E - NUTRITION AND FOOD SCIENCES

1. WING A - IN PATIENT CARE

2. WING B - IN PATIENT CARE

3. WING C - INTENSIVE CARE UNIT/CARDIOLOGY

4. WING D - OFFICES

5. WING E - OFFICES

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

WOODEN

AutoCAD SHX Text

UP

AutoCAD SHX Text BB-96 Fitness Instruction

AutoCAD SHX Text BB-100 Mechanical

AutoCAD SHX Text BB-95 Fitness

AutoCAD SHX Text BB-95B Men's LKR

AutoCAD SHX Text BB-95A Women's LKR

AutoCAD SHX Text

BB-91

AutoCAD SHX Text BB-93 Storage

AutoCAD SHX Text BB-94 Electrical

AutoCAD SHX Text

BB-92 TR

AutoCAD SHX Text

BB-67A

AutoCAD SHX Text

BB-67B

AutoCAD SHX Text BB-84 Office

AutoCAD SHX Text BB-85A Exam

AutoCAD SHX Text BB-67C Equip.

AutoCAD SHX Text BB-66 Women

AutoCAD SHX Text BB-64 Men

AutoCAD SHX Text

BB-60A

AutoCAD SHX Text

BB-60 W-LKRM

AutoCAD SHX Text

BB-61 HLDG

AutoCAD SHX Text

BB-57

AutoCAD SHX Text BB-58 Mech

AutoCAD SHX Text BB-54 PD A-Chief

AutoCAD SHX Text

BB-52

AutoCAD SHX Text

BB-59A

AutoCAD SHX Text

BB-59 M-LKRM

AutoCAD SHX Text BB-97 Stor

AutoCAD SHX Text BB-50 Storage

AutoCAD SHX Text BB-53 Police Admin

AutoCAD SHX Text BB-55 PD Chief

AutoCAD SHX Text BB-35 Imaging UPS

AutoCAD SHX Text

BB-67

AutoCAD SHX Text BB-32 SPS Chief

AutoCAD SHX Text BB-34 Mechanical

AutoCAD SHX Text

BB-34B

AutoCAD SHX Text BB-15 Storage

AutoCAD SHX Text

BB-16A

AutoCAD SHX Text BB-15B Men's

AutoCAD SHX Text

BB-15B1

AutoCAD SHX Text

BB-18B

AutoCAD SHX Text

BA-30 TR

AutoCAD SHX Text

BB-18A

AutoCAD SHX Text

BB-20A

AutoCAD SHX Text BB-17 Pre-Assembly Storage

AutoCAD SHX Text

BB-10 ENG/VAEA

AutoCAD SHX Text

BB-26

AutoCAD SHX Text BB-76 Staff Lounge

AutoCAD SHX Text

BB-22

AutoCAD SHX Text BB-27 Pharm Chief

AutoCAD SHX Text BB-80 In-patient Pharm

AutoCAD SHX Text BB-75 Pharmacy Receiving

AutoCAD SHX Text

BB-90 ANTE

AutoCAD SHX Text

BB-90B

AutoCAD SHX Text

BB-90A

AutoCAD SHX Text BB-78 HD Stor

AutoCAD SHX Text

BB-72A

AutoCAD SHX Text

BB-80C

AutoCAD SHX Text

BB-68

AutoCAD SHX Text BB-33 Pharm

AutoCAD SHX Text

BB-69

AutoCAD SHX Text

LIBERTY ELEV (1,2,3)

AutoCAD SHX Text BB-20 Receiving Decontamination

AutoCAD SHX Text

BB-21

AutoCAD SHX Text BA-72 Mech

AutoCAD SHX Text BA-67 Mech

AutoCAD SHX Text BA-10 BLDG 9 Switchgear

AutoCAD SHX Text BA-07A BLDG 9 Emergency Gen

AutoCAD SHX Text BA-01B BLDG 46 Emergency Gen

AutoCAD SHX Text BA-01A BLDG 46 Switchgear

AutoCAD SHX Text BA-07 SPS Storage

AutoCAD SHX Text BA-05 Envo Mgmt

AutoCAD SHX Text

BA-03 EMS

AutoCAD SHX Text

STAIR #9

AutoCAD SHX Text BB-80A Crtl Sub Vault

AutoCAD SHX Text

BB-80B

AutoCAD SHX Text

BC-05C

AutoCAD SHX Text

BC-05B

AutoCAD SHX Text

BC-79

AutoCAD SHX Text

BC-05A

AutoCAD SHX Text BC-01 Wrk Rm

AutoCAD SHX Text

BC-02 TR

AutoCAD SHX Text

VICTORY ELEV (7,8)

AutoCAD SHX Text BB-85B OC-Hlth

AutoCAD SHX Text BB-70 Pharm EDU

AutoCAD SHX Text BB-85 OC-Hlth

AutoCAD SHX Text BC-10 Social Work

AutoCAD SHX Text BC-11 HMLS Outreach

AutoCAD SHX Text

BC-30

AutoCAD SHX Text

BC-32 PACT SW

AutoCAD SHX Text BC-12 Intrvw Rm

AutoCAD SHX Text BC-11A Intrvw-Rm

AutoCAD SHX Text BC-13 Super

AutoCAD SHX Text

BC-15A OEF/OIF

AutoCAD SHX Text BC-45 OIT Off.

AutoCAD SHX Text

BC-43 OFFICE

AutoCAD SHX Text BC-41 Mech

AutoCAD SHX Text BC-47 Storage

AutoCAD SHX Text BC-15 OEF/OIF SW space

AutoCAD SHX Text BC-59 Mech

AutoCAD SHX Text

BC-63 TR

AutoCAD SHX Text BC-66 Men

AutoCAD SHX Text BC-44 OIT Office

AutoCAD SHX Text BC-50 Server Room

AutoCAD SHX Text BC-60 TeleCom-Room

AutoCAD SHX Text BC-74B Storage

AutoCAD SHX Text

BC-52 ICO

AutoCAD SHX Text BC-54 Storage

AutoCAD SHX Text BC-56 OIT Off.

AutoCAD SHX Text BC-58 OIT Off.

AutoCAD SHX Text BC-74A Canteen Kitchen

AutoCAD SHX Text BC-74 Serving

AutoCAD SHX Text BC-67 Women

AutoCAD SHX Text

BC-34 PIV

AutoCAD SHX Text BC-89 Lounge

AutoCAD SHX Text BC-69 Vending

AutoCAD SHX Text BC-68 Office

AutoCAD SHX Text

BC-64 TR

AutoCAD SHX Text

PATRIOT ELEV 10

AutoCAD SHX Text BC-75 Canteen Dining

AutoCAD SHX Text BC-91 EMS Brk-Rm

AutoCAD SHX Text

BC-90 CU

AutoCAD SHX Text BC-20 Cube Farm

AutoCAD SHX Text

BC-93 EMS

AutoCAD SHX Text

BC-90A CU

AutoCAD SHX Text BC-80 Retail Store

AutoCAD SHX Text BC-79 Mech

AutoCAD SHX Text BC-81 Ret-Storage

AutoCAD SHX Text BC-82 CTN-Chief

AutoCAD SHX Text

BC-83 ADMIN

AutoCAD SHX Text BC-94 Men's Locker

AutoCAD SHX Text BC-95 Women's Locker

AutoCAD SHX Text

BC-85A

AutoCAD SHX Text BC-85B FD-Stor

AutoCAD SHX Text BC-96 Men's Tlt

AutoCAD SHX Text

BD-02 TR/TEL

AutoCAD SHX Text BE-05 Mechanical

AutoCAD SHX Text

INDEPENDENCE ELEV (4,5)

AutoCAD SHX Text

BE-02

AutoCAD SHX Text BE-10 Mail-Rm Stor

AutoCAD SHX Text BE-09 Mech

AutoCAD SHX Text BE-29 Mech

AutoCAD SHX Text BE-30 N&FS Subsistence Storage

AutoCAD SHX Text BE-34 Pharm Storage

AutoCAD SHX Text

BE-40A

AutoCAD SHX Text

BE-42A

AutoCAD SHX Text BE-44A Compactor

AutoCAD SHX Text BE-44 Carts

AutoCAD SHX Text BE-42 Wmn-LKR

AutoCAD SHX Text BE-40 Men-LKR

AutoCAD SHX Text

BE-38C

AutoCAD SHX Text BE-35 Morgue

AutoCAD SHX Text BE-37 Mrg-Clr

AutoCAD SHX Text

BE-38 SP-CH MGMT

AutoCAD SHX Text

BE-45

AutoCAD SHX Text

BE-38A

AutoCAD SHX Text

BE-38B

AutoCAD SHX Text BE-31A Whse Storage

AutoCAD SHX Text BE-97 Stor

AutoCAD SHX Text BE-46 Mech

AutoCAD SHX Text

BE-50

AutoCAD SHX Text BE-25 Mech

AutoCAD SHX Text BE-27 Mech

AutoCAD SHX Text BE-24 Linen

AutoCAD SHX Text

BD-31 ENG

AutoCAD SHX Text

BD-33 EMS

AutoCAD SHX Text

BD-35 ENG

AutoCAD SHX Text

BD-37 ENG

AutoCAD SHX Text

BD-39 ENG

AutoCAD SHX Text BD-41 EM-Mng

AutoCAD SHX Text BD-43 Gems

AutoCAD SHX Text

BD-45 ENG

AutoCAD SHX Text

BD-47 ENG

AutoCAD SHX Text

BD-36 SFTY

AutoCAD SHX Text

BD-38 EEO

AutoCAD SHX Text

BD40 SFTY

AutoCAD SHX Text BD-42 ENg Conf

AutoCAD SHX Text BD-50 Engineering

AutoCAD SHX Text BD-50B ENG Chief

AutoCAD SHX Text BD-50A ENG A-Chief

AutoCAD SHX Text Shwr

AutoCAD SHX Text

BD-63 M-LKR

AutoCAD SHX Text BD-62 File-Rm

AutoCAD SHX Text BD-60E Biomed

AutoCAD SHX Text BD-60 Biomed D/O

AutoCAD SHX Text BD-60B W-Area

AutoCAD SHX Text BD-60C Charging Area

AutoCAD SHX Text BD-60D Biomed Drop-Off

AutoCAD SHX Text BD-65 Paint Shop

AutoCAD SHX Text BD-75A Electrical Shop

AutoCAD SHX Text BD-75B Carpentry

AutoCAD SHX Text BD-85A Plumnbing Shop

AutoCAD SHX Text BD-85B Mechanic Shop

AutoCAD SHX Text BD-90 Equipment Area

AutoCAD SHX Text

BD-92

AutoCAD SHX Text

BD-91

AutoCAD SHX Text

BD-84 TR

AutoCAD SHX Text BD-83 Elec.

AutoCAD SHX Text BD-86 Mech

AutoCAD SHX Text BD-70 Mechanical

AutoCAD SHX Text BD-80 Storage

AutoCAD SHX Text BD-95 Breakroom

AutoCAD SHX Text BD-10 M-Tlt

AutoCAD SHX Text

BD-12 FM-TLT

AutoCAD SHX Text BD-08 CTN-Stor

AutoCAD SHX Text

BD-06 STOR. RM

AutoCAD SHX Text

BD-04 BRKRM

AutoCAD SHX Text BD-05 Mail

AutoCAD SHX Text BA-01 Mechanical

AutoCAD SHX Text

BC-20A

AutoCAD SHX Text

BC-20B

AutoCAD SHX Text

BC-99 M&R

AutoCAD SHX Text

BB-12

AutoCAD SHX Text

BB-34A UPS

AutoCAD SHX Text

BB-16B

AutoCAD SHX Text BB-15A Women's

AutoCAD SHX Text

BA-44B

AutoCAD SHX Text

BA-44

AutoCAD SHX Text BC-46 OIT Office

AutoCAD SHX Text

BF-11

AutoCAD SHX Text

BLDG #3 SP-CH MGMT

AutoCAD SHX Text BF-003 Inv-Mgmt

AutoCAD SHX Text

STAIR #1

AutoCAD SHX Text BE-28 Loading Dock

AutoCAD SHX Text

BD-81 TLT

AutoCAD SHX Text

STAIR #22

AutoCAD SHX Text

STAIR #13

AutoCAD SHX Text

BB-17A

AutoCAD SHX Text

BB-15-A1

AutoCAD SHX Text BB-62 Armory

AutoCAD SHX Text

STAIR #14

AutoCAD SHX Text

STAIR #4

AutoCAD SHX Text

BD-63A TLT

AutoCAD SHX Text BD-20 EMS Chief

AutoCAD SHX Text

BD-21 EMS

AutoCAD SHX Text BE-10A Mail

AutoCAD SHX Text BE-20 Linen

AutoCAD SHX Text BD-11 WD-Prop

AutoCAD SHX Text

BB-56

AutoCAD SHX Text BB-30 SPS Asst Chief

AutoCAD SHX Text

BA-44A

AutoCAD SHX Text

BD-23 EMS

AutoCAD SHX Text BD-22 Biomed

AutoCAD SHX Text BD-34 Production

AutoCAD SHX Text BD-60A Soiled

AutoCAD SHX Text

BD-61 LCK-SM

AutoCAD SHX Text BB-09 BLDG #9 Tank room

AutoCAD SHX Text BB-24 Recieving

AutoCAD SHX Text

BE-07

AutoCAD SHX Text

BF-002

AutoCAD SHX Text

BE-47 BIO-HZD

AutoCAD SHX Text BE-31 Whse-Storage

AutoCAD SHX Text

BE-36

AutoCAD SHX Text

BC-85

AutoCAD SHX Text

BE-03

AutoCAD SHX Text

BB-67D ACOS

AutoCAD SHX Text BC-70 Office

AutoCAD SHX Text BE-99 BLDG#1 Switchgear

AutoCAD SHX Text BE-98 BLDG#1 Emergency Gen

AutoCAD SHX Text

BC-77

AutoCAD SHX Text BB-31 Pharm

AutoCAD SHX Text BB-28 Pharm

AutoCAD SHX Text

STAIR #15

AutoCAD SHX Text

BB-82

AutoCAD SHX Text

BB-90C

AutoCAD SHX Text

ELEV #12

AutoCAD SHX Text

UP

AutoCAD SHX Text

STAIR #7

AutoCAD SHX Text

STAIR #20

AutoCAD SHX Text #7

AutoCAD SHX Text

DN

AutoCAD SHX Text #5

AutoCAD SHX Text

STAIR #2

AutoCAD SHX Text

STAIR #10

AutoCAD SHX Text

STAIRWELL #3

AutoCAD SHX Text BD-65A Spray/Drying

AutoCAD SHX Text

SUB

AutoCAD SHX Text BA-09 Soiled Linens

AutoCAD SHX Text Mech

AutoCAD SHX Text BC-05 Anti-Coag Clinic

AutoCAD SHX Text

ELEV #6

AutoCAD SHX Text #4

AutoCAD SHX Text #8

AutoCAD SHX Text

BC-97

AutoCAD SHX Text BA-42 Office

AutoCAD SHX Text BA-35 Men

AutoCAD SHX Text BA-39 Women

AutoCAD SHX Text BA-37 Jan

AutoCAD SHX Text BA-41 Mech

AutoCAD SHX Text BA-43 Brk Rm

AutoCAD SHX Text BA-45 Office

AutoCAD SHX Text BA-70 Office

AutoCAD SHX Text BA-69 Conf Rm

AutoCAD SHX Text BA-65 Office

AutoCAD SHX Text

BB-15A

AutoCAD SHX Text

UP

AutoCAD SHX Text

CR

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

INTERSTITIAL

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

STAIR #9

AutoCAD SHX Text

STAIR #10

AutoCAD SHX Text

STAIR #3

AutoCAD SHX Text

STAIR #7

AutoCAD SHX Text

STAIR #2

AutoCAD SHX Text

STAIR #1

AutoCAD SHX Text

LIBERTY ELEV. (1,2,3)

AutoCAD SHX Text

INDEPENDENCE ELEV. (4,5)

AutoCAD SHX Text

VICTORY ELEV. (7,8)

AutoCAD SHX Text

UP

AutoCAD SHX Text

ELEV.#6

AutoCAD SHX Text

STAIR #15

AutoCAD SHX Text 1A-70 Stor. & Mech

AutoCAD SHX Text

STAIR #13

AutoCAD SHX Text 1A-69 Director

AutoCAD SHX Text 1A-30J Microbiology

AutoCAD SHX Text

1A-31 ATC

AutoCAD SHX Text 1A-33 Lab Mngr

AutoCAD SHX Text 1A-34 Path.

AutoCAD SHX Text 1A-36 Path.

AutoCAD SHX Text 1A-38 Path.

AutoCAD SHX Text 1A-39 Path. Chief

AutoCAD SHX Text 1A-69A

AutoCAD SHX Text 1A-67A Kit.

AutoCAD SHX Text

1A-40 MECH

AutoCAD SHX Text 1A-41 Path&Lab

AutoCAD SHX Text 1A-35 Lab Tr.

AutoCAD SHX Text 1A-37

AutoCAD SHX Text 1A-30I-A Stor

AutoCAD SHX Text 1A-30I Hist./Cytology

AutoCAD SHX Text 1A-30H Bld Bank

AutoCAD SHX Text 1A-66 Ass Dir Pat Care

AutoCAD SHX Text 1A-68 Ass Dir Op & Res

AutoCAD SHX Text 1A-64 Chief of Staff

AutoCAD SHX Text 1A-62 A.O. to COS

AutoCAD SHX Text 1A-60

AutoCAD SHX Text 1A-58 A.O. Planner

AutoCAD SHX Text 1A-50 Conf.

AutoCAD SHX Text 1B-30 C.T. Scanner

AutoCAD SHX Text 1B-34 Radiographic Fluoroscopic

AutoCAD SHX Text 1B-35 RadioGraphic

AutoCAD SHX Text 1B-30A

AutoCAD SHX Text

1B-67 MRI EQ

AutoCAD SHX Text 1B-63 MRI Ctrl

AutoCAD SHX Text 1B-60 Nuclear Med Ex

AutoCAD SHX Text 1B-66

AutoCAD SHX Text 1B-69 Imging Supvr

AutoCAD SHX Text 1B-70 Stress Testing

AutoCAD SHX Text 1B-68

AutoCAD SHX Text 1B-64 HT Lab

AutoCAD SHX Text

1B-65 TR

AutoCAD SHX Text 1B-71 Ultsnd

AutoCAD SHX Text 1B-62 Nuclear Med Ex

AutoCAD SHX Text 1B-82

AutoCAD SHX Text 1B-113 ON Call

AutoCAD SHX Text 1B-115

AutoCAD SHX Text 1B-116 Decont.

AutoCAD SHX Text 1B-124

AutoCAD SHX Text 1B-122

AutoCAD SHX Text 1B-110

AutoCAD SHX Text

1B-120 AMBULANCE DROP-OFF

AutoCAD SHX Text 1B-123

AutoCAD SHX Text 1B-121A

AutoCAD SHX Text

1B-121B TR

AutoCAD SHX Text

1B-125 EX 6

AutoCAD SHX Text

1B-126 EX 5

AutoCAD SHX Text

1B-127 EX 3 & 4

AutoCAD SHX Text

1B-128 EX 1 & 2

AutoCAD SHX Text 1B-100

AutoCAD SHX Text 1B-100A

AutoCAD SHX Text 1B-108

AutoCAD SHX Text 1B-107A

AutoCAD SHX Text 1C-101

AutoCAD SHX Text

1C-36 LOBBY

AutoCAD SHX Text 1B-101 Triage

AutoCAD SHX Text 1B-102

AutoCAD SHX Text 1B-103 Mental Hlth EX

AutoCAD SHX Text 1B-104 Isolation

AutoCAD SHX Text

1C-34 WOMEN'S

AutoCAD SHX Text

1C-33 MEN'S

AutoCAD SHX Text 1C-35B

AutoCAD SHX Text

1C-35 RECEPTION

AutoCAD SHX Text 1C-35C

AutoCAD SHX Text 1C-39

AutoCAD SHX Text 1C-40 Patient Adv

AutoCAD SHX Text

1C-35FA

AutoCAD SHX Text

1C-32 WAITING

AutoCAD SHX Text

1C-02 EX

AutoCAD SHX Text

1C-01 EX

AutoCAD SHX Text 1B-35A

AutoCAD SHX Text 1B-37A

AutoCAD SHX Text 1B-36 CTL Rm

AutoCAD SHX Text 1B-37 Radiographic

AutoCAD SHX Text 1B-38 Dexascan

AutoCAD SHX Text 1B-39 Conf/ Brk Rm

AutoCAD SHX Text 1B-41

AutoCAD SHX Text 1B-80C

AutoCAD SHX Text 1B-78 Vas. Lab

AutoCAD SHX Text 1B-80B

AutoCAD SHX Text 1B-74 Ultsnd

AutoCAD SHX Text 1B-73

AutoCAD SHX Text 1B-71A

AutoCAD SHX Text 1B-75

AutoCAD SHX Text 1B-72 Stor

AutoCAD SHX Text 1B-28

AutoCAD SHX Text 1B-29A

AutoCAD SHX Text 1B-29 C.T. Scanner

AutoCAD SHX Text 1B-29B

AutoCAD SHX Text 1A-54

AutoCAD SHX Text 1A-55

AutoCAD SHX Text 1A-57

AutoCAD SHX Text 1A-59

AutoCAD SHX Text 1A-63 Wk/CP

AutoCAD SHX Text 1A-22

AutoCAD SHX Text 1A-23

AutoCAD SHX Text 1A-24

AutoCAD SHX Text 1A-30D

AutoCAD SHX Text 1A-30C

AutoCAD SHX Text 1A-30E

AutoCAD SHX Text 1A-30F

AutoCAD SHX Text 1A-30G

AutoCAD SHX Text 1A-30B

AutoCAD SHX Text

1A-13 MEN'S

AutoCAD SHX Text 1A-15

AutoCAD SHX Text

1A-11 WOMEN'S

AutoCAD SHX Text 1A-09 OD Rm

AutoCAD SHX Text

1A-07 SW

AutoCAD SHX Text 1A-05 Tele Hlth

AutoCAD SHX Text 1A-25

AutoCAD SHX Text 1A-28

AutoCAD SHX Text

1A-26 HAC

AutoCAD SHX Text 1A-27 Elec

AutoCAD SHX Text…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .