Attachment C_Wage Determination NV20260090_2026 07 30.pdf
PDF 55 KB Posted
- Attached to
- Federal Highway Office Renovations, Carson City Federal Building Federal contract opportunity
- Solicitation number
- 47PD5526Q0051
- Issued by
- Not on record
About this file
This is a Davis-Bacon prevailing wage determination for building construction in Carson City, Nevada, effective July 30, 2026. The document establishes mandatory minimum wage rates and fringe benefits for all workers on federal construction projects subject to the Davis-Bacon Act in the specified county.
The wage determination lists comprehensive hourly rates for approximately 100+ construction trade classifications, including skilled trades (electricians, plumbers, carpenters, ironworkers), equipment operators (various crane and heavy equipment categories), laborers (organized into multiple skill groups), and specialty workers (roofers, glaziers, painters, etc.). Wage rates range from $30.29 to $97.98 per hour base rate, with fringe benefit allowances ranging from $0.00 to $47.89 per hour depending on the classification. Key high-wage classifications include Piledriver Diver-Diving at $97.98 base plus $25.29 fringe, Elevator Constructor at $87.48 base plus $47.89 fringe, and Boilermaker at $76.62 base. The document includes notation of Modification 1 dated 07/30/2026 and references the original solicitation SANV2025-001 from 10/01/2025. The determination also incorporates Executive Order 13706 requirements for paid sick leave (1 hour per 30 hours worked, up to 56 hours annually) and Executive Order 13658 minimum wage requirements of $13.65 per hour for the May 11, 2026 through December 31, 2026 period, with provisions for annual adjustments.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment B_SOW_FHWA Carson Office Renovation_rev2026 09 28.pdf | ||
| Pre-Bid RFIs 47PD5526Q0051_2026 10 02.pdf | ||
| SF30_Solicitation Amendment 47PD5526Q0051_0001_2026 10 02.pdf | ||
| Attachment D_Supplement SOW Documents_2026 10 02.pdf | ||
| Solicitation 47PD5526Q0051_Federal Highway Office Renovations.pdf | ||
| Attachment B_SOW_FHWA Carson Office Renovation_2026 06 09.pdf | ||
| Attachment A_SF1442.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"General Decision Number: NV20260090 07/30/2026
State: Nevada
Construction Types: Building
Counties: Nevada Counties of Carson City
Modification Number Publication Date 0 06/22/2026 1 07/30/2026
SANV2025-001 10/01/2025
Rates Fringes Air Balance Technician: Journeyman .................$ 59.85 33.51 Alarm Installer: Journeyman.........................$ 41.41 0.00 Boilermaker: Journeyman.............................$ 76.62 0.00 Bricklayer: Journeyman..............................$ 45.94 18.44 Carpenter: Journeyman...............................$ 43.13 25.29 Cement Mason: Journeyman ...........................$ 43.06 13.86 Electrician-Communication Technician: Installer.....$ 38.90 16.61 Electrician-Communication Technician: Technician....$ 44.73 17.15 Electrician-Neon Sign: Journeyman...................$ 63.15 0.00 Electrician-Wireman: Cable Splicer..................$ 55.78 30.66 Electrician-Wireman: Wireman........................$ 48.50 29.99 Elevator Constructor: Journeyman Mech...............$ 87.48 47.89 Fence Erector: Journeyman...........................$ 35.70 17.58 Flagperson: Journeyman..............................$ 33.58 17.58 Floorcoverer: Journeyman............................$ 42.63 19.41 Glazier: Journeyman.................................$ 34.27 0.00 Highway Stripers: Journeyman........................$ 38.20 17.58 Hod Carrier-Brick Mason Tender: Journeyman .........$ 35.95 17.58 Hod Carrier-Plasterer Tender: Gun Tender............$ 37.29 17.58 Hod Carrier-Plasterer Tender: Journeyman ...........$ 36.29 17.58 Ironworker: Journeyman .............................$ 51.85 39.12 Laborers: (Group 6) Nozzleman, Rodmen ..............$ 35.25 17.58 Laborers: (Group 6) Gunmen, Materialmen ............$ 35.25 17.58 Laborers: (Group 6) Reboundmen .....................$ 35.60 17.58 Laborers: Furniture Mover...........................$ 31.79 17.58 Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt);
Handling ard Servicing of Flares, Watchmen;
Gereral Laborer; Guideposts and Highway Signs;
Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector)......................$ 35.45 17.58 Laborers: Group 1-A (Flagger).......................$ 33.58 17.58 Laborers: Group 2 (Choker setter or Rigger
(clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper;
Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing;
Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components).........................................$ 35.55 17.58 Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping;
Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut);
Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 5A;
Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.)........$ 35.70 17.58 Laborers: Group 3A (Corcrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines;
Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level)...............$ 39.13 17.58 Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units;
High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling;
Concrete pump operator; Heavy Duty Vibrator with Stinger 5"" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking;
Cathodic protection, grounding for piepe work;
cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.)................$ 35.95 17.58 Laborers: Group 5 (Construction Specialists;
Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal).......$ 36.25 17.58 Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces adn all work performed in connection with removal of pavement.) ..............................$ 38.20 17.58 Laborers: Landscape.................................$ 30.29 17.58 Mechanical Insulator: Journeyman ...................$ 56.36 26.91 Millwright: Journeyman .............................$ 50.83 33.14 Millwright: Welder (add $3 to Journey base).........$ 53.83 33.14
Operating Engineers Steel Fabricator & Erector:
Group 1 (Cranes over 100 tons; Derrick over 100 tons; Self-Propelled Boom Type Devices over 100 tons)...............................................$ 53.61 34.85 Operating Engineers Steel Fabricator & Erector:
Group 1 Oiler.......................................$ 45.48 34.85 Operating Engineers Steel Fabricator & Erector:
Group 1 Truck Crane Oiler...........................$ 47.44 34.85 Operating Engineers Steel Fabricator & Erector:
Group 2 (Cranes over 45 tons up to and including 100 tons; Derrick, 100 tons and under;
Self-Propelled Boom Type Lifting Device, over 45 tons; Tower Crane)..................................$ 52.10 34.85 Operating Engineers Steel Fabricator & Erector:
Group 2 Oiler.......................................$ 45.27 34.85 Operating Engineers Steel Fabricator & Erector:
Group 2 Truck Crane Oiler...........................$ 47.19 34.85 Operating Engineers Steel Fabricator & Erector:
Group 3 (Cranes, 45 tons and under; Self-Propelled Boom Type Lifting Device, 45 tons and under)........$ 50.86 34.85 Operating Engineers Steel Fabricator & Erector:
Group 3 Hydraulic...................................$ 46.64 34.85 Operating Engineers Steel Fabricator & Erector:
Group 3 Oiler.......................................$ 45.05 34.85 Operating Engineers Steel Fabricator & Erector:
Group 3 Truck Crane Oiler...........................$ 46.97 34.85 Operating Engineers Steel Fabricator & Erector:
Group 4 (Chicago Boom; Forklift, 10 tons and over;
Heavy Duty Repairman/Welder)........................$ 49.13 34.85 Operating Engineers Steel Fabricator & Erector:
Group 5 (Boom Cat)..................................$ 48.03 34.85 Operating Engineers: Group 10 (Boom-Type Backfilling Machine; Bridge Crane; Cary-Lift or similar; Chemical Grouting Machine; Chief of Party;
Derricks (two (2) Group 10 Operators required when swing engine remote from hoist); Derrick Barges (except excavation work); Euclid Loader and similar types; Heavy Duty Repairman; Heavy Duty Rotary Drill Rigs; Lift-Slab (Vagtborg and similar types);
Loader (over two and one-half (2 1/2 cu. yds. up to an including four (4) cu. yds.); Locomotive (over one hundred (100) tons, single or multiple units);
Multiple-Engine Earthmoving Machines (Euclid Dozers, etc.) Pre-Stress Wire Wrapping Machine;
Rubber-Tired Scraper, Self-Loading; Single-Engine Scraper (over thirty-five (35) cu. yds.); Shuttle Car (Reclaim Station); Train Loading Station;
Trenching Machine multi-engine with sloping attachments (Jefco or similar); Vacuum Cooling Plant; Whirley Crane (up to and including twenty-five (25) tons)).............................$ 44.59 34.85 Operating Engineers: Group 10A (Backhoe-Hydraulic (up to an including one (1) cu. Yd.); Backhoe (up to an including one (1) cu.yd) (Cable); CMI Dual Lane Auto-Grader SP30 or similar type; Cranes (not over twenty-five (25) tons) (hammerhead and gantry); Finish Blade; Gradalls (up to and including one (1) cu. yd.); Motor Patrol Operator;
Power Shovels, Clamshells, Draglines, Cranes (up to and including one (1) cu. yd); Rubber-Tired Scraper, Self- Loading (twin engine);
Self-Propelled Boom- Type Lifting Device, center mount (over 10 tons up to and including 25 tons))...$ 44.78 34.85 Operating Engineers: Group 11 (Automatic Asphalt or Concrete Slip-Form Paver; Automatic Railroad Car
Dumper; Canal Trimmer; Cary Lift, Campbell or similar type; Cranes (over twenty-five (25) tons);
Euclid Loader when controlled from the Pullcat;
Finish Blade; Gradesetter, Grade Checker; Highline Cableway Operator; Loader (over four (4) cu. yds.
up to an including tweleve (12) cu. yds.);
Multi-Engine Earthmoving Equipment (up to and including seventy-five (75) cu. yds. struck m.r.c);
Multi-Engine Scrapers (when used to Push Pull);
Power Shovels, Clamshells, Draglines, Backhoes Gradalls (over one (1) cu. yd. and up to and including seven (7) cu. yds. m.r.c); Self-Propelled Boom-Type Lifing Device (center mount( over 25 tons m.r.c); Self-Propelled Compactor (with multiple-propulsion power units); Single-Engine Rubber-Tired Earthmoving Machine, with Tandem Scraper; Slip-Form Paver (concrete or asphalt);
Tandem Cats and Scraper; Tower Crane Mobile (including Rail Mount); Truck Mounted Hydraulic Crane when remote control equipped (over 10 tons up to and including 25 tons); Universal Liebher and Tower Cranes (and similar types); Wheel Excavator (up to an including seven hundred fifty (750) cu.
yds. per hour); Whirley Cranes (over twenty-five
(25) tons)).........................................$ 45.02 34.85 Operating Engineers: Group 11A (Band Wagons (in conjuction with Wheel Excavators); Operator of Helicopter (when used in construction work); Loader (over twelve (12) cu. yds.); Multi-Engine Earthmoving Equipment (over seventy-five (75) cu.
Yds. ""stuck"" m.r.c); Power Shovels, Clamshells, Draglines, Backhoes, and Gradalls (over seven 7 cu.
yds. m.r.c.); Remote-Controlled Earth Moving Equipment; Wheel Excavator (over seven hundred fifty (750) cu. yds. per hour)).....................$ 46.66 34.85 Operating Engineers: Group 11B (Holland Loader or similar or Loader (over 18 cu. Yds.))...............$ 47.47 34.85 Operating Engineers: Group 1A (Oiler (Construction); Partsman)...........................$ 41.07 34.85 Operating Engineers: Group 2 (Compressor Operator;
Material Loader and /or Conveyor Operator (handling bulding materials); Pump Operator)..................$ 41.60 34.85 Operating Engineers: Group 3 (Bobcat or similar loader, 1/4 cu . yd. or less; Corcrete Curing Machines (streets, highways, airports, canals);
Conveyor Belt Operator (tunnel); Forklift (under 20); Engineer Generating Plant (500 K. W.); Mixer Box Operator (concrete plant); Motorman;
Rodman/Chainman; Rotomist Operator; Olier (truck crane)).............................................$ 41.87 34.85 Operating Engineers: Group 4 (Concrete Mixer Operator, Skip type; Dink Operator; Forklift (20' or over) or Lumber Stacker; Ross Carrier; Skip Loader Operator (under one (1) cu. Yd.); Tie Spacer).............................................$ 42.61 34.85 Operating Engineers: Group 5 (Concrete Mixer (over one (1) cu. Yd.); Concrete Pumps or Pumpcrete Guns;
Elevator and Material Hoist (one (1) drum);
Groundman for Asphalt Milling and similar)..........$ 42.92 34.85 Operating Engineers: Group 6 (Auger Type drilling equipment up to and includting 30 ft. depth digging capacity M.R.C; Boom Truck or Dua-Purpose a-Frame Truck; B.L.H Lima Road Pactor or similar; Chip Box Spreader (Flaherty type or similar); Concrete Batch Plant (wet or dry); Concrete Saws (highways, streets, airports, canals); Locomotives (over thirty (30) tons); Maginnis International Full Slab Vibrator (airports, highways, canals, and warehouses); Mechanical Fishers (concrete) (Clary, Johnson Bidwell Bridge Deck or similar types);
Mechanical Burn, Curb and /or Curb and Gutter Machine (concrete or asphalt); Pavement Breaker, Truck Mounted, with compressor combination;
Pavement Breaker or Tamper (with or without compressor combination); Power Jumbo Operator (setting slip-forms, etc., in tunnels); Roller Operator (except asphalt); Self-Propelled Tape Machine; Self-Propelled Compactor (single engine);
Self-Propelled Power Sweeper Operator; Slip-Form Pum (power-driven by hydraulic, electric, air, gas, etc. lifiting device for concrete forms; Small Rubber-Tied Tractors; Snooper Crane, Paxton-Mitchell or similar; Stationary Pipe Wrapping, Cleaning and Bending Machine Operator)....$ 43.08 34.85 Operating Engineers: Group 7 (Auger Type drilling equipment over 30 ft. depth digging capacity M.R.C;
Compressor (over 2); Concrete Conveyor or Concrete Pump, truck or equipment mounted (any assistance requried shall be performed by an Assistant to Engineer) Boom length to apply Concrete Conveyor, Building site; Drilling and Boring Machine, vertical and horizontal (not to apply to waterliners, wagon drills or jack hammers); Crusher Plant Engineer; Generators; Instrument Man; Kolman Loader; Material Hoist (two (2) or more drums);
Mine or Shaft Hoist; Pipe bending Machines (pipeline only); Pipe Cleaning Machines (tractor-propelled and supported); Pipe Wrapping Machines (tractor-propelled and supported);
Portable Crushing and Screening Plants; Post Driller And/or Driver; Pumps (over 2); Screedman (except asphaltic or concrete paving);
Self-Propelled Boom-Type Lifting Device (center mount) (on ten (10) ton capacity or less); Slusher Operator; Soil Tester (Certified); Surface Heater and Planer Operator; Trenching Machine (maximum digging capacity three (3) ft. depth) (Any assistance in the operation, if needed, shall be performed by an Assistant to Engineer); Truck-Type Loader; Welding Machines (gasoline or diesel))......$ 43.33 34.85 Operating Engineers: Group 8 (Articulated on-Site Dump Trucks; Asphalt Plant Engineer; Apshalt Milling Machine; Cast-In-Place Pipe-Laying Machine;
Combination Slusher and Motor Operator; Concrete Batch Plant (multiple units); Dozer Operator; Drill Doctor; Elevating Grader Operator; Stiff Frame Off Road Haul Trucks; Grooving and Grinding Machine (highways); Ken Seal Operator; Marination Plant;
Loader (up to and including two and one-half (2 1/2) cu. yds); Mechanical Finishers or Spreader Machine (asphalt, Barber-Greene or similar);
Shuttle Buggy; Mechanical Trench Shield;
Mixermobile; Push Cats; Road Oil Mixing Machine Operator Wood-Mixer (and other similr Pugmill equipment); Roller Operator (asphalt); Rubber-Tired Earthmoving Equipment (up to and including thirty-five (35) cu. yds. ""struck"" M.R.C., Euclids, T-Pulls, DW10, 20, 21 and similar); Water Pull;
Screedman (Barber-Greene and similar) (asphaltic or concrete paving); Self-Propelled Compactors with
Dozer; Hyster 450, Cat 825 or similar; Sheepfoot;
Small Tractor (with boom); Soil Stabilizer (P&H or equal); Timber Skidder (rubber-tired) or similar equipment; Track Loader; Tractor-Drawn Scraper;
Tractor Operator; Tractor-Mounted Compressor Drill Combination; Trenching Machine Operator (over three
(3) feet depth); Tri-Batch Paver; Tunnerl Badger or Tunnel Boring Machine Operator; Tunnel Mole Boring Machine; Vermeer T-600b Rock Cutter; Vacuum Truck (excludes trailer mounted vaccums)).................$ 43.87 34.85 Operating Engineers: Group 9 (Chicago Boom;
Comination Backhoe and Loader (up to and including 3/8 cu. Yd.); Combination Mixer and Compressor (gunite); heavy Duty Repairman and /or Welder; Lull Hi-Lift (twenty (20) feet or over); Mucking Machine; Sub-Grader (Gurries or other types) Tractor (with Boom) (D6 or larger);
Track-Layer-Type Earthmoving Machine (single engine with tandem scrapers))..............................$ 44.24 34.85 Operating Engineers-Cranes & Piledriver: Group 1 (Derrick Barge Pedestal mounted over 100 tons;
Clamshells over 7 cu. Yds; Self-Propelled Boom Type Lifting Device, over 100 tons; Truck Crane or Crawler, land or barge mounted over 100 tons.)......$ 53.08 34.85 Operating Engineers-Cranes & Piledriver: Group 1 Oiler...............................................$ 45.68 34.85 Operating Engineers-Cranes & Piledriver: Group 1 Truck Crane Oiler...................................$ 47.57 34.85 Operating Engineers-Cranes & Piledriver: Group 2 (Derrick Barge Pedestal mounted 45 tons up to an including 100 tons; Clamshells up to an including 7
cu. Yds.; Self-Propelled Boom Type Lifting Device over 45 tons; Truck Crane or Crawler, land or barge mounted, over 45 tons up to an including 100 tons.).$ 51.54 34.85 Operating Engineers-Cranes & Piledriver: Group 2 Oiler...............................................$ 45.50 34.85 Operating Engineers-Cranes & Piledriver: Group 2 Truck Crane Oiler...................................$ 47.41 34.85 Operating Engineers-Cranes & Piledriver: Group 3 (Derrick Barge Pedestal mounted under 45 tons;
Self-Propelled Boom Type Lifting Device 45 tons and under; Skid/Scow Piledriver, any tonnage; Truck Crane or Crawler, land or barge mounted 45 tons and under.).............................................$ 50.09 34.85 Operating Engineers-Cranes & Piledriver: Group 3 Oiler...............................................$ 45.27 34.85 Operating Engineers-Cranes & Piledriver: Group 3 Truck Crane Oiler...................................$ 47.19 34.85 Operating Engineers-Cranes & Piledriver: Group 4 (Assistant Operator in lieu of Assistant to Engineer; Forklift, 10 tons and over; Heavy Duty Repairman/Welder)...................................$ 48.58 34.85 Operating Engineers-Cranes & Piledriver: Group 6 (Deck Engineer).....................................$ 44.19 34.85 Operating Engineers-Cranes & Piledriver: Group 8 (Deckhand; Fireman).................................$ 44.44 34.85 Painter: Brush/Roller Painter.......................$ 39.43 16.71 Painter: Paperhanger................................$ 42.19 16.71 Painter: Protective Coating-Application Brush ......$ 41.93 16.71 Painter: Protective Coating-Application Industrial Spray ..............................................$ 43.93 16.71 Painter: Specialty Pay(Faux Finish,Graining,Marbelizing)........................$ 41.40 16.71 Painter: Spray Painter..............................$ 41.93 16.71 Painter: Swing Stage................................$ 41.93 16.71
Piledriver: Certified Welder........................$ 44.63 25.29 Piledriver: Diver-Diving (Wet Pay)..................$ 97.98 25.29 Piledriver: Journeyman Driverman....................$ 43.63 25.29 Piledriver: Stand By Diver..........................$ 48.99 25.29 Piledriver: Tender..................................$ 47.99 25.29 Plasterer: Journeyman...............................$ 44.23 17.14 Plumber/Pipefitter: Journeyman .....................$ 53.38 27.72 Refrigeration Mechanic: Journeyman .................$ 43.10 26.54 Roofer: Journeyman..................................$ 40.76 12.42 Sheet Metal Worker: Journeyman .....................$ 47.51 33.14 Sprinkler Fitter: Journeyman .......................$ 53.77 31.15 Taper: Journeyman ..................................$ 46.00 17.36 Tile Setter/Terrazzo Worker/Marble Mason:
Terrazzo/Marble Mason - Journeyman..................$ 55.32 0.00 Tile Setter/Terrazzo Worker/Marble Mason: Tile Setter - Journeyman.................................$ 53.78 0.00 Tile Setter/Terrazzo Works/Mable Mason - Finisher...$ 43.46 0.00 Traffic Barrier Erector.............................$ 35.45 17.58 Truck Driver........................................$ 38.53 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .