Attachment d - Alternate Proposal Items.pdf

PDF 133 KB Posted

Attached to
Z2DZ--590-602 Renovate and Expand Domiciliary
Solicitation number
36C24620R0104_1
Issued by

About this file

This document includes an attachment to a Request for Proposal for renovation and expansion work at the Hampton VA Medical Center in Hampton, Virginia. The project involves renovating approximately 37,037 square feet within several existing building pods and constructing approximately 2,000 square feet of new space for patient care areas and a fitness center. The base proposal and four deductive alternates are outlined relating to the scope of work, with varying completion timeframes and deducted costs. Contractors must be registered in Vendor Information Pages and are a 100% SDVOSB set-aside with a magnitude of construction between $5-10 million under NAICS Code 236220. The pre-proposal site visit will take place on August 18th and requests for information are due by August 21st, with responses by amendment on August 28th. Final proposals are due September 21st.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate and Expand Domiciliary Building 148 VA Medical Center Hampton, VA

Project No. 590-602

ALTERNATE PROPOSAL ITEMS

A. Base Proposal, GENERAL CONSTRUCTION: Proposal item I, general construction: work includes, but is not limited to, general construction and alterations grading drainage, architectural, structural, mechanical, plumbing, fire protection and electrical work, equipment, utility systems and necessary removal of existing structures and construction and certain other items in building 148 complex. Currently the Hampton Veterans Affairs Medical Center (HVAMC) campus located in Hampton, VA has a project involving the renovation of approximately 37,037 square feet within pods A, B, C, D, S and approximately 2000 square feet of new construction in the patient care areas and a new fitness center. (Completion time 730 calendar days)

• Base Proposal $_____________________

B. Alternate I, DEDUCT ALTERNATE NO. I (Completion time 610 calendar days): Perform all work described in Base Proposal above except: replacing all the existing windows.

• Alternate I (DEDUCT ALTERNATE NO. I) $_____________________

C. Alternate II, DEDUCT ALTERNATE NO. II (Completion time 565 calendar days): Perform all work described in Base Proposal and Alternate I except: providing and installing new switchgear for the building.

• Alternate II (DEDUCT ALTERNATE NO. II) $_____________________

D. Alternate III, DEDUCT ALTERNATE NO. III (Completion time 390 calendar days): Perform all work described in Base Proposal, Alternate I and II except: replacing existing plumbing system.

• Alternate III (DEDUCT ALTERNATE NO. III) $_____________________

E. Alternate IV, DEDUCT ALTERNATE NO. IV (Completion time 360 calendar days): Perform all work described in Base Proposal, Alternate I, II, and III except: replacing the existing metal sloped roof.

• Alternate IV (DEDUCT ALTERNATE NO. IV) $_____________________