36C24620R0104 0003.pdf

PDF 731 KB Posted

Attached to
Z2DZ--590-602 Renovate and Expand Domiciliary
Solicitation number
36C24620R0104_1
Issued by

About this file

This is a request for proposal for renovation and expansion work at the Hampton Veterans Affairs Medical Center in Hampton, Virginia. The project involves renovating approximately 37,037 square feet within existing pods and buildings, as well as approximately 2,000 square feet of new construction for patient care areas and a new fitness center. The estimated value of construction is between $5-10 million. The solicitation is set aside exclusively for service-disabled veteran-owned small businesses. Proposals are due by September 21, 2020. A pre-proposal site visit will be held on August 18, 2020, with requests for information due by August 21, 2020. Answers to any requests will be provided by amendment on or around August 28, 2020.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

590-602

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667

Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton VA 23667

To all Offerors/Bidders

36C24620R0104

09-02-2020

X x x

The purpose of this amendment is to post RFI responses and specifications. See attachments.

All terms and conditions remain unchanged.

9/3/2020

CONTINUATION PAGE

See attached document: RFI Responses.

See attached document: Hampton Bldg 148 - Bid items 09-01-2020.

See attached document: 01 45 29.

See attached document: VA 01 00 00 revised.

See attached document: VA 01 45 00 (01-2018) Quality Control.

See attached document: VA 07 01 50_19_CD1.

See attached document: VA 07 54 19_CD1.

RFI Specification Answered by Answer Following approval of the CPM schedule, the VA, the General Contractor, its approved CPM Consultant, RE office representatives, and all subcontractors needed, as determined by the SRE, shall meet to discuss the monthly updated schedule. Is it possible to provide these monthly meetings via Webex in lieu of in person?

01 32 13.15; 1.9D COR Yes, monthly meetings via any VA approved site is possible.

Example of VA approved systems are Zoom, Teams, GoTo meeting, etc. Any others can be tested during the first meeting to determine any connectivity issues.

The SSHO or an equally-qualified Designated Representative/alternate will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6: Superintendence by the Contractor. Please clarify that this identifies the SSHO may also share the superintendent role if qualified.

01 35 26; 1.7D COR Yes, the SSHO can share the responsibility with the superintendent or the QC manager if qualified, however the QC manager cannot share responsibility with the superintendent. See attached updated spec section.

B. A Certified Safety Professional (CSP) with specialized knowledge in construction safety or a certified Construction Safety and Health Technician (CSHT) shall randomly conduct a monthly site safety inspection. The CSP or CSHT can be a corporate safety professional or independently contracted. The CSP or CSHT will provide their certificate number on the required report for verification as necessary. Please clarify if this is in addition to the inspections conducted by the onsite SSHO.

01 35 26; 1.9B COR Yes, it is an addition.

The CQC System Manager is assigned as CQC System Manager but can have duties as project superintendent in addition to quality control but not SSHO. Can the CQC System Manager be offsite with the Super/SSHO onsite?

01 45 00; 1.4B COR Per spec section "This CQC System manager is on the site at all times during construction and is employed by the General Contractor."

B. The Contractor is to appoint an individual, company or firm to act as the Commissioning Agent. Please confirm all costs associated with the CxA are by the

GC.

01 91 00; 1.8B COR Yes, all cost are by the GC.

There are no testing requirements within section 03 30 53. Please clarify if any testing is required and who is responsible for the testing and costs.

03 30 53 A/E Please see attached for testing requirements. The general contractor is responsible for testing and costs.

A. Preconstruction Testing:

1. Engage independent testing laboratory to tests and submit reports.

a. Deliver samples to laboratory in number and quantity required for testing.

2. Test mortar and materials specified.

3. Mortar:

a. Test for compressive strength and water retention according to ASTM C270.

Please clarify if any testing is required and who is responsible for the testing and costs.

04 05 13; 1.5A AE Please refer to masonry notes on drawings sheet S-001 and see attached for testing requirements. The general contractor is responsible for testing and costs Response: The contractor must provide testing.

01 45 29, TESTING LABORATORY SERVICES.

1. Take and test samples during progress of work according to ASTM C780. 01 45 29 is not included. In Division 01 00 00 it identifies all 3rd party testing is by the VA. Could you please clarify if this testing is by the GC or the VA?

04 05 13; 3.4A AE Please see attached for testing requirements. The general contractor is responsible for testing and costs. The VA may choose to contract separate services from the GC to validate the testing.

A. Record Survey:

1. Engage registered land surveyor or registered civil engineer as specified in Section 01 00 00, GENERAL REQUIREMENTS to perform survey.

2. Measure and record structural steel framing plumbness, level, and alignment after completing bolting and welding and before installation of work supported by structural steel.

Please verify the Survey Comapny and report are to be provided by the GC.

05 12 00; 3.3A COR Yes, provided by the GC.

A. Field Inspections and Tests: Performed by testing laboratory specified in Section 01

45 29, TESTING LABORATORY SERVICES.

1. Perform inspections and tests before concealing air barrier with subsequent work.

B. Inspections:

1. Compatibility of materials within air barrier system and adjacent materials.

2. Suitability of substrate and support for air barrier.

3. Suitability of conditions under which air barrier is applied.

4. Adequacy of substrate priming.

5. Application and treatment of joints and edges of transition strips, flexible opening transitions, and accessory materials.

6. Continuity and gap-free installation of air barrier, transition strips, and accessory materials. Section 01 45 29 was not included. Is this testing to be 3rd party and is the VA or the GC responsable for the costs?

07 27 26; 3.3 AE The general Contractor, see attached spec section

C. Inspector Qualifications: Contractor to engage a qualified inspector to perform inspections and final reports. The inspector to meet the criteria contained in ASTM E699 for agencies involved in quality assurance and to have a minimum of two years’ experience in construction field inspections of firestopping systems, products, and assemblies. The inspector to be completely independent of, and divested from, the Contractor, the installer, the manufacturer, and the supplier of material or item being inspected. Submit inspector qualifications.

Will this inspection company be hired by the GC or the VA?

07 84 00; 1.4C COR The general Contractor, see attached spec section.

Preconstruction Field-Adhesion Testing: Before installing elastomeric sealants, field test their adhesion to joint substrates according to Method A, Field-Applied Sealant Joint Hand Pull Tab, in Appendix X1.1 in ASTM C1193 or Method A, Tail Procedure, in

ASTM C1521.

1. Locate test joints where indicated in construction documents or, if not indicated, as directed by COR.

2. Conduct field tests for each application indicated below:

a. Each type of elastomeric sealant and joint substrate indicated.

b. Each type of non-elastomeric sealant and joint substrate indicated. Are these tests required to be 3rd party and if so who is responsable for the costs, the GC or the VA?

07 92 00; 1.3E COR The general Contractor, see attached spec section

C. Test Specimen:

1. Include window assembly and construction. Affix test chamber to interior side of test specimen and the conduct testing using positive static air pressure (Test method A).

2. Test specimens to be selected by the Contracting Officer's Representative after windows have been installed according to the drawings and specification. How many of the windows require this testing? Is the GC or the VA responsible for the costs associated with the testing?

08 51 13; 3.5 AE The COR will request at least 20% of the windows to be tested, however if testing fails the VA reserves the right to request additional testing to other windows. The general Contractor is responsible for cost.

1. Moisture test and pH results performed by a qualified independent testing agency or warranty holding manufacturer’s technical representative.

Are these test costs by the GC or the VA?

09 05 16; 1.3D COR By the GC.

A. Test floors in accordance with ASTM C627 to show compliance with codes 1 through 10. This is destructive testing. Do you want this testing done for all tile and who will pay for the repairs and the testing, the GC or the VA?

09 30 13; 3.18A COR By the GC.

Non-Destructive Examination of Piping Welds:

1. Perform radiographic examination of 50 percent of the first 10 welds made and 10 percent of all additional welds made. The COR reserves the right to identify individual welds for which the radiographic examination must be performed. All welds will be visually inspected by the COR. The VA reserves the right to require testing on additional welds up to 100 percent if more than 25 percent of the examined welds fail the inspection.

2. An approved independent testing firm regularly engaged in radiographic testing shall perform the radiographic examination of pipe joint welds.

All radiographs shall be reviewed and interpreted by an ASNT Certified Level III radiographer, employed by the testing firm, who shall sign the reading report.

3. Comply with ASME B31.1. Furnish a set of films showing each weld inspected, a reading report evaluating the quality of each weld, and a location plan showing the physical location where each weld is to be found in the completed project.

The specification calls for x-rays of the welds by 3rd party. Is this 3rd party and costs by the VA or the GC?

23 22 13; 3.2H AE The general Contractor.

Contractor shall provide all rent, labor, materials, tools, equipment, and construction services needed to provide a leased temporary Clinical/Medical Building (Modular Trailers). To price this correctly we need to know the power, communications, plumbing, HVAC, sprinkler, and other requirements for each room within the temporary building. Does it need to be sprinklered and have a fire alarm system with monitor? Could the government provide these design requirements so we are able to price the work? What access requirements are necessary? Sidewalks? ADA ramp? Covered entrance? Is there a very specific location for the trailer?

COR Per the drawings the mobile until shall meet NFPA and JCAHO regulations for clinical space. Refer to G-003 and G-003A for additional information.

Is this project taxable? Solicitation Contracting No

Alternate IV Deduct Alternate "Perform all work described in Base Proposal, Alternate I,II and III except: replacing the existing metal sloped roof." The base drawings do not indicate replacing the existing standing seam roof. There is note 4 on sheet AD109 that reads " Existing standing seam metal roof and fascia to remain. Scrape existing standing seam metal roofing and fascia to remove all rust and corrosion, and prepare surface for refinishing, as indicated on the new work roof plans." Roof Drawing AS109 note 1 reads " Clean, prepare, and refinish existing standing seam roofing and fascia" Is this alternate still valid ?

Solicitation Alternates

Yes

Will there be landscaping drawings issued for the area in and around Pod S at the two building addition locations?

AE No landscaping plan to be issued. Seed, topsoil and fertilize all pervious areas disturbed by construction.

Is there an existing lawn irrigation system that needs to be modified due to the new foundations that are going in? If yes can you please provide the as-built drawing for the existing lawn irrigation system?

COR No

Are we to assume that prior to construction start of each phase the VA will remove and store off site all furniture, fixtures, equipment, books, shelving, exercise equipment, personal items, ect. for the pod that we will be working in? And move back in and reinstall after construction is complete?

COR No, GC is responsible. See notes in the drawings

Will there be a requirement for temporary patient housing trailers? COR No In the report of hazardous materials it talks about asbestos containing materials at existing curb flashing, base flashing, pitch pockets, etc. Since the roofing is to remain, do you just want to remove the asbestos containing materials where affected by the two small building additions at POD S only?

Asbestos Report COR No

In the report of hazardous materials it talks about lead paint on 3 existing hollow metal door frames. Since these doors are existing to remain and are not called out to have new paint finish are we to leave them as is? If no, can you please provide details and new finishes for the 3 frames or how you want them remediated.

Hazardous Matls Report

COR Yes, Leave "AS-IS"

Is there any perimeter drain tile that we have to relocate due to the two new building additions in Pod S?

AE Existence of drain tile unknown

Can you provide any soil borings at the two new building additions at Pod S? If no soil borings are available, are we to assume bear soil at proposed design depths?

COR SOIL BORINGS ARE NOT AVAILABLE. REFER TO SHEETS S-101 AND

S-102 FOR FOUNDATION ELEVATION.

Reference Sheet G-004, the floor plans show Bid Deduct I, III, V for all the Pods. Please confirm this should read Bid Deduct I, III,IV.

COR this should read Bid Deduct I, III,IV

Reference Sheet G-003A, with 30 days of activation between phases, there are a total of 180 calendar days of non-construction time.

Referencing the time deducts in Attachment D, Alternate Proposal Items, this leaves only 36 days per building in Alternate 4, 78 days per building in Alternate 3, 113 days per building in alternate 2 and 122 days per building in alternate 1. Since the critical path is still HVAC and electrical scopes of work, the Contractor will need the full duration to still complete the non-deducted scopes, especiall for Pod S with the new building additions. As there are $3,720 of liquidated damages per day, we respectfully request for each Deduct Alternate to keep the full duration of 730 days form NTP.

COR There a total of 120 days for activation between phases.

Taking into consideration the critical path see attached updated bid items duration

Reference page 7 of the RFP, for Part II - Past Performance, in addition to PPQ's, can we include the CPARS for the relevant projects in this section?

Contracting CPARS can be included.

Reference page 7 of the RFP, Part III - Price, please confirm that the Offeror should include the bid bond in this Part.

Contracting The bid bond can be included in this Part

Reference Spec section 010000, paragraph 1.2.D, please confirm that Prime Contractor will not need to hire its own Testing Laboratory.

COR All Testing is the GC responsibility

Reference Spec sections 22 08 00 and 23 08 00 paragraph 1.1.B, the Commissioning Agent will be appointed by the VA. Please confirm the VA will contract directly with the Commissioning Agent.

COR No, the GC is responsible for the commissioning agent

There are numerous references to the requirements for corporate experience and past performance projects and they all differ as shown below.

Please clarify the minimum threshold for similar projects (e.g. scope, whether not they must be in hospitals, etc.)

a. Part 1, Subfactor 2 the paragraph for “Criteria” indicates that the minimum threshold for similar work is projects “where the principle objective was structural repair/structural renovations of hospitals within the United States, with a total contract value exceeding $2,000,000”.

b. The next paragraph, “Minimum Standard of Acceptability” states that the minimum threshold is ‘Projects where the principle objective was mechanical, electrical and plumbing upgrade renovations and building additions of hospitals within the United States, with a total contract value exceeding $2,000,000.

c. The corporate project experience form identifies similar work as “commercial building remodel/renovation; minimum threshold value exceeding $500,000”.

d. Part II, Past Performance includes the statement that “references meeting the “minimum threshold” criteria, but not related to hospital renovations will be rated “Somewhat Relevant””.

Contracting a&b. Sub-Factor 2 Criteria has been updated to include, "Projects where the principle objective was mechanical, electrical and plumbing upgrade renovations and building additions of hospitals within the United States, with a total contract value exceeding $2,000,000). "

c. The solicitation stating $2,000,000 is correct. The corporate experience form has been updated.

It is our understanding that the projects evaluated for both Part 1, Subfactor 2, Corporate Experience and Part II, Past Performance should be the same. Is this correct?

Contracting They do not have to be the same. They will have to meet the criteria stated in the solicitation.

Please confirm that an established program of smaller renovation projects which collectively meet the minimum threshold will be acceptable as Corporate Experience.

Contracting Each project needs to meet the minimum threshold.

Would past performance be considered relevant if multiple task orders were issued at the same facility, during similar or the same timeframe, when combined together are over $2,000,000? For example Phase 1 of a project at the Hampton VAMC is $1,500,000 and Phase 2 is $750,000 but are issued under separate contracts, can they be combined for the purposes of a single PPQ and be considered relevant and greater than $2,000,000?

Contracting They cannot be combined to meet the minimum threshold.

If projects are submitted as past performance that are over $2,000,000 with renovation and MEP scopes, not in a hospital setting but on a government or similar facility, will those projects be considered relevant?

Contracting As the solicitation states, "Past Performance references meeting the “minimum threshold” criteria, but not related to hospital renovations, will be rated “Somewhat Relevant.”

Will projects less than $2,000,000 be considered acceptable, if the other criteria are met?

Contracting Pg. 17 of the solicitation states the Criteria for Past Perfromance. It reads, "Offerors must provide a minimum of five (5) and a maximum of eight (8) references of their choice of completed projects, similar in size and scope (minimum threshold: Projects where the principle objective was renovations to hospital facilities within the United States, with a total contract value exceeding $2,000,000)."

Will projects completed at facilities other than a hospital be considered acceptable, if the other criteria are met?

Contracting Pg. 16 of the solicitation read, "Past Performance references meeting the “minimum threshold” criteria, but not related to hospital renovations, will be rated “Somewhat Relevant”.

Please confirm that the amount to be inserted for Alternate I is simply the amount to be deducted for not replacing all the existing windows.

GOV Add the deduct and bottom line after the deduct has been removed.

Please confirm that the amount to be inserted for Alternate II is simply the amount to be deducted for not providing and installing new switchgear for the building.

AE This statement is correct. Alternate II is simply stating that the new switchgear for the building will not be installed and the existing switchgear is to remain. Add the deduct and bottom line after the deduct has been removed.

Please confirm that the amount to be inserted for Alternate III is simply the amount to be deducted for not replacing existing plumbing system.

AE Add the deduct and bottom line after the deduct has been removed.

Please confirm that the amount to be inserted for Alternate IV is simply the amount to be deducted for not replacing the existing metal sloped roof.

AE Add the deduct and bottom line after the deduct has been removed.

Please confirm that the “existing plumbing system” referenced in Alternate III includes: all plumbing piping and associated appurtenances, all plumbing fixtures, and all associated architectural demolition and new finishes.

AE Correct. Add the deduct and bottom line after the deduct has been removed.

Please further define the work associated with Alternate IV “replacing the existing metal sloped roof”. The only requirement to replace the existing metal sloped roof is in the area associated with the new building addition:

Note 2 on Dwg. AD108 and Note 5 on Dwg. AS108. If the existing roofing in this area is not to be placed will new details in the area of the new addition?

AE Sheets AD108 and AS108 clearly indicate what areas of the roofs that will be removed and new.

Please advise if there are any page limitations to any subsection of the TAB B Technical Capability?

Contracting There is not a page limitation stated.

Is it acceptable to include the Bid Guarantee in Part III? Contracting Yes.

Regarding the Temporary Mobile Trailers shown on Sheet G-003A, is there a particular floorplan or layout required for the rooms and offices?

GOV No, as long as it meets the required amount of rooms and sizes as identified in the drawings

Regarding the Temporary Mobile Trailers shown on Sheet G-003A, are there any special requirements for locking / key requirements?

GOV No. However, the GC will provide 20 Exterior door keys and 2 interior office door keys per office doors.

Regarding the Temporary Mobile Trailers shown on Sheet G-003A, is there a preferred Modular trailer company?

GOV No, however Modular Genius Smart Building layout was used as basis of design

16. “This section seems to be missing. It discusses the roof in the air/vapor barrier section. SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE

Transitions: Section 07 52 16.13 STYRENE-BUTADIENE-STYRENE MODIFIED

BITUMINOUS MEMBRANE ROOFING, COLD APPLIED.”

Please clarify the referenced missing spec section.

AE See revised roof spec sections 07 01 50.19 and 07 54 19

BOWMAN FOSTER

& ASSOCIATES, INC

CONSULTING ENGINEERS 6353 Center Drive, Suite 101 Norfolk, VA 23502 (757) 466-7400

Renovate and Expand Domiciliary Building 148 VA Medical Center Hampton, VA

Project No. 590-602

BID ITEMS

A. BID ITEM I, GENERAL CONSTRUCTION: Bid item I, general construction: work includes, but is not limited to, general construction and alterations grading drainage, architectural, structural, mechanical, plumbing, fire protection and electrical work, equipment, utility systems and necessary removal of existing structures and construction and certain other items in building 148 complex. Currently the Hampton Veterans Affairs Medical Center (HVAMC) campus located in Hampton, VA has a project involving the renovation of approximately 37,037 square feet within pods A, B, C, D, S and approximately 2000 square feet of new construction in the patient care areas and a new fitness center. (Completion time 730 calendar days)

• BID ITEM I (BASE BID)

B. BID ITEM II, DEDUCT ALTERNATE NO. I (Completion time 715 calendar days): Perform all work described in Bid Item I above except: replacing all the existing windows.

• BID ITEM II (DEDUCT ALTERNATE NO. I)

C. BID ITEM III, DEDUCT ALTERNATE NO. II (Completion time 700 calendar days): Perform all work described in Bid Item I and Bid Item II except: providing and installing new switchgear for the building.

• BID ITEM III (DEDUCT ALTERNATE NO. II)

D. BID ITEM IV, DEDUCT ALTERNATE NO. III (Completion time 680 calendar days): Perform all work described in Bid Item I, II, and III except: replacing existing plumbing system.

• BID ITEM IV (DEDUCT ALTERNATE NO. III)

E. BID ITEM V, DEDUCT ALTERNATE NO. IV (Completion time 680 calendar days): Perform all work described in Bid Item I, II, III and IV except: replacing the existing metal sloped roof.

• BID ITEM V (DEDUCT ALTERNATE NO. IV)

FINAL (CD) SUBMITTAL

JULY 26, 2019

BFA Project No. 13-025M VA Project No. 590-602

BOWMAN FOSTER WWW.BFA-ENG.COM SINCE 1961

http://www.bfa-eng.com/

11-01-18

01 45 29 - 1

SECTION 01 45 29

TESTING LABORATORY SERVICES

PART 1 - GENERAL

1.1 DESCRIPTION:

This section specifies materials testing activities and inspection services required during project construction to be provided by a

Testing Laboratory retained by the General Contractor.

1.2 APPLICABLE PUBLICATIONS:

A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

B. American Association of State Highway and Transportation Officials

(AASHTO):

T27-11..................Standard Method of Test for Sieve Analysis of

Fine and Coarse Aggregates

T96-02 (R2006)..........Standard Method of Test for Resistance to

Degradation of Small-Size Coarse Aggregate by

Abrasion and Impact in the Los Angeles Machine

T99-10..................Standard Method of Test for Moisture-Density

Relations of Soils Using a 2.5 Kg (5.5 lb.)

Rammer and a 305 mm (12 in.) Drop

T104-99 (R2007).........Standard Method of Test for Soundness of

Aggregate by Use of Sodium Sulfate or Magnesium

Sulfate

T180-10.................Standard Method of Test for Moisture-Density

Relations of Soils using a 4.54 kg (10 lb.)

Rammer and a 457 mm (18 in.) Drop

T191-02(R2006)..........Standard Method of Test for Density of Soil In-

Place by the Sand-Cone Method

T310-13.................Standard Method of Test for In-place Density and Moisture Content of Soil and Soil-aggregate by Nuclear Methods (Shallow Depth)

C. American Concrete Institute (ACI):

506.4R-94 (R2004).......Guide for the Evaluation of Shotcrete

D. American Society for Testing and Materials (ASTM):

A370-12.................Standard Test Methods and Definitions for

Mechanical Testing of Steel Products

01 45 29 - 2

A416/A416M-10...........Standard Specification for Steel Strand, Uncoated Seven-Wire for Prestressed Concrete

C31/C31M-10.............Standard Practice for Making and Curing

Concrete Test Specimens in the Field

C33/C33M-11a............Standard Specification for Concrete Aggregates

C39/C39M-12.............Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

C109/C109M-11b..........Standard Test Method for Compressive Strength of Hydraulic Cement Mortars

C136-06.................Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

C138/C138M-10b..........Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of

Concrete

C140-12.................Standard Test Methods for Sampling and Testing

Concrete Masonry Units and Related Units

C143/C143M-10a..........Standard Test Method for Slump of Hydraulic

Cement Concrete

C172/C172M-10...........Standard Practice for Sampling Freshly Mixed

Concrete

C173/C173M-10b..........Standard Test Method for Air Content of freshly

Mixed Concrete by the Volumetric Method

C330/C330M-09...........Standard Specification for Lightweight

Aggregates for Structural Concrete

C567/C567M-11...........Standard Test Method for Density Structural

Lightweight Concrete

C780-11.................Standard Test Method for Pre-construction and

Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry

C1019-11................Standard Test Method for Sampling and Testing

Grout

C1064/C1064M-11.........Standard Test Method for Temperature of Freshly

Mixed Portland Cement Concrete

C1077-11c...............Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

C1314-11a...............Standard Test Method for Compressive Strength of Masonry Prisms

01 45 29 - 3

D422-63(2007)...........Standard Test Method for Particle-Size Analysis of Soils

D698-07e1...............Standard Test Methods for Laboratory Compaction

Characteristics of Soil Using Standard Effort

D1140-00(2006)..........Standard Test Methods for Amount of Material in

Soils Finer than No. 200 Sieve

D1143/D1143M-07e1.......Standard Test Methods for Deep Foundations

Under Static Axial Compressive Load

D1188-07e1..............Standard Test Method for Bulk Specific Gravity and Density of Compacted Bituminous Mixtures

Using Coated Samples

D1556-07................Standard Test Method for Density and Unit

Weight of Soil in Place by the Sand-Cone Method

D1557-09................Standard Test Methods for Laboratory Compaction

Characteristics of Soil Using Modified Effort

(56,000ft lbf/ft3 (2,700 KNm/m3))

D2166-06................Standard Test Method for Unconfined Compressive

Strength of Cohesive Soil

D2167-08)...............Standard Test Method for Density and Unit

Weight of Soil in Place by the Rubber Balloon

Method

D2216-10................Standard Test Methods for Laboratory

Determination of Water (Moisture) Content of

Soil and Rock by Mass

D2974-07a...............Standard Test Methods for Moisture, Ash, and

Organic Matter of Peat and Other Organic Soils

D3666-11................Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and

Paving Materials

D3740-11................Standard Practice for Minimum Requirements for

Agencies Engaged in Testing and/or Inspection of Soil and Rock as used in Engineering Design and Construction

D6938-10................Standard Test Method for In-Place Density and

Water Content of Soil and Soil-Aggregate by

Nuclear Methods (Shallow Depth)

E94-04(2010)............Standard Guide for Radiographic Examination

01 45 29 - 4

E164-08.................Standard Practice for Contact Ultrasonic

Testing of Weldments

E329-11c................Standard Specification for Agencies Engaged in

Construction Inspection, Testing, or Special

Inspection

E543-09.................Standard Specification for Agencies Performing

Non-Destructive Testing

E605-93(R2011)..........Standard Test Methods for Thickness and Density of Sprayed Fire Resistive Material (SFRM)

Applied to Structural Members

E709-08.................Standard Guide for Magnetic Particle

Examination

E1155-96(R2008).........Determining FF Floor Flatness and FL Floor

Levelness Numbers

F3125/F3125M-15.........Standard Specification for High Strength

Structural Bolts, Steel and Alloy Steel, Heat

Treated, 120 ksi (830 MPa) and 150 ksi (1040

MPa) Minimum Tensile Strength, Inch and Metric

Dimensions

E. American Welding Society (AWS):

D1.D1.1M-10.............Structural Welding Code-Steel

1.3 REQUIREMENTS:

A. Accreditation Requirements: Construction materials testing laboratories must be accredited by a laboratory accreditation authority and will be required to submit a copy of the Certificate of Accreditation and Scope of Accreditation. The laboratory’s scope of accreditation must include the appropriate ASTM standards (i.e.; E329, C1077, D3666, D3740, A880, E543) listed in the technical sections of the specifications.

Laboratories engaged in Hazardous Materials Testing shall meet the requirements of OSHA and EPA. The policy applies to the specific laboratory performing the actual testing, not just the “Corporate

Office.”

B. Inspection and Testing: Testing laboratory shall inspect materials and workmanship and perform tests described herein and additional tests requested by COR. When it appears materials furnished, or work performed by Contractor fail to meet construction contract requirements, Testing Laboratory shall direct attention of COR to such failure.

01 45 29 - 5

C. Written Reports: Testing laboratory shall submit test reports to COR, Contractor, unless other arrangements are agreed to in writing by the

COR. Submit reports of tests that fail to meet construction contract requirements on colored paper.

D. Verbal Reports: Give verbal notification to COR immediately of any irregularity.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 EARTHWORK:

A. General: The Testing Laboratory shall provide qualified personnel, materials, equipment, and transportation as required to perform the services identified/required herein, within the agreed to schedule and/or time frame. The work to be performed shall be as identified herein and shall include but not be limited to the following:

1. Observe fill and subgrades during proof-rolling to evaluate suitability of surface material to receive fill or base course.

Provide recommendations to the COR regarding suitability or unsuitability of areas where proof-rolling was observed. Where unsuitable results are observed, witness excavation of unsuitable material and recommend to Resident Engineer extent of removal and replacement of unsuitable materials and observe proof-rolling of replaced areas until satisfactory results are obtained.

2. Provide part time observation of fill placement and compaction and field density testing in building areas and provide part time observation of fill placement and compaction and field density testing in pavement areas to verify that earthwork compaction obtained is in accordance with contract documents.

3. Provide supervised geotechnical technician to inspect excavation, subsurface preparation, and backfill for structural fill.

B. Testing Compaction:

1. Determine maximum density and optimum moisture content for each type of fill, backfill and subgrade material used, in compliance with

ASTM D698 and/or ASTM D1557.

2. Make field density tests in accordance with the primary testing method following ASTM D6938 wherever possible. Field density tests utilizing ASTM D1556 shall be utilized on a case by case basis only if there are problems with the validity of the results from the primary method due to specific site field conditions. Should the

01 45 29 - 6 testing laboratory propose these alternative methods, they should provide satisfactory explanation to the COR before the tests are conducted.

a. Building Slab Subgrade: At least one test of subgrade for every

185 m2 (2000 square feet) of building slab, but in no case fewer than three tests. In each compacted fill layer, perform one test for every 185 m2 (2000 square feet) of overlaying building slab, but in no case fewer than three tests.

b. Foundation Wall Backfill: One test per 30 m (100 feet) of each layer of compacted fill but in no case fewer than two tests.

c. Pavement Subgrade: One test for each 335 m2 (400 square yards), but in no case fewer than two tests.

d. Curb, Gutter, and Sidewalk: One test for each 90 m (300 feet), but in no case fewer than two tests.

e. Trenches: One test at maximum 30 m (100 foot) intervals per 1200 mm (4 foot) of vertical lift and at changes in required density, but in no case fewer than two tests.

f. Footing Subgrade: At least one test for each layer of soil on which footings will be placed. Subsequent verification and approval of each footing subgrade may be based on a visual comparison of each subgrade with related tested subgrade when acceptable to COR. In each compacted fill layer below wall footings, perform one field density test for every 30 m (100 feet) of wall. Verify subgrade is level, all loose or disturbed soils have been removed, and correlate actual soil conditions observed with those indicated by test borings.

C. Fill and Backfill Material Gradation: One test per 10 cubic yards stockpiled or in-place source material. Gradation of fill and backfill material shall be determined in accordance with ASTM C136.

D. Testing for Footing Bearing Capacity: Evaluate if suitable bearing capacity material is encountered in footing subgrade.

E. Testing Materials: Test suitability of on-site and off-site borrow as directed by COR.

3.2 LANDSCAPING:

A. Test topsoil for organic materials, pH, phosphate, potash content, and gradation of particles.

1. Test for organic material by using ASTM D2974.

01 45 29 - 7

2. Determine percent of silt, sand, clay, and foreign materials such as rock, roots, and vegetation.

B. Submit laboratory test report of topsoil to COR.

3.3 SITE WORK CONCRETE:

Test site work concrete including materials for concrete as required in

Article CONCRETE of this section.

3.4 CONCRETE:

A. Batch Plant Inspection and Materials Testing:

1. Perform continuous batch plant inspection until concrete quality is established to satisfaction of COR with concurrence of Contracting

Officer and perform periodic inspections thereafter as determined by

COR.

2. Periodically inspect and test batch proportioning equipment for accuracy and report deficiencies to Resident Engineer.

3. Sample and test mix ingredients as necessary to insure compliance with specifications.

4. Sample and test aggregates daily and as necessary for moisture content. Test the dry rodded weight of the coarse aggregate whenever a sieve analysis is made, and when it appears there has been a change in the aggregate.

5. Certify, in duplicate, ingredients and proportions and amounts of ingredients in concrete conform to approved trial mixes. When concrete is batched or mixed off immediate building site, certify

(by signing, initialing or stamping thereon) on delivery slips

(duplicate) that ingredients in truck-load mixes conform to proportions of aggregate weight, cement factor, and water-cement ratio of approved trial mixes.

B. Field Inspection and Materials Testing:

1. Provide a technician at site of placement at all times to perform concrete sampling and testing.

2. Review the delivery tickets of the ready-mix concrete trucks arriving on-site. Notify the Contractor if the concrete cannot be placed within the specified time limits or if the type of concrete delivered is incorrect. Reject any loads that do not comply with the

Specification requirements. Rejected loads are to be removed from the site at the Contractor’s expense. Any rejected concrete that is placed will be subject to removal.

01 45 29 - 8

3. Take concrete samples at point of placement in accordance with ASTM

C172. Mold and cure compression test cylinders in accordance with

ASTM C31. Make at least three cylinders for each 40 m3 (50 cubic yards) or less of each concrete type, and at least three cylinders for any one day's pour for each concrete type. After good concrete quality control has been established and maintained as determined by

COR make three cylinders for each 80 m3 (100 cubic yards) or less of each concrete type, and at least three cylinders from any one day's pour for each concrete type. Label each cylinder with an identification number. COR may require additional cylinders to be molded and cured under job conditions.

4. Perform slump tests in accordance with ASTM C143. Test the first truck each day, and every time test cylinders are made. Test pumped concrete at the hopper and at the discharge end of the hose at the beginning of each day’s pumping operations to determine change in slump.

5. Determine the air content of concrete per ASTM C173. For concrete required to be air-entrained, test the first truck and every 20 m3

(25 cubic yards) thereafter each day. For concrete not required to be air-entrained, test every 80 m3 (100 cubic yards) at random. For pumped concrete, initially test concrete at both the hopper and the discharge end of the hose to determine change in air content.

6. If slump or air content fall outside specified limits, make another test immediately from another portion of same batch.

7. Perform unit weight tests in compliance with ASTM C138 for normal weight concrete and ASTM C567 for lightweight concrete. Test the first truck and each time cylinders are made.

8. Notify laboratory technician at batch plant of mix irregularities and request materials and proportioning check.

9. Verify that specified mixing has been accomplished.

10. Environmental Conditions: Determine the temperature per ASTM C1064 for each truckload of concrete during hot weather and cold weather concreting operations:

a. When ambient air temperature falls below 4.4 degrees C (40 degrees F), record maximum and minimum air temperatures in each

24 hour period; record air temperature inside protective enclosure; record minimum temperature of surface of hardened concrete.

01 45 29 - 9

b. When ambient air temperature rises above 29.4 degrees C (85 degrees F), record maximum and minimum air temperature in each 24 hour period; record minimum relative humidity; record maximum wind velocity; record maximum temperature of surface of hardened concrete.

11. Inspect the reinforcing steel placement, including bar size, bar spacing, top and bottom concrete cover, proper tie into the chairs, and grade of steel prior to concrete placement. Submit detailed report of observations.

12. Observe conveying, placement, and consolidation of concrete for conformance to specifications.

13. Observe condition of formed surfaces upon removal of formwork prior to repair of surface defects and observe repair of surface defects.

14. Observe curing procedures for conformance with specifications, record dates of concrete placement, start of preliminary curing, start of final curing, end of curing period.

15. Observe preparations for placement of concrete:

a. Inspect handling, conveying, and placing equipment, inspect vibrating and compaction equipment.

b. Inspect preparation of construction, expansion, and isolation joints.

16. Observe preparations for protection from hot weather, cold weather, sun, and rain, and preparations for curing.

17. Observe concrete mixing:

a. Monitor and record amount of water added at project site.

b. Observe minimum and maximum mixing times.

18. Measure concrete flatwork for levelness and flatness as follows:

a. Perform Floor Tolerance Measurements FF and FL in accordance with

ASTM E1155. Calculate the actual overall F- numbers using the inferior/superior area method.

b. Perform all floor tolerance measurements within 48 hours after slab installation and prior to removal of shoring and formwork.

c. Provide the Contractor and the COR with the results of all profile tests, including a running tabulation of the overall FF and FL values for all slabs installed to date, within 72 hours after each slab installation.

19. Other inspections:

a. Grouting under base plates.

01 45 29 - 10

b. Grouting anchor bolts and reinforcing steel in hardened concrete.

C. Laboratory Tests of Field Samples:

1. Test compression test cylinders for strength in accordance with ASTM

C39. For each test series, test one cylinder at 7 days and one cylinder at 28 days. Use remaining cylinder as a spare tested as directed by COR. Compile laboratory test reports as follows:

Compressive strength test shall be result of one cylinder, except when one cylinder shows evidence of improper sampling, molding or testing, in which case it shall be discarded and strength of spare cylinder shall be used.

2. Make weight tests of hardened lightweight structural concrete in accordance with ASTM C567.

3. Furnish certified compression test reports (duplicate) to COR. In test report, indicate the following information:

a. Cylinder identification number and date cast.

b. Specific location at which test samples were taken.

c. Type of concrete, slump, and percent air.

d. Compressive strength of concrete in MPa (psi).

e. Weight of lightweight structural concrete in kg/m3 (pounds per cubic feet).

f. Weather conditions during placing.

g. Temperature of concrete in each test cylinder when test cylinder was molded.

h. Maximum and minimum ambient temperature during placing.

i. Ambient temperature when concrete sample in test cylinder was taken.

j. Date delivered to laboratory and date tested.

3.5 REINFORCEMENT:

A. Review mill test reports furnished by Contractor.

3.6 ARCHITECTURAL PRECAST CONCRETE:

A. Inspection at Plant: Forms, placement of reinforcing steel, concrete cover, and placement and finishing of concrete.

B. Concrete Testing: Test concrete including materials for concrete as required in Article CONCRETE of this section, except make two test cylinders for each day's production of each strength of concrete produced.

C. Inspect members to insure specification requirements for curing and finishes have been met.

01 45 29 - 11

3.7 MASONRY:

A. Mortar Tests:

1. Laboratory compressive strength test:

a. Comply with ASTM C780.

b. Obtain samples during or immediately after discharge from batch mixer.

c. Furnish molds with 50 mm (2 inch), 3 compartment gang cube.

d. Test one sample at 7 days and 2 samples at 28 days.

2. Two tests during first week of operation; one test per week after initial test until masonry completion.

B. Grout Tests:

1. Laboratory compressive strength test:

a. Comply with ASTM C1019.

b. Test one sample at 7 days and 2 samples at 28 days.

c. Perform test for each 230 m2 (2500 square feet) of masonry.

C. Masonry Unit Tests:

1. Laboratory Compressive Strength Test:

a. Comply with ASTM C140.

b. Test 3 samples for each 460 m2 (5000 square feet) of wall area.

D. Prism Tests: For each type of wall construction indicated, test masonry prisms per ASTM C1314 for each 460 m2 (5000 square feet) of wall area.

Prepare one set of prisms for testing at 7 days and one set for testing at 28 days.

3.8 STRUCTURAL STEEL:

A. General: Provide shop and field inspection and testing services to certify structural steel work is done in accordance with contract documents. Welding shall conform to AWS D1.1 Structural Welding Code.

B. Prefabrication Inspection:

1. Review design and shop detail drawings for size, length, type and location of all welds to be made.

2. Approve welding procedure qualifications either by pre-qualification or by witnessing qualifications tests.

3. Approve welder qualifications by certification or retesting.

4. Approve procedure for control of distortion and shrinkage stresses.

5. Approve procedures for welding in accordance with applicable sections of AWS D1.1.

C. Fabrication and Erection:

1. Weld Inspection:

01 45 29 - 12

a. Inspect welding equipment for capacity, maintenance and working condition.

b. Verify specified electrodes and handling and storage of electrodes in accordance with AWS D1.1.

c. Inspect preparation and assembly of materials to be welded for conformance with AWS D1.1.

d. Inspect preheating and interpass temperatures for conformance with AWS D1.1.

e. Measure 25 percent of fillet welds.

f. Welding Magnetic Particle Testing: Test in accordance with ASTM

E709 for a minimum of:

1) 20 percent of all shear plate fillet welds at random, final pass only.

2) 20 percent of all continuity plate and bracing gusset plate fillet welds, at random, final pass only.

3) 100 percent of tension member fillet welds (i.e., hanger connection plates and other similar connections) for root and final passes.

4) 20 percent of length of built-up column member partial penetration and fillet welds at random for root and final passes.

5) 100 percent of length of built-up girder member partial penetration and fillet welds for root and final passes.

D. Submit inspection reports, record of welders and their certification, and identification, and instances of noncompliance to COR.

3.9 STEEL DECKING:

A. Provide field inspection of welds of metal deck to the supporting steel, and testing services to insure steel decking has been installed in accordance with contract documents and manufacturer’s requirements.

B. Qualification of Field Welding: Qualify welding processes and welding operators in accordance with “Welder Qualification” procedures of AWS

D1.1. Refer to the “Plug Weld Qualification Procedure” in Part 3 “Field

Quality Control.”

C. Submit inspection reports, certification, and instances of noncompliance to COR.

3.10 SPRAYED-ON FIREPROOFING:

A. Provide field inspection and testing services to certify sprayed-on fireproofing has been applied in accordance with contract documents.

01 45 29 - 13

B. Obtain a copy of approved submittals from COR.

C. Use approved installation in test areas as criteria for inspection of work.

D. Test sprayed-on fireproofing for thickness and density in accordance with ASTM E605.

1. Thickness gauge specified…