VA 07 01 50_19_CD1.pdf
PDF 131 KB Posted
- Attached to
- Z2DZ--590-602 Renovate and Expand Domiciliary
- Solicitation number
- 36C24620R0104_1
About this file
This solicitation package includes a request for proposal for renovation and expansion of a domiciliary at the Hampton VA Medical Center located in Hampton, Virginia. Key details include a requirement for construction services with a magnitude between $5 million to $10 million. This is a 100% service-disabled veteran-owned small business set-aside under NAICS code 236220 with a size standard of $39.5 million. A pre-proposal site visit will be held on August 18, 2020 and requests for information are due by August 21, 2020 with answers provided via amendment by August 28, 2020. Proposals are due by September 21, 2020. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RENOVATE AND EXPAND DOMICILIARY BUILDING 148 590-602
VETERAN’S AFFAIRS MEDICAL CENTER
HAMPTON, VA
07 01 50.19 - 1
SECTION 07 01 50.19
PREPARATION FOR RE-ROOFING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Existing roofing membrane preparation for new roofing system installation.
B. Existing Roofing System: PVC . System components include:
1. Roofing membrane.
2. Cover board.
3. Roof insulation.
1.2 RELATED REQUIREMENTS
A. New Roofing System: Section 07 54 19, POLYVINYL-CHLORIDE (PVC) ROOFING.
B. Sheet Metal Counterflashing: Section 07 60 00, SHEET METAL FLASHING AND
TRIM.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American National Standards Institute/Single-Ply Roofing Institute
(ANSI/SPRI):
1. FX-1-01(R2006) Standard Field Test Procedure for Determining the
Withdrawal Resistance of Roofing Fasteners.
C. American Society for Nondestructive Testing (ASNT):
1. SNT-TC-1A - Personnel Qualification and Certification for
Nondestructive Testing.
D. ASTM International (ASTM):
1. C208-12 - Cellulosic Fiber Insulating Board.
2. C578-15 - Rigid, Cellular Polystyrene Thermal Insulation.
3. C728-15 - Perlite Thermal Insulation Board.
4. C1177/C1177M-13 - Glass Mat Gypsum Substrate for Use as Sheathing.
5. C1153-97(2003)e1 - Location of Wet Insulation in Roofing Systems
Using Infrared Imaging.
6. C1278/C1278M-07a(2015) - Fiber-Reinforced Gypsum Panel.
7. D4263-83(2012) - Indicating Moisture in Concrete by the Plastic
Sheet Method.
07 01 50.19 - 2
E. U.S. Department of Commerce National Institute of Standards and
Technology (NIST):
1. DOC PS 1-09 - Structural Plywood.
2. DOC PS 2-04 - Performance Standard for Wood-Based Structural-Use
Panels.
1.4 PREINSTALLATION MEETINGS
A. Conduct preinstallation meeting minimum 30 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. Inspection and Testing Agency.
c. Contractor.
d. Installer.
e. Manufacturer's field representative.
f. Other installers responsible for adjacent and intersecting work, including mechanical and electrical equipment installers.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Removal and installation schedule.
b. Removal and installation sequence.
c. Preparatory work.
d. Protection before, during, and after installation.
e. Removal and installation.
f. Temporary roofing including daily terminations.
g. Transitions and connections to other work.
h. Inspecting and testing.
i. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.5 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and installation details.
C. Manufacturer's Literature and Data:
07 01 50.19 - 3
1. Description of each product.
2. Description of temporary roof system and components.
3. List of patching materials.
4. Temporary roofing installation instructions and preparation instructions to receive new roofing.
D. Photographs: Document existing conditions potentially affected by roofing operations before work begins.
1.6 QUALITY ASSURANCE
A. Installer Qualifications:
1. Same installer as Section 07 54 19, POLYVINYL-CHLORIDE (PVC)
ROOFING.
2. Approved by existing roofing system warrantor when work affects existing roofing system under warranty.
1.7 FIELD CONDITIONS
A. Building Occupancy: Perform work to minimize disruption to normal building operations.
1. Verify occupants are evacuated from affected building areas when working on structurally impaired roof decking above occupied areas.
2. Provide notice minimum 72 hours before beginning activities affecting normal building operations.
B. Existing Roofing Available Information:
1. The following are available for Contractor reference:
a. Construction drawings.
2. Examine available information before beginning work of this section.
C. Weather Limitations: Proceed with reroofing preparation only during dry weather conditions as specified for new roofing installation in
Section 07 54 19, POLYVINYL-CHLORIDE (PVC) ROOFING .
1. Remove only as much roofing in one day as can be made watertight in same day.
D. Hazardous materials are not expected in existing roofing system.
1. Known hazardous materials were removed before start of work.
2. Do not disturb suspected hazardous materials. When discovered, notify Contracting Officer's Representative.
3. Hazardous materials discovered during execution of the work will be removed by Government as work of a separate contract.
07 01 50.19 - 4
1.8 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Existing Warranties: Perform work to maintain existing roofing warranty in effect.
1. Notify warrantor before beginning, and upon completion of reroofing.
2. Obtain warrantor's instructions for maintaining existing warranty.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Patching Materials: Match existing roofing system materials.
B. Metal Flashing: See Section 07 60 00, SHEET METAL FLASHING AND TRIM.
C. Temporary Protection Materials:
1. Expanded Polystyrene (EPS) Insulation: ASTM C578.
2. Plywood: NIST DOC PS 1, Grade CD Exposure 1.
3. Oriented Strand Board (OSB): NIST DOC PS 2, Exposure 1.
D. Temporary Roofing System Materials: Contractor's option.
E. Recover Board:
1. Glass Mat Gypsum Board: ASTM C1177/C1177M, water-resistant; 13 mm
(1/2 inch) thick.
F. Fasteners: Type and size required by roof membrane manufacturer to resist wind uplift.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing roofing system indicated to remain.
1. Cover roof membrane with temporary protection materials without impeding drainage.
2. Limit traffic and material storage to protected areas.
3. Maintain temporary protection until replacement roofing is completed.
C. Protect existing construction and completed work from damage.
D. Protect landscaping from damage.
E. Maintain access to existing walkways and adjacent occupied facilities.
07 01 50.19 - 5
F. Coordinate use of rooftop fresh air intakes with Contracting Officer's
Representative to minimize effect on indoor air quality.
G. Ensure temporary protection materials are available for immediate use in case of unexpected rain.
H. Ensure roof drainage remains functional.
1. Keep drainage systems clear of debris.
2. Prevent water from entering building and existing roofing system.
I. Coordinate rooftop utilities remaining active during roofing work with
Contacting Officer's Representative.
3.2 RE-ROOFING PREPARATION - GENERAL
A. Notify Contacting Officer's Representative of planned operations, daily.
1. Identify location and extent of roofing removal.
2. Request authorization to proceed.
3.3 PARTIAL ROOFING SYSTEM REMOVAL
A. Remove existing roofing completely, exposing structural roof deck at locations and to extent indicated on drawings.
1. Remove cover board, and roof insulation.
2. Remove or cut-off roofing system fasteners.
3.4 DECK PREPARATION
A. Inspect structural roof deck after roofing system removal.
B. Steel Roof Decks:
1. Visually inspect structural roof deck installation and fasteners.
a. Notify Contracting Officer's Representative of unsuitable conditions and inadequate fastenings potentially affecting roof system performance.
3.5 TEMPORARY ROOFING
A. Install temporary roofing to maintain building watertight.
B. Remove temporary roofing before installing new roofing.
3.6 BASE FLASHING REMOVAL
A. Expose base flashings to permit removal.
1. Two-Piece Counterflashings: Remove cap flashing and store for reuse.
2. Single Piece Counterflashings: Carefully bend counterflashing.
3. Metal Copings: Remove decorative cap and store for reuse.
07 01 50.19 - 6
B. Remove existing base flashings.
1. Clean substrates to receive new flashings.
C. Replace counterflashings damaged during removal.
1. Counterflashings: See Section 07 60 00 SHEET METAL FLASHING AND
TRIM.
3.7 FIELD QUALITY CONTROL
A. Field Tests: Performed by testing laboratory specified in Section
01 45 29, TESTING LABORATORY SERVICES.
1. Fastener Pull Out Tests: ANSI/SPRI FX-1.
3.8 DISPOSAL
A. Collect waste materials in containers.
B. Remove waste materials from project site, regularly, to prevent accumulation.
C. Legally dispose of waste materials.
- - E N D - -
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Existing roofing membrane preparation for new roofing system installation. |
| B. Existing Roofing System: PVC . System components include: |
| 1. Roofing membrane. |
| 2. Cover board. |
| 3. Roof insulation. |
| 1.2 RELATED REQUIREMENTS |
| A. New Roofing System: Section 07 54 19, POLYVINYL-CHLORIDE (PVC) ROOFING. |
| B. Sheet Metal Counterflashing: Section 07 60 00, SHEET METAL FLASHING AND TRIM. |
| 1.3 APPLICABLE PUBLICATIONS |
| A. Comply with references to extent specified in this section. |
| B. American National Standards Institute/Single-Ply Roofing Institute (ANSI/SPRI): |
| 1. FX-1-01(R2006) Standard Field Test Procedure for Determining the Withdrawal Resistance of Roofing Fasteners. |
| C. American Society for Nondestructive Testing (ASNT): |
| 1. SNT-TC-1A - Personnel Qualification and Certification for Nondestructive Testing. |
| D. ASTM International (ASTM): |
| 1. C208-12 - Cellulosic Fiber Insulating Board. |
| 2. C578-15 - Rigid, Cellular Polystyrene Thermal Insulation. |
| 3. C728-15 - Perlite Thermal Insulation Board. |
| 4. C1177/C1177M-13 - Glass Mat Gypsum Substrate for Use as Sheathing. |
| 5. C1153-97(2003)e1 - Location of Wet Insulation in Roofing Systems Using Infrared Imaging. |
| 6. C1278/C1278M-07a(2015) - Fiber-Reinforced Gypsum Panel. |
| 7. D4263-83(2012) - Indicating Moisture in Concrete by the Plastic Sheet Method. |
| E. U.S. Department of Commerce National Institute of Standards and Technology (NIST): |
| 1. DOC PS 1-09 - Structural Plywood. |
| 2. DOC PS 2-04 - Performance Standard for Wood-Based Structural-Use Panels. |
| 1.4 PREINSTALLATION MEETINGS |
| A. Conduct preinstallation meeting minimum 30 days before beginning Work of this section. |
| 1. Required Participants: |
| a. Contracting Officer's Representative. |
| b. Inspection and Testing Agency. |
| c. Contractor. |
| d. Installer. |
| e. Manufacturer's field representative. |
| f. Other installers responsible for adjacent and intersecting work, including mechanical and electrical equipment installers. |
| 2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting. |
| a. Removal and installation schedule. |
| b. Removal and installation sequence. |
| c. Preparatory work. |
| d. Protection before, during, and after installation. |
| e. Removal and installation. |
| f. Temporary roofing including daily terminations. |
| g. Transitions and connections to other work. |
| h. Inspecting and testing. |
| i. Other items affecting successful completion. |
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
| 1.5 SUBMITTALS |
| A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. |
| B. Submittal Drawings: |
| 1. Show size, configuration, and installation details. |
| C. Manufacturer's Literature and Data: |
| 1. Description of each product. |
| 2. Description of temporary roof system and components. |
| 3. List of patching materials. |
| 4. Temporary roofing installation instructions and preparation instructions to receive new roofing. |
D. Photographs: Document existing conditions potentially affected by roofing operations before work begins.
| 1.6 QUALITY ASSURANCE |
| A. Installer Qualifications: |
| 1. Same installer as Section 07 54 19, POLYVINYL-CHLORIDE (PVC) ROOFING. |
| 2. Approved by existing roofing system warrantor when work affects existing roofing system under warranty. |
| 1.7 FIELD CONDITIONS |
| A. Building Occupancy: Perform work to minimize disruption to normal building operations. |
| 1. Verify occupants are evacuated from affected building areas when working on structurally impaired roof decking above occupied areas. |
| 2. Provide notice minimum 72 hours before beginning activities affecting normal building operations. |
| B. Existing Roofing Available Information: |
| 1. The following are available for Contractor reference: |
| a. Construction drawings. |
2. Examine available information before beginning work of this section.
| C. Weather Limitations: Proceed with reroofing preparation only during dry weather conditions as specified for new roofing installation in Section 07 54 19, POLYVINYL-CHLORIDE (PVC) ROOFING . |
| 1. Remove only as much roofing in one day as can be made watertight in same day. |
| D. Hazardous materials are not expected in existing roofing system. |
| 1. Known hazardous materials were removed before start of work. |
| 2. Do not disturb suspected hazardous materials. When discovered, notify Contracting Officer's Representative. |
| 3. Hazardous materials discovered during execution of the work will be removed by Government as work of a separate contract. |
| 1.8 WARRANTY |
| A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction." |
| B. Existing Warranties: Perform work to maintain existing roofing warranty in effect. |
| 1. Notify warrantor before beginning, and upon completion of reroofing. |
| 2. Obtain warrantor's instructions for maintaining existing warranty. |
| PART 2 - PRODUCTS |
| 2.1 MATERIALS |
| A. Patching Materials: Match existing roofing system materials. |
| B. Metal Flashing: See Section 07 60 00, SHEET METAL FLASHING AND TRIM. |
| C. Temporary Protection Materials: |
| 1. Expanded Polystyrene (EPS) Insulation: ASTM C578. |
| 2. Plywood: NIST DOC PS 1, Grade CD Exposure 1. |
| 3. Oriented Strand Board (OSB): NIST DOC PS 2, Exposure 1. |
| D. Temporary Roofing System Materials: Contractor's option. |
| E. Recover Board: |
| 1. Glass Mat Gypsum Board: ASTM C1177/C1177M, water-resistant; 13 mm (1/2 inch) thick. |
F. Fasteners: Type and size required by roof membrane manufacturer to resist wind uplift.
| PART 3 - EXECUTION |
| 3.1 PREPARATION |
| A. Examine and verify substrate suitability for product installation. |
| B. Protect existing roofing system indicated to remain. |
| 1. Cover roof membrane with temporary protection materials without impeding drainage. |
| 2. Limit traffic and material storage to protected areas. |
| 3. Maintain temporary protection until replacement roofing is completed. |
| C. Protect existing construction and completed work from damage. |
| D. Protect landscaping from damage. |
| E. Maintain access to existing walkways and adjacent occupied facilities. |
| F. Coordinate use of rooftop fresh air intakes with Contracting Officer's Representative to minimize effect on indoor air quality. |
| G. Ensure temporary protection materials are available for immediate use in case of unexpected rain. |
| H. Ensure roof drainage remains functional. |
| 1. Keep drainage systems clear of debris. |
| 2. Prevent water from entering building and existing roofing system. |
I. Coordinate rooftop utilities remaining active during roofing work with Contacting Officer's Representative.
| 3.2 RE-ROOFING PREPARATION - GENERAL |
| A. Notify Contacting Officer's Representative of planned operations, daily. |
| 1. Identify location and extent of roofing removal. |
| 2. Request authorization to proceed. |
| 3.3 PARTIAL ROOFING SYSTEM REMOVAL |
| A. Remove existing roofing completely, exposing structural roof deck at locations and to extent indicated on drawings. |
| 1. Remove cover board, and roof insulation. |
| 2. Remove or cut-off roofing system fasteners. |
| 3.4 DECK PREPARATION |
| A. Inspect structural roof deck after roofing system removal. |
| B. Steel Roof Decks: |
| 1. Visually inspect structural roof deck installation and fasteners. |
| a. Notify Contracting Officer's Representative of unsuitable conditions and inadequate fastenings potentially affecting roof system performance. |
| 3.5 TEMPORARY ROOFING |
| A. Install temporary roofing to maintain building watertight. |
| B. Remove temporary roofing before installing new roofing. |
| 3.6 BASE FLASHING REMOVAL |
| A. Expose base flashings to permit removal. |
| 1. Two-Piece Counterflashings: Remove cap flashing and store for reuse. |
| 2. Single Piece Counterflashings: Carefully bend counterflashing. |
| 3. Metal Copings: Remove decorative cap and store for reuse. |
| B. Remove existing base flashings. |
| 1. Clean substrates to receive new flashings. |
| C. Replace counterflashings damaged during removal. |
| 1. Counterflashings: See Section 07 60 00 SHEET METAL FLASHING AND TRIM. |
| 3.7 FIELD QUALITY CONTROL |
| A. Field Tests: Performed by testing laboratory specified in Section 01 45 29, TESTING LABORATORY SERVICES. |
| 1. Fastener Pull Out Tests: ANSI/SPRI FX-1. |
| 3.8 DISPOSAL |
| A. Collect waste materials in containers. |
| B. Remove waste materials from project site, regularly, to prevent accumulation. |
| C. Legally dispose of waste materials. |
File details come from the government source that posted it. Updated .