Revised STATEMENT OF WORK Asbestos .docx
DOCX document 16 MB Posted
- Solicitation number
- 36C24824Q1221
About this file
This document is a Revised STATEMENT OF WORK for an asbestos survey contract opportunity. The federal contract opportunity is for the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 8 to conduct a FY24 re-baseline asbestos survey for the Lake Baldwin facility.
The key requirements include performing a comprehensive asbestos survey to identify the type, quantity, and location of asbestos-containing materials at the Lake Baldwin facility. The contractor will be required to develop a detailed report documenting the survey findings and providing cost estimates for recommended asbestos abatement activities. Other responsibilities include providing recommendations for facility management and operations to mitigate asbestos exposure risks. The contract will have a period of performance of 12 months. No specific pricing terms or set-asides are provided in the Statement of Work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 36C24824Q1221 0004.docx | DOCX document | |
| 36C24824Q1221 0002.docx | DOCX document | |
| 36C24824Q1221 0003.docx | DOCX document | |
| 36C24824Q1221 0002.docx | DOCX document | |
| 36C24824Q1221 0002.docx | DOCX document | |
| 52.212-1 ADDENDUM to FAR 52.docx | DOCX document | |
| 2010 Lakemont Campus Asbestos Report .pdf | ||
| S06 GOVERNMENT RESPONSE TO CONTRACTORS QUESTIONS.docx | DOCX document | |
| 36C24824Q1221 0002.docx | DOCX document | |
| S02 36C24824Q1221 0001.docx | DOCX document | |
| 36C24824Q1221.docx | DOCX document | |
| ATTACHMENT B 2014 LAKE BALDWIN BLDG 502 ASBESTOS SURVEY.pdf | ||
| ATTACHMENT D VHA DIRECTIVE 7714 ASBESTOS MANAGEMENT PROGRAM.pdf | ||
| ATTACHMENT C RE BASELINE ASBESTOS ASSESSMENT SURVEY BUILDING PLANS.docx | DOCX document | |
| 36C24824Q1221.docx | DOCX document | |
| ATTACHMENT A 2014 LAKE BALDWIN BLDG 500 ASBESTOS SURVEY.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
?.## PERFORMANCE WORK STATEMENT REVISED (08/12/2024)
Asbestos Survey Services
1. Introduction:
This is a non-personal service contract for the procurement of asbestos survey services. The Government shall not exercise any supervision or control over the contractor service providers performing the services herein. Such service providers shall be accountable solely to the contractor, who is responsible to the Government. The contractor shall provide all the labor, materials, equipment, and transportation necessary to conduct the survey, collect samples, perform lab analysis, and produce the required deliverables.
The Orlando VA Healthcare System (OVAHCS) Safety Department, located at 13800 Veterans Way, Orlando, FL 32827, is responsible for the Health, Safety, and Well-Being of the Staff, Patients, and Veterans at the OVAHCS hospitals and Outpatient Clinics.
2. Background:
Federal regulations for asbestos control have been established by the Occupational Safety and Health Administration (OSHA) and the Environmental Protection Agency (EPA). These regulations are thorough in that they inspect the most accessible functional spaces and observe bulk samples taken of suspect materials. The last Baseline Assessment survey report (See Attachment D.1 and D.2) for the Orlando VA Medical Center located at Lake Baldwin was conducted in 2013. VHA Directive 7714 of 6 April 2017, Asbestos Management Program, calls for a survey following requirements of the Asbestos Hazard Emergency Response Act (AHERA), known as a baseline survey (previously called triennial survey).
The Baseline AHERA Survey is unobtrusive in that samples are not taken where doing so would result in objectionable surface damage or where institutional barriers preclude access. The Asbestos Baseline Survey and Facility Asbestos O&M Plan will be updated when the VISN Occupational Safety and Health Manager or VISN Industrial Hygienist determines that abatement/ removal updates to the baseline have been inadequate during Annual Workplace Evaluations (AWE) (formerly triennial).
3. Objective:
The principal objective is to survey all buildings listed herein. Collecting representative samples of suspect asbestos-containing materials (ACMs), assessing their condition, and quantifying the materials and hazards present throughout the buildings. Provide a Re-Baseline Asbestos Assessment Survey Report for the place of performance herein.
4. Place of Performance:
a. Orlando VA Medical Center, Lake Baldwin VA Clinic. 5201 Raymond St, Orlando, FL 32083.
b. Orlando VA Medical Center, Lakemont Campus. 2500 S Lakemont Ave, Orlando, FL 32814.
i. Table 1. Clin 1 Location:
| Building Number |
| Building Name / Description |
| Estimated Square Footage. |
| Attachments. |
| Building Date/Renovation |
| 500 |
| Lake Baldwin - Main Campus / Main Clinic. |
| 21,4190 |
1981/2012
| 501 |
| Lake Baldwin – Warehouse. |
| 15,201 |
1981/0
| 502 |
| Lake Baldwin - Boiler/Generator Plant. |
| 8,509 |
1980/2008
| 504 |
| Lake Baldwin – Primary Clinics. |
| 19,404 |
ii. Table 2. Clin 2 Locations:
| Building Number |
| Building Name / Description |
| Estimated Square Footage. |
| Attachments. |
| Building Date. |
| 517 |
| Lake Baldwin – Maintenance Shop. |
| 1,385 |
1982/0
| 518 |
| Lake Baldwin – Medical Gas storage. |
| 450 |
1981/2010
| 519 |
| Lake Baldwin – Domiciliary Bldg. 1 |
| 11,448 |
1987/0
| 520 |
| Lake Baldwin – Domiciliary Bldg. 2 |
| 11,448 |
1987/0
| 521 |
| Lake Baldwin – Domiciliary Bldg. 3 |
| 11,448 |
| See the attachments above in Bldgs. 519 - 520. |
| 1987/0 |
| 522 |
| Lake Baldwin – Domiciliary Bldg. 4 |
| 11,448 |
| See the attachments above in Bldgs. 519 - 520. |
| 1987/0 |
| 3125 |
| Lake Baldwin – Engineering Storage. |
| 534 |
1998/0
| 3126 |
| Lake Baldwin – Volunteer / FLA / Biomed. |
| 2,627 |
1943/0
| 3127 |
| Lake Baldwin – Grounds Keeping Building. |
| 540 |
| 3128 |
| Lake Baldwin – Domiciliary / IRMS. |
| 1,929 |
1943/0
| 3129 |
| Lake Baldwin – Environmental Management Services (Housekeeping). |
| 2,175 |
1943/0
| 3132 |
| Lake Baldwin – Engineering Administration. |
| 1,961 |
1943/0
| 3133 |
| Lake Baldwin - Carpentry, Lock Smith, Offices. |
| 2,475 |
1943/0
| 3134 |
| Lake Baldwin - ENG SHOPS- Plumbing & Electrical. |
| 2,839 |
1943/0
| 2500 |
| Lakemont Campus. |
| 148,559 |
1993/2010
***See Attachment D.3: Re Baseline Asbestos Assessment Survey Building Plans***
5. Hours of Operation:
a. Contractor shall perform work during normal working hours, from Monday through Friday, 8:00 a.m. to 4:30 pm. It may be necessary to collect samples outside of normal working hours in areas that are particularly sensitive to disruptions, have tight security controls, or are designated as “clean” areas requiring maintenance of a sterile environment. This should be considered when creating and implementing the schedule for this survey. These hours are listed below in paragraph b and c.
b. Evening Hours: TBD as needed (4:30 p.m. to 10:00 p.m.).
c. Weekend Hours: TBD as needed (8:00 a.m. to 4:30 p.m.).
d. The contractor shall coordinate with the VA Point of Contact (POC) when evening and weekend hours are needed to be scheduled.
6. Government Holidays:
a. The contractor shall not perform work on Federal holidays or when the Government facility closes due to local or national emergencies, administrative changes, or similar Government-directed facility closings. Government shutdowns occur when the Government refuses passage of key bills resulting in the cession of some or all operations by the Government. If the Department of Veterans Affairs is affected by a Government shutdown during the period of performance, the contractor shall not provide services or submit claims against the Government during and after the shutdown. Recognized federal holidays are listed in Table 3.
b. Table 3.
| Holiday |
| Date |
| Month |
| New Year’s Day |
| 1st |
| January |
| Martin Luther King Jr.’s Birthday |
| 3rd Monday |
| January |
| President’s Day |
| 3rd Monday |
| February |
Memorial Day
| Last Monday |
| May |
| Juneteenth |
| 19th |
| June |
| Independence Day |
| 4th |
| July |
| Labor Day |
| 1st Monday |
| September |
| Columbus Day |
| 2nd Monday |
| October |
| Veterans Day |
| 11th |
| November |
| Thanksgiving Day |
| 4th Thursday |
| November |
| Christmas Day |
| 25th |
| December |
7. Abbreviated Terms:
a. ACM: Asbestos Containing Materials
b. AHERA: Asbestos Hazard Emergency Response Act
c. CO: Contracting Officer.
d. CS: Contract Specialist.
e. EPA: Environmental Protection Agency
f. NESHAPS: National Emission Standard for Hazardous Air Pollutants
g. NIST: National Institute of Standards and Technology
h. NVLAP: National Voluntary Laboratory Accreditation Program
i. OSHA: Occupational Safety & Health Administration
j. PLM: Polarized Light Microscopy
k. POC: VA Point of Contact.
l. PWS: Performance Work Statement.
m. TEM: Transmission Electronic Microscopy
n. VA: Veterans Affairs
8. Applicable Publications:
a. It shall be the contractor’s responsibility to identify the applicable federal, state, and local laws and regulations and Veterans’ Health Administration (VHA) Directives and apply the procedures and protocols as required. The contractor shall comply with the public laws and statutes including all changes and amendments of federal, state, and local environmental statutes and regulations in effect of the date of issuance of this contract. The contractor shall adhere to the most stringent code or requirement when presented with a conflict between codes, laws, regulations, and standards. The contractor shall make an immediate request to the POC, followed by a written request to the CO concerning conflicts with, or recommended deviations from codes, laws, regulations, standards, and opinions of review officials as described above. The contracting Officer has the right to waive the use of the more stringent code, however, no work altering the scope of this contract shall be undertaken prior to receipt of written approval from the CO. The most current editions of the publications listed below constitute an addendum to this document wherever referenced or applicable.
i. 29 CFR 1910.134 Respiratory Protection Standard. eCFR :: 29 CFR 1910.134 -- Respiratory protection.
ii. 29 CFR 1910.1001 Occupational Exposure to Asbestos, Tremolite, Anthophyllite and Actinolite. eCFR :: 29 CFR 1910.1001 -- Asbestos.
iii. 29 CFR 1926.62 Construction Standard. eCFR :: 29 CFR 1926.62 -- Lead.
iv. 40 CFR 61, Sub-part M, National Emission Standard for Asbestos. eCFR :: 40 CFR Part 61 Subpart M -- National Emission Standard for Asbestos
v. 40 CFR 763 EPA Appendix E to Subpart E (ASHARA). eCFR :: 40 CFR Part 763 Subpart E -- Asbestos-Containing Materials in Schools
vi. EPA 560/5-85-024, Guidance for Controlling Asbestos-Containing Materials in Buildings. purple-book_epa_705-g-2020-2762.pdf
vii. EPA, Asbestos Hazard Emergency Response Act (AHERA) protocols. Asbestos Laws and Regulations | US EPA
viii. U. S. Occupational Safety and Health Administration (OSHA). Home | Occupational Safety and Health Administration (osha.gov)
ix. VHA Directive 7714 Asbestos Management Program. See attachment D.4 in section D.
9. Scope:
a. The contractor shall be responsible for determining the existence of asbestos by conducting Re-Baseline Asbestos Hazard Emergency Response Act (AHERA) Survey that provides the general location, type, quantity, and condition of ACM present. It is thorough in that most accessible functional spaces are inspected, and bulk samples taken of suspect materials are observed.
b. The contractor shall be an accredited asbestos professional by an Environmental Protection Agency (EPA) Model Accreditation Plan (MAP). The contractor shall hold current EPA certifications in Asbestos Building Inspection, Management Planning, and Project. Personnel assigned to or utilized by the contractor in the performance of this contract shall, at a minimum:
i. Be authorized to work in the United States.
ii. Valid Florida Asbestos Business License.
iii. Valid Florida Asbestos Consultant License with valid training certifications for Asbestos.
iv. Management Planner, Asbestos Survey and Mechanical Inspector, and Asbestos Project Designer.
c. All asbestos sampling and analysis shall meet the state’s current requirements and the requirements of this document. The primary source of the contractors’ survey shall be field verification; the contractor shall not rely on the accuracy of previous surveys and shall conduct sampling of questionable or modified areas following a review of previous reports in addition to all areas not covered by previous surveys.
d. The asbestos survey report shall contain a listing of all buildings and rooms, showing where samples were taken, an indexed schedule of samples surveyed with the sample number and other pertinent notes, and a narrative on the methodology of the survey. The laboratory bulk sample report numbers will be correlated with the samples taken. Drawings shall be compatible in scale with all other site drawings unless otherwise noted. This survey shall also provide a consistent and effective Hazard Assessment for all ACMs identified. The final survey results shall be incorporated into a database of all readings using a Personal Computer to create a user-friendly, easily updateable database system that is compatible with existing computer hardware and provide a means for the VA to plan repairs, renovations, and demolition projects, prioritizing health risks for ongoing maintenance.
10. Task:
a. The contractor shall collect asbestos bulk samples and send them to a laboratory for testing to determine the percent of asbestos, type of asbestos, and binding material, and the results documented within the deliverable reports. The contractor shall provide the OVAHCS with hard copies and digital copies (PDF) of all documents (laboratory results, photo log, sampling data, schematics, drawings, field notes, chain of custody, and reports) ports.
b. Asbestos Survey: The contractor shall review prior surveys completed if available (See Attachment A and B), as-built drawings, historical documents, and other related project resources that are available to the contractor. However, field verification of the site by the contractor shall be the primary source of the investigative services. The site visits shall include the taking of bulk samples from suspected locations, performing professional observations, and the use of sound engineering judgment to determine if further detailed sampling is required in specified areas. Sampling should not be taken if it renders the material unstable causes leaking or other deterioration of the base material or poses a hazard to those working in and around the building.
c. Procedures: Asbestos survey shall be performed using general procedures and protocols appearing in EPA 40 CFR, part 763 (AHERA Protocols). However, all suspected asbestos-containing materials, not just interior structures, shall be included in this survey. This work will require removing ceiling tiles, accessing hard ceilings via access panels, entering confined spaces, and working in areas of reduced lighting, high temperatures, and high humidity. The contractor shall be trained to enter confined spaces and shall take all necessary precautions in performing this type of work. The contractor shall replace the same or equal finish material or building components damaged during site investigation and sampling. All safety equipment required for survey and sample collections are the responsibility of the contractor.
d. Whenever asbestos-containing materials (ACM) are discovered by the contractor during field visits, surveys, or verification of prior surveys completed, the contractor shall then incorporate the provisions of this document and data collected into the deliverable reports and drawings.
e. Quality Control Plan: The contractor shall establish a quality control plan for all work, including that of all sub-contractors, to assure compliance with applicable codes and regulations. The contractor shall submit a copy of the quality control plan within 10 calendar days following the contract award. Quality control measures shall include, but not be limited to:
i. Methods for performing all required inspections and tests.
ii. Methods of compliance with applicable Federal, state, and local codes and regulations and VHA directives related to conducting the survey.
iii. Qualifications of field and office personnel assigned to the project.
11. Suspect Material:
a. Exposure to airborne asbestos has been associated with multiple diseases. The Environmental Protection Agency and the Occupational Safety and Health Administration have adopted regulations requiring control procedures for the exposure and disposal of these materials. These regulations also provide guidance to ensure safe working conditions. Examples of materials which may contain or be covered by asbestos are as follows:
i. Thermal System Insulation - TSI (Pipe Insulation and Fittings).
ii. Stack insulation.
iii. Boiler gaskets.
iv. Vibration isolators.
v. Air handling unit blanket
vi. Transite vent hood.
vii. Transite wall.
viii. Transite (soffit and fascia).
ix. All other Transite materials.
x. Sink undercoating.
xi. Sink backsplash.
xii. Sheetrock and joint compound.
xiii. Spray-on ceiling material.
xiv. Linoleum.
xv. Floor tile and mastic.
xvi. Acoustic ceiling tile.
xvii. Roofing materials and associated tars and mastics.
xviii. Exterior stucco.
12. Hidden Suspect Material:
a. Materials may exist in inaccessible or hidden areas of the facility that cannot be observed or inspected during this survey. The contractor shall include all quantities of inaccessible building materials that are suspect ACMs and include them in the database and survey reports. Hidden materials may include, but are not limited to:
i. TSI covered with metal jacketing.
ii. Gasket material at pipe connections between flanges.
iii. Vent pipe or duct insulation within wall cavities.
iv. Vinyl floor tile or sheet flooring beneath sub-floors or overlays.
v. Spray-on acoustic texture hidden by door jams or covered with drywall.
13. Collection of Samples:
a. Collection of samples will be in accordance with CFR 763.86 Sampling. Samples shall be analyzed to cover all suspect materials. Samples of suspect ACMs will be collected in accordance with AHERA and NESHAPS protocols to meet current U.S. Occupational Safety and Health Administration (OSHA), EPA, and VA requirements. The sampling protocol established within AHERA (extended to commercial buildings by ASHARA) shall be used to determine the required number of samples for suspect friable ACM. For miscellaneous materials that are suspected of non-friable ACMs, NESHAPS protocol shall govern the number of samples to be taken.
b. Operating Room Flooring are not to be sampled.
c. Carpets are allowed to be lifted to obtain a sample, so long as they are in an inconspicuous area and do not hinder the aesthetic look of the area.
d. Table 4. SAMPLING PROTOCOL
| Type of Material |
| Estimated Quantity |
| Required Samples |
| Sprayed or Troweled-on Surfacing Material |
| Greater than 5,000 ft2 |
| 7 |
| Sprayed or Troweled-on Surfacing Material |
| Between 1,000 and 5,000 ft2 |
| 5 |
| Sprayed or Troweled-on Surfacing Material |
| Less than 1,000 ft2 |
| 3 |
| Thermal System Insulation |
| All Quantities |
| 3 |
| Miscellaneous Materials |
| All Quantities |
| 2 |
e. Protocol deviation: The contractor may request, on a case-by-case basis, the implementation of a stop-at-first positive strategy of analysis for approval by the POC.
f. Destructive Sampling: All Suspect ACMs included in this survey shall be collected by the most unobtrusive means possible. Destructive sampling is not permitted. Any debris generated by the sampling shall be cleaned by wet-cleaning methods or by vacuuming utilizing a High-Efficiency Particulate Air (HEPA) filter. Visible emissions shall not be permitted during the sampling, packaging, transportation, or disposal of the samples.
g. Exposure Prevention: The contractor shall collect all samples of suspect ACM in accordance with EPA and OSHA regulations, preventing airborne fiber exposure to the surveyor, the public, and facility personnel.
i. Samples taken in occupied office spaces will be taken in locations that minimize the risk of potential exposure to occupants and the visual impact of the resulting sample location.
ii. The contractor shall restore visible sample locations to a condition as close to the original as possible filling holes with caulking, sealant, or another filler agent similar in tone to the affected material.
iii. When sampling friable materials, the contractor shall encapsulate all sample locations to prevent any subsequent release of asbestos fibers after sample collection.
iv. The contractor shall immediately notify the POC of any hazardous material or highly friable, contaminated occupied areas that pose an immediate threat to the health of the occupants. A written notification shall immediately follow.
h. Measurements: Quantities of materials shall be measured wherever practical to minimize the use of estimated material quantities in the final report.
i. Some material quantities may be determined from area or lineal measurements on existing AutoCAD as-built drawings.
ii. All methods of measurement, whether measured, estimated, or extracted from CAD drawings, shall be approved by the POC.
iii. CAD drawing will be provided to the awardee upon request. CAD drawings will be available only for the pdf documents that were provided in the solicitation.
iv. The survey shall produce quantities with an accuracy from which an abatement contractor could base their quote.
14. Asbestos Laboratory Requirements:
a. Suspect bulk samples shall be sent to a third-party or an in-house accredited laboratory in the analysis of asbestos samples by Polarized Light Microscopy (PLM) using the Environmental Protection Agency (EPA) Method 600/R-93/116. Additional analysis may be performed on samples where the results are deemed inconclusive by standard PLM, using PLM point count at the request of the VA. This accreditation is provided by the United States Department of Commerce, the National Institute of Standards and Technology (NIST), and the National Voluntary Laboratory Accreditation Program (NVLAP).
b. Chain of custody: Samples of ACM shall be transported under full chain of custody to the laboratory for analysis.
c. Sample Retention: Samples shall be retained by the laboratory for at least ninety calendar days if the reanalysis of any samples is required.
d. Disposal: Bulk samples, or portions thereof, resulting from the survey and not sent to the laboratory shall be managed and disposed of by the contractor in accordance with established federal, state, and local rules and regulations.
15. Asbestos Survey Reports:
a. The Asbestos Survey Reports shall be labeled and formatted with tabs listed as described in paragraph 15.a., b., c., and d. The formatting of these copies shall discern between buildings, floors, and other site material locations, likewise electronic copies shall be provided in Adobe PDF, and Microsoft Excel file format (Electronic documents shall be organized similarly to their text versions), clearly labeled with Project Number, Project Name, Date and Contents before submission to the VA. The contractor shall provide an electronic copy and shall contain .pdf files of each drawing. Each electronic copy will be labeled as station #, project #, date, etc. Electronic files shall conform to a user-friendly, easily updateable database system that is compatible with existing computer hardware and provide a means for the VA to plan repairs, renovations, and demolition projects, prioritizing health risks for ongoing maintenance. All reports shall include proof of lab accreditation and shall be required for each location and type of lab, (Fixed Site, Mobile Facility, and Field Operation) each shall have a separate accreditation. Listed below are the requirements for each of the deliverable reports:
b. Asbestos Survey Report: This report shall include a narrative, and tabulated templates that at a minimum can identify ACM by:
i. Building/Floor/Room Number
ii. Referenced Drawing Designation
iii. Material Type and Description
iv. Measurable Quantity (Square Feet, Lineal Feet, and/or Diameter)
v. Homogenous Material ID Number
vi. Friable (Yes/No)
vii. Type (TS-Surf-Miscellaneous)
viii. EPA Category (RACM, CAT1 Non-Friable, CAT II Non-Friable)
ix. ACM Quantity
c. Sample Data Report: This report shall include the Original Laboratory Report, Chain-of-Custody Documentation, and ACM and/or PACM Re-inspection & Reassessment Report. The report templates shall at a minimum identify ACM by:
i. Sample Number
ii. Homogenous Material ID Number
iii. Sample Location
iv. Sample Description
v. Percent and Type of Asbestos Identified
d. Hazard Assessment Report: This report shall include at a minimum a narrative report with tabulated report templates that can identify ACM and quantity by:
i. Material Condition (Good, Damaged, Significantly Damaged)
ii. Potential for Disturbance (Low, Med, Hi) Comments/Response
16. Drawings:
a. The contractor shall use/produce drawings that show the locations and types of the ACM identified.
b. The contractor can request drawings from the POC if they are not readily available.
17. Deliverables:
a. Pre-Survey Report: The contractor shall collect and evaluate all existing sampling data, and records of removal, encapsulation, or enclosure of all known asbestos. This shall be presented in a tabular form. Photographs are not required; however, a single photograph of the building showing the building number is encouraged. The contractor shall submit this summation of known acceptable data and areas of no data or unacceptable data within 16 calendar days after the contract award date.
b. Safety Plan: The contractor shall prepare and submit a plan for implementing facility Safety measures (e.g., response to fire alarm, lockout/ tag out, confined space entry, electrical safety) within 15 calendar days after the contract award date.
c. Schedule Milestone Plan: The contractor shall submit with your quote a detailed schedule Milestone plan outlining how your entity will perform the Re-Baseline testing in accordance with the PWS.
d. Re-Baseline Asbestos Report: The report shall be emailed to the POC within 20 calendar days after the period of performance.
18. Deliverable Schedule:
a. Table 5.
| Item Number |
| Item Description |
| Deliverable Dates |
| 1 |
| Submit Pre-Survey Report. |
| within 16 calendar days after the contract award date. |
| 2 |
| Submit Safety Plan. |
| within 15 calendar days after the contract award date. |
| 3 |
| Submit Re-Baseline Asbestos Survey Report. |
| within 20 calendar days after period of performance. |
19. RECORDS MANAGEMENT OBLIGATIONS:
a. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
b. Definitions
“Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
i. includes VHA records.
ii. does not include personal materials.
iii. applies to records created, received, or maintained by contractors pursuant to their VHA contract.
iv. may include deliverables and documentation associated with deliverables.
c. Requirements
i. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
ii. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
iii. In accordance with 36 CFR 1222.32, the contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
iv. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230.
v. The contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected. The contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control or the contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
vi. The contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
vii. The contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy.
viii. The contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract.
ix. The contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
x. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
xi. Training. All contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training. The contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
** VHA training for contractors is available in Talent Management System (TMS):
Records Management for Records Officers and Liaisons, Item #3873736
d. Flow down of requirements to subcontractors
i. The contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
ii. Violation by a subcontractor of any provision set forth in this clause will be attributed to the contractor.
Lake Baldwin Bldg 502 Floor Plan.pdf image4.emf
Lake Baldwin Bldg 504 Floor Plan.pdf
VHAORLStallR
Sticky Note
Orange Team
Purple Team
Teal Team image5.emf
LB Bldg 517.pdf image6.emf
LB Bldg 518.pdf image7.emf
Dom 2 Floor.pdf image8.emf
Dom 3 Floor.pdf image9.emf
Dom 1 Floor.pdf image10.emf
LB Bldg 3125.pdf image11.emf
LB Bldg 3126 Construction Drawings.pdf
U C
F R
I D
G E
M I
O
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A103
ARCHITECTURAL FINISH PLANS
AND DETAILS
A i l e
P a t h
DESIGN DEVELOPMENT
NON SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
BUILDING 3126
ORLANDO VA
675-19-105
Building 3126 Project Director
08/14/2019 KRL JLCRevisions: Date:
C.A.G. Caribeño
Architectural Group, Inc.
1250 W. EAU GALLIE BLVD, SUITE F.
MELBOURNE, FL 32935
PH (321) 622-6900
FAX (321) 622-6901
CONTACT: KENNETH R. LEBRON, AIA
KennethL@cag-architecs.com www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbounre, Florida 32904
PH: 321.345.9026 KENNETH R. LEBRON, AIA
Florida License #AR0017819
AD101
ARCHITECTURAL DEMO PLAN AND
NOTES
i l h
DESIGN DEVELOPMENT
Building 3126 Project Director
08/14/2019 KRL JLCRevisions: Date:
KENNETH R. LEBRON, AIA
Florida License #AR0017819
PH: 321.345.9026
FACP
FLORIDA CERTIFICATE #AR 0017819
13 E. MELBOURNE AVE. UNIT C
MELBOURNE, FL 32901
PHONE (321) 327-5960 FAX (321) 914-3991
VA FORM 08 - 6231
100% CONSTRUCTION
DOCUMENTS
:\U se rs
\c va nm et er .A
BO
VE
P\ oc um en ts
\0 ov at
Bu ild in g
EP
FP
_c
PN
X8
X.
rv
/2 7/
:4
0:
ED-101
ELECTRICAL - POWER BLDG 3126 -
DEMO BUILDING 3126
11/27/19 AG CVMRICHARD E. COBURN, P.E.
FL License #32820
CODED NOTES:
1. DISCONNECT AND REMOVE ALL ELECTRICAL, FIRE ALARM, ETC. DEVICES FROM AREA
INDICATED, UNLESS OTHERWISE NOTED. REMOVE CONDUIT AND CONDUCTORS BACK TO NEXT
DEVICE OR JUNCTION BOX ON CIRCUIT THAT IS NOT BEING REMOVED. CONTRACTOR SHALL
VERIFY THAT ALL REMAINING CIRCUITS ARE ELECTRICALLY CONTINUOUS. CONTRACTOR SHALL
PROVIDE CONDUCTORS, CONDUIT AND JUNCTION BOXES AS REQUIRED TO KEEP REMAINING
DEVICES OPERATIONAL DURING DEMOLITION. IF NO OTHER DEVICES REMAIN ON CIRCUIT,
REMOVE CONDUIT AND CONDUCTORS BACK TO SOURCE. SWITCH BREAKER TO OFF POSITION
AND MARK BREAKER AS "SPARE". REFER TO ARCHITECTURAL PLANS FOR EXTENTS OF
DEMOLITION.
2. EXISTING FIRE ALARM CONTROL PANEL AND ASSOCIATED BACKUP SYSTEM SHALL REMAIN AS
INSTALLED.
3. EXISTING PANEL TO REMAIN AS INSTALLED.
4. DISCONNECT AND REMOVE ELECTRICAL CONNECTION FROM MECHANICAL EQUIPMENT BACK TO
SOURCE. SWITCH BREAKER TO OFF POSITION AND MARK BREAKER AS "SPARE". REFER TO
MECHANICAL PLANS FOR EXTENTS OF DEMOLITION.
5. MECHANICAL EQUIPMENT AND ASSOCIATED ELECTRICAL DISCONNECT IS EXISTING TO REMAIN
AS INSTALLED.
6. EXISTING GROUND BAR TO REMAIN AS INSTALLED.
7. EXISTING DISCONNECT TO REMAIN AS INSTALLED.
8. DISCONNECT AND REMOVE EXISTING SURGE PROTECTION DEVICE.
9. DISCONNECT EXISTING TO REMAIN BRANCH CIRCUITS FROM PANEL AND MAKE READY FOR
CONNECTION TO NEW PANEL IN SAME LOCATION. DISCONNECT PANEL FEEDERS AND REMOVE
PANEL. TURN PANEL OVER TO COTR.
NOT FOR CONSTRUCTION
1/4" = 1'-0"1 ELECTRICAL BLDG 3126-DEMO
XX
N
0 2' 4' 8' 12'
1/4" = 1'-0"
Revisions: Date:
ED-102
ELECTRICAL - LIGHITNG BLDG
3126 - DEMO BUILDING 3126
1/4" = 1'-0"1 LIGHTING BLDG 3126- DEMO
1. DISCONNECT AND REMOVE ALL LIGHTS AND ASSOCIATED LIGHTING CONTROL DEVICES IN THIS
AREA. REMOVE CONDUIT AND CONDUCTORS BACK TO NEXT DEVICE OR JUNCTION BOX ON
CIRCUIT THAT IS NOT BEING REMOVED. CONTRACTOR SHALL VERIFY THAT ALL REMAINING
CIRCUITS ARE ELECTRICALLY CONTINUOUS. CONTRACTOR SHALL PROVIDE CONDUCTORS,
CONDUIT AND JUNCTION BOXES AS REQUIRED TO KEEP REMAINING DEVICES OPERATIONAL
DURING DEMOLITION. IF NO OTHER DEVICES REMAIN ON CIRCUIT, REMOVE CONDUIT AND
CONDUCTORS BACK TO SOURCE. SWITCH BREAKER TO OFF POSITION AND MARK BREAKER AS
"SPARE". REFER TO ARCHITECTURAL PLANS FOR EXTENTS OF DEMOLITION.
2. EXISTING PANEL TO REMAIN AS INSTALLED.
SHELVES
K-3427HIG HLINETO ILETSVITREO US CHINA
K-2861HUDSONC_LAVATORYCAST IRON
K-3427HIGHLINE TOILETS VITREOUS CHINA
IC
FR
IG
MO
MO MOMO
33a
3a 3
A2N
A1N
A2E A2
A2 A2
A2 A2E
A2E A2
A2 A2
A2 A1N A1N A1N A1N
A2E A2 A2
A2 A2 A2
A2 A2 A2E
J2E
A2N A2NE
A2NE
A1N
A2NE A2N
PL1-5
X X X X
X
X
PL1-5 PL1-5
PL1-5 PL1-5
PL2-14 PL2-14 PL2-14
PL2-14
PL2-14 PL2-14
PL1-5 PL2-14 PL2-14 PL2-14
PL2-14 PL2-14
PL1-5 PL1-5 PL2-14 PL2-14
b b a a
1 1 1
1 11
FE FE FE FE
PL1-3 PL1-3 PL1-3 PL1-3
FE
PL1-3
STORAGE 102
OFFICE
VOLUNTEER
VOLUNTER
WORK
MECH ROOM
BIOMED
I.T.
TOILET
FL STATE
UNION OFFICE
STORAGE
PL2
EL-101
ELECTRICAL - LIGHTING BLDG
3126 - NEW BUILDING 3126
1/4" = 1'-0"1 LIGHTING BLDG 3126- NEW
1. LIGHTING CONTROLS IN THIS ROOM SHALL BE CONFIGURED FOR MANUAL ON,
MANUAL/VACANCY OFF OPERATION. VACANCY SENSORS SHALL BE CONFIGURED FOR 20
MINUTE TIME OUT PERIOD.
2. LIGHTING CONTROLS IN THIS AREA SHALL BE CONFIGURED FOR AUTO ON, AUTO OFF
OPERATION. OCCUPANCY SENSORS SHALL BE CONFIGURED FOR 30 MINUTE TIME OUT PERIOD.
3. COORDINATE EXACT LOCATION OF FIXTURE WITH DUCT WORK PRIOR TO CONSTRUCTION.
N 0 2' 4' 8' 12'
LIGHTING FIXTURE SCHEDULE
TYPE DESCRIPTION MANUFACTURER MODEL VOLTAGE LAMP TYPE VA COMMENTS
A1N 2x2 FLAT PANEL LED LIGHT FIXTURE. 3400 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM.
WITH NLIGHT CAPABILITIES ON BOARD.
ACUITY BRANDS EPANL 2X2 3400LM 80CRI 40K MIN1
NLIGHT MVOLT
120 V LED 34 VA
A2 2x4 FLAT PANEL LED LIGHT FIXTURE. 3000 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM. ACUITY BRANDS EPANL 2X4 3000LM 80CRI 40K MIN1 ZT
MVOLT
120 V LED 30 VA
A2E 2x4 FLAT PANEL LED LIGHT FIXTURE. 3000 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM.
WITH INTEGRAL EMERGENCY BATTERY PACK.
ACUITY BRANDS EPANL 2X4 3000LM 80CRI 40K MIN1 ZT
MVOLT E10WCP
A2N 2x4 FLAT PANEL LED LIGHT FIXTURE. 3000 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM.
WITH NLIGHT CAPABILITIES ON BOARD.
ACUITY BRANDS EPANL 2X4 3000LM 80CRI 40K MIN1
NLIGHT MVOLT
A2NE 2x4 FLAT PANEL LED LIGHT FIXTURE. 3000 LUMEN MINIMUM, 4000K COLOR TEMPERATURE, 80CRI MINIMUM.
WITH INTEGRAL EMERGENCY BATTERY PACK AND NLIGHT CAPABILITIES ON BOARD.
ACUITY BRANDS EPANL 2X4 3000LM 80CRI 40K MIN1
NLIGHT MVOLT E10WCP
FE WALL MOUNTED, TRAPAZOIDAL EXTERIOR LIGHTING FIXTURE, LED, 4000 K, FORWARD THROW DISTRIBUTION, WITH INTGRAL LIGHT/MOTION SENSOR, UL WET LOCATION LISTED, INTEGRAL EMERGENCY
BATTERY PACK.
ACUITY BRANDS WST LED P2 40K VF 120 PIR1FC3V
E20WH DDBXD
120 V LED 36 VA MOUNT AT 9'-0" AFF TO BOTTOM OF FIXTURE
OR AS OTHERWISE NOTED ON PLAN SHEETS.
J2E 4', LED, SURFACE MOUNTED LINEAR FIXTURE. 4000K COLOR TEMPERATURE, 80CRI MINIMUM, 3000 LUMENS
MINIMUM. WITH INTEGRAL EMERGENCY BATTERY PACK.
ACUITY BRANDS ZL1D L48 3000LM FST MVOLT 40K 80CRI
E10WLCP WH
X RECESSED EDGE LIT LED EXIT SIGN, CEILING MOUNTED, RED LETTERS, CLEAR BACKGROUND AND SINGLE
OR DOUBLE FACE
ACUITY BRANDS EDGR 1 R EL SD 120 V LED 10 VA
SHELVES
K-3427HIG HLINETO ILETSVITREO US CHINA
K-3427HIGHLINE TOILETSVITREOUS CHINA
SD
SDSD
SD SD SD
SD SD
P P P P P
J
M M M
2TYPICAL
5 55 5
PL1-6
PL1-11
PL1-9
PL1-17
PL1-14
PL2-2
PL2-4
PL1-15
PL1-12
PL1-12
PL2-8
PL2-8
PL1-7
PL1-7
PL1-10
PL2-3
PL2-11
PL2-9
PL1-2 PL1-2 PL1-4 PL1-4
PL2-5
PL2-7
PL2-5
PL2-7
PL1-13
PL2-6 PL2-6 PL2-6
PL2-12
WPPL1-12
WP
FACP
PL2-1
3126-ODU 1
3126-(E)CU 2
3126-(E)CU 1
3126-(E)AHU 1
3126-(E)AHU 2
PL2-13,15
PL1-23,25
PL1-27,29
30AR
30AF
3R
PL1-13126-(E)EWH 1
3126-EF 2 3126-EF 3 3126-EF 4
PL2-16 PL2-16
PL2-16
101010
PL2-16
3126-EF 1
3126-CP 1 PL1
PL1-8
PL1-8
PL2-10
30AR
20AF
3R
PL1-16
EXISTING
FIRE ALARM
CONTROL
PANEL
"FACP"
ADDRESSABLE FIRE
ALARM PANEL WITH
BATTERY BACK UP
EXISTING DIALER,
PROVIDE DEDICATED
TELEPHONE
CONNECTION
GROUND FLOOR
R R
TYPICAL CONTROL RELAYS
INDICATING DEVICES
TYPICAL INITIATION DEVICES
ROOF
SDHD
EP-101
ELECTRICAL - POWER BLDG 3126 -
NEW BUILDING 3126
1/4" = 1'-0"1 ELECTRICAL BLDG 3126- NEW
1. LOCAL MAINTENANCE DISCONNECT, COORDINATE EXACT LOCATION WITH MECHANICAL
EQUIPMENT PRIOR TO CONSTRUCTION. IDU POWER FED FROM ASSOCIATED ODU. PROVIDE
CONDUIT AND CABLES AS REQUIRED BY MANUFACTURERS INSTALLATION INSTRUCTIONS FOR A
CODE COMPLIANT INSTALLATION.
2. PROVIDE NEW FIRE ALARM INITIATION AND NOTIFICATION DEVICES. CONNECT NEW FIRE ALARM
DEVICES TO EXISTING FIRE ALARM CONTROL PANEL. NEW DEVICES SHALL BE COMPATIBLE
WITH EXISTING FIRE ALARM SYSTEM. EXISTING FIRE ALARM SYSTEM IS SIMPLEX 4100U FIRE
CONTROL.
3. EXISTING MAIN ELECTRICAL GROUND BAR.
4. NEW TELECOMMUNICATIONS MAIN GROUND BUSBAR. REFER TO SHEET T-501 FOR MORE
INFORMATION.
5. TOP OUTLET(S) OF DUPLEX AND DOUBLE DUPLEX RECEPTACLES INDICATED SHALL BE
CONNECTED TO THE PLUG LOAD CONTROLLED POWER PACK VIA THE VACANCY SENSOR
LOCATED IN THE ROOM. CONTROLLED OUTLETS SHALL BE IDENTIFIED PER NEC 406.3(E).
OUTLETS SHALL BE DE-ENERGIZED WHEN SENSOR TIMES OUT AND SWITCHES LIGHTS OFF.
REFER TO PLUG LOAD CONTROL DIAGRAM ON SHEET E-502 FOR MORE INFORMATION.
6. EXISTING EQUIPMENT TO REMAIN AS INSTALLED.
7. EXISTING MECHANICAL EQUIPMENT. EXISTING CIRCUITS TO REMAIN AS INSTALLED.
8. (2)#10AWG CU, #10AWG CU GROUND IN 3/4" CONDUIT.
9. (2)#6AWG CU, #10AWG CU GROUND IN 3/4" CONDUIT.
10. LOCAL MAINTENANCE DISCONNECT. COORDINATE EXACT LOCATION WITH MECHANICAL
EQUIPMENT PRIOR TO CONSTRUCTION. EXHAUST FAN SHALL BE INTERLOCKED LOCAL LIGHTING
CONTROLS. REFER TO SHEET E-502 FOR MORE INFORMATION.
11. DUPLEX OUTLET FOR CONNECTION OF OVER COUNTER MICROWAVE. COORDINATE EXACT
LOCATION AND MOUNTING HEIGHT IN FIELD AND WITH ARCHITECTURAL DRAWINGS PRIOR TO
CONSTRUCTION.
N 0 2' 4' 8' 12'
N.T.S2 FIRE ALARM RISER DIAGRAM
1 EXIT SIGN MOUNTING - GYPBOARD CEILING
NTS
WIRE TIE THROUGH
MOUNTING CHANNEL
& CROSS BEAM, TYP.
INTEGRAL GALVANIZED LIPPED
STEEL MOUNTING CHANNEL
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING
INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING HARDWARE.
DRYWALL CEILING
CROSS TEE, TYP.
GYPSUM
BOARD
CEILING MAIN
BEAM.
6.35mm (1/4") SCREW
LOCKING SQUARE
WASHER & NUT
JUNCTION BOX
FIXTURE WHIP FROM JUNCTION
BOX (1829mm (6') LONG MAX)
HANGER WIRE AND MOUNTING
CHANNEL ATTACHED TO STRUCTURE
REFER TO SPECIFICATION SECTION
26 51 00 DRYWALL CEILING
CROSS TEE, TYP.
CEILING HANGER WIRE
2 EXIT SIGN MOUNTING - LAY-IN CEILING
INTEGRAL GALVANIZED LIPPED
STEEL MOUNTING CHANNEL
GENERAL NOTE:
1. INSTALL IN ACCORDANCE WITH MANUFACTURER'S MOUNTING
INSTRUCTIONS AND USING THE RECOMMENDED MOUNTING HARDWARE.
ARCHITECTURAL
CEILING GRID
ACOUSTICAL
CEILING
TILE (TYP)
WIRE TIE THROUGH
MOUNTING CHANNEL
& CROSS BEAM, TYP.
HANGER WIRE AND MOUNTING CHANNEL
ATTACHED TO STRUCTURE REFER TO
SPECIFICATION SECTION 26 51 00
FIXTURE WHIP FROM JUNCTION
BOX (1829mm (6') LONG MAX)
CEILING HANGER WIRE
WASHER & NUT
6.35mm (1/4") SCREW
3 FLOOR SLAB PENETRATION DETAIL
9.52mm
(SIZE AS REQUIRED)
CONDUIT FITTING
SPRING
NUT, TYP
FLOOR SLAB,
TYP.
FIRESTOP SEALANT
PER SECTION 07 84 00,
FIRESTOPPING
CONDUIT, TYP MINERAL WOOL
(FIRMLY PACKED)
INTEGRAL GALVANIZED
LIPPED STEEL MOUNTING
CHANNEL, TYP.
STEEL EXPANSION
ANCHOR, TYP
(3/ 8") M AX
4 CONDUIT TRAPEZE MOUNTING DETAIL
CONDUIT CLAMP.
SIZE AS REQUIRED
INTEGRAL
GALVANIZED
LIPPED STEEL
MOUNTING
CHANNEL
REFER TO PLANS FOR
QUANTITY & SIZE OF
CONDUITS
GENERAL NOTES:
1. INTEGRAL GALVANIZED LIPPED STEEL MOUNTING
CHANNEL LONGER THAN 915mm (36") SHALL BE
INSTALLED WITH A CENTER SUPPORT ROD.
2. FASTEN THREADED ROD TO STRUCTURE BY APPROVED
METHOD PER SPECIFICATION 26 05 33, RACEWAY AND
BOXES FOR ELECTRICAL SYSTEMS. FIELD VERIFY EXACT
CONDITIONS.
3. FOR TRAPEZE INSTALLATIONS IN SEISMIC AREAS REFER
TO SPECIFICATION SECTION 13 05 41, SEISMIC
RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
WASHER & LOCKNUT
9.52mm (3/8") MIN
GALVANIZED THREADED
ROD, TYP.
INTEGRAL
GALVANIZED
LIPPED STEEL
MOUNTING
CHANNEL
WASHER & LOCKNUT
LE NGTH AS REQU IRED
5 GROUNDING BAR DETAIL
(2 m
(4
( 1")
25mm (1")
(1")
(2")
51mm
(1 1/ 2") TYP
38mm
(1
(5
8")
6.35mm
(1/4") DIA.
MOUNTING
HOLES TYP. OF
(4)
BASE
CLAMP/
BRACKET
9.52mm (3/8")
DIA. HOLE TYP.
OF (6)
9.52mm (3/8") x 16mm (5/8")
HEX HEAD BOLT
9.52mm (3/8") LOCK WASHER
9.52mm (3/8") FLAT WASHER & 9.52mm (3/8") LOCK WASHER
6.35mm
(1/4") THICK
CU BAR
(2'- 0") MI N
610mm
6.35mm (1/4")
DIA. HOLE TYP
OF (8)
GENERAL NOTES:
1. ALL HARDWARE SHALL BE STAINLESS STEEL.
2. PROVIDE 1 MOUNTING POINT PER 305mm (12") OF BAR LENGTH.
3. HOLES MAY BE ADDED IF REQUIRED.
SECTION
STEEL
EXPANSION
ANCHOR
INSULATOR
9.52mm (3/8") FLAT WASHER
E-501
ELECTRICAL DETAILS BUILDING 3126
Section A-A
1A 1B
SPECIFIED TECHNOLOGIES INC- SPECSEAL LCI SEALANT
* INDICATES SUCH PRODUCTS SHALL BEAR THE UL
OR CUL CERTIFICATION MARK FOR JURISDICTIONS
EMPLOYINGTHE UL OR CUL CERTIFICATION (SUCH AS
CANADA), RESPECTIVELY.
SYSTEM NO. W-L-5122
1. WALL ASSEMBLY - THE 1 OR 2 HR FIRE-RATED GYPSUM BOARD/STUD WALL ASSEMBLY SHALL BE
CONSTRUCTED OF THE MATERIALS AND IN THE MANNER SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES
WALL OR PARTITION DESIGN IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING
CONSTRUCTION FEATURES:
A.
STUDS - WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS OR STEEL
CHANNEL STUDS. WOOD STUDS
TO CONSIST OF NOM 2 BY 4 IN. LUMBER SPACED 16 IN. OC. STEEL STUDS TO BE MIN 3-5/8 IN. WIDE AND
SPACED MAX 24 IN. OC.
B. GYPSUM BOARD* - THICKNESS, TYPE, NUMBER OF LAYERS AND FASTENERS AS SPECIFIED IN THE INDIVIDUAL
WALL AND PARTITION DESIGN. MAX DIAM OF OPENING IS 7-1/2 IN.
THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS EQUAL TO THE HOURLY FIRE RATING OF THE WALL
ASSEMBLY IN WHICH IT IS INSTALLED.
2. THROUGH PENETRANT - ONE METALLIC PIPE OR TUBE TO BE INSTALLED ECCENTRICALLY OR CONCENTRICALLY
WITHIN THE FIRESTOP SYSTEM. PIPE OR TUBE TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF THE WALL
ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES AND TUBES MAY BE USED:
A. STEEL PIPE - NOM 4 IN. DIAM (OR SMALLER) SCHEDULE 5 (OR HEAVIER) STEEL PIPE.
B. IRON PIPE - NOM 4 IN. DIAM (OR SMALLER) CAST OR DUCTILE IRON PIPE.
C. COPPER PIPE - NOM 2 IN. DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.
D. COPPER TUBE - NOM 2 IN. DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBE.
3. TUBE INSULATION - PLASTICS# - NOM 3/4 IN. THICK ACRYLONITRILE BUTADIENE/POLYVINYL CHLORIDE (AB/PVC)
FLEXIBLE FOAM FURNISHED IN THE FORM OF TUBING. ANNULAR SPACE SHALL BE MIN 0 IN. (POINT CONTACT) TO
MAX 1-1/2 IN.
SEE PLASTICS (QMFZ2) CATEGORY IN THE PLASTICS RECOGNIZED COMPONENT DIRECTORY FOR NAMES OF
MANUFACTURERS. ANY RECOGNIZED COMPONENT TUBE INSULATION MEETING THE ABOVE SPECIFICATIONS
AND HAVING A UL 94 FLAMMABILITY CLASSIFICATION OF 94-5VA MAY BE USED.
4. FILL, VOID OR CAVITY MATERIAL* - SEALANT - MIN 5/8 IN. THICKNESS OF FILL MATERIAL APPLIED WITHIN
ANNULUS, FLUSH WITH BOTH SURFACES OF WALL ASSEMBLY. AT POINT CONTACT LOCATION, MIN 1/4 IN. DIAM
BEAD OF FILL MATERIAL APPLIED AT INSULATED METALLIC PIPE/GYPSUM BOARD INTERFACE ON BOTH
SURFACES OF WALL.
1/16" THICK WHITE PLASTIC
WITH COLORED FACE PER
SPECIFICATIONS
1/2" HIGH LETTERING FOR
EQUIPMENT NAME
1/4" HIGH LETTERING FOR
REMAINING TEXT
ADHESIVE BACKING WHEN
INSTALLED IN CONDITIONED
SPACES
EQUIPMENT VOLTAGE
EQUIPMENT NAME
FASTEN WITH BRASS SCREWS
WHEN LOCATED IN NON-
CONDITIONED OR EXTERIOR
EQUIPMENT SOURCE
(PANEL & CIRCUIT)
120V, 1PH
FED FROM "MDP-4"
AHU-X
AHU-X
240V, 1PH
FED FROM "MDP-4"
120/240V, 1PH, 3W
FED FROM PANEL "XXXX"
VIA T-XXX
TYPICAL 120/240V PANELBOARD
PANEL "XXXX"
1/16" THICK WHITE PLASTIC
WITH COLORED FACE PER
SPECIFICATIONS
1/2" HIGH LETTERING FOR
PANELBOARD NAME
1/4" HIGH LETTERING FOR
REMAINING TEXT
ADHESIVE BACKING WHEN
INSTALLED IN CONDITIONED
80"
48"
90"
54"
18" AFF
6" AFC
36"
AFF
FIRE HORN (OR CHIME) &
LIGHT 80" AFF FROM
BOTTOM OF DEVICEEXIT
DUPLEX
RECEPTACLE
CENTERED BETWEEN
DOOR & CEILING
(COORDINATE WITH
ARCHITECT)
CENTERED OVER
DOOR (WHERE
APPLICABLE)
FA PULL STATION
SWITCH
TELE. OUTLET
CLOCK
OUTLET
VOLUME
CONTROL
SPECIAL POWER OUTLET
FINISHED FLOOR
DUPLEX RECEPTACLE
REMOTE TEST
VC
COMPUTER
OUTLET
RT
TELE. OUTLET
TELEVISION OUTLET42" A.F.F. W/ 36" COUNTER,
39" A.F.F. W/ 30" COUNTER,
48" A.F.F. WITHOUT COUNTER
78" MAX. TO
TOP DEVICE
OR AS NOTED ON PLANS
WALL MOUNTED LIGHT
FIXTURES AS NOTED ON
PLANS
PANELBOARD
L
CL
CL CL
STUD TO STUD TELESCOPING BOX SUPPORT, B-
LINE BB2 SERIES OR EQUAL.
CONDUITS
EQUIPMENT
GROUND
CONDUCTOR
GROUND SCREW
ON WIRING DEVICE.
GROUND SCREW
IN OUTLET BOX.
PLASTER RINGNEUTRAL CONDUCTOR
HOT CONDUCTOR
METAL STUD
DRYWALL
PLASTER RING
CONDUIT
4 SQUARE OUTLET BOX
OUTLET BOX SECURED TO BOX
SUPPORT
WIRE NUT (TYP.)
GROUND SCREW IN OUTLET
BOX.
PHASE A
PAHSE B
PHASE C
NEUTRAL
GROUND
BLACK
RED
BLUE
WHITE
GREEN
VOLTAGE
240V/120V
IDENTIFICATION OF GROUNDED CONUCTORS SHALL
BE PERFORMED BASED ON NEC ARTICLE 200.
TO
SOURCE
ID#
B B
G V
PLUG LOAD CONTROL POWER
PACK (1 PACK REQUIRED FOR
EACH RECEPTACLE CIRCUIT BEING
CONTROLLED)
SMALL OFFICES WITH
OCCUPANCY/VACANCY SENSORS AND DIMMING
CONTROL
B B
LIGHTING CONTROL NOTES:
1. RISERS DIAGRAMS ARE TO SHOW DESIGN INTENT FOR
STANDALONE AND NETWORK AREAS.
2. SENSORS AND POWER PACKS MUST OPERATE IN VACANCY
MODE OR OCCUPANCY MODE OF OPERATION.
3. REFER TO FLOOR PLANS FOR QUANTITIES OF CONTROL
DEVICES SUCH AS OCCUPANCY SENSORS, PHOTOCELLS, AND
DIMMER SWITCHES.
4. QUANTITIES OF DIMMING POWER PACKS AND UL924 DIMMING
POWER PACKS REQUIRED PER SWITCH LEGS AND ZONES.
5. ROOM LOCATIONS LISTED BELOW INDICATE GENERAL DESIGN
INTENT BUT ARE NOT LIMITED TO JUST THOSE SPECIFIC
ROOMS.
CAT 5 (LOW VOLTAGE)
CLASS 1 (LINE VOLTAGE)
CLASS 2 (LOW VOLTAGE)
WIRE LEGEND
EQUIPMENT LEGEND
OCCUPANCY/VACANCY SENSOR AND
PHOTOCELL COMBO
MODEL #: nCM PDT 10 ADCX
ON/OFF RAISE/LOWER
DIMMER OVERRIDE SWITCH
MODEL #: Npodm DX
DIMMER/VACANCY DIMMING PACK
MODEL #: NPP16 D SA
PLUG LOAD CONTROL POWER PACK
MODEL #: NPP20 PL
SENSORSWITCH nLight
RESTROOMS EXHAUST FAN INTERLOCKED WITH
OCCUPANCY SENSORS
LIGHTING CONTROL NOTES:
1. SENSORS AND POWER PACKS MUST OPERATE IN VACANCY
MODE OR OCCUPANCY MODE OF OPERATION.
2. REFER TO FLOOR PLANS FOR QUANTITIES OF CONTROL DEVICES
SUCH AS OCCUPANCY SENSORS, PHOTOCELLS, AND CONTROL
SWITCHES.
3. QUANTITIES OF POWER PACKS REQUIRED PER SWITCH LEGS
AND ZONES.
EXHAUST
FAN
H
RESTROOM
LIGHTS
H
SWITCHING AND 0-10V DIMMING
PACK MODEL #: nPP16 D
EQUIPMENT LEGEND
DIMMER/OCCUPANCY/VACANCY WALL
SWITCH COMBINATION UNIT
MODEL #: WSX PDT D
SENSORSWITCH nLight
CAT 5 (LOW VOLTAGE)
CLASS 1 (LINE
VOLTAGE)
WIRE LEGEND
E-502
ELECTRICAL DETAILS BUILDING 3126
N.T.S.
CONDUIT PENETRATION OF FIREWALL1 N.T.S.
EQUIPMENT NAMEPLATE2 N.T.S.
PANELBOARD NAMEPLATE3
TYPICAL MOUNTING HEIGHTS4 N.T.S.
TYPICAL RECEPTACLE MOUNTING DETAIL5
WIRE COLOR CHART6
PLUG LOAD/LIGHTING CONTROL DIAGRAM7 N.T.S.
LIGHTING CONTROL DIAGRAM8
SWITCH, MULTIPOSITION
SWITCH, NORMALLY CLOSED FLOAT
SWITCH, NORMALLY CLOSED FOOT OPERATED
SWITCH, NORMALLY CLOSED LIMIT
SWITCH, NORMALLY CLOSED TIME DELAY
SWITCH, NORMALLY CLOSED TEMPERATURE ACTIVATED
SWITCH, NORMALLY OPEN FLOAT
SWITCH, NORMALLY OPEN LIMIT
SWITCH, NORMALLY OPEN TEMPERATURE ACTIVATED
SWITCH, NORMALLY OPEN TIME DELAY
SWITCH, SINGLE BREAK
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
MOLDED CASE CIRCUIT BREAKER
LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
HIGH-VOLTAGE OIL CIRCUIT BREAKER
HIGH-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
SWITCH AND FUSE UNIT
FUSED DRAWOUT POTENTIAL TRANSFORMER
ELECTRICAL SYMBOLS - DIAGRAM
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
DELTA CONNECTION
TRANSFORMER
WYE CONNECTION
EARTH GROUND
PULL BOX
PRESSURE SWITCH-CLOSE ON INCREASE
PRESSURE SWITCH-OPEN ON INCREASE
FUSIBLE LINK
TIME CLOCK
GENERATOR, POWER
BATTERY
CAPACITOR
LIGHTNING ARRESTOR
RECTIFIER, CATHODIC PROTECTION SANITARY
RELAY
50 = INSTANTANEOUS OVERCURRENT OR
RATE-OF-RISE
51 = AC-TIME OVERCURRENT
67 = AC-DIRECTIONAL OVERCURRENT
86 LOCKING OUT
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
POTHEAD
STRESS CONE
METER
AMMETER
VOLTMETER
WATTMETER
WATT-HOUR METER
PB
TC
J
V
W
WH
ABC
PA…