Attachment D - Bid Drawings - 33 pages.pdf
PDF 9 MB Posted
- Attached to
- Y1DZ--437-25-103, 3 Year Electrical Testing & Maintenance Federal contract opportunity
- Solicitation number
- 36C26325B0012
About this file
These are detailed electrical system testing and maintenance bid drawings for the Fargo VA Medical Center, comprising 33 pages of technical diagrams and specifications for a comprehensive electrical infrastructure assessment and maintenance project. The drawings cover multiple buildings (Buildings 1, 9, 10, 11, 12, 13, 30, 40, 46, 51, 52, 54, and 56) and include detailed one-line electrical plans, transformer plans, power and data floor plans, and electrical details. The drawings document existing electrical infrastructure, including transformers, switchgear, distribution panels, emergency power systems, and specific electrical equipment locations across the VA campus. Key technical elements include electrical system layouts, circuit details, conduit routing, grounding specifications, and installation requirements for various electrical components, with emphasis on maintaining minimal disruption to VA healthcare services during the electrical testing and maintenance work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26325B0012 0003.docx | DOCX document | |
| Attachment A - Statement of Work - Revised 6-26-2025.pdf | ||
| 36C26325B0012 0002.docx | DOCX document | |
| Attachment J - 437-25-103 Electrical Testing Questions and Answers Responses.pdf | ||
| Attachment I - Site Visit Sign In Sheets 6-12-2025.pdf | ||
| Attachment H _ 846770 Report _ Hyko Solutions _ Fargo VA _ Signed.pdf | ||
| 36C26325B0012 0001.docx | DOCX document | |
| Attachment G - VAAR 852.219-75 Limitations on Subcontracting-Cert of Compliance_JAN 2023 [DEVIATION] - 2 pages.pdf | ||
| Attachment E - Wage Rate determination - 8 pages.pdf | ||
| Attachment F - Questions Request Form - 1 page.pdf | ||
| Attachment C - Specifications - 438 pages.pdf | ||
| Attachment A - SOW 12 pages.pdf | ||
| Attachment B - Appendix A - Example Schedule - 3 pages.pdf | ||
| 36C26325B0012_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
BLDG. NO.
1 MEDICAL CENTER
3 ADMINISTRATION OFFICE
8 FLAGPOLE
9 MEDICAL CENTER
10 BOILER PLANT
11 MAINTENANCE GARAGE
12 WAREHOUSE
13 LAUNDRY
30 ADMINISTRATION OFFICE
39 HIGH VOLTAGE SWITCHGEAR BLDG
42 UND SCHOOL OF MEDICINE
46 MEDICAL CENTER
MC- MOTORCYCLE PARKING
CP- CAR/VAN POOL PARKING
- HANDICAPPED PARKING
40 VBA REGIONAL OFFICE
41 OXYGEN STORAGE TANK
43 PICNIC SHELTER AND PATIO
44 XCEL ENERGY BLDG (NATURAL GAS)
20 GATE WELL
50 COLD STORAGE BUILDING
51 HRMS
52 ADMINISTRATION OFFICE
53 HAZMAT STORAGE BUILDING
54 PANDEMIC FLU STORAGE BUILDING
RE
D
RI
VE
R
OF
TH
E
NO
RT
H
19th AVE. N.
21st AVE. N.
EL
M
S
TR
EE
T
MC
EL
M
S
TR
EE
T
30W 30E
12 13
CITY
LIFT
STATION
(STORM
SEWER)
DIKE
DIKE
BOTTOM O
F D
IKE SLO
PE
BO
TT
O M
O F
D
IK
E
SL
O
PE
DIKE
DIKE
DIKE
DIKE
TOP O
F EARTHEN DIKE
TO
P
O F
EA
R
TH
EN
D
IK
E
MAIN HOSPITAL
BUILDING
BO
TT
O M
O F
D
IK
E
SL
O
PE
1-9-46
56 CHILLER PLANT
MC
UND
UND
N
FF
E N
FF
E
AFGE
AFGE
AFGE
AFGE
RO EOM
HCHV
C P
C
PC
PC
PC
P
C
PC
P
C P
VA
N
VA
N
R
MC
R- RESERVED PARKING
R
R R
UND- UNIVERSITY OF NORTH DAKOTA
AFGE- AMERICAN FEDERATION GOVERNMENT EMPLOYEE
RO EOM- REGIONAL OFFICE EMPLOYEE OF THE MONTH
HCHV- HEALTH CARE HOMELESS VETERANS
NFFE- NATIONAL FEDERATION FEDERAL EMPLOYEE
VAMC AND ROC
2101 ELM ST. N
FARGO, ND 58102
701-239-3760
FILE PATH: S:\ENGINEERING\05 PROJECTS FILES\437-25-103 3-YEAR ELECTRICAL\CONTRACTING SOP - CONSTRUCTION INFO\DRAWINGS FILE NAME: 437-25-103 05-20-25
PAGE
X 0.0
DWG.
PROJECT NUMBER
437-25-103
Perform 3 Year Electrical Testing And Maintenance 2025
PROJECT NUMBER
GENERAL CONSTRUCTION NOTES
1. VA WILL BE NOTIFIED OF ANY ACTIVITIES THAT ARE KNOWN TO OR COULD POTENTIALLY MEET ANY OF THE
FOLLOWING CRITERIA:
1.1. COMPROMISE LIFE SAFETY
1.2. CAUSE FUMES OR NOXIOUS ODORS
1.3. GENERATE LARGE QUANTITIES OF DUST
1.4. INTERFERE WITH THE OPERATION OF THE FIXED FIRE DETECTION OR SUPPRESSION SYSTEMS
2. CONTRACTOR WILL AT ALL TIMES ENSURE ALL MEANS OF EGRESS MEET THE FOLLOWING REQUIREMENTS
2.1. FIRE/SMOKE DOORS ARE UNLOCKED AND FREE OF OBSTRUCTIONS
2.2. SUFFICIENT MEANS OF EGRESS AND IS FREE OF OBSTRUCTIONS
2.3. ALL EGRESS ROUTES PROPERLY MARKED
2.4. TRASH AND DEBRIS IS REMOVED WITHIN A REASONABLE TIMEFRAME. DEBRIS IS COVERED AND
DAMPENED PRIOR TO BEING TRANSPORTED THROUGH THE FACILITY.
2.5. TOOLS AND MATERIALS WILL BE STORED NEATLY AND IN AN ORDERLY MANNER.
3. THE CONTRACTOR WILL ENSURE THE FIRE ALARM, FIRE DETECTION, AND FIRE SUPPRESSION SYSTEMS
COMPLY WITH THE FOLLOWING CONDITIONS:
3.1. FIRE ALARM PULL STATIONS ARE UNOBSTRUCTED
3.2. MEASURES USED TO PROTECT FIRE ALARM, FIRE DETECTION AND FIRE SUPPRESSION SYSTEMS ARE
REMOVED WHEN CONTRACTOR IS NOT ACTIVELY WORKING
3.3. HOT WORK PERMITS ARE UTILIZED AND ARE CURRENT ANY TIME AN ACTIVITY COULD CAUSE A FIRE.
3.4. SPRINKLER HEADS WILL NEVER BE OBSTRUCTED
3.5. INTERIM LIFE SAFETY MEASURES ARE IN PLACE AND ARE BEING EFFECTIVELY MANAGED
4. THE CONTRACTOR WILL MAINTAIN A CLEAN WORK SPACE IN ORDER TO PROVIDE A SAFE WORKING ENVIRONMENT AND MINIMIZE THE SPREAD OF DUST THROUGH THE FACILITY. WORKS SITES WILL BE
INSPECTED DAILY TO ENSURE THEY MEET THE FOLLOWING REQUIREMENTS:
4.1. FLOOR MATS AND DUST TACK MATS ARE LOCATED AT ACCESS POINTS TO THE CONSTRUCTION AREA AND
REPLACED WHEN NEEDED.
4.2. SIGNS AND BARRIERS WILL BE UTILIZED TO RESTRICT UNAUTHORIZED ACCESS TO THE CONSTRUCTION
AREAS. SIGNS AND BARRIERS WILL BE CLEANED PRIOR TO THEIR REMOVAL.
4.3. DRY SWEEPING WILL NOT BE PERFORMED WITHOUT THE USE OF APPROVED SWEEPING COMPOUNDS.
4.4. NEGATIVE PRESSURE IS USED AND MAINTAINED AS REQUIRED BY THE VA. THE CONTRACTOR IS
EXPECTED TO ENSURE EXHAUST DUCTING IS NOT LOCATED NEAR ANY OTHER AIR INTAKE ASSEMBLY OR
POSE A REASONABLE HAZARD TO INDIVIDUALS OUTSIDE.
4.5. ALL HVAC DUCTING WILL BE COVERED DURING ACTIVITIES THAT COULD POTENTIALLY GENERATE DUST OR NOXIOUS FUMES UNLESS THE DUCTING IS BEING USED TO GENERATE NEGATIVE AIR AND WILL NOT
AFFECT OTHER HVAC SYSTEMS. .
5. HAZARDOUS MATERIALS WILL BE STORED IN ACCORDANCE WITH OSHA AND THEIR MANUFACTURERS RECOMMENDATIONS. CONTRACTOR WILL PROVIDE SDS INFORMATION FOR ALL CHEMICALS ON SITE UPON REQUEST. SDS SHEETS MUST BE AVAILABLE IN THE EVENT OF A FIRE IN ORDER TO ALLOW THE FIRE
DEPARTMENT ACCESS TO NECESSARY SAFETY INFORMATION.
6. OSHA DEFINED CONFINED SPACES WILL NOT BE ENTERED WITHOUT PRIOR APPROVAL BY THE VA.
7. CONTRACTORS ARE EXPECTED TO OBSERVE AND MAINTAIN A LOCKOUT AND TAGOUT POLICY.
HAZARDOUS MATERIALS WHICH INCLUDE BUT ARE NOT LIMITED TO ASBESTOS ARE CLEARLY IDENTIFIED TO
ALL INDIVIDUALS WORKING WITHIN THE CONSTRUCTION ZONE. HAZARDOUS WILL BE QUICKLY MITIGATED AND ELIMINATED AS SOON AS REASONABLY POSSIBLE. ASBESTOS IS KNOWN TO BE PRESENT IN ALL AREAS WITHIN THE CONSTRUCTION LIMITS. THE VA WILL BE PROVIDED A COPY OF ALL DISPOSAL PAPER WORK FOR RECORD
KEEPING. CONTRACTOR WILL PROVIDE A COPY OF ALL TESTING REPORTS.
8. ALL CONSTRUCTION MATERIALS MUST BE NON-COMBUSTABLE OR CARRY A NFPA FIRE RATING. SPRAY FOAM IS NOT ACCEPTABLE UNLESS IT IS SPECIFICALLY APPROVED BY THE VA.ALL NEW OR EXISTING PENETRATIONS
WILL BE FIRE CAULKED.
9. A MINIMUM OF 21 DAYS NOTIFICATION WILL BE PROVIDED PRIOR TO THE SHUT DOWN OF ANY UTILITY.
10. RECORDS OF EXISTING CONDITIONS MAY BE AVAILABLE BUT THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ALL SITE CONDITIONS. ALL UTILITY LOCATES WILL BE BY THE CONTRACTOR.
13. CONTRACTOR PARKING IS LOCATED ON THE NORTH EAST SIDE OF CAMPUS AND SHARED WITH OTHER
CONTRACTORS. CONTRACTORS ARE EXPECTED TO LOCK OR SECURE THEIR EQUIPMENT AND CONSTRUCTION MATERIALS. PARKING OUTSIDE THE DESIGNATED PARKING AREA MUST BE COORDINATED WITH POLICE SERVICES OR THE CONTRACTORS VEHICLE MAY BE TOWED AT THE CONTRACTORS EXPENSE. ALL WORKERS SHALL BE INFORMED THIS IS A FEDERAL FACILITY AND WEAPONS OF ANY KIND OF EXPLOSIVES ARE NOT ALLOWED. EACH WORKER AND/OR THEIR VEHICLE IS SUBJECT TO BEING SEARCHED. SECURITY CAMERAS ARE IN USE ON THE FACILITY AND IS REASONABLE THAT A CONTRACTOR MAY INCIDENTALLY BE RECORDED WHILE
WORKING IN THE FACILITY.
14. THE PRIME CONTRACTOR WILL PROVIDE A JOB SITE FOREMAN WHO IS OSHA 30 HOUR SAFETY QUALIFIED
WHO MUST BE CAPABLE OF MAKING DECISIONS FOR THE PRIME CONTRACTOR. FAILURE OF THE
CONTRACTOR TO HAVE A COMPETENT SUPERINTENDENT ON THE JOB SITE AT ALL TIMES WILL RESULT IN HAVING THE JOB SITE SHUT DOWN. ALL CONTRACTORS WILL BE A MINIMUM OF OSHA 10 HOUR SAFETY QUALIFIED. CONTRACTOR WILL PROVIDE A COMPETENT PERSON FOR ALL CONSTRUCTION ACTIVITY.
PROFESSIONAL CERTIFICATIONS MUST BE CURRENT AND DOCUMENTATION MAY BE REQUESTED BY THE VA AT ANY TIME. ATTIRE AND DEMEANOR OF ALL CONTRACT EMPLOYEES MUST BE DECENT AND RESPECTFUL AND FAILURE TO BE RESPECTFUL COULD RESULT IN THE REMOVAL OF THE INDIVIDUAL FROM THE WORK
SITE.
15. VHA DIRECTIVE 1192, SEASONAL INFLUENZA PREVENTION MEMORANDUM APPLIES TO ANY INDIVIDUAL WORKING AT THE VA AND DOES INCLUDE CONTRACTORS. THE DIRECTIVE DICTATES THAT ALL PERSONNEL WORKING AT THE VA WILL HAVE A CURRENT INFLUENZA VACCINE OR ACCEPTABLE WAIVER. PROOF OF VACCINATION OR AN ACCEPTABLE WAIVER MUST BE PROVIDED UPON REQUEST BY THE VA. ADDITIONAL HEALTH PROTECTION MEASURES MAY BE IMPLIMENTED BEFORE OR DURING CONSTRUCTION IN RESPONSE
TO THE COVID PANDEMIC AND THE CONTRACTOR IS EXPECTED TO MAKE EVERY REASONABLE
ACCOMMODATION TO THESE POLICIES.
16. THE FARGO VA IS A NON-SMOKING FACILITY.
17. ALL CHANGES IN CONTRACT WORK AND EXTENSIONS OF TIME MUST BE AUTHORIZED BY THE CONTRACTING
OFFICER PRIOR TO BEGINNING THE CHANGE. CHANGES TO THE CONTRACT THAT ARE PERFORMED WITHOUT AUTHORIZATION BY THE CONTRACTING OFFICER ARE PERFORMED AT THE RISK OF THE CONTRACTOR.
18. WORK IS EXPECTED TO BE DONE IN PHASES TO ENSURE THAT VA PRIORITIES ARE ADDRESSED FIRST.
PHASED CONSTRUCTION IS ALSO REQUIRED TO ENSURE THAT FUNCTIONAL AREAS OF THE HOSPITAL REMAIN
OPERATIONAL AT ALL TIMES.
19. THE CONTRACTOR IS EXPECTED TO WORK AFTER NORMAL BUSINESS HOURS TO ENSURE THE
CONSTRUCTION IS COMPLETED ON THE CONSTRUCTION COMPLETION DATE ESTABLISHED AT THE AWARD OF THE CONTRACT. ACTIVITIES THAT DISRUPT NORMAL HOSPITAL FUNCTIONS WHICH INCLUDE BUT ARE NOT LIMITED TO FLOOR REMOVAL, ASBESTOS ABATEMENT, AND UTILITY SHUT DOWNS MAY BE REQUIRED TO BE
DONE DURING EVENINGS, OR WEEKENDS IN ORDER TO REDUCE DISRUPTION.
SHEET LIST TABLE
SHEET
NUMBER
SHEET
TITLE
SHEET
DESCRIPTION
1 X 0.0 COVER PAGE
2 A 0.1 TERMINOLOGY
3 A 0.3 LIFE SAFETY PLANS
4 E 0.0 ELECTRICAL TERMINOLOGY
5 E 0.1 ELECTRICAL SYMBOLOGY
6 E 2.20 BASEMENT POWER AND DATA PLAN
7 E 2.21 FIRST FLOOR POWER AND DATA
PLAN
8 E 2.22 SECOND FLOOR POWER AND DATA
PLAN
9 E2.23 THIRD FLOOR POWER AND DATA
PLAN
10 E 2.24 FOURTH FLOOR POWER AND DATA
PLAN
11 E 2.25 FIFTH FLOOR POWER AND DATA
PLAN
12 E 2.27 T1-E AND T1-W TRANSFORMER PLAN
13 E 2.28 T1-C TRANSFORMER PLAN
14 E 2.29 T56-1 TRANSFORMER PLAN
15 E 2.30 T9-E, T9-W, T-9 XRAY TRANSFORMER
PLAN
16 E 2.31 T11 TRANSFORMER PLAN
17 E 2.40 BLDG 40 SITE PLAN
18 E 5.00A SITE MEDIUM VOLTAGE ONE-LINE
PLAN A
19 E 5.00B SITE MEDIUM VOLTAGE ONE-LINE
PLAN B
20 E 5.00C SITE MEDIUM VOLTAGE ONE-LINE
PLAN C
21 E 5.01A BLDG 01 ONE-LINE PLAN A
22 E 5.01B BLDG 01 ONE-LINE PLAN B
23 E 5.09A BLDG 09 ONE-LINE PLAN A
24 E 5.09B BLDG 09 ONE-LINE PLAN B
25 E 5.09C BLDG 09 ONE-LINE PLAN C
26 E 5.09D BLDG 09 ONE-LINE PLAN D
27 E 5.10 BLDG 10 ONE-LINE PLAN
28 E 5.11 BLDG 11-12-13-30-51-52-54 ONE-LINE
PLAN
29 E 5.40 BLDG 40 ONE-LINE PLAN
30 E 5.46A BLDG 46 ONE-LINE PLAN A
31 E 5.46B BLDG 46 ONE-LINE PLAN B
32 E 5.56 BLDG 56 ONE-LINE PLAN
33 E 7.0 ELECTRICAL DETAILS
BID DOCUMENTS
94N1
ES464C1
464C3
464C3
EC94N2
4C
EC
4C
4C
EC92W2 94N1
A R C H
F u l l
B l e e d
E
X
I n c h e s
PA
G
E
SI
ZE
VA
M
C A
N D
R O
C
E
LM
S
T.
N
FA
R
G O
, N D
1-
9-
FI
LE
P
A
TH
: S :\E
N G
IN
EE
R
IN
G \0
PR
O
JE
C
TS
F
IL
ES
\4
-2
5-
3-
YE
A
R E
LE
C
TR
IC
A L\
C O
N
TR
A C
TI
N
G S
O P
- C O
N
ST
R U
C
TI
O N
IN
FO
\D R
A W
IN
G
S
FI
LE
N
A M
E:
-2
5-
-2 0-
M ay
0, Ja nu ar y
TE
R
M
IN
O
LO
G Y
PA
PH
PR
O
JE
C
T N
U M
B
ER
7-
-1
Pe rf or m
Y ea r E le ct ric al
T es tin g
A nd
M ai nt en an ce
D R
A W
IN
G
D
ES
C R
IP
TI
O N
PR
O
JE
C
T N
A M
E R
EV
IE
W
ED
B Y
R
EV
IS
ED
C R
EA
TE
D
C R
EA
TE
D B
Y
PR
IN
TE
D
O N
M ay
0, R
EV
IS
ED
B Y
B
ID
D O
C U
M
EN
TS
PA
G
E
A
.1
D W
G
O
F
CG
PRE-CONSTRUCTION RISK ASSESSMENT (PCRA)
Project #
Project Title:
Area of Construction:
Contractor/Supervisor:
PCRA Completed by:
SAFETY/ENGINEERING
Y N
Will exits or exit egress routes from occupied areas change?
Will the construction area have less than two remote exits?
Will there be excessive distance to exit?
Will access to Emergency Services become blocked or obstructed?
Will any part of the fire protection systems (detection, notification or suppression) be shut down or impaired for >4 hours in a 24-hour period?
Will smoke or firewalls be breached?
Will any temporary construction partitions be built?
Will the project result in the accumulation of construction debris?
Will construction affect grounds safety (pits, storage, equipment, etc.)?
Will construction present other life safety hazards?
Will protection of hazardous areas be compromised?
INTERVENTION
A. Ensure Alternate Egress Routes B. Ensure Alternate Emergency Access C. Fire Department Notification D. Ensure Smoke-Tight Temporary Construction
NY
E. Additional Fire Fighting Equipment F. Control Combustible Loads G. Conduct 2 Fire Drills Per Shift in All Areas H. Increase Hazard Surveillance Rounds
CONSTRUCTION ACTIVITY
Will there be any anticipated utility shutdowns? (Communications, electrical, heating/cooling, HVAC, medical gases, vacuum, water, server)
Will noise levels be excessive?
Will vibration levels be excessive?
Will additional security measures be implemented?
Will work require Hot Works Permit?
Will work require Above Ceiling Work Permit?
1.
PATIENT SAFETY COORDINATOR
Y N CONSTRUCTION ACTIVITY
Does this project involve a patient care area either directly or adjacent to?
List:
Do areas involved have knowledge of construction?
List:
Does this project alter patient access to building/patient care area, either temporarily or permanently?
If YES, indicate intervention:
The new/temporary access path should be intuitive, i.e. easy to follow.
Access
Construction Area/
Materials
Critical Alarms
Signage should be adequate for decreased visual acuity and at appropriate viewing levels for both ambulating and w/c bound individuals.
Construction areas should not be accessible by unauthorized personnel.
Construction areas should be visually identified.
c. Wander guard technology d.
The access path should be smooth, without tripping hazards.
The access path should be handicap accessible.
Construction materials and tools should be moved and stored appropriately to preclude unauthorized access?
Critical clinical alarms shall be functional and audible within and adjacent to the construction zone? Including but not limited to:
a. Emergency CODE Systems
b. Medical Gas Alarms (Oxygen, Air, Suction) Vital Sign Monitoring/Telemetry Systems
Additional Requirements:
1.
2.
e. Medication/Nutrition Pumps
f. Nurse Call Systems
Loud, sudden or unexpected noises must be avoided; if any noise louder than ambient noise is going to occur, occupants of surrounding rooms must be notified immediately prior to commencement of noise. If excessive noise is unavoidable, work must be coordinated with the AOD.
I. Additional Training of Emergency Personnel J.
K.
L.
Ensure Additional Employee Education Institute a Fire Watch w/documentation Post temporary signage
If YES, describe intervention:
Est. Start Date:
Est. Duration:
If YES, select ILSM from list below or describe other intervention:
A
A A
A
C
A
D
E
H
H H
E
E E
B
E
E
F
J
H
H H
I
H
G
G
J
J J
J
I
H
H
L
L L
L
K
INFECTION CONTROL RISK ASSESSMENT
INFECTION CONTROL COORDINATOR
Y N CONSTRUCTION ACTIVITY TYPE
A: Inspection, non-invasive activity-includes, not limited to removal of ceiling tiles for inspection (1/50 sq ft), painting (not sanding), wall covering, electrical trim work, minor plumbing, activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
B: Small scale, short duration, moderate to high levels-includes but not limited to installation of telephone/computer cabling, access to chase spaces, cutting of walls or ceiling where dust migration can be controlled.
C: Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes but not limited to sanding of walls for painting or wall covering; removal of floor coverings, ceiling tiles, and casework; new wall construction; minor duct work or electrical work above the ceilings; major cabling activity; any activity which cannot be completed in a single work shift.
D: Major duration and construction activities-Includes, but not limited to:
activities that require consecutive work shifts; requires heavy demolition or removal of a complete cabling system; new construction.
Patient Risk Group LOW Risk
Project Class
Class:
CLASS I
MEDIUM Risk HIGH Risk HIGHEST Risk
1.
2.
1.
2.
CLASS II
TYPE A
I I I
II
During Construction Project:
Execute work by methods to minimize raising dust from construction operations.
Immediately replace any ceiling tile displaced for visual inspection.
Include all items from Class I above Provides active means to prevent air-borne dust from dispersing into atmosphere
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Place dust mat at access points of work area.
7. Contain construction waste before transport in tightly covered containers.
8.
1.
2.
3.
CLASS III
Include all items from Class I/II above Involve Infection Control in design/planning before construction begins.
Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
4. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
5. Cover transport receptacles or carts. Tape covering unless solid lid.
1.
2.
CLASS IV
Include all items from Class I/II/III above Involve Infection Control in design/planning before construction begins.
3. Seal holes, pipes, conduits, and punctures appropriately.
4. If exiting to a patient care area, construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
5. Walk-off mats are required to minimize tracking of heavy dirt and dust from construction areas. Shoe covers may be considered in certain areas.
ICRA PROJECT CLASS:
Could there be a risk of TB Exposure?
Could water quality be compromised?
Y
Y
N If yes, describe type of risk and Intervention:
N If yes, Explain:
1. Include all items from Class I/II/III above
Isolate HVAC system in areas where work is being performed to prevent contamination of duct system.
1.
1. Wipe surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Remove isolation of HVAC system in areas where work is being performed.
Include all items from Class I/II above
2. Do not remove barriers from work area until completed project is thoroughly cleaned as required by Chief, EMS and Infection Control Coordinator.
3.
4.
Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
TYPE B
II
II
II
III/IV
Y N PATIENT RISK GROUP (may modify as appropriate))
Low Risk- (ex Office Areas)
Medium Risk-(ex Cardiology, ECHO, Endoscopy, Nuclear Medicine, Physical Therapy, Radiology/MRI, Respiratory Therapy)
High Risk-(ex CCU, ER, Labor & Delivery, Laboratories (specimen), Newborn Nursery, Outpatient Surgery, Pediatrics, Pharmacy, Post Anesthesia care, Surgical Units)
Highest Risk-(ex Any area caring for Immunocompromised patients, Burn Unit, Cardiac Cath Lab, Central Sterile Supply, ICU, Medical Unit, Negative pressure isolation rooms, Oncology, Operating rooms including C-section)
TYPE C
II
TYPE D
III/IV
III
III/IV
III/IV
IV
IV
IV
Upon Completion of Project:
Additional Requirements:
Patient Safety Coordinator/Date Infection Control Coordinator/Date
IH/Safety Date Project Engineer/Date
INFECTION CONTROL
1. INFECTION CONTROL IS CRITICAL IN ALL MEDICAL CENTER FACILITIES. INTERIOR CONSTRUCTION ACTIVITIES CAUSING DISTURBANCE OF EXISTING DUST, OR CREATING NEW DUST, MUST BE CONDUCTED WITHIN VENTILATION-CONTROLLED AREAS THAT MINIMIZE THE FLOW OF AIRBORNE PARTICLES INTO PATIENT AREAS. EXTERIOR CONSTRUCTION ACTIVITIES CAUSING DISTURBANCE OF SOIL OR CREATES DUST IN SOME OTHER MANNER MUST BE CONTROLLED.
2. AN AHA ASSOCIATED WITH INFECTION CONTROL WILL BE PERFORMED BY VA PERSONNEL IN ACCORDANCE WITH FGI GUIDELINES (I.E. INFECTION CONTROL RISK ASSESSMENT (ICRA)). THE ICRA PROCEDURE FOUND ON THE AMERICAN SOCIETY FOR HEALTHCARE ENGINEERING (ASHE) WEBSITE WILL BE UTILIZED. RISK CLASSIFICATIONS OF CLASS II OR LOWER WILL REQUIRE APPROVAL BY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY BEFORE BEGINNING ANY CONSTRUCTION WORK. RISK CLASSIFICATIONS OF CLASS III OR HIGHER WILL REQUIRE A PERMIT BEFORE BEGINNING ANY CONSTRUCTION WORK. INFECTION CONTROL PERMITS WILL BE ISSUED BY THE SAFETY OFFICE. THE INFECTION CONTROL PERMITS WILL BE POSTED OUTSIDE THE APPROPRIATE CONSTRUCTION AREA. MORE THAN ONE PERMIT MAY BE ISSUED FOR A CONSTRUCTION PROJECT IF THE WORK IS LOCATED IN SEPARATE AREAS REQUIRING SEPARATE CLASSES. THE PRIMARY PROJECT SCOPE AREA FOR THIS PROJECT IS: CLASS [____}, HOWEVER, WORK OUTSIDE THE PRIMARY PROJECT SCOPE AREA MAY VARY. THE REQUIRED INFECTION CONTROL PRECAUTIONS WITH EACH CLASS
ARE AS FOLLOWS:
2.1. CLASS I REQUIREMENTS:
2.1.1. DURING CONSTRUCTION WORK:
2.1.1.1. NOTIFY THE COR
2.1.1.2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS.
2.1.1.3. CEILING TILES: IMMEDIATELY REPLACE A CEILING TILES DISPLACED FOR VISUAL INSPECTION.
2.1.2. UPON COMPLETION:
2.1.2.1. CLEAN WORK AREA UPON COMPLETION OF TASK
2.1.2.2. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY
2.2. CLASS II REQUIREMENTS:
2.2.1. DURING CONSTRUCTION WORK:
2.2.1.1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY
2.2.1.2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST COLLECTORS
WHERE POSSIBLE.
2.2.1.3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
2.2.1.4. SEAL UNUSED DOORS WITH DUCT TAPE.
2.2.1.5. BLOCK OFF AND SEAL AIR VENTS.
2.2.1.6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
2.2.2. UPON COMPLETION:
2.2.2.1. WIPE WORK SURFACES WITH CLEANER/DISINFECTANT.
2.2.2.2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
2.2.2.3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
2.2.2.4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED
2.2.2.5. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY
2.3. CLASS III REQUIREMENTS:
2.3.1. DURING CONSTRUCTION WORK:
2.3.1.1. OBTAIN PERMIT FROM THE // RESIDENT ENGINEER // PROJECT MANAGER // AND FACILITY SAFETY // MANAGER // OFFICER // OR CONTRACTING OFFICER
REPRESENTATIVE // OR GOVERNMENT DESIGNATED AUTHORITY //
2.3.1.2. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2.3.1.3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS.
2.3.1.4. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC
CALIBRATION AND MONITORED BY THE CONTRACTOR.
2.3.1.5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
2.3.1.6. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
2.3.2. UPON COMPLETION:
2.3.2.1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT
DESIGNATED AUTHORITY AND THOROUGHLY CLEANED BY THE VA ENVIRONMENTAL SERVICES DEPARTMENT.
2.3.2.2. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS.
2.3.2.3. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
2.3.2.4. WET MOP AREA WITH CLEANER/DISINFECTANT.
2.3.2.5. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
2.3.2.6. RETURN PERMIT TO THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY
2.4. CLASS IV REQUIREMENTS:
2.4.1. DURING CONSTRUCTION WORK:
2.4.1.1. OBTAIN PERMIT FROM THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY.
2.4.1.2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2.4.1.3. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL WORK HOURS.
2.4.1.4. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND CONTINUOUSLY MONITORED WITH A DIGITAL DISPLAY, RECORDING AND ALARM INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION, MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE CONTRACTOR.5) SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
2.4.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.
2.4.1.6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK
AREA.
2.4.2. UPON COMPLETION:
2.4.2.1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT
DESIGNATED AUTHORITY WITH THOROUGH CLEANING BY THE VA ENVIRONMENTAL SERVICES DEPT.
2.4.2.2. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS.
2.4.2.3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
2.4.2.4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
2.4.2.5. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
2.4.2.6. WET MOP AREA WITH CLEANER/DISINFECTANT.
2.4.2.7. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
2.4.2.8. RETURN PERMIT TO THE CONTRACTING OFFICER REPRESENTATIVE OR GOVERNMENT DESIGNATED AUTHORITY.
2.5. BARRIERS SHALL BE ERECTED AS REQUIRED BASED UPON CLASSIFICATION (CLASS III & IV REQUIRES BARRIERS). FOR ADDITIONAL DETAILS ON BARRIERS REFER TO
SPECIFICATION 01 35 26-25.
1 SCALE: 1
32" = 1'
FLOOR 4 LIFE SAFETY PLAN
AutoCAD SHX Text 4A-36
AutoCAD SHX Text
TESTING
AutoCAD SHX Text
STAIR #14
AutoCAD SHX Text
STAIR #15
AutoCAD SHX Text
STAIR #9
AutoCAD SHX Text
STAIR #13
AutoCAD SHX Text
STAIR #10
AutoCAD SHX Text
STAIR #7
AutoCAD SHX Text
STAIR #2
AutoCAD SHX Text
STAIR #1
AutoCAD SHX Text
LIBERTY ELEV (1,2,3)
AutoCAD SHX Text
INDEPENDENCE ELEV (4,5)
AutoCAD SHX Text
VICTORY ELEV (7,8)
AutoCAD SHX Text
STAIR #3
AutoCAD SHX Text
STAIR #21
AutoCAD SHX Text 4B-58
AutoCAD SHX Text 4B-58A
AutoCAD SHX Text 4B-64
AutoCAD SHX Text 4B-60
AutoCAD SHX Text 4B-60A
AutoCAD SHX Text
4B-55 LNDY
AutoCAD SHX Text 4B-64A
AutoCAD SHX Text 4B-62
AutoCAD SHX Text 4B-70 Nrse-St
AutoCAD SHX Text 4B-70A
AutoCAD SHX Text 4B-55A
AutoCAD SHX Text 4B-57
AutoCAD SHX Text 4B-57A
AutoCAD SHX Text 4B-59
AutoCAD SHX Text 4B-59A
AutoCAD SHX Text 4B-63
AutoCAD SHX Text 4B-63A
AutoCAD SHX Text 4B-65 Dining
AutoCAD SHX Text 4B-66
AutoCAD SHX Text 4B-67
AutoCAD SHX Text
4B-50 HSKP
AutoCAD SHX Text 4B-48 Interdis.
AutoCAD SHX Text 4B-46 In-Pt Psych
AutoCAD SHX Text 4B-44 WK-Rm
AutoCAD SHX Text 4B-42 Nutn
AutoCAD SHX Text 4B-40 Dayroom
AutoCAD SHX Text 4B-26
AutoCAD SHX Text 4B-24 Psych
AutoCAD SHX Text
4B-49 CLN
AutoCAD SHX Text 4B-47 Soiled
AutoCAD SHX Text 4B-45 Nrse Mngr
AutoCAD SHX Text
4B-43 CLNL S.W.
AutoCAD SHX Text
4B-36 MHICM
AutoCAD SHX Text 4B-20 GRP-Rm
AutoCAD SHX Text 4A-20 GRP-Rm
AutoCAD SHX Text 4A-22 MH Nurse
AutoCAD SHX Text 4A-24 Nurse
AutoCAD SHX Text 4A-26 Psych
AutoCAD SHX Text 4A-28 Psych
AutoCAD SHX Text 4A-30 Pysch office
AutoCAD SHX Text 4A-32 Nurse
AutoCAD SHX Text 4A-34 Nurse
AutoCAD SHX Text 4A-67 Psych
AutoCAD SHX Text 4A-63 S.W.
AutoCAD SHX Text 4A-61 S.W
AutoCAD SHX Text 4A-59 S.W.
AutoCAD SHX Text 4A-57 S.W.
AutoCAD SHX Text 4A-55 S.W.
AutoCAD SHX Text 4A-70 Storage
AutoCAD SHX Text 4A-68 S.W.
AutoCAD SHX Text 4A-64 Copier
AutoCAD SHX Text 4A-62 S.W.
AutoCAD SHX Text 4A-60 Suicide Prevent
AutoCAD SHX Text 4A-58 S.W.
AutoCAD SHX Text 4A-56 Psych
AutoCAD SHX Text 4A-54 Break
AutoCAD SHX Text 4A-52 C&P
AutoCAD SHX Text
4A-50 HCHV
AutoCAD SHX Text 4A-48 Psych
AutoCAD SHX Text 4A-46 Psych
AutoCAD SHX Text 4A-44 Psych
AutoCAD SHX Text 4A-42 Psych
AutoCAD SHX Text 4A-47 Psych
AutoCAD SHX Text 4A-45 Psych
AutoCAD SHX Text 4A-43 Psych
AutoCAD SHX Text 4A-40 Mech
AutoCAD SHX Text 4A-35 Psych
AutoCAD SHX Text 4A-33 Psych
AutoCAD SHX Text 4A-31 Nurse
AutoCAD SHX Text 4A-29 Psych
AutoCAD SHX Text 4A-27 Psych
AutoCAD SHX Text
4A-23 GRP-RM
AutoCAD SHX Text 4A-23A
AutoCAD SHX Text 4A-07 M-Tlt
AutoCAD SHX Text 4A-05 FM-Tlt
AutoCAD SHX Text 4A-03
AutoCAD SHX Text 4A-01
AutoCAD SHX Text 4A-15 Waiting Rm
AutoCAD SHX Text
4A-16 TR
AutoCAD SHX Text 4A-17
AutoCAD SHX Text 4A-19M&E
AutoCAD SHX Text 4E-19 Mech
AutoCAD SHX Text
4E-19A ELEV #6 EQ ROOM
AutoCAD SHX Text 4D-05 Mech
AutoCAD SHX Text 4D-07
AutoCAD SHX Text
4D-07A ELEV #5 EQ-ROOM
AutoCAD SHX Text 4E-22
AutoCAD SHX Text 4E-23
AutoCAD SHX Text 4E-24 Med Libn
AutoCAD SHX Text 4E-09 Storage
AutoCAD SHX Text 4E-10 Library
AutoCAD SHX Text 4E-21
AutoCAD SHX Text 4E-20
AutoCAD SHX Text 4E-18
AutoCAD SHX Text 4E-17 Conf/Class
AutoCAD SHX Text 4E-16
AutoCAD SHX Text 4E-14
AutoCAD SHX Text 4E-15 Computer Training
AutoCAD SHX Text 4E-15A
AutoCAD SHX Text 4D-06 Mech
AutoCAD SHX Text 4D-08 Elev #4 EQ-Room
AutoCAD SHX Text 4C-05 Brk-Rm
AutoCAD SHX Text 4C-08
AutoCAD SHX Text 4C-06
AutoCAD SHX Text 4C-48
AutoCAD SHX Text 4C-49 DERM Ex
AutoCAD SHX Text 4C-50 DERM Ex
AutoCAD SHX Text 4C-51 DERM Ex
AutoCAD SHX Text
4C-52 INT
AutoCAD SHX Text 4C-40 Waiting
AutoCAD SHX Text 4C-44 Fitting
AutoCAD SHX Text
4C-47 CLN
AutoCAD SHX Text 4C-46 Soiled
AutoCAD SHX Text 4C-45 Derm Ste
AutoCAD SHX Text 4C-39 Aud/Eye Recp
AutoCAD SHX Text 4B-76
AutoCAD SHX Text 4B-74
AutoCAD SHX Text 4B-72
AutoCAD SHX Text
4B-70B LNGE
AutoCAD SHX Text 4B-74A
AutoCAD SHX Text 4B-72A
AutoCAD SHX Text 4B-76A
AutoCAD SHX Text 4B-71 M & E
AutoCAD SHX Text 4B-73
AutoCAD SHX Text 4B-73A
AutoCAD SHX Text 4B-75
AutoCAD SHX Text 4B-75A
AutoCAD SHX Text 4C-28
AutoCAD SHX Text 4C-29
AutoCAD SHX Text 4C-27 Elec
AutoCAD SHX Text 4C-25
AutoCAD SHX Text 4C-26
AutoCAD SHX Text 4C-23
AutoCAD SHX Text 4C-23A Mod RM
AutoCAD SHX Text 4C-17 Eye-Ex
AutoCAD SHX Text 4C-11 Eye-Ex
AutoCAD SHX Text 4C-10 Eye-Ex
AutoCAD SHX Text
4B-35 SATP
AutoCAD SHX Text 4B-34 Admin
AutoCAD SHX Text 4B-33 Admin
AutoCAD SHX Text 4B-32 Admin
AutoCAD SHX Text 4B-28 Pharm
AutoCAD SHX Text 4B-29 Pharm
AutoCAD SHX Text 4B-30 Admin
AutoCAD SHX Text 4B-31 Admin
AutoCAD SHX Text 4B-27 H.W.
AutoCAD SHX Text
4B-23 TR
AutoCAD SHX Text 4C-22 Eye Int.
AutoCAD SHX Text 4C-21 Eye Int.
AutoCAD SHX Text 4C-20 Laser
AutoCAD SHX Text 4B-16 Recp
AutoCAD SHX Text 4B-14 Admin
AutoCAD SHX Text 4B-12 C&P
AutoCAD SHX Text 4B-10 Exam
AutoCAD SHX Text 4B-19 Proc Rm
AutoCAD SHX Text 4B-06
AutoCAD SHX Text 4B-04
AutoCAD SHX Text 4B-02
AutoCAD SHX Text 4C-18 Flour. Ang.
AutoCAD SHX Text 4C-07 Eye
AutoCAD SHX Text
4D-02 TR
AutoCAD SHX Text 4D-04
AutoCAD SHX Text 4C-03
AutoCAD SHX Text 4C-02 Meds
AutoCAD SHX Text 4C-01
AutoCAD SHX Text 4C-31 Aud Ex
AutoCAD SHX Text 4C-32 Aud Ex
AutoCAD SHX Text 4C-24
AutoCAD SHX Text 4C-16 Eye Ex
AutoCAD SHX Text 4C-14 Eye Ex
AutoCAD SHX Text 4C-13 Eye Ex
AutoCAD SHX Text 4C-12 Eye Ex
AutoCAD SHX Text 4C-15 Waiting
AutoCAD SHX Text 4C-34 Audio
AutoCAD SHX Text 4C-35 Audio
AutoCAD SHX Text 4C-54 Cerumen
AutoCAD SHX Text
4C-33 AUD EX
AutoCAD SHX Text 4C-31 Men
AutoCAD SHX Text 4C-55 Women
AutoCAD SHX Text 4C-30 Audlgy Ste.
AutoCAD SHX Text 4A-51 M&E
AutoCAD SHX Text 4A-38
AutoCAD SHX Text
4A-53 TLT
AutoCAD SHX Text
TV
AutoCAD SHX Text
CONTRACT LIMIT LINE
AutoCAD SHX Text
DEMOLITION LINE
AutoCAD SHX Text
ELEVATION INDICATOR
AutoCAD SHX Text
CENTER LINE INDICATOR
AutoCAD SHX Text
EXISTING TO REMAIN LINE
AutoCAD SHX Text
FEATURES ABOVE LINE INDICATOR
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
BREAK, ROUND (USER DEFINES SIZE)
AutoCAD SHX Text
BREAK, STRAIGHT (SEE SECTION INDICATORS, BUILDING, WITH BREAK STANDARDS)
AutoCAD SHX Text
DETAIL INDICATOR
AutoCAD SHX Text
DETAIL INDICATOR
AutoCAD SHX Text
DETAIL INDICATOR FOR SMALL CONDITIONS
AutoCAD SHX Text
DIMENSION LINE
AutoCAD SHX Text
DOOR OPENING/BORROWED LIGHT IDENTIFIER
AutoCAD SHX Text
DRAWING BLOCK TITLE, TYPICAL
AutoCAD SHX Text
ELEVATION INDICATOR, EXTERIOR
AutoCAD SHX Text
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
AutoCAD SHX Text
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
AutoCAD SHX Text
ARCHITECTURAL SYMBOLS
AutoCAD SHX Text
CENTER LINE
AutoCAD SHX Text
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
AutoCAD SHX Text
GRAPHIC SCALE, "=1'-0"18"=1'-0"
AutoCAD SHX Text
DRAWING BLOCK TITLE
AutoCAD SHX Text 1 1/2" = 1'-0"
AutoCAD SHX Text C4
AutoCAD SHX Text 1 1/2'
AutoCAD SHX Text 1/2'
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text A-201
AutoCAD SHX Text A4
AutoCAD SHX Text
AutoCAD SHX Text 16'
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
AutoCAD SHX Text A2
AutoCAD SHX Text A-202
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text A-202
AutoCAD SHX Text A2
AutoCAD SHX Text A-201
AutoCAD SHX Text A4
AutoCAD SHX Text A-512
AutoCAD SHX Text D2
AutoCAD SHX Text A-512
AutoCAD SHX Text D2
AutoCAD SHX Text A-512
AutoCAD SHX Text D2
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
AutoCAD SHX Text C2
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
ROOM NAME AND NUMBER
AutoCAD SHX Text
FEC
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AA
AutoCAD SHX Text
COLUMN GRID
AutoCAD SHX Text
KEYNOTE
AutoCAD SHX Text
WALL OR PARTITION TYPE
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
CORNER GUARD
AutoCAD SHX Text
NORTH ARROW
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
MATERIALS LEGEND
AutoCAD SHX Text
EXISTING CONSTRUCTION TO REMAIN
AutoCAD SHX Text
EXISTING CONSTRUCTION TO BE REMOVED
AutoCAD SHX Text
NEW CONSTRUCTION
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
BASE COURSE
AutoCAD SHX Text
RIGID INSULATION
AutoCAD SHX Text
BATT INSULATION
AutoCAD SHX Text V V ITEM - VA SUPPLIED & INSTALLED VC ITEM - VA SUPPLIED & CONTRACTOR INSTALLED CC ITEM - CONTRACTOR SUPPLIED & INSTALLED
AutoCAD SHX Text A4
AutoCAD SHX Text A-201
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SHEET WHERE REF.
AutoCAD SHX Text
SHEET WHERE DRAWN
AutoCAD SHX Text
AutoCAD SHX Text A3.1
AutoCAD SHX Text A4.3
AutoCAD SHX Text
BUILDING SECTION INDICATOR
AutoCAD SHX Text
DETAIL INDICATOR
AutoCAD SHX Text GENERAL NOTES 1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE HARD SUSPENDED CEILING, OR ACOUSTICAL CEILING. 2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS. 3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED. 4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING. 5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS. 6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES. 7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR. 8. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM ELEVATION OF WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 175MM [7"] ABOVE FINISHED FLOOR. 9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES. 10. STEAM HEADER SET PRESSURE: ___ KPA [PSIG] NORMAL STEAM HEADER SET PRESSURE: ___ KPA [PSIG] NORMAL ___ KPA [PSIG] NORMAL ___ KPA [PSIG] LOW DEMAND PERIODS 11. ALTITUDE-BOILER ROOM FLOOR: ___ M [FT.] ABOVE SEA LEVEL ALTITUDE-BOILER ROOM FLOOR: ___ M [FT.] ABOVE SEA LEVEL ___ M [FT.] ABOVE SEA LEVEL 12. SEISMIC PROVISIONS NOT REQUIRED SEISMIC PROVISIONS NOT REQUIRED 13. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTEDALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED
EC460W2-23
460W1
ES460C1
460C2
EC460W2
11S2-43 11S2-28
EC11N1-21
91N5-26
EC91N2-2
EC11E1-21
91S1-14
91S3-69
EC91S2
91S3 91S4
91C4
461C2-29
EC91N2
91N5
91N5-25
91N4-40
EC461N1
EB11S1
11S4
EC11S1-13
91S1-26 91S1-24
91S1-24
91S1-26
ES461C1-16
461N2
461N2
EC11E1
11S7-1
11S8-44
11S2-14
VERIFY
EC11E1-21
91S1
EC461N1
EB11S1-26
11S7-1
461C1A
461C3
EC461C1
ES461C1
461C1
461C2
461N1
ES461N1
EC
1N
1N
EB
1N
EC11S1
EC11S2
ES11S1
11S1
11S2
11S8
11S9
11S5
11S6
11S7
Xref ..\^Base Maps\FL_01.dwg
EC463C1-17
93S1-47
EC93S1-30
463C3-34 463C3-36
463C2-41
EC92N2-23
EC
3C
3C
ES
3C
3C
EC
3C
EB463C1
3C
3C
EC
3C
EC
3C 5 463C3
93N1
93N1
EC93N1
EC93S1
93S1
93S1
93S1-49
93N1-50
Xref ..\^Base Maps\FL_03.dwg
EC462N1-25
EC12S2-40
12S3-50
12C1-VERIFY
462N1-15
EC92N2-23
S4
S3
EC12S2
C
EC462C1
EC92N2
EC92N1
462N2
N
462N1
N
EC462N1-25
462C1-10
462C1-33
EC92W1-9
EC462C1-21462C1
EC462C1-21
EC462N1-25
92W1
92W1
92W3
92W4
92W5
92W6
EC92W3
EC92W4
EC92W3
EC92W2
EC92W4
EC92W5
EC92W6
EC92W5
EC92W6
92W7
Xref ..\^Base Maps\FL_02.dwg
A R C H
F u l l
B l e e d
E
X
I n c h e s
PA
G
E
SI
ZE
VA
M
C A
N D
R O
C
E
LM
S
T.
N
FA
R
G O
, N D
1-
9-
FI
LE
P
A
TH
: S :\E
N G
IN
EE
R
IN
G \0
PR
O
JE
C
TS
F
IL
ES
\4
-2
5-
3-
YE
A
R E
LE
C
TR
IC
A L\
C O
N
TR
A C
TI
N
G S
O P
- C O
N
ST
R U
C
TI
O N
IN
FO
\D R
A W
IN
G
S
FI
LE
N
A M
E:
-2
5-
-2 0-
M ay
0, Ja nu ar y
LI
FE
S A
FE
TY
P
LA
N S
PA
PH
PR
O
JE
C
T N
U M
B
ER
7-
-1
Pe rf or m
Y ea r E le ct ric al
T es tin g
A nd
M ai nt en an ce
D R
A W
IN
G
D
ES
C R
IP
TI
O N
PR
O
JE
C
T N
A M
E R
EV
IE
W
ED
B Y
R
EV
IS
ED
C R
EA
TE
D
C R
EA
TE
D B
Y
PR
IN
TE
D
O N
M ay
0, R
EV
IS
ED
B Y
4 SCALE: 1
32" = 1'
FLOOR 3 LIFE SAFETY PLAN
B
ID
D O
C U
M
EN
TS
PA
G
E
A
.3
D W
G
O
F
3 SCALE: 1
32" = 1'
FLOOR 2 LIFE SAFETY PLAN
1 SCALE: 1
32" = 1'
FLOOR 0 LIFE SAFETY PLAN 2 SCALE: 1
32" = 1'
FLOOR 1 LIFE SAFETY PLAN
1. WING A - CERNER
2. WING B - PHARMACY, STERILE PROCESSING
3. WING C - SOCIAL SERVICES, CANTINA, PATRIOT CAFE
4. WING D - ENGINEERING, ENVIRONMENTAL MANAGEMENT
5. WING E - SUPPLY CHAIN MANAGEMENT
1. WING A - DIRECTORS SUITE
2. WING B - IMAGING/EMERGENCY DEPARTMENT
3. WING C - LOBBY/WOMENS HEALTH
4. WING D - PRIMARY CARE/SPECIALITY CARE
5. WING E - PROSTHETICS/OCCUPATION AND PHYSICAL THERAPY
1. WING A - SURGICAL OFFICES
2. WING B - OPERATING AND RECOVERY ROOMS
3. WING C - GASTRO-INTESTINAL PROCEDURE ROOMS
4. WING D - COMMUNITY LIVING CENTER
5. WING E - NUTRITION AND FOOD SCIENCES
1. WING A - IN PATIENT CARE
2. WING B - IN PATIENT CARE
3. WING C - INTENSIVE CARE UNIT/CARDIOLOGY
4. WING D - OFFICES
5. WING E - OFFICES
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
WOODEN
AutoCAD SHX Text
UP
AutoCAD SHX Text BB-96 Fitness Instruction
AutoCAD SHX Text BB-100 Mechanical
AutoCAD SHX Text BB-95 Fitness
AutoCAD SHX Text BB-95B Men's LKR
AutoCAD SHX Text BB-95A Women's LKR
AutoCAD SHX Text
BB-91
AutoCAD SHX Text BB-93 Storage
AutoCAD SHX Text BB-94 Electrical
AutoCAD SHX Text
BB-92 TR
AutoCAD SHX Text
BB-67A
AutoCAD SHX Text
BB-67B
AutoCAD SHX Text BB-84 Office
AutoCAD SHX Text BB-85A Exam
AutoCAD SHX Text BB-67C Equip.
AutoCAD SHX Text BB-66 Women
AutoCAD SHX Text BB-64 Men
AutoCAD SHX Text
BB-60A
AutoCAD SHX Text
BB-60 W-LKRM
AutoCAD SHX Text
BB-61 HLDG
AutoCAD SHX Text
BB-57
AutoCAD SHX Text BB-58 Mech
AutoCAD SHX Text BB-54 PD A-Chief
AutoCAD SHX Text
BB-52
AutoCAD SHX Text
BB-59A
AutoCAD SHX Text
BB-59 M-LKRM
AutoCAD SHX Text BB-97 Stor
AutoCAD SHX Text BB-50 Storage
AutoCAD SHX Text BB-53 Police Admin
AutoCAD SHX Text BB-55 PD Chief
AutoCAD SHX Text BB-35 Imaging UPS
AutoCAD SHX Text
BB-67
AutoCAD SHX Text BB-32 SPS Chief
AutoCAD SHX Text BB-34 Mechanical
AutoCAD SHX Text
BB-34B
AutoCAD SHX Text BB-15 Storage
AutoCAD SHX Text
BB-16A
AutoCAD SHX Text BB-15B Men's
AutoCAD SHX Text
BB-15B1
AutoCAD SHX Text
BB-18B
AutoCAD SHX Text
BA-30 TR
AutoCAD SHX Text
BB-18A
AutoCAD SHX Text
BB-20A
AutoCAD SHX Text BB-17 Pre-Assembly Storage
AutoCAD SHX Text
BB-10 ENG/VAEA
AutoCAD SHX Text
BB-26
AutoCAD SHX Text BB-76 Staff Lounge
AutoCAD SHX Text
BB-22
AutoCAD SHX Text BB-27 Pharm Chief
AutoCAD SHX Text BB-80 In-patient Pharm
AutoCAD SHX Text BB-75 Pharmacy Receiving
AutoCAD SHX Text
BB-90 ANTE
AutoCAD SHX Text
BB-90B
AutoCAD SHX Text
BB-90A
AutoCAD SHX Text BB-78 HD Stor
AutoCAD SHX Text
BB-72A
AutoCAD SHX Text
BB-80C
AutoCAD SHX Text
BB-68
AutoCAD SHX Text BB-33 Pharm
AutoCAD SHX Text
BB-69
AutoCAD SHX Text
LIBERTY ELEV (1,2,3)
AutoCAD SHX Text BB-20 Receiving Decontamination
AutoCAD SHX Text
BB-21
AutoCAD SHX Text BA-72 Mech
AutoCAD SHX Text BA-67 Mech
AutoCAD SHX Text BA-10 BLDG 9 Switchgear
AutoCAD SHX Text BA-07A BLDG 9 Emergency Gen
AutoCAD SHX Text BA-01B BLDG 46 Emergency Gen
AutoCAD SHX Text BA-01A BLDG 46 Switchgear
AutoCAD SHX Text BA-07 SPS Storage
AutoCAD SHX Text BA-05 Envo Mgmt
AutoCAD SHX Text
BA-03 EMS
AutoCAD SHX Text
STAIR #9
AutoCAD SHX Text BB-80A Crtl Sub Vault
AutoCAD SHX Text
BB-80B
AutoCAD SHX Text
BC-05C
AutoCAD SHX Text
BC-05B
AutoCAD SHX Text
BC-79
AutoCAD SHX Text
BC-05A
AutoCAD SHX Text BC-01 Wrk Rm
AutoCAD SHX Text
BC-02 TR
AutoCAD SHX Text
VICTORY ELEV (7,8)
AutoCAD SHX Text BB-85B OC-Hlth
AutoCAD SHX Text BB-70 Pharm EDU
AutoCAD SHX Text BB-85 OC-Hlth
AutoCAD SHX Text BC-10 Social Work
AutoCAD SHX Text BC-11 HMLS Outreach
AutoCAD SHX Text
BC-30
AutoCAD SHX Text
BC-32 PACT SW
AutoCAD SHX Text BC-12 Intrvw Rm
AutoCAD SHX Text BC-11A Intrvw-Rm
AutoCAD SHX Text BC-13 Super
AutoCAD SHX Text
BC-15A OEF/OIF
AutoCAD SHX Text BC-45 OIT Off.
AutoCAD SHX Text
BC-43 OFFICE
AutoCAD SHX Text BC-41 Mech
AutoCAD SHX Text BC-47 Storage
AutoCAD SHX Text BC-15 OEF/OIF SW space
AutoCAD SHX Text BC-59 Mech
AutoCAD SHX Text
BC-63 TR
AutoCAD SHX Text BC-66 Men
AutoCAD SHX Text BC-44 OIT Office
AutoCAD SHX Text BC-50 Server Room
AutoCAD SHX Text BC-60 TeleCom-Room
AutoCAD SHX Text BC-74B Storage
AutoCAD SHX Text
BC-52 ICO
AutoCAD SHX Text BC-54 Storage
AutoCAD SHX Text BC-56 OIT Off.
AutoCAD SHX Text BC-58 OIT Off.
AutoCAD SHX Text BC-74A Canteen Kitchen
AutoCAD SHX Text BC-74 Serving
AutoCAD SHX Text BC-67 Women
AutoCAD SHX Text
BC-34 PIV
AutoCAD SHX Text BC-89 Lounge
AutoCAD SHX Text BC-69 Vending
AutoCAD SHX Text BC-68 Office
AutoCAD SHX Text
BC-64 TR
AutoCAD SHX Text
PATRIOT ELEV 10
AutoCAD SHX Text BC-75 Canteen Dining
AutoCAD SHX Text BC-91 EMS Brk-Rm
AutoCAD SHX Text
BC-90 CU
AutoCAD SHX Text BC-20 Cube Farm
AutoCAD SHX Text
BC-93 EMS
AutoCAD SHX Text
BC-90A CU
AutoCAD SHX Text BC-80 Retail Store
AutoCAD SHX Text BC-79 Mech
AutoCAD SHX Text BC-81 Ret-Storage
AutoCAD SHX Text BC-82 CTN-Chief
AutoCAD SHX Text
BC-83 ADMIN
AutoCAD SHX Text BC-94 Men's Locker
AutoCAD SHX Text BC-95 Women's Locker
AutoCAD SHX Text
BC-85A
AutoCAD SHX Text BC-85B FD-Stor
AutoCAD SHX Text BC-96 Men's Tlt
AutoCAD SHX Text
BD-02 TR/TEL
AutoCAD SHX Text BE-05 Mechanical
AutoCAD SHX Text
INDEPENDENCE ELEV (4,5)
AutoCAD SHX Text
BE-02
AutoCAD SHX Text BE-10 Mail-Rm Stor
AutoCAD SHX Text BE-09 Mech
AutoCAD SHX Text BE-29 Mech
AutoCAD SHX Text BE-30 N&FS Subsistence Storage
AutoCAD SHX Text BE-34 Pharm Storage
AutoCAD SHX Text
BE-40A
AutoCAD SHX Text
BE-42A
AutoCAD SHX Text BE-44A Compactor
AutoCAD SHX Text BE-44 Carts
AutoCAD SHX Text BE-42 Wmn-LKR
AutoCAD SHX Text BE-40 Men-LKR
AutoCAD SHX Text
BE-38C
AutoCAD SHX Text BE-35 Morgue
AutoCAD SHX Text BE-37 Mrg-Clr
AutoCAD SHX Text
BE-38 SP-CH MGMT
AutoCAD SHX Text
BE-45
AutoCAD SHX Text
BE-38A
AutoCAD SHX Text
BE-38B
AutoCAD SHX Text BE-31A Whse Storage
AutoCAD SHX Text BE-97 Stor
AutoCAD SHX Text BE-46 Mech
AutoCAD SHX Text
BE-50
AutoCAD SHX Text BE-25 Mech
AutoCAD SHX Text BE-27 Mech
AutoCAD SHX Text BE-24 Linen
AutoCAD SHX Text
BD-31 ENG
AutoCAD SHX Text
BD-33 EMS
AutoCAD SHX Text
BD-35 ENG
AutoCAD SHX Text
BD-37 ENG
AutoCAD SHX Text
BD-39 ENG
AutoCAD SHX Text BD-41 EM-Mng
AutoCAD SHX Text BD-43 Gems
AutoCAD SHX Text
BD-45 ENG
AutoCAD SHX Text
BD-47 ENG
AutoCAD SHX Text
BD-36 SFTY
AutoCAD SHX Text
BD-38 EEO
AutoCAD SHX Text
BD40 SFTY
AutoCAD SHX Text BD-42 ENg Conf
AutoCAD SHX Text BD-50 Engineering
AutoCAD SHX Text BD-50B ENG Chief
AutoCAD SHX Text BD-50A ENG A-Chief
AutoCAD SHX Text Shwr
AutoCAD SHX Text
BD-63 M-LKR
AutoCAD SHX Text BD-62 File-Rm
AutoCAD SHX Text BD-60E Biomed
AutoCAD SHX Text BD-60 Biomed D/O
AutoCAD SHX Text BD-60B W-Area
AutoCAD SHX Text BD-60C Charging Area
AutoCAD SHX Text BD-60D Biomed Drop-Off
AutoCAD SHX Text BD-65 Paint Shop
AutoCAD SHX Text BD-75A Electrical Shop
AutoCAD SHX Text BD-75B Carpentry
AutoCAD SHX Text BD-85A Plumnbing Shop
AutoCAD SHX Text BD-85B Mechanic Shop
AutoCAD SHX Text BD-90 Equipment Area
AutoCAD SHX Text
BD-92
AutoCAD SHX Text
BD-91
AutoCAD SHX Text
BD-84 TR
AutoCAD SHX Text BD-83 Elec.
AutoCAD SHX Text BD-86 Mech
AutoCAD SHX Text BD-70 Mechanical
AutoCAD SHX Text BD-80 Storage
AutoCAD SHX Text BD-95 Breakroom
AutoCAD SHX Text BD-10 M-Tlt
AutoCAD SHX Text
BD-12 FM-TLT
AutoCAD SHX Text BD-08 CTN-Stor
AutoCAD SHX Text
BD-06 STOR. RM
AutoCAD SHX Text
BD-04 BRKRM
AutoCAD SHX Text BD-05 Mail
AutoCAD SHX Text BA-01 Mechanical
AutoCAD SHX Text
BC-20A
AutoCAD SHX Text
BC-20B
AutoCAD SHX Text
BC-99 M&R
AutoCAD SHX Text
BB-12
AutoCAD SHX Text
BB-34A UPS
AutoCAD SHX Text
BB-16B
AutoCAD SHX Text BB-15A Women's
AutoCAD SHX Text
BA-44B
AutoCAD SHX Text
BA-44
AutoCAD SHX Text BC-46 OIT Office
AutoCAD SHX Text
BF-11
AutoCAD SHX Text
BLDG #3 SP-CH MGMT
AutoCAD SHX Text BF-003 Inv-Mgmt
AutoCAD SHX Text
STAIR #1
AutoCAD SHX Text BE-28 Loading Dock
AutoCAD SHX Text
BD-81 TLT
AutoCAD SHX Text
STAIR #22
AutoCAD SHX Text
STAIR #13
AutoCAD SHX Text
BB-17A
AutoCAD SHX Text
BB-15-A1
AutoCAD SHX Text BB-62 Armory
AutoCAD SHX Text
STAIR #14
AutoCAD SHX Text
STAIR #4
AutoCAD SHX Text
BD-63A TLT
AutoCAD SHX Text BD-20 EMS Chief
AutoCAD SHX Text
BD-21 EMS
AutoCAD SHX Text BE-10A Mail
AutoCAD SHX Text BE-20 Linen
AutoCAD SHX Text BD-11 WD-Prop
AutoCAD SHX Text
BB-56
AutoCAD SHX Text BB-30 SPS Asst Chief
AutoCAD SHX Text
BA-44A
AutoCAD SHX Text
BD-23 EMS
AutoCAD SHX Text BD-22 Biomed
AutoCAD SHX Text BD-34 Production
AutoCAD SHX Text BD-60A Soiled
AutoCAD SHX Text
BD-61 LCK-SM
AutoCAD SHX Text BB-09 BLDG #9 Tank room
AutoCAD SHX Text BB-24 Recieving
AutoCAD SHX Text
BE-07
AutoCAD SHX Text
BF-002
AutoCAD SHX Text
BE-47 BIO-HZD
AutoCAD SHX Text BE-31 Whse-Storage
AutoCAD SHX Text
BE-36
AutoCAD SHX Text
BC-85
AutoCAD SHX Text
BE-03
AutoCAD SHX Text
BB-67D ACOS
AutoCAD SHX Text BC-70 Office
AutoCAD SHX Text BE-99 BLDG#1 Switchgear
AutoCAD SHX Text BE-98 BLDG#1 Emergency Gen
AutoCAD SHX Text
BC-77
AutoCAD SHX Text BB-31 Pharm
AutoCAD SHX Text BB-28 Pharm
AutoCAD SHX Text
STAIR #15
AutoCAD SHX Text
BB-82
AutoCAD SHX Text
BB-90C
AutoCAD SHX Text
ELEV #12
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR #7
AutoCAD SHX Text
STAIR #20
AutoCAD SHX Text #7
AutoCAD SHX Text
DN
AutoCAD SHX Text #5
AutoCAD SHX Text
STAIR #2
AutoCAD SHX Text
STAIR #10
AutoCAD SHX Text
STAIRWELL #3
AutoCAD SHX Text BD-65A Spray/Drying
AutoCAD SHX Text
SUB
AutoCAD SHX Text BA-09 Soiled Linens
AutoCAD SHX Text Mech
AutoCAD SHX Text BC-05 Anti-Coag Clinic
AutoCAD SHX Text
ELEV #6
AutoCAD SHX Text #4
AutoCAD SHX Text #8
AutoCAD SHX Text
BC-97
AutoCAD SHX Text BA-42 Office
AutoCAD SHX Text BA-35 Men
AutoCAD SHX Text BA-39 Women
AutoCAD SHX Text BA-37 Jan
AutoCAD SHX Text BA-41 Mech
AutoCAD SHX Text BA-43 Brk Rm
AutoCAD SHX Text BA-45 Office
AutoCAD SHX Text BA-70 Office
AutoCAD SHX Text BA-69 Conf Rm
AutoCAD SHX Text BA-65 Office
AutoCAD SHX Text
BB-15A
AutoCAD SHX Text
UP
AutoCAD SHX Text
CR
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
INTERSTITIAL
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
STAIR #9
AutoCAD SHX Text
STAIR #10
AutoCAD SHX Text
STAIR #3
AutoCAD SHX Text
STAIR #7
AutoCAD SHX Text
STAIR #2
AutoCAD SHX Text
STAIR #1
AutoCAD SHX Text
LIBERTY ELEV. (1,2,3)
AutoCAD SHX Text
INDEPENDENCE ELEV. (4,5)
AutoCAD SHX Text
VICTORY ELEV. (7,8)
AutoCAD SHX Text
UP
AutoCAD SHX Text
ELEV.#6
AutoCAD SHX Text
STAIR #15
AutoCAD SHX Text 1A-70 Stor. & Mech
AutoCAD SHX Text
STAIR #13
AutoCAD SHX Text 1A-69 Director
AutoCAD SHX Text 1A-30J Microbiology
AutoCAD SHX Text
1A-31 ATC
AutoCAD SHX Text 1A-33 Lab Mngr
AutoCAD SHX Text 1A-34 Path.
AutoCAD SHX Text 1A-36 Path.
AutoCAD SHX Text 1A-38 Path.
AutoCAD SHX Text 1A-39 Path. Chief
AutoCAD SHX Text 1A-69A
AutoCAD SHX Text 1A-67A Kit.
AutoCAD SHX Text
1A-40 MECH
AutoCAD SHX Text 1A-41 Path&Lab
AutoCAD SHX Text 1A-35 Lab Tr.
AutoCAD SHX Text 1A-37
AutoCAD SHX Text 1A-30I-A Stor
AutoCAD SHX Text 1A-30I Hist./Cytology
AutoCAD SHX Text 1A-30H Bld Bank
AutoCAD SHX Text 1A-66 Ass Dir Pat Care
AutoCAD SHX Text 1A-68 Ass Dir Op & Res
AutoCAD SHX Text 1A-64 Chief of Staff
AutoCAD SHX Text 1A-62 A.O. to COS
AutoCAD SHX Text 1A-60
AutoCAD SHX Text 1A-58 A.O. Planner
AutoCAD SHX Text 1A-50 Conf.
AutoCAD SHX Text 1B-30 C.T. Scanner
AutoCAD SHX Text 1B-34 Radiographic Fluoroscopic
AutoCAD SHX Text 1B-35 RadioGraphic
AutoCAD SHX Text 1B-30A
AutoCAD SHX Text
1B-67 MRI EQ
AutoCAD SHX Text 1B-63 MRI Ctrl
AutoCAD SHX Text 1B-60 Nuclear Med Ex
AutoCAD SHX Text 1B-66
AutoCAD SHX Text 1B-69 Imging Supvr
AutoCAD SHX Text 1B-70 Stress Testing
AutoCAD SHX Text 1B-68
AutoCAD SHX Text 1B-64 HT Lab
AutoCAD SHX Text
1B-65 TR
AutoCAD SHX Text 1B-71 Ultsnd
AutoCAD SHX Text 1B-62 Nuclear Med Ex
AutoCAD SHX Text 1B-82
AutoCAD SHX Text 1B-113 ON Call
AutoCAD SHX Text 1B-115
AutoCAD SHX Text 1B-116 Decont.
AutoCAD SHX Text 1B-124
AutoCAD SHX Text 1B-122
AutoCAD SHX Text 1B-110
AutoCAD SHX Text
1B-120 AMBULANCE DROP-OFF
AutoCAD SHX Text 1B-123
AutoCAD SHX Text 1B-121A
AutoCAD SHX Text
1B-121B TR
AutoCAD SHX Text
1B-125 EX 6
AutoCAD SHX Text
1B-126 EX 5
AutoCAD SHX Text
1B-127 EX 3 & 4
AutoCAD SHX Text
1B-128 EX 1 & 2
AutoCAD SHX Text 1B-100
AutoCAD SHX Text 1B-100A
AutoCAD SHX Text 1B-108
AutoCAD SHX Text 1B-107A
AutoCAD SHX Text 1C-101
AutoCAD SHX Text
1C-36 LOBBY
AutoCAD SHX Text 1B-101 Triage
AutoCAD SHX Text 1B-102
AutoCAD SHX Text 1B-103 Mental Hlth EX
AutoCAD SHX Text 1B-104 Isolation
AutoCAD SHX Text
1C-34 WOMEN'S
AutoCAD SHX Text
1C-33 MEN'S
AutoCAD SHX Text 1C-35B
AutoCAD SHX Text
1C-35 RECEPTION
AutoCAD SHX Text 1C-35C
AutoCAD SHX Text 1C-39
AutoCAD SHX Text 1C-40 Patient Adv
AutoCAD SHX Text
1C-35FA
AutoCAD SHX Text
1C-32 WAITING
AutoCAD SHX Text
1C-02 EX
AutoCAD SHX Text
1C-01 EX
AutoCAD SHX Text 1B-35A
AutoCAD SHX Text 1B-37A
AutoCAD SHX Text 1B-36 CTL Rm
AutoCAD SHX Text 1B-37 Radiographic
AutoCAD SHX Text 1B-38 Dexascan
AutoCAD SHX Text 1B-39 Conf/ Brk Rm
AutoCAD SHX Text 1B-41
AutoCAD SHX Text 1B-80C
AutoCAD SHX Text 1B-78 Vas. Lab
AutoCAD SHX Text 1B-80B
AutoCAD SHX Text 1B-74 Ultsnd
AutoCAD SHX Text 1B-73
AutoCAD SHX Text 1B-71A
AutoCAD SHX Text 1B-75
AutoCAD SHX Text 1B-72 Stor
AutoCAD SHX Text 1B-28
AutoCAD SHX Text 1B-29A
AutoCAD SHX Text 1B-29 C.T. Scanner
AutoCAD SHX Text 1B-29B
AutoCAD SHX Text 1A-54
AutoCAD SHX Text 1A-55
AutoCAD SHX Text 1A-57
AutoCAD SHX Text 1A-59
AutoCAD SHX Text 1A-63 Wk/CP
AutoCAD SHX Text 1A-22
AutoCAD SHX Text 1A-23
AutoCAD SHX Text 1A-24
AutoCAD SHX Text 1A-30D
AutoCAD SHX Text 1A-30C
AutoCAD SHX Text 1A-30E
AutoCAD SHX Text 1A-30F
AutoCAD SHX Text 1A-30G
AutoCAD SHX Text 1A-30B
AutoCAD SHX Text
1A-13 MEN'S
AutoCAD SHX Text 1A-15
AutoCAD SHX Text
1A-11 WOMEN'S
AutoCAD SHX Text 1A-09 OD Rm
AutoCAD SHX Text
1A-07 SW
AutoCAD SHX Text 1A-05 Tele Hlth
AutoCAD SHX Text 1A-25
AutoCAD SHX Text 1A-28
AutoCAD SHX Text
1A-26 HAC
AutoCAD SHX Text 1A-27 Elec
AutoCAD SHX Text…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .