ATTACHMENT C RE BASELINE ASBESTOS ASSESSMENT SURVEY BUILDING PLANS.docx

DOCX document 16 MB Posted

Attached to
F107--FY24 Re-Baseline Asbestos Survey for Lake Baldwin
Solicitation number
36C24824Q1221
Issued by

About this file

This document appears to be an attachment titled "ATTACHMENT C RE BASELINE ASBESTOS ASSESSMENT SURVEY BUILDING PLANS" related to the federal contract opportunity "F107--FY24 Re-Baseline Asbestos Survey for Lake Baldwin".

The key details are:

  • The opportunity is a solicitation issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 8.
  • It requires a baseline asbestos assessment survey and building plans for the Lake Baldwin facility.
  • The document does not provide specifics on the required products or services, response dates, award details, pricing terms, or set asides. It appears to be architectural plans or drawings rather than a statement of work or other procurement-focused documentation.

View the file

Other files

File Type Posted
S02 36C24824Q1221 0004.docx DOCX document
36C24824Q1221 0002.docx DOCX document
36C24824Q1221 0003.docx DOCX document
36C24824Q1221 0002.docx DOCX document
36C24824Q1221 0002.docx DOCX document
52.212-1 ADDENDUM to FAR 52.docx DOCX document
Revised STATEMENT OF WORK Asbestos .docx DOCX document
2010 Lakemont Campus Asbestos Report .pdf PDF
S06 GOVERNMENT RESPONSE TO CONTRACTORS QUESTIONS.docx DOCX document
36C24824Q1221 0002.docx DOCX document
S02 36C24824Q1221 0001.docx DOCX document
36C24824Q1221.docx DOCX document
ATTACHMENT B 2014 LAKE BALDWIN BLDG 502 ASBESTOS SURVEY.pdf PDF
ATTACHMENT D VHA DIRECTIVE 7714 ASBESTOS MANAGEMENT PROGRAM.pdf PDF
36C24824Q1221.docx DOCX document
ATTACHMENT A 2014 LAKE BALDWIN BLDG 500 ASBESTOS SURVEY.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Orlando VA Healthcare System Re-Baseline Asbestos Assessment Survey Building Plans.

i. Table 1. Clin 1 Location:

Building Number
Building Name / Description
Estimated Square Footage.
Attachments.
500
Lake Baldwin - Main Campus / Main Clinic.
21,4190
501
Lake Baldwin – Warehouse.
15,201
502
Lake Baldwin - Boiler/Generator Plant.
8,509
504
Lake Baldwin – Primary Clinics.
19,404

ii. Table 2. Clin 2 Locations:

Building Number
Building Name / Description
Estimated Square Footage.
Attachments.
517
Lake Baldwin – Maintenance Shop.
1,385
518
Lake Baldwin – Medical Gas storage.
450
519
Lake Baldwin – Domiciliary Bldg. 1
11,448
520
Lake Baldwin – Domiciliary Bldg. 2
11,448
521
Lake Baldwin – Domiciliary Bldg. 3
11,448
See the attachments above in Bldgs. 519 - 520.
522
Lake Baldwin – Domiciliary Bldg. 4
11,448
See the attachments above in Bldgs. 519 - 520.
3125
Lake Baldwin – Engineering Storage.
534
3126
Lake Baldwin – Volunteer / FLA / Biomed.
2,627
3127
Lake Baldwin – Grounds Keeping Building.
540
3128
Lake Baldwin – Domiciliary / IRMS.
1,929
3129
Lake Baldwin – Environmental Management Services (Housekeeping).
2,175
3132
Lake Baldwin – Engineering Administration.
1,961
3133
Lake Baldwin - Carpentry, Lock Smith, Offices.
2,475
3134
Lake Baldwin - ENG SHOPS- Plumbing & Electrical.
2,839
2500
Lakemont Campus.
148,559

Lake Baldwin Bldg 502 Floor Plan.pdf image4.emf

Lake Baldwin Bldg 504 Floor Plan.pdf

VHAORLStallR

Sticky Note

Orange Team

Purple Team

Teal Team image5.emf

LB Bldg 517.pdf image6.emf

LB Bldg 518.pdf image7.emf

Dom 2 Floor.pdf image8.emf

Dom 3 Floor.pdf image9.emf

Dom 1 Floor.pdf image10.emf

LB Bldg 3125.pdf image11.emf

LB Bldg 3126 Construction Drawings.pdf

U C

F R

I D

G E

M I

O

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A103

ARCHITECTURAL FINISH PLANS

AND DETAILS

A i l e

P a t h

DESIGN DEVELOPMENT

NON SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BUILDING 3126

ORLANDO VA

675-19-105

Building 3126 Project Director

08/14/2019 KRL JLCRevisions: Date:

C.A.G. Caribeño

Architectural Group, Inc.

1250 W. EAU GALLIE BLVD, SUITE F.

MELBOURNE, FL 32935

PH (321) 622-6900

FAX (321) 622-6901

CONTACT: KENNETH R. LEBRON, AIA

KennethL@cag-architecs.com www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbounre, Florida 32904

PH: 321.345.9026 KENNETH R. LEBRON, AIA

Florida License #AR0017819

AD101

ARCHITECTURAL DEMO PLAN AND

NOTES

i l h

DESIGN DEVELOPMENT

Building 3126 Project Director

08/14/2019 KRL JLCRevisions: Date:

KENNETH R. LEBRON, AIA

Florida License #AR0017819

PH: 321.345.9026

FACP

FLORIDA CERTIFICATE #AR 0017819

13 E. MELBOURNE AVE. UNIT C

MELBOURNE, FL 32901

PHONE (321) 327-5960 FAX (321) 914-3991

VA FORM 08 - 6231

100% CONSTRUCTION

DOCUMENTS

:\U se rs

\c va nm et er .A

BO

VE

P\ oc um en ts

\0 ov at

Bu ild in g

EP

FP

_c

PN

X8

X.

rv

/2 7/

:4

0:

ED-101

ELECTRICAL - POWER BLDG 3126 -

DEMO BUILDING 3126

11/27/19 AG CVMRICHARD E. COBURN, P.E.

FL License #32820

CODED NOTES:

1. DISCONNECT AND REMOVE ALL ELECTRICAL, FIRE ALARM, ETC. DEVICES FROM AREA

INDICATED, UNLESS OTHERWISE NOTED. REMOVE CONDUIT AND CONDUCTORS BACK TO NEXT

DEVICE OR JUNCTION BOX ON CIRCUIT THAT IS NOT BEING REMOVED. CONTRACTOR SHALL

VERIFY THAT ALL REMAINING CIRCUITS ARE ELECTRICALLY CONTINUOUS. CONTRACTOR SHALL

PROVIDE CONDUCTORS, CONDUIT AND JUNCTION BOXES AS REQUIRED TO KEEP REMAINING

DEVICES OPERATIONAL DURING DEMOLITION. IF NO OTHER DEVICES REMAIN ON CIRCUIT,

REMOVE CONDUIT AND CONDUCTORS BACK TO SOURCE. SWITCH BREAKER TO OFF POSITION

AND MARK BREAKER AS "SPARE". REFER TO ARCHITECTURAL PLANS FOR EXTENTS OF

DEMOLITION.

2. EXISTING FIRE ALARM CONTROL PANEL AND ASSOCIATED BACKUP SYSTEM SHALL REMAIN AS

INSTALLED.

3. EXISTING PANEL TO REMAIN AS INSTALLED.

4. DISCONNECT AND REMOVE ELECTRICAL CONNECTION FROM MECHANICAL EQUIPMENT BACK TO

SOURCE. SWITCH BREAKER TO OFF POSITION AND MARK BREAKER AS "SPARE". REFER TO

MECHANICAL PLANS FOR EXTENTS OF DEMOLITION.

5. MECHANICAL EQUIPMENT AND ASSOCIATED ELECTRICAL DISCONNECT IS EXISTING TO REMAIN

AS INSTALLED.

6. EXISTING GROUND BAR TO REMAIN AS INSTALLED.

7. EXISTING DISCONNECT TO REMAIN AS INSTALLED.

8. DISCONNECT AND REMOVE EXISTING SURGE PROTECTION DEVICE.

9. DISCONNECT EXISTING TO REMAIN BRANCH CIRCUITS FROM PANEL AND MAKE READY FOR

CONNECTION TO NEW PANEL IN SAME LOCATION. DISCONNECT PANEL FEEDERS AND REMOVE

PANEL. TURN PANEL OVER TO COTR.

NOT FOR CONSTRUCTION

1/4" = 1'-0"1 ELECTRICAL BLDG 3126-DEMO

XX

N

0 2' 4' 8' 12'

1/4" = 1'-0"

Revisions: Date:

ED-102

ELECTRICAL - LIGHITNG BLDG

3126 - DEMO BUILDING 3126

1/4" = 1'-0"1 LIGHTING BLDG 3126- DEMO

1. DISCONNECT AND REMOVE ALL LIGHTS AND ASSOCIATED LIGHTING CONTROL DEVICES IN THIS

AREA. REMOVE CONDUIT AND CONDUCTORS BACK TO NEXT DEVICE OR JUNCTION BOX ON

CIRCUIT THAT IS NOT BEING REMOVED. CONTRACTOR SHALL VERIFY THAT ALL REMAINING

CIRCUITS ARE ELECTRICALLY CONTINUOUS. CONTRACTOR SHALL PROVIDE CONDUCTORS,

CONDUIT AND JUNCTION BOXES AS REQUIRED TO KEEP REMAINING DEVICES OPERATIONAL

DURING DEMOLITION. IF NO OTHER DEVICES REMAIN ON CIRCUIT, REMOVE CONDUIT AND

CONDUCTORS BACK TO SOURCE. SWITCH BREAKER TO OFF POSITION AND MARK BREAKER AS

"SPARE". REFER TO ARCHITECTURAL PLANS FOR EXTENTS OF DEMOLITION.

2. EXISTING PANEL TO REMAIN AS INSTALLED.

SHELVES

K-3427HIG HLINETO ILETSVITREO US CHINA

K-2861HUDSONC_LAVATORYCAST IRON

K-3427HIGHLINE TOILETS VITREOUS CHINA

IC

FR

IG

MO

MO MOMO

33a

3a 3

A2N

A1N

A2E A2

A2 A2

A2 A2E

A2E A2

A2 A2

A2 A1N A1N A1N A1N

A2E A2 A2

A2 A2 A2

A2 A2 A2E

J2E

A2N A2NE

A2NE

A1N

A2NE A2N

PL1-5

X X X X

X

PL1-5 PL1-5

PL1-5 PL1-5

PL2-14 PL2-14 PL2-14

PL2-14

PL2-14 PL2-14

PL1-5 PL2-14 PL2-14 PL2-14

PL2-14 PL2-14

PL1-5 PL1-5 PL2-14 PL2-14

b b a a

1 1 1

1 11

FE FE FE FE

PL1-3 PL1-3 PL1-3 PL1-3

FE

PL1-3

STORAGE 102

OFFICE

VOLUNTEER

VOLUNTER

WORK

MECH ROOM

BIOMED

I.T.

TOILET

FL STATE

UNION OFFICE

STORAGE

PL2

EL-101

ELECTRICAL - LIGHTING BLDG

3126 - NEW BUILDING 3126

1/4" = 1'-0"1 LIGHTING BLDG 3126- NEW

1. LIGHTING CONTROLS IN THIS ROOM SHALL BE CONFIGURED FOR MANUAL ON,

MANUAL/VACANCY OFF OPERATION. VACANCY SENSORS SHALL BE CONFIGURED FOR 20

MINUTE TIME OUT PERIOD.

2. LIGHTING CONTROLS IN THIS AREA SHALL BE CONFIGURED FOR AUTO ON, AUTO OFF

OPERATION. OCCUPANCY SENSORS SHALL BE CONFIGURED FOR 30 MINUTE TIME OUT PERIOD.

3. COORDINATE EXACT LOCATION OF FIXTURE WITH DUCT WORK PRIOR TO CONSTRUCTION.

N 0 2' 4' 8' 12'

LIGHTING FIXTURE SCHEDULE

TYPE DESCRIPTION MANUFACTURER MODEL VOLTAGE LAMP TYPE VA COMMENTS

A1N 2x2 FLAT PANEL LED LIGHT FIXTURE. 3400 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM.

WITH NLIGHT CAPABILITIES ON BOARD.

ACUITY BRANDS EPANL 2X2 3400LM 80CRI 40K MIN1

NLIGHT MVOLT

120 V LED 34 VA

A2 2x4 FLAT PANEL LED LIGHT FIXTURE. 3000 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM. ACUITY BRANDS EPANL 2X4 3000LM 80CRI 40K MIN1 ZT

MVOLT

120 V LED 30 VA

A2E 2x4 FLAT PANEL LED LIGHT FIXTURE. 3000 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM.

WITH INTEGRAL EMERGENCY BATTERY PACK.

ACUITY BRANDS EPANL 2X4 3000LM 80CRI 40K MIN1 ZT

MVOLT E10WCP

A2N 2x4 FLAT PANEL LED LIGHT FIXTURE. 3000 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM.

WITH NLIGHT CAPABILITIES ON BOARD.

ACUITY BRANDS EPANL 2X4 3000LM 80CRI 40K MIN1

NLIGHT MVOLT

A2NE 2x4 FLAT PANEL LED LIGHT FIXTURE. 3000 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM.

WITH INTEGRAL EMERGENCY BATTERY PACK AND NLIGHT CAPABILITIES ON BOARD.

ACUITY BRANDS EPANL 2X4 3000LM 80CRI 40K MIN1

NLIGHT MVOLT E10WCP

FE WALL MOUNTED, TRAPAZOIDAL EXTERIOR LIGHTING FIXTURE, LED, 4000 K, FORWARD THROW DISTRIBUTION, WITH INTGRAL LIGHT/MOTION SENSOR, UL WET LOCATION LISTED, INTEGRAL EMERGENCY

BATTERY PACK.

ACUITY BRANDS WST LED P2 40K VF 120 PIR1FC3V

E20WH DDBXD

120 V LED 36 VA MOUNT AT 9'-0" AFF TO BOTTOM OF FIXTURE

OR AS OTHERWISE NOTED ON PLAN SHEETS.

J2E 4', LED, SURFACE MOUNTED LINEAR FIXTURE. 4000K COLOR TEMPERATURE, 80CRI MINIMUM, 3000 LUMENS

MINIMUM. WITH INTEGRAL EMERGENCY BATTERY PACK.

ACUITY BRANDS ZL1D L48 3000LM FST MVOLT 40K 80CRI

E10WLCP WH

X RECESSED EDGE LIT LED EXIT SIGN, CEILING MOUNTED, RED LETTERS, CLEAR BACKGROUND AND SINGLE

OR DOUBLE FACE

ACUITY BRANDS EDGR 1 R EL SD 120 V LED 10 VA

K-3427HIGHLINE TOILETSVITREOUS CHINA

SD

SDSD

SD SD SD

SD SD

P P P P P

J

M M M

2TYPICAL

5 55 5

PL1-6

PL1-11

PL1-9

PL1-17

PL1-14

PL2-2

PL2-4

PL1-15

PL1-12

PL1-12

PL2-8

PL2-8

PL1-7

PL1-7

PL1-10

PL2-3

PL2-11

PL2-9

PL1-2 PL1-2 PL1-4 PL1-4

PL2-5

PL2-7

PL2-5

PL2-7

PL1-13

PL2-6 PL2-6 PL2-6

PL2-12

WPPL1-12

WP

FACP

PL2-1

3126-ODU 1

3126-(E)CU 2

3126-(E)CU 1

3126-(E)AHU 1

3126-(E)AHU 2

PL2-13,15

PL1-23,25

PL1-27,29

30AR

30AF

3R

PL1-13126-(E)EWH 1

3126-EF 2 3126-EF 3 3126-EF 4

PL2-16 PL2-16

PL2-16

101010

PL2-16

3126-EF 1

3126-CP 1 PL1

PL1-8

PL1-8

PL2-10

30AR

20AF

3R

PL1-16

EXISTING

FIRE ALARM

CONTROL

PANEL

"FACP"

ADDRESSABLE FIRE

ALARM PANEL WITH

BATTERY BACK UP

EXISTING DIALER,

PROVIDE DEDICATED

TELEPHONE

CONNECTION

GROUND FLOOR

R R

TYPICAL CONTROL RELAYS

INDICATING DEVICES

TYPICAL INITIATION DEVICES

ROOF

SDHD

EP-101

ELECTRICAL - POWER BLDG 3126 -

NEW BUILDING 3126

1/4" = 1'-0"1 ELECTRICAL BLDG 3126- NEW

1. LOCAL MAINTENANCE DISCONNECT, COORDINATE EXACT LOCATION WITH MECHANICAL

EQUIPMENT PRIOR TO CONSTRUCTION. IDU POWER FED FROM ASSOCIATED ODU. PROVIDE

CONDUIT AND CABLES AS REQUIRED BY MANUFACTURERS INSTALLATION INSTRUCTIONS FOR A

CODE COMPLIANT INSTALLATION.

2. PROVIDE NEW FIRE ALARM INITIATION AND NOTIFICATION DEVICES. CONNECT NEW FIRE ALARM

DEVICES TO EXISTING FIRE ALARM CONTROL PANEL. NEW DEVICES SHALL BE COMPATIBLE

WITH EXISTING FIRE ALARM SYSTEM. EXISTING FIRE ALARM SYSTEM IS SIMPLEX 4100U FIRE

CONTROL.

3. EXISTING MAIN ELECTRICAL GROUND BAR.

4. NEW TELECOMMUNICATIONS MAIN GROUND BUSBAR. REFER TO SHEET T-501 FOR MORE

INFORMATION.

5. TOP OUTLET(S) OF DUPLEX AND DOUBLE DUPLEX RECEPTACLES INDICATED SHALL BE

CONNECTED TO THE PLUG LOAD CONTROLLED POWER PACK VIA THE VACANCY SENSOR

LOCATED IN THE ROOM. CONTROLLED OUTLETS SHALL BE IDENTIFIED PER NEC 406.3(E).

OUTLETS SHALL BE DE-ENERGIZED WHEN SENSOR TIMES OUT AND SWITCHES LIGHTS OFF.

REFER TO PLUG LOAD CONTROL DIAGRAM ON SHEET E-502 FOR MORE INFORMATION.

6. EXISTING EQUIPMENT TO REMAIN AS INSTALLED.

7. EXISTING MECHANICAL EQUIPMENT. EXISTING CIRCUITS TO REMAIN AS INSTALLED.

8. (2)#10AWG CU, #10AWG CU GROUND IN 3/4" CONDUIT.

9. (2)#6AWG CU, #10AWG CU GROUND IN 3/4" CONDUIT.

10. LOCAL MAINTENANCE DISCONNECT. COORDINATE EXACT LOCATION WITH MECHANICAL

EQUIPMENT PRIOR TO CONSTRUCTION. EXHAUST FAN SHALL BE INTERLOCKED LOCAL LIGHTING

CONTROLS. REFER TO SHEET E-502 FOR MORE INFORMATION.

11. DUPLEX OUTLET FOR CONNECTION OF OVER COUNTER MICROWAVE. COORDINATE EXACT

LOCATION AND MOUNTING HEIGHT IN FIELD AND WITH ARCHITECTURAL DRAWINGS PRIOR TO

CONSTRUCTION.

N 0 2' 4' 8' 12'

N.T.S2 FIRE ALARM RISER DIAGRAM

1 EXIT SIGN MOUNTING - GYPBOARD CEILING

NTS

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM, TYP.

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING HARDWARE.

DRYWALL CEILING

CROSS TEE, TYP.

GYPSUM

BOARD

CEILING MAIN

BEAM.

6.35mm (1/4") SCREW

LOCKING SQUARE

WASHER & NUT

JUNCTION BOX

FIXTURE WHIP FROM JUNCTION

BOX (1829mm (6') LONG MAX)

HANGER WIRE AND MOUNTING

CHANNEL ATTACHED TO STRUCTURE

REFER TO SPECIFICATION SECTION

26 51 00 DRYWALL CEILING

CROSS TEE, TYP.

CEILING HANGER WIRE

2 EXIT SIGN MOUNTING - LAY-IN CEILING

INTEGRAL GALVANIZED LIPPED

STEEL MOUNTING CHANNEL

GENERAL NOTE:

1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING

INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING HARDWARE.

ARCHITECTURAL

CEILING GRID

ACOUSTICAL

CEILING

TILE (TYP)

WIRE TIE THROUGH

MOUNTING CHANNEL

& CROSS BEAM, TYP.

HANGER WIRE AND MOUNTING CHANNEL

ATTACHED TO STRUCTURE REFER TO

SPECIFICATION SECTION 26 51 00

FIXTURE WHIP FROM JUNCTION

BOX (1829mm (6') LONG MAX)

CEILING HANGER WIRE

WASHER & NUT

6.35mm (1/4") SCREW

3 FLOOR SLAB PENETRATION DETAIL

9.52mm

(SIZE AS REQUIRED)

CONDUIT FITTING

SPRING

NUT, TYP

FLOOR SLAB,

TYP.

FIRESTOP SEALANT

PER SECTION 07 84 00,

FIRESTOPPING

CONDUIT, TYP MINERAL WOOL

(FIRMLY PACKED)

INTEGRAL GALVANIZED

LIPPED STEEL MOUNTING

CHANNEL, TYP.

STEEL EXPANSION

ANCHOR, TYP

(3/ 8") M AX

4 CONDUIT TRAPEZE MOUNTING DETAIL

CONDUIT CLAMP.

SIZE AS REQUIRED

INTEGRAL

GALVANIZED

LIPPED STEEL

MOUNTING

CHANNEL

REFER TO PLANS FOR

QUANTITY & SIZE OF

CONDUITS

GENERAL NOTES:

1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING

CHANNEL LONGER THAN 915mm (36") SHALL BE

INSTALLED WITH A CENTER SUPPORT ROD.

2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED

METHOD PER SPECIFICATION 26 05 33, RACEWAY AND

BOXES FOR ELECTRICAL SYSTEMS. FIELD VERIFY EXACT

CONDITIONS.

3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS REFER

TO SPECIFICATION SECTION 13 05 41, SEISMIC

RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL

COMPONENTS.

WASHER & LOCKNUT

9.52mm (3/8") MIN

GALVANIZED THREADED

ROD, TYP.

INTEGRAL

LIPPED STEEL

MOUNTING

CHANNEL

WASHER & LOCKNUT

LE NGTH AS REQU IRED

5 GROUNDING BAR DETAIL

(2 m

(4

( 1")

25mm (1")

(1")

(2")

51mm

(1 1/ 2") TYP

38mm

(1

(5

8")

6.35mm

(1/4") DIA.

MOUNTING

HOLES TYP. OF

(4)

BASE

CLAMP/

BRACKET

9.52mm (3/8")

DIA. HOLE TYP.

OF (6)

9.52mm (3/8") x 16mm (5/8")

HEX HEAD BOLT

9.52mm (3/8") LOCK WASHER

9.52mm (3/8") FLAT WASHER & 9.52mm (3/8") LOCK WASHER

6.35mm

(1/4") THICK

CU BAR

(2'- 0") MI N

610mm

6.35mm (1/4")

DIA. HOLE TYP

OF (8)

GENERAL NOTES:

1. ALL HARDWARE SHALL BE STAINLESS STEEL.

2. PROVIDE 1 MOUNTING POINT PER 305mm (12") OF BAR LENGTH.

3. HOLES MAY BE ADDED IF REQUIRED.

SECTION

STEEL

EXPANSION

ANCHOR

INSULATOR

9.52mm (3/8") FLAT WASHER

E-501

ELECTRICAL DETAILS BUILDING 3126

Section A-A

1A 1B

SPECIFIED TECHNOLOGIES INC- SPECSEAL LCI SEALANT

* INDICATES SUCH PRODUCTS SHALL BEAR THE UL

OR CUL CERTIFICATION MARK FOR JURISDICTIONS

EMPLOYINGTHE UL OR CUL CERTIFICATION (SUCH AS

CANADA), RESPECTIVELY.

SYSTEM NO. W-L-5122

1. WALL ASSEMBLY - THE 1 OR 2 HR FIRE-RATED GYPSUM BOARD/STUD WALL ASSEMBLY SHALL BE

CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES

WALL OR PARTITION DESIGN IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING

CONSTRUCTION FEATURES:

A.

STUDS - WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS OR STEEL

CHANNEL STUDS. WOOD STUDS

TO CONSIST OF NOM 2 BY 4 IN. LUMBER SPACED 16 IN. OC. STEEL STUDS TO BE MIN 3-5/8 IN. WIDE AND

SPACED MAX 24 IN. OC.

B. GYPSUM BOARD* - THICKNESS, TYPE, NUMBER OF LAYERS AND FASTENERS AS SPECIFIED IN THE INDIVIDUAL

WALL AND PARTITION DESIGN. MAX DIAM OF OPENING IS 7-1/2 IN.

THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS EQUAL TO THE HOURLY FIRE RATING OF THE WALL

ASSEMBLY IN WHICH IT IS INSTALLED.

2. THROUGH PENETRANT - ONE METALLIC PIPE OR TUBE TO BE INSTALLED ECCENTRICALLY OR CONCENTRICALLY

WITHIN THE FIRESTOP SYSTEM. PIPE OR TUBE TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF THE WALL

ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES AND TUBES MAY BE USED:

A. STEEL PIPE - NOM 4 IN. DIAM (OR SMALLER) SCHEDULE 5 (OR HEAVIER) STEEL PIPE.

B. IRON PIPE - NOM 4 IN. DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.

C. COPPER PIPE - NOM 2 IN. DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.

D. COPPER TUBE - NOM 2 IN. DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBE.

3. TUBE INSULATION - PLASTICS# - NOM 3/4 IN. THICK ACRYLONITRILE BUTADIENE/POLYVINYL CHLORIDE (AB/PVC)

FLEXIBLE FOAM FURNISHED IN THE FORM OF TUBING. ANNULAR SPACE SHALL BE MIN 0 IN. (POINT CONTACT) TO

MAX 1-1/2 IN.

SEE PLASTICS (QMFZ2) CATEGORY IN THE PLASTICS RECOGNIZED COMPONENT DIRECTORY FOR NAMES OF

MANUFACTURERS. ANY RECOGNIZED COMPONENT TUBE INSULATION MEETING THE ABOVE SPECIFICATIONS

AND HAVING A UL 94 FLAMMABILITY CLASSIFICATION OF 94-5VA MAY BE USED.

4. FILL, VOID OR CAVITY MATERIAL* - SEALANT - MIN 5/8 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN

ANNULUS, FLUSH WITH BOTH SURFACES OF WALL ASSEMBLY. AT POINT CONTACT LOCATION, MIN 1/4 IN. DIAM

BEAD OF FILL MATERIAL APPLIED AT INSULATED METALLIC PIPE/GYPSUM BOARD INTERFACE ON BOTH

SURFACES OF WALL.

1/16" THICK WHITE PLASTIC

WITH COLORED FACE PER

SPECIFICATIONS

1/2" HIGH LETTERING FOR

EQUIPMENT NAME

1/4" HIGH LETTERING FOR

REMAINING TEXT

ADHESIVE BACKING WHEN

INSTALLED IN CONDITIONED

SPACES

EQUIPMENT VOLTAGE

EQUIPMENT NAME

FASTEN WITH BRASS SCREWS

WHEN LOCATED IN NON-

CONDITIONED OR EXTERIOR

EQUIPMENT SOURCE

(PANEL & CIRCUIT)

120V, 1PH

FED FROM "MDP-4"

AHU-X

AHU-X

240V, 1PH

FED FROM "MDP-4"

120/240V, 1PH, 3W

FED FROM PANEL "XXXX"

VIA T-XXX

TYPICAL 120/240V PANELBOARD

PANEL "XXXX"

1/16" THICK WHITE PLASTIC

WITH COLORED FACE PER

SPECIFICATIONS

1/2" HIGH LETTERING FOR

PANELBOARD NAME

1/4" HIGH LETTERING FOR

REMAINING TEXT

ADHESIVE BACKING WHEN

INSTALLED IN CONDITIONED

80"

48"

90"

54"

18" AFF

6" AFC

36"

AFF

FIRE HORN (OR CHIME) &

LIGHT 80" AFF FROM

BOTTOM OF DEVICEEXIT

DUPLEX

RECEPTACLE

CENTERED BETWEEN

DOOR & CEILING

(COORDINATE WITH

ARCHITECT)

CENTERED OVER

DOOR (WHERE

APPLICABLE)

FA PULL STATION

SWITCH

TELE. OUTLET

CLOCK

OUTLET

VOLUME

CONTROL

SPECIAL POWER OUTLET

FINISHED FLOOR

DUPLEX RECEPTACLE

REMOTE TEST

VC

COMPUTER

OUTLET

RT

TELE. OUTLET

TELEVISION OUTLET42" A.F.F. W/ 36" COUNTER,

39" A.F.F. W/ 30" COUNTER,

48" A.F.F. WITHOUT COUNTER

78" MAX. TO

TOP DEVICE

OR AS NOTED ON PLANS

WALL MOUNTED LIGHT

FIXTURES AS NOTED ON

PLANS

PANELBOARD

L

CL

CL CL

STUD TO STUD TELESCOPING BOX SUPPORT, B-

LINE BB2 SERIES OR EQUAL.

CONDUITS

EQUIPMENT

GROUND

CONDUCTOR

GROUND SCREW

ON WIRING DEVICE.

GROUND SCREW

IN OUTLET BOX.

PLASTER RINGNEUTRAL CONDUCTOR

HOT CONDUCTOR

METAL STUD

DRYWALL

PLASTER RING

CONDUIT

4 SQUARE OUTLET BOX

OUTLET BOX SECURED TO BOX

SUPPORT

WIRE NUT (TYP.)

GROUND SCREW IN OUTLET

BOX.

PHASE A

PAHSE B

PHASE C

NEUTRAL

GROUND

BLACK

RED

BLUE

WHITE

GREEN

VOLTAGE

240V/120V

IDENTIFICATION OF GROUNDED CONUCTORS SHALL

BE PERFORMED BASED ON NEC ARTICLE 200.

TO

SOURCE

ID#

B B

G V

PLUG LOAD CONTROL POWER

PACK (1 PACK REQUIRED FOR

EACH RECEPTACLE CIRCUIT BEING

CONTROLLED)

SMALL OFFICES WITH

OCCUPANCY/VACANCY SENSORS AND DIMMING

CONTROL

B B

LIGHTING CONTROL NOTES:

1. RISERS DIAGRAMS ARE TO SHOW DESIGN INTENT FOR

STANDALONE AND NETWORK AREAS.

2. SENSORS AND POWER PACKS MUST OPERATE IN VACANCY

MODE OR OCCUPANCY MODE OF OPERATION.

3. REFER TO FLOOR PLANS FOR QUANTITIES OF CONTROL

DEVICES SUCH AS OCCUPANCY SENSORS, PHOTOCELLS, AND

DIMMER SWITCHES.

4. QUANTITIES OF DIMMING POWER PACKS AND UL924 DIMMING

POWER PACKS REQUIRED PER SWITCH LEGS AND ZONES.

5. ROOM LOCATIONS LISTED BELOW INDICATE GENERAL DESIGN

INTENT BUT ARE NOT LIMITED TO JUST THOSE SPECIFIC

ROOMS.

CAT 5 (LOW VOLTAGE)

CLASS 1 (LINE VOLTAGE)

CLASS 2 (LOW VOLTAGE)

WIRE LEGEND

EQUIPMENT LEGEND

OCCUPANCY/VACANCY SENSOR AND

PHOTOCELL COMBO

MODEL #: nCM PDT 10 ADCX

ON/OFF RAISE/LOWER

DIMMER OVERRIDE SWITCH

MODEL #: Npodm DX

DIMMER/VACANCY DIMMING PACK

MODEL #: NPP16 D SA

PLUG LOAD CONTROL POWER PACK

MODEL #: NPP20 PL

SENSORSWITCH nLight

RESTROOMS EXHAUST FAN INTERLOCKED WITH

OCCUPANCY SENSORS

LIGHTING CONTROL NOTES:

1. SENSORS AND POWER PACKS MUST OPERATE IN VACANCY

MODE OR OCCUPANCY MODE OF OPERATION.

2. REFER TO FLOOR PLANS FOR QUANTITIES OF CONTROL DEVICES

SUCH AS OCCUPANCY SENSORS, PHOTOCELLS, AND CONTROL

SWITCHES.

3. QUANTITIES OF POWER PACKS REQUIRED PER SWITCH LEGS

AND ZONES.

EXHAUST

FAN

H

RESTROOM

LIGHTS

SWITCHING AND 0-10V DIMMING

PACK MODEL #: nPP16 D

EQUIPMENT LEGEND

DIMMER/OCCUPANCY/VACANCY WALL

SWITCH COMBINATION UNIT

MODEL #: WSX PDT D

SENSORSWITCH nLight

CAT 5 (LOW VOLTAGE)

CLASS 1 (LINE

VOLTAGE)

WIRE LEGEND

E-502

ELECTRICAL DETAILS BUILDING 3126

N.T.S.

CONDUIT PENETRATION OF FIREWALL1 N.T.S.

EQUIPMENT NAMEPLATE2 N.T.S.

PANELBOARD NAMEPLATE3

TYPICAL MOUNTING HEIGHTS4 N.T.S.

TYPICAL RECEPTACLE MOUNTING DETAIL5

WIRE COLOR CHART6

PLUG LOAD/LIGHTING CONTROL DIAGRAM7 N.T.S.

LIGHTING CONTROL DIAGRAM8

SWITCH, MULTIPOSITION

SWITCH, NORMALLY CLOSED FLOAT

SWITCH, NORMALLY CLOSED FOOT OPERATED

SWITCH, NORMALLY CLOSED LIMIT

SWITCH, NORMALLY CLOSED TIME DELAY

SWITCH, NORMALLY CLOSED TEMPERATURE ACTIVATED

SWITCH, NORMALLY OPEN FLOAT

SWITCH, NORMALLY OPEN LIMIT

SWITCH, NORMALLY OPEN TEMPERATURE ACTIVATED

SWITCH, NORMALLY OPEN TIME DELAY

SWITCH, SINGLE BREAK

FUSE WITH RATING

NORMALLY CLOSED RELAY CONTACT

NORMALLY OPEN RELAY CONTACT

MOLDED CASE CIRCUIT BREAKER

LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

HIGH-VOLTAGE OIL CIRCUIT BREAKER

HIGH-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

SWITCH AND FUSE UNIT

FUSED DRAWOUT POTENTIAL TRANSFORMER

ELECTRICAL SYMBOLS - DIAGRAM

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

DELTA CONNECTION

TRANSFORMER

WYE CONNECTION

EARTH GROUND

PULL BOX

PRESSURE SWITCH-CLOSE ON INCREASE

PRESSURE SWITCH-OPEN ON INCREASE

FUSIBLE LINK

TIME CLOCK

GENERATOR, POWER

BATTERY

CAPACITOR

LIGHTNING ARRESTOR

RECTIFIER, CATHODIC PROTECTION SANITARY

RELAY

50 = INSTANTANEOUS OVERCURRENT OR

RATE-OF-RISE

51 = AC-TIME OVERCURRENT

67 = AC-DIRECTIONAL OVERCURRENT

86 LOCKING OUT

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED

STARTER, COMBINATION WITH DISCONNECT SWITCH

STARTER OR MOTOR CONTROLLER

POTHEAD

STRESS CONE

METER

AMMETER

VOLTMETER

WATTMETER

WATT-HOUR METER

PB

TC

V

W

WH

ABC

PANEL MAIN CIRCUIT BREAKER TYPE

### - INDICATES BREAKER RATING

ABC - INDICATES PANEL DESIGNATION

ABC

PANEL MAIN LUG TYPE

### - INDICATES BUS RATING

ABC - INDICATES PANEL DESIGNATION

###A ENCLOSED CIRCUIT BREAKER

### - INDICATES BREAKER RATING

GND GROUND BUS BAR

EMERGENCY PUSH BUTTON

NC NC - NORMALLY CLOSED

NO - NORMALLY OPEN

SHUNT TRIP CIRCUIT BREAKER

SURGE PROTECTION DEVICESPD

PL1

NEW PANEL

SPD

EXISTING PANEL

EXISTING PANEL FEEDER

REPLACE EXISTING SURGE

PROTECTION DEVICE (SPD) WITH

NEW SPD

NEW BREAKER

NEW (3) #300KCMIL AL, #300KCMIL

AL NEUTRAL CONDUCTORS SPLICED

INTO NEW ARIAL 3-PHASE UTILITY

CONDUCTORS IN NEW 2-1/2"

CONDUIT AND WEATHER HEAD.

NEW (3) #3/0AWG AL, #

3/0AWG AL NEUTRAL ARIAL

CONDUCTORS SPLICED INTO

EXISTING ARIAL 3-PHASE

UTILITY CONDUCTORS AT

EXISTING POWER POLE.

SPLICE AND DRIP LOOP

SPD

NEW SPD

E-901

ELECTRICAL DIAGRAMS BUILDING 3126

N.T.S1 PARTIAL NORMAL POWER ONE-LINE DIAGRAM

Notes:

Total Est. Demand Current: 49 A Receptacle 6.8 kVA 100.00% 6.8 kVA Total Conn. Current: 47 A Other 0.2 kVA 100.00% 0.2 kVA Total Est. Demand: 10.3 kVA Lighting 0.7 kVA 100.00% 0.7 kVA Total Conn. Load: 9.8 kVA HVAC 2.1 kVA 125.00% 2.6 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 46 A 48 A Total Load: 4.8 kVA 5.0 kVA

19 0.0 kVA 0.0 kVA 1 20 A Spare 20

SPD 20 A 2

0.0 kVA 0.0 kVA 1 20 A Spare 18

15 1.0 kVA 0.2 kVA 1 20 A Rest Room Exhaust Fans 16

ODU/IDU-1 20 A 2

1.0 kVA 0.7 kVA 1 20 A Lighting - 106 Thru 113 14

11 Receptacle - Quad IT Rack 107 20 A 1 0.4 kVA 0.2 kVA 1 20 A Receptacle - GFCI Exterior 12 9 Receptacle - Quad IT Rack 107 20 A 1 0.4 kVA 0.4 kVA 1 20 A Receptacle - Qaud 109 10 7 Receptacle - Furniture 111 20 A 1 0.8 kVA 0.4 kVA 1 20 A Receptacle - 107 8 5 Receptacle - Furniture 111 20 A 1 0.8 kVA 0.6 kVA 1 20 A Receptacle - GFCI 108,110,112 6 3 Receptacle - Quad 109,111 20 A 1 1.2 kVA 0.8 kVA 1 20 A Receptacle - 109,111 4 1 EXISTING FACP 20 A 1 0.1 kVA 0.8 kVA 1 20 A Receptacle - 106,109 2

CKT Circuit Description Trip Poles A B Poles Trip Circuit Description CKT

EXISTING PANEL

Enclosure: Type 1 Mounting: Surface Wires: 3 Mains Rating: 100 A

Supply From: PL1 Phases: 1 Mains Type: MCB Location: IT 107 Volts: 208V/120V A.I.C. Rating:

Branch Panel: PL2

1. Electric heat in AHU and Condensing unit are non concurent loads.

Receptacle 15.4 kVA 82.47% 12.7 kVA Other 0.6 kVA 100.00% 0.6 kVA Total Est. Demand Current: 112 A Lighting - Exterior 0.2 kVA 100.00% 0.2 kVA Total Conn. Current: 114 A Lighting 1.3 kVA 100.00% 1.3 kVA Total Est. Demand: 40.4 kVA HVAC 20.4 kVA 110.77% 22.6 kVA Total Conn. Load: 40.9 kVA Equipment 3.0 kVA 100.00% 3.0 kVA Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Legend:

Total Amps: 119 A 111 A 111 A Total Load: 14.3 kVA 13.3 kVA 13.3 kVA

41 Spare 20 A 1 0.0 0.0 42 39 Spare 20 A 1 0.0 0.0 40 37 Spare 20 A 1 0.0 0.0

3 30 A SPD

35 Spare 20 A 1 0.0 0.0 1 20 A Spare 36 33 5.0 0.0 1 20 A Spare 34

EXISTING PL2 90 A 2

4.8 0.0 1 20 A Spare 32

29 3.8 0.0 1 20 A Spare 30

RELOCATED AHU-2 70 A 2

3.8 0.0 -- -- Space 28

25 0.2 4.4 26

RELOCATED CU-2 30 A 2

0.2 4.4

2 70 A EXISTING - AHU-1

21 EXISTING Grounds Shed 20 A 1 1.5 0.2 22

19 EXISTING EWH1 20 A 1 1.5 0.2

2 60 A EXISTING CU-1

17 Receptacle - Refrig 100 20 A 1 0.2 1.5 1 20 A EXISTING EMS Shed 18 15 Receptacle - Microwave 105 20 A 1 0.2 0.2 1 20 A Receptacle - Microwave 100 16 13 Receptacle - GFCI 100,105,106 20 A 1 0.6 0.2 1 20 A Receptacle - Refrig 105 14 11 Receptacle - 103,105 20 A 1 1.0 0.6 1 20 A Receptacle - 104, Exterior 12 9 Receptacle - 101,100 20 A 1 1.0 0.4 1 20 A Receptacle - Qaud 106 10 7 Receptacle - Quad 103 20 A 1 0.8 0.8 1 20 A Receptacle - Qaud 102 8 5 Lighting - 100 Thru 105 20 A 1 0.6 1.0 1 20 A Receptacle - 100,102 6 3 Lighting - Exterior 20 A 1 0.2 0.8 1 20 A Receptacle - Furniture 100 4 1 CP-1 20 A 1 0.0 0.8 1 20 A Receptacle - Furniture 100 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Enclosure: Type 1 Mounting: Surface Wires: 4 Mains Rating: 225 A

Supply From: Phases: 3 Mains Type: MCB Location: Volts: 120/208 Wye A.I.C. Rating:

Branch Panel: PL1

DUCTWORK SYMBOLS

SYMBOL DESCRIPTION

HVAC ABBREVIATIONS

ABBR. DESCRIPTION ABBR. DESCRIPTION

A/E ARCHITECT / ENGINEER

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

CC COOLING COIL

CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)

CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CH CHILLER

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

DB DECIBELS

Db DRY-BULB TEMPERATURE

DD-1 DESIGN DEVELOPMENT (SUBMISSION1)

DD-2 DESIGN DEVELOPMENT (SUBMISSION2)

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

ENT ENTERING

ERC ELECTRIC REHEAT COIL

ABBR. DESCRIPTION

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX. EXISTING

F FAHRENHEIT

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT EXCHANGER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FT FEET

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HC HEATING COIL

HOA HAND/OFF/AUTOMATIC

HP HORSEPOWER

HSTAT HUMIDISTAT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IN INCHES

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

kW KILOWATT

LAT LEAVING AIR TEMPERATURE

LF LINEAR FOOT (FEET)

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MERV MINIMUM EFFICIENCY REPORTING VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

R/E RETURN OR EXHAUST

RA RETURN AIR

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RLA RUN LOAD AMPERE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SD SMOKE DETECTOR

SD-1 SCHEMATIC DESIGN (SUBMISSION1)

SD-2 SCHEMATIC DESIGN (SUBMISSION2)

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SI SQUARE INCHES

SP STATIC PRESSURE

SPS STATIC PRESSURE SENSOR

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

W/ WITH

W/O WITHOUT

LIMIT OF DEMOLITION

DN

DN

UP

UP

SUPPLY DUCT (UP &DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY

CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE

(WALL TYPE)

EXHAUST OR RETURN CEILING

REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM

REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN REGISTER

OR TOP GRILLE (WALL TYPE)

VANED ELBOW & AIR SPLIT TYPE

DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING

DUCT

INCLINED RISE, IN DIRECTION OF

AIR FLOW

INCLINED DROP, IN DIRECTION OF

AIR FLOW

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING

DIFFUSERS

SQUARE 2-WAY CEILING

LINEAR SLOT

DIFFUSER

SQUARE 1-WAY CEILING

BACK DRAFT

DAMPER

BDD

FC

10x8

FLEXIBLE CONNECTION,

EQUIPMENT, VIBRATION,

OR SEISMIC

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS

MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW

(LONG

RADIUS)

NEW DUCT (INSIDE DIMENSIONS:

WIDTH x DEPTH)

EXISTING DUCT TO

REMAIN

FIRE

VD

DUCT WITH SOUND

LINING

FLEXIBLE DUCTWORK

(INSULATED)

MANUAL

VOLUME

EXISTING DUCT TO BE

REMOVED

SUPPLY

RETURN45°

STANDARD BRANCH SUPPLY

OR RETURN, NO SPLITTER(45° TAP)

45°

2 1

1/24

STAINLESS STEEL

AUTOMATIC CONTROL DAMPER

MODULATING

AUTOMATIC CONTROL DAMPER TWO

POSITION

FAN POWERED VARIABLE

VOLUME TERMINAL UNIT WITH HEATING COIL

MB

DOUBLE DUCT MIXING

BOX

TERMINAL UNIT WITH REHEAT

COIL

POINT OF CHANGE IN DUCT

CONSTRUCTION BY STATIC PRESSURE

CLASS. THE NUMBER ASSIGNS

PRESSURE CLASS (IN. OF WATER)

WHICH WILL ACCOMMODATE

MAXIMUM OPERATING PRESSURE IN

THE DUCT SUBSECTION. THE

SYMBOL CONTINUES THE

ASSIGNMENT UNTIL THE DUCT

TERMINATES OR ANOTHER SYMBOL

APPEARS. A "N" SUPERSCRIPT

INDICATES NEGATIVE PRESSURE.

PIPING SYMBOLS

HOT WATER HEATING SUPPLY

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HOT WATER HEATING RETURN

HWS

HWR

CHR

CHS

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRICREDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

FLOW ELEMENT

PIPE UP

PIPE DOWN

MODULATING CONTROL VALVE

FE

GENERAL PIPING SYMBOLS

VALVE SYMBOLS

DRAWING SYMBOLS

BASIC MATERIALS

EXISTING TO BE REMOVED (HEAVY, DASHED LINE)

EXISTING TO REMAIN (THIN, HALFTONED LINE)

NEW (HEAVY, SOLID LINE)

26-SF 3

DETAIL NUMBER DRAWING

DRAWING NUMBER WHERE SHOWN

SECTIONLETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

SUPPLY FAN NO. 3 IN BUILDING NO. 26

EQUIPMENT ABBREVIATION (SUPPLY FAN). AN "(E)" SHOWN

IN FRONT OF EQUIPMENT TAGS NOTIFIES THAT EQUIPMENT IS

H4

H7

NUMBER WHERE DRAWN

AIR DISTRIBUTION DEVICE TAG

AIRFLOW (CFM)

45145

12x6 SA

12/6 SA

12Ø SA

RECTANGULAR DUCT TAG

DUCT CLASSIFICATION (REFER TO ABBREVIATIONS)

OVAL DUCT TAG

ROUND DUCT TAG

DUCT SIZE (INCHES)

DUCT SIZE (INCHES)

DUCT DIAMETER (INCHES)

AIR TERMINAL SYMBOLS

T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT

CONTROLS SYMBOLS

PC PRESSURE CONTROLLER. SEE SEQUENCE

OF OPERATION

TEST PLUG (PRESSURE/TEMPERATURE)

MANUAL AIR VENT

MV

QUICK-COUPLE HOSE CONNECTOR

GATE VALVE WITH 3/4" HOSE ADAPTER

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

BALL VALVE

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

DEMOLITION SHEET NOTE CALLOUT

NEW CONSTRUCTION SHEET NOTE CALLOUT

FD

\m kn ot t\D

\R ev it Lo ca l F ile s\

_m t@ ab eg ro up c.

co

.rv

1:

:3

AM

MH-001

MECHANICAL LEGENDS,

SYMBOLS, NOTES, & SCHEDULES BUILDING 3126

11/27/19 KJD JARKYLE J .DAVIS, P.E.

FL License #84275

NOTES:

1. AIR DISTRIBUTION DEVICES LOCATED WITHIN ACOUSTICAL TILE CEILINGS SHALL BE

PROVIDED WITH BORDER TYPE 3 FOR LAY-IN MOUNTING. AIR DISTRIBUTION DEVICES

LOCATED WITHIN GYPSUM BOARD CEILINGS OR WALLS SHALL BE PROVIDED WITH

BORDER TYPE 1 FOR SURFACE MOUNTING. REFER TO ARCHITECTURAL DOCUMENTS

FOR CEILING TYPES.

2. AIR DISTRIBUTION DEVICES LOCATED IN SMALL ROOMS WHERE FULL 24"x24" GRID

ARE NOT AVAILABLE SHALL BE PROVIDED WITH SURFACE MOUNTING BORDERS IN

LIEU OF LAY-IN. SECURE EACH DEVICE TO CEILING GRID WITH FIELD-FABRICATED

SUPPORTS.

AIR DISTRIBUTION SCHEDULE

MARK CFM NECK SIZE

FACE SIZE

LENGTH DESCRIPTION

A 0-100 101-220

6Ø 8Ø

24X24

SUPPLY DIFFUSER

BASIS OF DESIGN: PRICE - ASPD

COLOR: OFF-WHITE

MATERIAL: ALUMINUM

OPPOSED BLADE DAMPER: NO

B 0-2245 60X16 60X16 RETURN GRILLE

BASIS OF DESIGN: PRICE - 635

COLOR: MATCH WALL

OPPOSED BLADE DAMPER: YES

C 0-175 175-375 376-550

8Ø 10Ø 16Ø

TRANSFER GRILLE

BASIS OF DESIGN: PRICE - APDDR

COLOR: OFF-WHITE

OPPOSED BLADE DAMPER: NO

GENERAL NOTES

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR

ABOVE THE HARD SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES

ARE NET INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER THE

ARCHITECTURAL SPECIFICATIONS.

4. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT

DETAILS.

5. LOW WALL RETURN GRILLES CALLED OUT ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 7" [175mm] ABOVE FINISHED FLOOR.

6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.

7. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.

TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

8. DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR FABRICATION.

COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH AS OFFSETS IN

PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO OBSTRUCTIONS OR

INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.

9. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC DUCT

CONSTRUCTION STANDARD.

10. INSTALL ALL FIRE DAMPERS, SMOKE DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS IN ACCORDANCE WITH MANUFACTURE'S INSTALLATION DIRECTIONS. PROVIDE ACCESS DOORS TO ALLOW COMPLETE

INSPECTION AND MAINTENANCE OF ALL DEVICES.

11. PROVIDE 1.5R ELBOWS IN DUCTWORK AS INDICATED. IF 1.5R ELBOWS DO NOT FIT, PROVIDE 1.0R ELBOWS. IF 1.0R ELBOWS DO NOT FIT, PROVIDE 90 DEGREE RECTANGULAR DUCT ELBOWS WITH TURNING

VANES.

12. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.

13. COORDINATE DIFFUSER, GRILLE AND REGISTER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING

PLANS AND EQUIPMENT OF ALL TRADES.

14. LOCATE THERMOSTATS, TEMPERATURE SENSORS, HUMIDISTATS, AND HUMIDITY SENSORS AT 48" ABOVE

FINISHED FLOOR UNLESS NOTED OTHERWISE. COORDINATE LOCATIONS WITH OTHER EQUIPMENT, FURNITURE, AND DOOR SWINGS.

15. ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE

ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.

16. DAMPERS AND INSIDES OF DUCTS VISIBLE THROUGH GRILLES, REGISTERS AND DIFFUSERS SHALL BE

PAINTED FLAT BLACK.

17. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.

18. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.

19. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO

FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.

20. VERIFY FINISH WITH ARCHITECT PRIOR TO PURCHASING GRILLES, REGISTERS, DIFFUSERS, LOUVERS AND

OTHER AIR DISTRIBUTION DEVICES.

21. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK CONNECTING TO FANS, AIR HANDLING UNITS, AND FAN COIL UNITS.

22. PROVIDE TRANSITIONS AT DIFFUSER NECKS AS REQUIRED TO MATCH SIZES OF FLEX DUCTS TO BE

CONNECTED.

23. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.

24. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL

FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.

25. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE SIZE OF THE DIFFUSER NECK.

AIR HANDLING UNIT REBALANCE SCHEDULE

MARK SUPPLY CFM OUTSIDE AIR CFM

3126-(E)AHU 1 1625 390

3126-(E)AHU 2 1125 165

1. AIR HANDLING UNITS SHALL BE REBALANCED TO VALUE INDICATED ABOVE.

MINI-SPLIT DUCTLESS HEAT PUMP SCHEDULE

INDOOR UNIT OUTDOOR UNIT

MODEL NO. SA CFM (MAX.)

TOTAL COOLING

CAPACITY (MBH)

TOTAL HEATING

CAPACITY (MBH) MARK MODEL NO. SEER NOM. TONS

AMBIENT TEMP.

(°F)

UNIT ELECTRICAL

RATED AMPS MCA MOCP V/PH/HZ

LSN180HSV5 706 18.0 21.6 ODU-1 LSU180HSV5 21.5 1.5 95 9.85 13 20 208/1/60

1. MODEL NUMBERS AND UNIT SELECTIONS ARE BASED ON LG.

2. INDOOR UNIT IS ELECRICALLY POWERED FROM THE OUTDOOR UNIT.

3. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.

4. DISCONNECT PROVIDED BY ELECTRICAL. REFER TO ELECTRICAL DRAWINGS.

5. PROVIDE LOW AMBIENT KIT FOR OPERATION IN AMBIENT TEMPERATURES DOWN TO 0° F.

6. SIZE REFRIGERANT LINES PER MANUFACTURER RECOMMENDATIONS. PROVIDE OVERSIZE LINES AND/OR REFRIGERATION LINE EXTENSION KIT BASED ON

MANUFACTURERS RECOMMENDATIONS FOR EXTENDED REFRIGERATION LINE RUNS.

7. PROVIDE 5 YEAR COMPRESSOR WARRANTY.

8. PROVIDE ANTI-RECYCLE COMPRESSOR TIMER.

9. PROVIDE CONDENSER COIL GUARDS.

10. PROVIDE 7 DAY PROGRAMMABLE THERMOSTAT. UNITS SHALL BE THERMOSTATICALLY CONTROLLED TO CYCLE WITH LOADS. NO ADDITIONAL CONTROLS ARE REQUIRED.

11. PROVIDE CONDENSATE PUMP WITH INLINE CHECK VALVE LOCATED IN DRAIN LINE.

SHEET LIST

Sheet Number Sheet Name

MH-001 MECHANICAL LEGENDS, SYMBOLS, NOTES, & SCHEDULES

MD-101 MECHANICAL FLOOR PLAN - DEMO

MH-101 MECHANICAL FLOOR PLAN - NEW

MH-201 MECHANICAL DETAILS

EXHAUST FAN SCHEDULE

MARK MANUFACTURER MODEL NO. TYPE CFM STATIC PRESS. FAN RPM

ELECTRICAL

DRIVE TYPE MAX SONESFLA V/PH/HZ

3126-EF-1 BROAN XB80 CEILING CABINET 70 0.25 - 0.3 120/1/60 DIRECT 0.3

3126-EF-2 BROAN XB80 CEILING CABINET 70 0.25 - 0.3 120/1/60 DIRECT 0.3

3126-EF-3 BROAN XB80 CEILING CABINET 70 0.25 - 0.3 120/1/60 DIRECT 0.3

3126-EF-4 BROAN XB80 CEILING CABINET 70 0.25 - 0.3 120/1/60 DIRECT 0.3

1. DISCONNECT SWITCH PROVIDED BY ELECTRICAL. REFER TO ELECTRICAL DRAWINGS.

2. PROVIDE SPEED CONTROLLER.

3. ALL EXHAUST FANS TO BE INTERLOCKED W/ LOCAL LIGHTING CONTROL. REFER TO ELECTRICAL DRAWINGS.

1 1

3126-(E)CU 13126-(E)AHU 1

3MD101 2

6 5

:2

MD-101

MECHANICAL FLOOR PLAN - DEMO BUILDING 3126

1/4" = 1'-0"MD-101

1 MECHANICAL FLOOR PLAN - BLDG 3126 - DEMO

1. DEMOLISH ALL EXISTING SUPPLY AND RETURN DUCTWORK AND

SUPPLY AND RETURN CEILING DEVICES WITHIN THIS AREA.

2. EXISTING AIR HANDLING UNIT TO BE RELOCATED. ALL REFRIGERANT

AND CONDENSATE PIPING SHALL BE DEMOLISHED. PATCH

PENETRATIONS TO MATCH EXISTING WALL TYPE.

3. EXISTING OUTDOOR UNIT TO BE RELOCATED.

4. DEMOLISH OUTSIDE AIR DUCT AND LOUVER. PATCH WALL OPENING

TO MATCH EXISTING WALL TYPE.

5. EXISTING SUPPLY AIR DUCT DEMOLISHED BACK TO AIR HANDLING

UNIT.

6. EXISTING RETURN AIR DUCT DEMOLISHED BACK TO AIR HANDLING

UNIT.

DEMO GENERAL NOTES:

1. CONTRACTOR SHALL PERFORM A PRE-DEMO TEST AND BALANCE OF

EXISTING UNITS PRIOR TO DEMOLITION AND A REPORT SHALL BE

SUBMITTED TO ENGINEER FOR REVIEW.

2. RELOCATE EXISTING THERMOSTATS TO LOCATIONS SHOWN ON NEW PLAN.

3. DEMOLISH EXISTING ROOF EXHAUST FAN AND PROVIDE CAP FOR CURB.

NTSMD-101

3 M - PHOTO 2 - DEMO

2 M - PHOTO 1 - DEMO

4 M - PHOTO 3 - DEMO

5 M - PHOTO 4 - DEMO

SHELVESK-2861HUDSONC_LAVATORYCAST IRON

K-2861HUDSONC_LAVATORYCAST IRON K-2861HUDSONC_LAVATORYCAST IRON

x1

SA

RA

x8 S

10x8 SA

8ø SA

8x8 SA

T

3126-ODU 1

3126-(E)AHU 1 3126-(E)CU 1

OFFICE 100

A 90

A 85 A 150

A 175

A 175 A 175

A 135

A 140

A 220

A 215

A 50

A 215

A 175

A 50 A 50

A 200 A 200

A 200

A 50

3126-EF 1

3126-EF 2

3126-EF 3 3126-EF 4

C 150 C 150

C 175

C 175 C 425 C 425

C 425 C 425

14x8 SA

C 375

C 375

C 550C 550 C 410

C 415 C 415

14x8 SA

8ø

6ø EA 6ø EA

6ø EA

B2245 15

62x18 RA

16 161616

MH-101

3126-IDU 1

12x16 SA

8x8 OA

15 1

B2245

FLOOR

3126-(E)AHU 1

14x20 SA x2

14x20 RA

10x10 OA

15 1

B2245

:3

MECHANICAL FLOOR PLAN - NEW BUILDING 3126

1. ROUTE NEW 3/4" CONDENSATE THRU NEW WALL PENETRATION AND

DISCHARGE ON SPASHBLOCK.

2. SPLASHBLOCK.

3. RELOCATED OUTDOOR UNIT.

4. RELOCATED AIR HANDLING UNIT.

5. PROVIDE MANUAL BALANCING DAMPER AND MOTORIZED DAMPER.

MOTORIZED DAMPER SHALL BE INTERLOCKED WITH OPERATION OF

AHU. BALANCE OA TO MEET OA INDICATED IN SCHEDULE.

6. DUCT SAME SIZE AS UNIT CONNECTION.

7. MANUFACTURER'S RECOMMENDED CLEARANCE.

8. EQUIPMENT MOUNTED ON 4" CONCRETE PAD. EXTEND CONCRETE PAD

6" BEYOND PERIMETER OF EQUIPMENT.

9. 3/4" CONDENSATE ROUTED ABOVE CEILING.

10. REFRIGERANT LINES ROUTED ABOVE CEILING.

11. ROUTE CONDENSATE AND REFRIGERANT LINES THROUGH WALL AND

SEAL PENETRATION WATERTIGHT. PROVIDE METAL SHROUD TO

CONCEAL PIPING FROM PENETRATION DOWN TO GRADE. PAINT METAL

SHROUD TO MATCH EXISTING BUILDING FINISH. CONDENSATE LINE

SHALL BE ROUTED DOWN TO DISCHARGE AT SPASHBLOCK.

REFRIGERANT LINES SHALL BE ROUTED TO OUTDOOR UNIT.

12. MOUNT EXISTING CONDENSING UNIT ON 4" CONCRETE PAD. EXTEND

CONCRETE PAD 6" BEYOND PERIMETER OF EQUIPMENT.

13. 12"X12" OUTSIDE AIR LOUVER. BASIS OF DESIGN - GREENHECK

EHH-601D.

14. 18"X18" OUTSIDE AIR LOUVER. BASIS OF DESIGN - GREENHECK

EHH-601D.

15. ROUTE NEW REFRIGERANT PIPE THRU NEW WALL PENETRATION AND

AND CONNECT TO EXISTING UNIT. SIZE REFRIGERANT PIPING PER

MANUFACTURER'S INSTRUCTION.

16. ROUTE 6" EA TO WALL CAP. BASIS OF DESIGN - BROAN 843BL.

17. 3126-(E)AHU 1 EXISTING THERMOSTAT NEW LOCATION.

18. 3126-(E)AHU 2 EXISTING THERMOSTAT NEW LOCATION.

19. ANGLE IRON SUPPORT (SEE DETAIL #13, SHEET M-201).

NEW GENERAL NOTES:

1. DUCT RUNOUTS TO DIFFUSERS SHALL MATCH THE

SIZE OF THE DIFFUSER NECK.

1/4" = 1'-0"MH-101

1 MECHANICAL FLOOR PLAN - BLDG 3126 - NEW

1/2" = 1'-0"MH-101

3 MECHANICAL SECTION - 3126-(E)AHU 2

1/2" = 1'-0"MH-101

2 MECHANICAL SECTION - 3126-(E)AHU 1

0 1' 2' 4' 6'

1/2" = 1'-0"

W1/2W

2/3W

VANE

R SHALL

EQUAL

OR BE

GREATER

THAN W.

OR BE

GREATER

THAN

1/3W.

OR BE

GREATER

THAN

1/6W.

1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

2. ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT

RADIUS ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES

SHALL BE CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED

BY SMACNA.

1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS

DETAILED BY SMACNA.

2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS

VANE TYPE REGARDLESS OF W DIMENSION.

3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN VANES AND A 3/4" [20mm]

TRAILING EDGE.

4. WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES

SHALL BE DOUBLE VANE TYPE.

W1

SMACNA FIGURE 4-6

45° LEED IN RIGID

DUCT TO AIR

TERMINAL UNIT.

MAIN SUPPLY

PLAN VIEW

FLOW

LO

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW AIR

FLOW

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4"

[100mm] MIN.

BRANC

H DUCT

VD

FLEXIBLE DUCT

SIZE SAME AS

DIFFUSER INLET:

5'-0" MAX LENGTH

12"

SUPPORT SADDLE

FROM STRUCTURE

VOLUME DAMPER

W/ LOCKING QUAD

SADDLE

SHEET

METAL

CONICAL OUTLET

BRANCH DUCT

USE RIGID

ELBOWS FOR

CHANGE

OF DIRECTION

GREATER

THAN 45°

[300mm]

SEE SPECIFICATIONS FOR

CLAMPS AND SEALANT

(TYP.)

NOTE:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT

PERMITTED FOR THE DEDICATED AHU SERVING THE

SURGICAL

SUITE.

TYPICAL

DIFFUSER OR

REGISTER IN

LAY-IN CLG.

THERMAL

INSULATION

SEE SPECIFICATIONS

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED

ON

FAN SIDE

WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH

MATERIAL

TAUT

FLEXIBLE

MATERIAL

AS

SPECIFIED

1"x1/8" [25x3mm] DRAW

BAND

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

5/16" [8mm] FLANGE

SHEET METAL

SCREWS

ON 12" [300mm]

CENTERSRIVET ON

4" [100mm]

CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

1" [25mm] FLANGE & HEMALTERNATE

POSITION

OF BOLT 1 1/2" [40mm]

POCKET SLIP

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

[15mm] [15mm] [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT

FLANGED

ON FAN SIDE

WASHER

FLEXIBLE

MATERIAL AS

SPECIFIED

1/2" 1 1/2"1/2"

3. INSULATION: FOR COLD DUCTS INSULATE BRACES AND PROVIDE

VAPOR BARRIER.

4. SIMILAR FOR RECTANGULAR DUCT.

MAXIMUM DUCT WIDTH

IN. [mm]

UP TO 26 [650]

27 [675] TO 40 [1000]

41 [1000] TO 60 [1500]

61 [1500] TO 72 [1800]

MAXIMUM SIZE ANGLE

NONE

1-1/2x1-1/2x3/16 [40x40x7] 2x2x3/16 [50x50x7] 2x2x3/16 [50x50x7]

MAXIMUM SPACING

GALVANIZED ANGLE

IRON OR

EQUIVALENT

STRENGTH CHANNEL

ALL THREAD

ROD. MINIMUM

3/8" [10mm]∅

72 [1800] 48 [1200] 24 [600]

1. PROVIDE BRACING TO LIMIT THE AMPLITUDE OF WALL VIBRATION AND WALL

DEFLECTION TO SPECIFIED MAXIMUMS.

2. MINIMUM BRACING REQUIREMENTS:

BAND

OVER 50"

[1250mm]∅

HANGER RODS

BAND OF

SAME SIZE AS

HANGER STRAP

LOAD RATED

FASTENERS

50" [1250mm]∅ &

UNDER

TABULATED DATA FROM SMACNA ALLOWS

FOR DUCT REINFORCING AND

INSULATION, BUT NO EXTERNAL LOAD.

2500 [1133]

1320 [598]

420 [190]ONE 1 [25] x 18 GA STRAP36 [900]

TWO 1/2 [13]∅ RODS

TWO 3/8 [10]∅. RODS

ONE 1 [25] x 16 GA STRAP

84 [2100]

60 [1500] 50 [1250] 700 [317]

ONE 1 [25] x 22 GA STRAP

QUANTITY/SIZEMAX. DUCT ∅

26 [650]

HANGER STRAPS OR RODS

MAX. LOAD

LBS. [kg]

260 [119]

MAX.

144 [3600]

SPACING

IN. [mm] IN. [mm]

VOLUME DAMPER DETAIL

1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR

INSULATION.

2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION

SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS & ROUND

DAMPERS.

INSULATION SEE

SPECIFICATION

BLADE

1/8" [6mm]

CLEARANCE

ALL AROUND

OUTSIDE END

BEARING

INSIDE END

BEARING

HANDLE WITH

LOCKING

QUADRANT

STAND-OFF

1/2" [15mm]

ROUND ROD PIN

STIFFEN

BLADE AS

REQUIRED

SIDE ELEVATION SECTION

18 GAUGE STAINLESS STEEL

STRAPS 1" WIDE MIN (DO

NOT BLOCK ACCESS

PANELS) 2-MIN PER 4'0".

WRAP CONTINUOUS OVER

CONDENSER AND SECURE

TO CONCRETE PAD WITH

1/4"X1-1/2" STAINLESS

STEEL CONCRETE SCREWS

OR ANCHORS. (EACH SIDE)

4" THK

FIBERMESH

REINFORCED

CONCRETE PAD

6" MIN

ALL

SIDES

CONDENSING UNIT

PROVIDE 6" CLEAR

GRAVEL AROUND

CONDENSER. SOD

THEREAFTER.

3/8" STEEL ROD

W/ THREADED ENDS

(TYP. 4 PLCS.)

REFRIGERANT PIPING

SUSPENDED RODS

FROM CONCRETE

FLOOR SLAB

EQUIVALENT TO

SIMPSON BLUE

BANGAR CAST IN

PLACE ROD HANGARS

SUPPORT

FROM

STRUCTURE

ABOVE AS

REQUIRED

VIBRATION

ISOLATORS

CONDENSATE

LINE

INDOOR UNIT

CASSETTE

LINTEL BY OTHERS

CLIP ANGLE

(ALL AROUND)

BIRDSCREEN FRAME

WITH MAXIMUM FREE

AREA

BIRDSCREEN

STORMPROOF LOUVER

CAULKING

15°

PITCH TO DRAIN

SECURE FRAME TO

WALL WITH EXPANSION

BOLTS 12" ON CENTER,

ALL 4 SIDES

SHEET METAL FASTENED TO ANGLE

6" ON CENTER. ANGLE FASTENED

TO LOUVER AT INTERMEDIATE

SUPPORTS AND FRAMES

FASTEN 6" ON CENTER

WALL BY OTHERS

RAIN SILL

CAULK

EXTERIOR

CAULK ALL

AROUND

NOTE: SUPPORT PLENUM FROM FLOOR

OR STRUCTURE ABOVE WITH GALVANIZED

STEEL ANGLES AND CHANNELS

SUPPLY

RETURN

OUTSIDE AIR

MOTORIZED DAMPER

INTERLOCKED WITH

FAN MOTOR

NEW VOLUME DAMPER

NEW R/A DUCT, DUCTED TO AHU

UNISTRUT P2481 PIPE BRACKET

ANCHOR UNISTRUT SUPPORT TO

NEW CONDENSATE

DRAIN (INSULATED)

REFRIGERANT

LINES

FLEX CONNECTION

NOTE: AN OVERFLOW DEVICE SHALL BE PROVIDED FOR

CONDENSATE CONTROL IN ACCORDANCE TO FBC - MECHANICAL

(2017) 307.2.3 IF SOME FORM OF AUXILLIARY/SECONDARY DRAIN

SYSTEM IS NOT CURRENTLY INSTALLED.

EXISTING AIR

HANDLING UNIT

NEW DUCT SUPPORT ANCHOR TO

SLAB

FLOOR SLAB

NEW VOLUME DAMPER

MOUNT UNIT ON ANGLE IRON

SUPPORT. HEIGHT OF SUPPORT

SHALL BE DETERMINED BASED

ON RA DUCT CONNECTION

MH-201

MECHANICAL DETAILS BUILDING 3126

DUCTWORK RADIUS ELBOWS2

DUCTWORK SQUARE VANE ELBOWS3

SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS4

EXHAUST OR RETURN BRANCH DUCTWORK5

FLEXIBLE AIR DUCT CONNECTOR6

FLEXIBLE DUCT CONNECTIONS7

FLAT OVAL/RECTANGULAR DUCT HANGERS/ REINFORCEMENT9

ROUND DUCT HANGERS8 N.T.S.

VOLUME DAMPER DETAIL1

CU MOUNTED ON GRADE10

SUSPENDED MINISPLIT CEILING CASSETTE11

WALL LOUVER/PLENUM12

VERTICAL AHU INSTALLATION13

GENERAL NOTES

1. REFERENCE THE SPECIFICATIONS FOR MATERIAL AND EQUIPMENT INSTALLATION STANDARDS.

2. THE PLUMBING INSTALLATION SHALL COMPLY WITH ALL CURRENT STATE AND LOCAL CODES.

3. COORDINATE UTILITIES AND SERVICES WITH CIVIL ENGINEER.

4. PLANS ARE NOT COMPLETELY TO SCALE. PIPE ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO INDICATE EXACT

ROUTING. CONTRACTOR SHALL PROVIDE ANY ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER INSTALLATION AND TO MAINTAIN CLEARANCES. VERIFY STRUCTURAL, MECHANICAL AND ELECTRICAL INSTALLATIONS AND OTHER POTENTIAL

OBSTRUCTIONS AND ROUTE PIPING TO AVOID INTERFERENCES.

5. PROVIDE ALL OFFSETS AND FITTINGS AND MAKE CONNECTION TO SITE UTILITIES.

6. CONCEAL PIPING ABOVE CEILINGS, WITHIN WALLS OR CHASES EXCEPT IN MECHANICAL ROOMS OR AS SPECIFICALLY

NOTED.

7. PROVIDE ACCESS PANELS FOR ALL VALVES CONCEALED IN WALLS OR ABOVE NON-ACCESSIBLE CEILINGS.

8. SLEEVE AND/OR FIRESTOP ALL PENETRATIONS THROUGH RATED WALLS, CEILINGS, AND FLOORS WITH U/L LISTED

ASSEMBLIES. FIRESTOP ASSEMBLIES SHALL BE EQUAL TO OR EXCEED THE RATING OF THE WALL, CEILING OR FLOOR. SEE

ARCHITECTURAL DRAWINGS FOR FINAL FINISHES.

9. FLASH AND COUNTER-FLASH ROOF PENETRATIONS.

10. WHEN BEAM SLEEVE PENETRATIONS ARE NECESSARY, COORDINATE PENETRATIONS WITH ALL TRADES, THE ARCHITECT AND

THE STRUCTURAL ENGINEER.

11. PROVIDE FOUNDATION PAD PENETRATION SLEEVES. ALLOW 1" MINIMUM CLEARANCE BETWEEN SLEEVE INSIDE SURFACE

AND PIPE EXTERIOR.

12. SEE ARCHITECTURAL DRAWINGS FOR FIXTURE LOCATIONS AND MOUNTING HEIGHTS.

13. PROVIDE AUTOMATIC TRAP PRIMERS FOR FLOOR DRAIN & FLOOR SINK TRAP SEALS.

14. PROVIDE AN AIR GAP, WHEN REQUIRED BY CODE, SERVING INDIVIDUAL FIXTURES, DEVICES, APPLIANCES AND APPARATUS.

15. ALL EXPOSED PIPE AND FITTINGS IN FINISHED AREAS SHALL BE CHROME PLATED.

16. PROVIDE CLEANOUTS IN ACCORDANCE WITH ALL SATE AND LOCAL CODES. INSTALL CLEAN OUT WITH COVER FLUSH TO

FINISH SURFACE.

17. COORDINATE PIPING WITH ALL ELECTRICAL EQUIPMENT (PANELS, TRANSFORMERS, ETC.) PRIOR TO ANY INSTALLATION. DO

NOT ROUTE ANY PIPING OVER ANY ELECTRICAL PANELS UNDER ANY CIRCUMSTANCES. ANY PIPING RUN OVER PANELS

SHALL BE RE-ROUTED AT NO ADDITIONAL COST.

18. PROVIDE SANITARY WASTE, VENT, DOMESTIC WATER, ETC. ROUGH-IN AND MAKE FINAL CONNECTIONS (TO INCLUDE PROVIDING ALL NECESSARY RELATED STOPS, VALVES, TRAPS, ETC. AND MAKE READY FOR USE) TO ALL EQUIPMENT, WHETHER FURNISHED BY THIS CONTRACTOR OR FURNISHED BY OTHERS.

19. PROVIDE WATER HAMMER ARRESTOR ON H & CW PIPE.

20. CONTRACTOR TO PROVIDE ALL APPURTENANCES TO COMPLETE INSTALLATION AND CONNECTIONS IN ITS ENTIRETY TO

FIXTURES AND EQUIPMENT.

DIRECTION OF FLOW

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

AND EXISTING WORK

POINT OF CONNECTION BETWEEN NEW

PIPE UP

PIPE DOWN

DOMESTIC HOT WATER, HOT WATER

DOMESTIC COLD WATER, COLD WATER

DOMESTIC HOW WATER RETURN, HOT WATER RETURN

VENT (SANITARY)

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

DRAWING NUMBER WHERE DRAWN

PL105

PL105

PIPING SYMBOLS

EXISTING DOMESTIC HOT WATER, HOT WATER (HALFTONED)

EXISTING DOMESTIC COLD WATER, COLD WATER (HALFTONED)

EXISTING DOMESTIC HOW WATER RETURN, HOT WATER RETURN (HALFTONED)

SOIL, WASTE, OR SANITARY SEWER

EXISTING VENT (SANITARY) (HALFTONED

SS S

EXISTING SOIL, WASTE, OR SANITARY SEWER (HALFTONED)SS S

ABOVE GRADE PIPING (EXCEPT FOR VENT)

BELOW GRADE PIPING

GENERAL SYMBOLS

VALVE SYMBOLS

BALL VALVE

GATE VALVE WITH 3/4 " HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

GATE VALVE

MANUAL AIR VENT

TEST PLUG

(PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENT

AV

TYPICAL UNIT NO.

BUILDING NO.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .