Attachment C Plans Drawings.pdf

PDF 5 MB Posted

Attached to
ITB 12192 Road Improvements at Saddle Mountain State Natural Area
Solicitation number
S-63400-00013766
Issued by
Clatsop County, Oregon

About this file

The file is a set of engineering plan drawings for the Saddle Mountain Roadway Improvements project, prepared for the Oregon Parks and Recreation Department (OPRD) in Clatsop County, Oregon. The project involves roadway milling, restoration, repair, and overlay along Saddle Mountain Road, with improvements spanning multiple tax lots across approximately 1,800 linear feet. The roadway work includes removing and replacing existing asphalt surfaces, adding new aggregate base materials, installing 2" HMAC base course and 1-1/2" HMAC overlay, constructing new aggregate shoulders, and implementing various roadway repair techniques. The project also includes installing culvert markers, traffic control signage, and erosion control measures.

The project documentation indicates comprehensive roadway rehabilitation with three primary improvement types: roadway milling and restoration, complete roadway repair, and roadway overlay. The contract (number 12192) is managed by Blaine Kaphammer from OPRD, with the park managed by Ben Cox. The project area encompasses multiple tax lots totaling approximately 1,746.35 acres, with the roadway improvements located at 0.80 miles east of Highway 26/Highway 53 interchange. The project coordinates are located at latitude 45° 57' 44.20" N and longitude 123° 41' 52.29" W, and includes detailed specifications for roadway surface preparation, base material management, asphalt placement, and transition details between improvement sections.

View the file

Other files

File Type Posted
BID TABULATION~5.docx DOCX document
Attachment B Technical Specifications.doc DOC document
Attachment A-2 Pricing Form~1.xlsx XLSX spreadsheet
ITB 12192 Saddle Mountain Road Improvements.docx DOCX document
A-2 Pricing Form Rev Addenda 2.xlsx XLSX spreadsheet
Addendum 1 to ITB 12192 Road Improvements at Saddle Mtn SNA~2.docx DOCX document
Addendum 2 to ITB 12192 Road Improvements at Saddle Mtn SNA~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

VICINITY MAP

NOT TO SCALE

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

STATE MAP

NOT TO SCALE

Brookings Medford

CLATSOP, OREGON

ABBREVIATIONS: CONTINUED: CONTINUED:CONTINUED:

AC ASPHALTIC CONCRETE

BC BACK OF CURB

BFP BACKFLOW PREVENTION DEVICE

BW BACK OFWALK

CATV CABLE TELEVISION

C&G CURB AND GUTTER

CF CURB FACE

C CENTERLINE

CO CLEAN OUT

CONC CONCRETE

DCV DETECTOR CHECK VALVE

DRWY DRIVEWAY

EC END OF CURVE

ECAB ELECTRIC CABINET

ELEC ELECTRIC

EM ELECTRIC METER

EMH ELECTRICIC MAN-HOLE

EP EDGE OF PAVEMENT

EPB ELECTRICAL PULL BOX

ESMT EASEMENT

FD FOUND

FDC FENCE

FL FLOWLINE

FP FINISH PAD ELEVATION

FS FINISH SURFACE

FW FRONT OF WALK

DIRECTION OF DRAINAGE FLOW

GS GAS LINE

GA GUY ANCHOR

GM GAS METER

GV GAS VALVE

HC HANDICAP

HCR HANDICAP RAMP

ICB IRRIGATION CONTROL BOX

ICV IRRIGATION CONTROL VALVE

INV INVERT

LF LINEAR FEET

LT STD LIGHT STANDARD

MH MANHOLE

NTS NOT TO SCALE

OH OVERHEAD

PB PULL BOX

PCC POINT COMPOUND CURVE

PED PEDESTAL

PI POINT OF INTERSECTION

PIV POST INDICATOR VALVE

PKWY PARKWAY

P PROPERTY LINE

P.O.C. POINT OF CONNECTION

PP POWER POLE

PRC POINT OF REVERSE CURVE

P.U.E. PUBLIC UTILITY EASEMENT

R RADIUS

R.C.B. REINFORCED CONCRETE BOX

RCLW RECLAIMED WATER LINE

RET RETAINING

R/W RIGHT OF WAY

SS SANITARY SEWER

SCO SEWER CLEAN-OUT

SD STORM DRAIN

SDCO STORM CLEAN-OUT

SDMH STORM DRAIN MANHOLE

SE SOUTHEAST

SE'LY SOUTHEASTERLY

SF SQUARE FEET

SLCB STREET LIGHT CONTROL BOX

SLPB STREET LIGHT PULL BOX

SMH SEWER MANHOLE

SP SIGN POST

STD STANDARD

STLT STREET LIGHT

SW SIDEWALK

TC TOP OF CURB

TG TOP OF GRATE

10"TR 10" DEMETER TREE

TOE TOE OF SLOPE

TOP TOP OF SLOPE

TRANS TRANSFORMER

TW TOP OF WALL

TYP. TYPICAL

V VALVE

VG VALLEY GUTTER

VLT VAULT

W WATER LINE

WM WATER METER

WV WATER VALVE

BEGIN

PROJECT

END

PROJECT

PARK ENTRANCE IS LOCATED AT - 0.80 MILES EAST

OF HIGHWAY 26 / HIGHWAY 53 INTERCHANGE

PROJECT LOCATION:

CONTACTS

PROJECT MANAGER:

BLAINE KAPHAMMER

OREGON PARKS & RECREATION DEPT.

725 SUMMER ST. NE, STE C

SALEM, OR 97301-1266

OFFICE: (503) 910-4324

OWNER/APPLICANT:

OREGON PARKS & RECREATION DEPT.

725 SUMMER ST. NE, STE C

SALEM, OR 97301-1271

OFFICE: (503) 986-0707

FAX: (503) 986-0792

PROJECT DATA

PARK MANAGER:

BEN COX

9500 SANDPIPER LANE (PO BOX 366)

NEHALEM, OR 97131

OFFICE: (503) 812-0650

LAT. 45° 57' 44.20" N

LONG. 123° 41' 52.29" W

T. 06 N, R. 08 W (TAX LOTS 4400 & 4700)

T. 05 N, R. 08 W (TAX LOTS 201, 202, & 203)

T. 05 N, R. 09 W, (TAX LOT 1000)

T. 05 N, R. 09 W, S. 24 (TAX LOTS 100 & 102)

TAX LOT SIZES:

TAX LOT 4700 - 61.73 ACRES

TAX LOT 4400 - 1,406.78 ACRES

TAX LOT 201 - 122.06 ACRES

TAX LOT 202 - 37.01 ACRES

TAX LOT 203 - 32.01 ACRES

TAX LOT 1000 - 85.48 ACRES

TAX LOT 100 - 6.01 ACRES

TAX LOT 102 - 4.96 ACRES

PROJECT COORDINATES:

TAX LOT INFORMATION:

Coos Bay

PROJECT

LOCATION

SHEET INDEX

C1 TITLE SHEET

G1 GENERAL NOTES

C2 TRAFFIC CONTROL PLAN

C3-C6 ROADWAY IMPROVEMENT PLAN

ESC1 EROSION AND SEDIMENT CONTROL PLANS

ESC2 EROSION AND SEDIMENT CONTROL DETAILS

D1-D4 DETAILS

OPRIS# 73402

CONTRACT# 12192

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

R O

A D

W A

Y

IM

P R

O

VE

M E

N T

P

LA

N

.d w g

Jo se ph L itt le

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text C1

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text 12192

AutoCAD SHX Text

NORTH

AutoCAD SHX Text COLOR CODES: RED - ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES - ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES YELLOW - GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. - GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. ORANGE - COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. - COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. BLUE - WATER, IRRIGATION, AND SLURRY LINES. - WATER, IRRIGATION, AND SLURRY LINES. WATER, IRRIGATION, AND SLURRY LINES. GREEN - SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. - SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. WHITE - PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE - PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE CENTERLINE AND WIDTH OF PROPOSED LINEAL INSTALLATIONS OF BURIED FACILITIES. PINK - TEMPORARY SURVEY MARKINGS - TEMPORARY SURVEY MARKINGS TEMPORARY SURVEY MARKINGS PURPLE - SLURRY AND RECLAIMED- SLURRY AND RECLAIMEDSLURRY AND RECLAIMED

AutoCAD SHX Text ATTENTION: OREGON LAW REQUIRES YOU TO : OREGON LAW REQUIRES YOU TO OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: (NOTE: : THE ADMINSTRATIVE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987).

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

G E

N E

R A

L N

O

TE

S .d w g

Jo se ph

L itt le

IMPROVEMENT NOTES:

ROADWAY MILLING AND RESTORATION. CONTRACTOR SHALL MILL A

MINIMUM OF 2” OF EXISTING THE ASPHALT SURFACE. IF

NECESSARY ADD ADDITIONAL BASE MATERIAL PER OWNER

APPROVAL. RESHAPE AND COMPACT BASE MATERIALS AS

NECESSARY. INSTALL 2” OF HMAC BASE COURSE CLASS II

PAVEMENT AND FINISH WITH 1-1/2” HMAC OVERLAY PER PROJECT

SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET D1.

COMPLETE ROADWAY REPAIR. CONTRACTOR TO REMOVE FULL

SECTION OF EXISTING ASPHALT PAVING, ADD THE NECESSARY

AMOUNT OF AGGREGATE BASE TO BRIDGE SUNKEN AREA. SHAPE

AND COMPACT NEW AGGREGATE BASE, PLACE 2” OF HMAC BASE

COURSE CLASS II PAVEMENT AND FINISH WITH 1-1/2” ASPHALT

WEARING SURFACE PER PROJECT SPECIFICATIONS AND AS SHOWN

IN DETAIL 1 SHOWN ON SHEET D2

ROADWAY OVERLAY. CONTRACTOR SHALL PREPARE EXISTING

PAVEMENT SURFACE FOR NEW PAVEMENT OVERLAY PER PROJECT

SPECIFICATIONS. FINISH WITH NEW 1-1/2” HMAC CLASS II

PAVEMENT. OVERLAY PER PROJECT SPECIFICATIONS AND AS

SHOWN ON DETAIL 1 ON SHEET D3.

CONTRACTOR SHALL INSTALL NEW CARSONITE SIGN POST WITH

ROADWAY STATIONING AS SHOWN IN DETAIL 2, SHEET D4. AT EACH

EXISTING CULVERT LOCATION.

CONTRACTOR SHALL CONSTRUCT ASPHALT TAPER AT TRANSITIONS

BETWEEN IMPROVEMENT AND EXISTING ROAD SURFACE PER

DETAIL 3 ON SHEET D4

ASPHALT PAVING GENERAL IMPROVEMENT NOTES:

CONTRACTOR SHALL SAW CUT AND PLACE NEW BUTT JOINTS AT

ALL BEGIN AND ENDING OF IMPROVEMENT AREAS AS SHOWN ON

DETAIL 1, SHEET D4

CONTRACTOR SHALL CONSTRUCT AGGREGATE ROADWAY

SHOULDER AT ALL ROADWAY REPAIR AREAS AS SHOWN IN REPAIR

DETAILS ON SHEETS D1 AND D2.

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text G1

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

12192

SADDLE MOUNTAIN RD.

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

TRAFFIC CONTROL NOTES:

1 INSTALL TYPE III TEMPORARY CONSTRUCTION BARRICADE WITH CONSTRUCTION R11-2 "ROAD CLOSED" SIGN PER ODOT

STANDARD DRAWING TM820

2 INSTALL TEMPORARY CONSTRUCTION SIGN WITH "ROAD CLOSED AT BRIDGE 200 FT AHEAD" PER ODOT STANDARD DRAWING

TM822

3 INSTALL TEMPORARY CONSTRUCTION SIGN WITH "ROAD CLOSED AT BRIDGE 500 FT AHEAD" PER ODOT STANDARD DRAWING

TM822

4 INSTALL TEMPORARY CONSTRUCTION SIGN WITH "THRU TRAFFIC ONLY" PER ODOT STANDARD DRAWING TM822

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

TR

A

FF

IC

C O

N

TR

O L.

dw g

Jo se ph

L itt le

1" = '

SCALE IN FEET

30 60

SADDLE MOUNTAIN RD.

DIRT RO

AD

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text C2

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

TRAFFIC CONTROL PLAN

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

LINE LEGEND

ROADWAY MILLING AND RESTORATION PER NOTE #1

COMPLETE ROADWAY REPAIR PER NOTE #2

ROAD OVERLAY PER NOTE #3

NO IMPROVEMENT

IMPROVEMENT NOTES:

ROADWAY MILLING AND RESTORATION. CONTRACTOR SHALL MILL A

MINIMUM OF 2” OF EXISTING THE ASPHALT SURFACE. IF NECESSARY ADD

ADDITIONAL BASE MATERIAL PER OWNER APPROVAL. RESHAPE AND

COMPACT BASE MATERIALS AS NECESSARY. INSTALL 2” OF HMAC BASE

COURSE CLASS II PAVEMENT AND FINISH WITH 1-1/2” HMAC OVERLAY PER

PROJECT SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET

D1.

COMPLETE ROADWAY REPAIR. CONTRACTOR TO REMOVE FULL SECTION

OF EXISTING ASPHALT PAVING, ADD THE NECESSARY AMOUNT OF

AGGREGATE BASE TO BRIDGE SUNKEN AREA. SHAPE AND COMPACT NEW

AGGREGATE BASE, PLACE 2” OF HMAC BASE COURSE CLASS II PAVEMENT

AND FINISH WITH 1-1/2” ASPHALT WEARING SURFACE PER PROJECT

SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET D2

ROADWAY OVERLAY. CONTRACTOR SHALL PREPARE EXISTING

PAVEMENT SURFACE FOR NEW PAVEMENT OVERLAY PER PROJECT

SPECIFICATIONS. FINISH WITH NEW 1-1/2” HMAC CLASS II PAVEMENT.

OVERLAY PER PROJECT SPECIFICATIONS AND AS SHOWN ON DETAIL 1 ON

SHEET D3.

2 ASPHALT PAVING GENERAL IMPROVEMENT NOTES:

CONTRACTOR SHALL SAW CUT AND PLACE NEW BUTT JOINTS AT

ALL BEGIN AND ENDING OF IMPROVEMENT AREAS AS SHOWN ON

DETAIL 1, SHEET D4

CONTRACTOR SHALL CONSTRUCT AGGREGATE ROADWAY

SHOULDER AT ALL ROADWAY REPAIR AREAS AS SHOWN IN REPAIR

DETAILS ON SHEETS D1 AND D2.

CONTRACTOR SHALL INSTALL NEW CARSONITE SIGN POST WITH

ROADWAY STATIONING AS SHOWN IN DETAIL 2, SHEET D4. AT EACH

EXISTING CULVERT LOCATION.

CONTRACTOR SHALL CONSTRUCT ASPHALT TAPER AT TRANSITIONS

BETWEEN IMPROVEMENT AND EXISTING ROAD SURFACE PER

DETAIL 3 ON SHEET D4

1" = '

SCALE IN FEET

250 500

SE

E

SH

EE

T C4

P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

HIGHW

AY 26

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

R O

A D

W A

Y

IM

P R

O

VE

M E

N T

P

LA

N

.d w g

Jo se ph L itt le

AutoCAD SHX Text

CULVERT #35

AutoCAD SHX Text

CULVERT #34

AutoCAD SHX Text

CULVERT #33

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text C3

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

ROADWAY IMPROVEMENT PLAN

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text 12192

AutoCAD SHX Text

BEGIN ROADWAY STATIONING

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

TYP.

COMPLETE ROADWAY REPAIR PER NOTE #2

ROAD OVERLAY PER NOTE #3

NO IMPROVEMENT

IMPROVEMENT NOTES:

ROADWAY MILLING AND RESTORATION. CONTRACTOR SHALL MILL A

MINIMUM OF 2” OF EXISTING THE ASPHALT SURFACE. IF NECESSARY ADD

ADDITIONAL BASE MATERIAL PER OWNER APPROVAL. RESHAPE AND

COMPACT BASE MATERIALS AS NECESSARY. INSTALL 2” OF HMAC BASE

COURSE CLASS II PAVEMENT AND FINISH WITH 1-1/2” HMAC OVERLAY PER

PROJECT SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET

D1.

COMPLETE ROADWAY REPAIR. CONTRACTOR TO REMOVE FULL SECTION

OF EXISTING ASPHALT PAVING, ADD THE NECESSARY AMOUNT OF

AGGREGATE BASE TO BRIDGE SUNKEN AREA. SHAPE AND COMPACT NEW

AGGREGATE BASE, PLACE 2” OF HMAC BASE COURSE CLASS II PAVEMENT

AND FINISH WITH 1-1/2” ASPHALT WEARING SURFACE PER PROJECT

SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET D2

ROADWAY OVERLAY. CONTRACTOR SHALL PREPARE EXISTING

PAVEMENT SURFACE FOR NEW PAVEMENT OVERLAY PER PROJECT

SPECIFICATIONS. FINISH WITH NEW 1-1/2” HMAC CLASS II PAVEMENT.

OVERLAY PER PROJECT SPECIFICATIONS AND AS SHOWN ON DETAIL 1 ON

SHEET D3.

2 ASPHALT PAVING GENERAL IMPROVEMENT NOTES:

CONTRACTOR SHALL SAW CUT AND PLACE NEW BUTT JOINTS AT

ALL BEGIN AND ENDING OF IMPROVEMENT AREAS AS SHOWN ON

DETAIL 1, SHEET D4

CONTRACTOR SHALL CONSTRUCT AGGREGATE ROADWAY

SHOULDER AT ALL ROADWAY REPAIR AREAS AS SHOWN IN REPAIR

DETAILS ON SHEETS D1 AND D2.

CONTRACTOR SHALL INSTALL NEW CARSONITE SIGN POST WITH

ROADWAY STATIONING AS SHOWN IN DETAIL 2, SHEET D4. AT EACH

EXISTING CULVERT LOCATION.

CONTRACTOR SHALL CONSTRUCT ASPHALT TAPER AT TRANSITIONS

BETWEEN IMPROVEMENT AND EXISTING ROAD SURFACE PER

DETAIL 3 ON SHEET D4

1" = '

SCALE IN FEET

250 500

SEE SHEET C3

P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

SE

E

SH

EE

T C

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

R O

A D

W A

Y

IM

P R

O

VE

M E

N T

P

LA

N

.d w g

Jo se ph L itt le

AutoCAD SHX Text

CULVERT #32

AutoCAD SHX Text

CULVERT #31

AutoCAD SHX Text

CULVERT #30

AutoCAD SHX Text

CULVERT #29

AutoCAD SHX Text

CULVERT #27

AutoCAD SHX Text

CULVERT #26

AutoCAD SHX Text

CULVERT #25

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text C4

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

ROADWAY IMPROVEMENT PLAN

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text 12192

AutoCAD SHX Text

4 TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

COMPLETE ROADWAY REPAIR PER NOTE #2

ROAD OVERLAY PER NOTE #3

NO IMPROVEMENT

IMPROVEMENT NOTES:

ROADWAY MILLING AND RESTORATION. CONTRACTOR SHALL MILL A

MINIMUM OF 2” OF EXISTING THE ASPHALT SURFACE. IF NECESSARY ADD

ADDITIONAL BASE MATERIAL PER OWNER APPROVAL. RESHAPE AND

COMPACT BASE MATERIALS AS NECESSARY. INSTALL 2” OF HMAC BASE

COURSE CLASS II PAVEMENT AND FINISH WITH 1-1/2” HMAC OVERLAY PER

PROJECT SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET

D1.

COMPLETE ROADWAY REPAIR. CONTRACTOR TO REMOVE FULL SECTION

OF EXISTING ASPHALT PAVING, ADD THE NECESSARY AMOUNT OF

AGGREGATE BASE TO BRIDGE SUNKEN AREA. SHAPE AND COMPACT NEW

AGGREGATE BASE, PLACE 2” OF HMAC BASE COURSE CLASS II PAVEMENT

AND FINISH WITH 1-1/2” ASPHALT WEARING SURFACE PER PROJECT

SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET D2

ROADWAY OVERLAY. CONTRACTOR SHALL PREPARE EXISTING

PAVEMENT SURFACE FOR NEW PAVEMENT OVERLAY PER PROJECT

SPECIFICATIONS. FINISH WITH NEW 1-1/2” HMAC CLASS II PAVEMENT.

OVERLAY PER PROJECT SPECIFICATIONS AND AS SHOWN ON DETAIL 1 ON

SHEET D3.

2 ASPHALT PAVING GENERAL IMPROVEMENT NOTES:

CONTRACTOR SHALL SAW CUT AND PLACE NEW BUTT JOINTS AT

ALL BEGIN AND ENDING OF IMPROVEMENT AREAS AS SHOWN ON

DETAIL 1, SHEET D4

CONTRACTOR SHALL CONSTRUCT AGGREGATE ROADWAY

SHOULDER AT ALL ROADWAY REPAIR AREAS AS SHOWN IN REPAIR

DETAILS ON SHEETS D1 AND D2.

CONTRACTOR SHALL INSTALL NEW CARSONITE SIGN POST WITH

ROADWAY STATIONING AS SHOWN IN DETAIL 2, SHEET D4. AT EACH

EXISTING CULVERT LOCATION.

CONTRACTOR SHALL CONSTRUCT ASPHALT TAPER AT TRANSITIONS

BETWEEN IMPROVEMENT AND EXISTING ROAD SURFACE PER

DETAIL 3 ON SHEET D4

1" = '

SCALE IN FEET

250 500

SEE SHEET C4

P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

SEE SHEET C6

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

R O

A D

W A

Y

IM

P R

O

VE

M E

N T

P

LA

N

.d w g

Jo se ph L itt le

AutoCAD SHX Text

SADDLE

AutoCAD SHX Text

MOUNTAIN

AutoCAD SHX Text

RD

AutoCAD SHX Text

CULVERT #24

AutoCAD SHX Text

CULVERT #20

AutoCAD SHX Text

CULVERT #22

AutoCAD SHX Text

CULVERT #21

AutoCAD SHX Text

CULVERT #19

AutoCAD SHX Text

CULVERT #17

AutoCAD SHX Text

CULVERT #16

AutoCAD SHX Text

CULVERT #15

AutoCAD SHX Text

CULVERT #13

AutoCAD SHX Text

CULVERT #14

AutoCAD SHX Text

CULVERT #12

AutoCAD SHX Text

CULVERT #11

AutoCAD SHX Text

CULVERT #10

AutoCAD SHX Text

CULVERT #15

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text C5

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

ROADWAY IMPROVEMENT PLAN

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text 12192

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

TYP.

COMPLETE ROADWAY REPAIR PER NOTE #2

ROAD OVERLAY PER NOTE #3

NO IMPROVEMENT

IMPROVEMENT NOTES:

ROADWAY MILLING AND RESTORATION. CONTRACTOR SHALL MILL A

MINIMUM OF 2” OF EXISTING THE ASPHALT SURFACE. IF NECESSARY ADD

ADDITIONAL BASE MATERIAL PER OWNER APPROVAL. RESHAPE AND

COMPACT BASE MATERIALS AS NECESSARY. INSTALL 2” OF HMAC BASE

COURSE CLASS II PAVEMENT AND FINISH WITH 1-1/2” HMAC OVERLAY PER

PROJECT SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET

D1.

COMPLETE ROADWAY REPAIR. CONTRACTOR TO REMOVE FULL SECTION

OF EXISTING ASPHALT PAVING, ADD THE NECESSARY AMOUNT OF

AGGREGATE BASE TO BRIDGE SUNKEN AREA. SHAPE AND COMPACT NEW

AGGREGATE BASE, PLACE 2” OF HMAC BASE COURSE CLASS II PAVEMENT

AND FINISH WITH 1-1/2” ASPHALT WEARING SURFACE PER PROJECT

SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET D2

ROADWAY OVERLAY. CONTRACTOR SHALL PREPARE EXISTING

PAVEMENT SURFACE FOR NEW PAVEMENT OVERLAY PER PROJECT

SPECIFICATIONS. FINISH WITH NEW 1-1/2” HMAC CLASS II PAVEMENT.

OVERLAY PER PROJECT SPECIFICATIONS AND AS SHOWN ON DETAIL 1 ON

SHEET D3.

2 ASPHALT PAVING GENERAL IMPROVEMENT NOTES:

CONTRACTOR SHALL SAW CUT AND PLACE NEW BUTT JOINTS AT

ALL BEGIN AND ENDING OF IMPROVEMENT AREAS AS SHOWN ON

DETAIL 1, SHEET D4

CONTRACTOR SHALL CONSTRUCT AGGREGATE ROADWAY

SHOULDER AT ALL ROADWAY REPAIR AREAS AS SHOWN IN REPAIR

DETAILS ON SHEETS D1 AND D2.

CONTRACTOR SHALL INSTALL NEW CARSONITE SIGN POST WITH

ROADWAY STATIONING AS SHOWN IN DETAIL 2, SHEET D4. AT EACH

EXISTING CULVERT LOCATION.

CONTRACTOR SHALL CONSTRUCT ASPHALT TAPER AT TRANSITIONS

BETWEEN IMPROVEMENT AND EXISTING ROAD SURFACE PER

DETAIL 3 ON SHEET D4

1" = '

SCALE IN FEET

250 500

SEE SHEET C5 P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

PARKING AREA

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

R O

A D

W A

Y

IM

P R

O

VE

M E

N T

P

LA

N

.d w g

Jo se ph L itt le

AutoCAD SHX Text

SADDLE

AutoCAD SHX Text

MOUNTAIN

AutoCAD SHX Text

RD

AutoCAD SHX Text 9'

AutoCAD SHX Text 19'

AutoCAD SHX Text

TYP

AutoCAD SHX Text

TYP

AutoCAD SHX Text

ADA PARKING SYMBOL SEE DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 22'

AutoCAD SHX Text 60°'

AutoCAD SHX Text 9'

AutoCAD SHX Text 41'

AutoCAD SHX Text 26'

AutoCAD SHX Text 22'

AutoCAD SHX Text

CULVERT #10

AutoCAD SHX Text

CULVERT #15

AutoCAD SHX Text

CULVERT #8

AutoCAD SHX Text

CULVERT #7

AutoCAD SHX Text

CULVERT #6

AutoCAD SHX Text

CULVERT #3

AutoCAD SHX Text

CULVERT #2

AutoCAD SHX Text

CULVERT #1

AutoCAD SHX Text

CULVERT #5

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text C6

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

ROADWAY IMPROVEMENT PLAN

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text 12192

AutoCAD SHX Text

SADDLE MOUNTAIN RD.

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

PROJECT BMP'S:

WM-9 SANITARY/SEPTIC WASTE MANAGEMENT

WM-10 LIQUID WASTE MANAGEMENT

WM-9 SANITARY/SEPTIC MANAGEMENT

WM-8 CONCRETE WASTE MANAGEMENT

WM-5 SOLID WASTE MANAGEMENT

WM-3 STOCKPILE MANAGEMENT

WM-2 MATERIAL USE

WM-1 MATERIAL DELIVERY AND STORAGE

WE-1 WIND EROSION

TC-1 STABILIZED CONSTRUCTION ENTRANCE/EXIT

SE-10 3-BAG HIGH STORM DRAIN INLET PROTECTION

SE-8 2-BAG HIGH SANDBAG BARRIER

SE-7 STREET SWEEPING AND VACUUMING

SE-4 1-BAG SANDBAG VELOCITY REDUCER

NS-13 CONCRETE FINISHING

NS-6 ILLICIT CONNECTION/ILLEGAL DISCHARGE DETECTION REPORTING

NS-3 PAVING AND GRINDING OPERATIONS

NS-1 WATER CONSERVATION

ES-2 PRESERVATION OF EXISTING VEGETATION

EC-1 SCHEDULING

EROSION CONTROL NOTES:

INSTALLATION OF EROSION CONTROL MEASURES NOTED WITHIN THIS PLAN SHALL BE COORDINATED WITH THE OWNER (OR PROJECT MANAGER) AT THE BEGINNING OF EACH WEEK DURING THE CONSTRUCTION PHASE OF THIS PROJECT.

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

E R

O S

IO

N

C O

N

TR

O L.

dw g

Jo se ph

L itt le

AutoCAD SHX Text

SADDLE

AutoCAD SHX Text

MOUNTAIN

AutoCAD SHX Text

RD

AutoCAD SHX Text 9'

AutoCAD SHX Text 19'

AutoCAD SHX Text

TYP

AutoCAD SHX Text

TYP

AutoCAD SHX Text

ADA PARKING SYMBOL SEE DETAIL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 22'

AutoCAD SHX Text 60°'

AutoCAD SHX Text 9'

AutoCAD SHX Text 41'

AutoCAD SHX Text 26'

AutoCAD SHX Text 22'

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text

ESC1

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

EROSION AND SEDIMENT CONTROL PLANS

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text 12192

BEGIN ROADWAY STATIONING

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

INSPECTION FREQUENCY

SITE CONDITION MINIMUM FREQUENCY

1. ACTIVE PERIOD

DAILY WHEN STORMWATER RUNOFF,

INCLUDING RUNOFF FROM SNOWMELT, IS

OCCURRING. AT LEAST ONCE EVERY TWO

WEEKS, REGARDLESS OF WHETHER OR NOT

RUNOFF IS OCCURRING.

2. PRIOR TO THE SITE BECOMING

INACTIVE OR IN ANTICIPATION OF

SITE INACCESSIBILITY

ONCE TO ENSURE THAT EROSION AND

SEDIMENT CONTROL MEASURES ARE IN

WORKING ORDER. ANY NECESSARY

MAINTENANCE AND REPAIR MUST BE MADE

PRIOR TO LEAVING THE SITE.

3. INACTIVE PERIODS GREATER

THAN FOURTEEN (14) CALENDAR

DAYS.

ONCE EVERY MONTH.

4. PERIODS DURING WHICH THE

SITE IS INACCESSIBLE DUE TO

INCLEMENT WEATHER.

IF PRACTICAL, INSPECTIONS MUST OCCUR

DAILY AT A RELEVANT AND ACCESSIBLE

DISCHARGE POINT OR DOWNSTREAM

LOCATION.

5. PERIODS DURING WHICH

DISCHARGE IS UNLIKELY DUE TO

FROZEN CONDITIONS.

MONTHLY. RESUME MONITORING

IMMEDIATELY UPON MELT, OR WHEN

WEATHER CONDITIONS MAKE DISCHARGES

LIKELY.

SUBGRADE

REINFORCEMENT

GEOTEXTILE

AREA DRAIN, CATCH BASIN

OR SWALE INLET

BURLAP SACKS TO

OVERLAP EDGES OF SWALE

SPILLWAY FROM SWALE

GRAVEL FILLED

SANDBAGS

STACKED TIGHTLY

(2)TWO BAGS HIGH

INLET PIPE

RAISED 1.5'

TYP.

SPILLWAY FROM FLOWLINE

GRAVEL FILLED

SANDBAGS

STACKED TIGHTLY

EXISTING COUNTY DITCH

CONSTRUCTION ENTRANCE4

ESC2 NOT TO SCALE

CATCH BASIN DRAIN INLET PROTECTION5

ESC2 NOT TO SCALE

INSPECTION FREQUENCY TABLE6

ESC2 NOT TO SCALE

DRAINAGE INLET PROTECTION (PLAN VIEW)7

ESC2 NOT TO SCALE

BURLAP SACKS

TO OVERLAP EDGES

OF SWALE

(2)TWO BAGS HIGH

2"X2"X36" WOOD STAKE

COMPOST FILTER SOCK (12" TYPICAL)

BLOWN/PLACED

FILTER MEDIA

12" M

IN

3" M

IN

4" M

AX

FLOW

WORK

AREA

AREA TO BE

PROTECTED

FLOW

WORK

AREA

AREA TO BE

PROTECTED

2"X2"X36" WOOD STAKE PLACED 10' O.C.

FL

O

W

AREA TO BE

PROTECTED

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

E R

O S

IO

N

C O

N

TR

O L.

dw g

Jo se ph

L itt le

MULCH SOCK DETAIL (PROFILE VIEW)1

ESC2 NOT TO SCALE

MULCH SOCK DETAIL (PLAN VIEW)1

ESC2 NOT TO SCALE

MULCH SOCK DETAIL (OVERLAP)1

ESC2 NOT TO SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text

ESC2

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

EROSION AND SEDIMENT CONTROL DETAILS

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

AutoCAD SHX Text 12192

AutoCAD SHX Text

50' MIN

12" MIN DEPTH

IMPROVEMENT NOTES:

ROADWAY MILLING AND RESTORATION. CONTRACTOR SHALL MILL A

MINIMUM OF 2” OF EXISTING THE ASPHALT SURFACE. IF NECESSARY ADD

ADDITIONAL BASE MATERIAL PER OWNER APPROVAL. RESHAPE AND

COMPACT BASE MATERIALS AS NECESSARY. INSTALL 2” OF HMAC BASE

COURSE CLASS II PAVEMENT AND FINISH WITH 1-1/2” HMAC OVERLAY PER

PROJECT SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET

D1.

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

R O

A D

W A

Y

IM

P R

O

VE

M E

N T

P

LA

N

.d w g

Jo se ph L itt le

P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

16' TYP.1'

NEW 2"-4" DEEP AGGREGATE SHOULDER

1:3 SLOPE TO CATCH EXISTING

APPROXIMATE EXISTING

SURFACE GRADE

REPLACE WITH NEW 2" HMAC BASE COURSE

CLASS II PAVEMENT.

<<< 1% MIN 2% MAX SLOPE MATCHING DRAINAGE OF

SURROUNDING AREA>>>

N.T.S.

1 ROADWAY MILLING AND RESTORATION DETAIL

D1

MILL A MINIMUM OF 2" OF EXISTING PAVING

IF NECESSARY RESHAPE AND COMPACT

EXISTING BASE MATERIALS.

IF NECESSARY ADD ADDITIONAL

BASE MATERIAL WITH OPRD

MANAGER APPROVAL.

TYP.

CONTRACTOR SHALL CONSTRUCT NEW AGGREGATE ROADWAY

SHOULDER AT ALL ROADWAY REPAIR SECTIONS.

ALL WORK TO COMPLY WITH PROJECT SPECIFICATIONS.

ASPHALT PAVING GENERAL IMPROVEMENT NOTES:

IMPROVED ASPHALT PAVING SECTION

NEW 1-1/2" HMAC

OVERLAY

REPLACE WITH NEW 2" HMAC BASE COURSE

CLASS II PAVEMENT.

MILL A MINIMUM OF 2" OF EXISTING PAVING

IF NECESSARY ADD ADDITIONAL

BASE MATERIAL WITH OWNER APPROVAL.

IF NECESSARY RESHAPE

AND COMPACT EXISTING

BASE MATERIALS.

NEW 1-1/2" HMAC

OVERLAY

ROADWAY TRANSITION DETAIL BETWEEN IMPROVED ROADWAY SECTIONS

1-1/2" OVERLAY

2" HMAC BASE COURSE EX. AC UNDISTURBED

BASE ROCK

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text D1

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

COMPLETE ROADWAY REPAIR. CONTRACTOR TO REMOVE FULL SECTION

OF EXISTING ASPHALT PAVING, ADD THE NECESSARY AMOUNT OF

AGGREGATE BASE TO BRIDGE SUNKEN AREA. SHAPE AND COMPACT NEW

AGGREGATE BASE, PLACE 2” OF HMAC BASE COURSE CLASS II PAVEMENT

AND FINISH WITH 1-1/2” ASPHALT WEARING SURFACE PER PROJECT

SPECIFICATIONS AND AS SHOWN IN DETAIL 1 SHOWN ON SHEET D2

P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

16' TYPICAL

FAILED AND SUNKEN PAVING TO

BE REPLACED. MAY BE HALF TO FULL

WIDTH OF ROADWAY.

16' TYPICAL

RECONSTRUCTED BASE SECTION

1'

1'<<< 1% MIN 4% MAX SLOPE MATCHING

DRAINAGE OF SURROUNDING AREA>>>

TYPICAL EXISTING SUNKEN ROADWAY CONDITION

COMPLETED ROADWAY REPAIR DETAIL

TRANSITION BACK TO EXISTING

GRADE MAX SLOPE 3:1

SEE IMPROVED SECTION RIGHT & BELOW

EXISTING

ROADWAY

FAILURE

REMOVE

EXISTING FAILED

BASE MATERIAL

ADD NEW BASE

MATERIAL AS

NEEDED TO BRIDGE

THE SUNKEN AREA.

SHAPE AND RE-COMPACT

PER PROJECT SPECIFICATIONS.

CONTRACTOR SHALL CONSTRUCT AGGREGATE ROADWAY

SHOULDER AT ALL ROADWAY REPAIR AREAS AS SHOWN IN REPAIR

DETAILS HEREON.

ASPHALT PAVING GENERAL IMPROVEMENT NOTES:

BUILD UP BASE SECTION PER

OPRD PROJECT MANAGER

DIRECTION. FILL WITH 1' TO 2.5' OF AGGREGATE

BASE FILL, SHAPE AND COMPACT PER

IMPROVEMENT NOTE 2 SHOWN BELOW. .

IMPROVED ASPHALT PAVING SECTION

IMPROVEMENT NOTES:

NEW 2"-4" DEEP AGGREGATE

SHOULDER 1:3 SLOPE TO

CATCH EXISTING

TYP. MIN.

NEW 2" HMAC BASE

COURSE ASPHALT

PAVEMENT

DEPTH VARIES

NEW 1-1/2" HMAC

OVERLAY

MILL A MINIMUM OF 2"

OF EXISTING PAVING

REPLACE WITH NEW

2" HMAC BASE COURSE

CLASS II PAVEMENT.

NEW 1-1/2" HMAC

OVERLAY

N.T.S.

1 COMPLETE ROADWAY REPAIR DETAIL

D2

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text D2

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

ROADWAY OVERLAY. CONTRACTOR SHALL PREPARE EXISTING

PAVEMENT SURFACE FOR NEW PAVEMENT OVERLAY PER PROJECT

SPECIFICATIONS. FINISH WITH NEW 1-1/2” HMAC CLASS II PAVEMENT.

OVERLAY PER PROJECT SPECIFICATIONS AND AS SHOWN ON DETAIL 1 ON

SHEET D3.

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

R O

A D

W A

Y

IM

P R

O

VE

M E

N T

P

LA

N

.d w g

Jo se ph L itt le

P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

16' TYP.1' NEW 2"-4" DEEP AGGREGATE SHOULDER

1:3 SLOPE TO CATCH EXISTING

APPROXIMATE EXISTING

SURFACE GRADE

<<< 1% MIN 2% MAX SLOPE MATCHING DRAINAGE OF

SURROUNDING AREA>>>

N.T.S.

1 ROADWAY OVERLAY DETAIL

PER PROJECT SPECIFICATIONS.

INSTALL NEW TACK COAT.

EXISTING AGGREGATE BASE TO

REMAIN UNDISTURBED.

FINISH WITH 1-1/2" HMAC CLASS II

PAVEMENT PER PROJECT

SPECIFICATIONS.

MIN,

TYP.

EXISTING ASPHALT TO REMAIN

THICKNESS UNKNOWN.

INSTALL NEW TACK

COAT UNDER OVERLAY.

FINISHED ROADWAY OVERLAY PAVING SECTION

IMPROVEMENT NOTES:

PREP EXISTING ASPHALT PAVEMENT

FOR OVERLAY PER PROJECT SPECIFICAITONS.

D3

NEW 1-1/2" HMAC

OVERLAY PREP EXISTING ASPHALT PAVEMENT

FOR OVERLAY PER PROJECT SPECIFICAITONS.

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text D3

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

/1

1/

0:

A M

R

:\2

O re go n P ar ks a nd

R ec re at io n

D ep ar tm en t -

O P

R D

\2

2-

S ad dl e M ou nt ai n

R oa dw ay a nd

C ul ve rt

A ss es sm en t R ep or tin g\

F in al

D es ig n\

D ra w in gs \D w g\

R O

A D

W A

Y

IM

P R

O

VE

M E

N T

P

LA

N

.d w g

Jo se ph L itt le

P:

-2

-8

O 'H

AR

E

PA

R

KW

AY

, S U

IT

E

M

ED

FO

R

D , O

R

EG

O N

R

EG I N

E

N

12, AM

81061PE

OREGON

E

EXPIRATION DATE: 06/30/26

REG

I STERED PROFESS IONAL

R.

D A V I D W . T U T T L E

EXISTING ASPHALT OR

AGGREGATE ROADWAY

SAWCUT BUTT JOINT TRANSITION

TACK AND SAND SEAL JOINT.

EXISTING AGGREGATE BASE

IMPROVED ROADWAY

N.T.S.

1 BUTT JOINT DETAIL

D4

N.T.S.

2 CARSONITE MARKER

D4

1' EMBEDMENT

4.50' REVEAL

EMBEDMENT

M

ILE PO

ST 4.2PLACE MARKER AT 3' OFF OF THE

WESTERLY EDGE OF PAVEMENT AT EACH

CULVERT CROSSING. BOTH CARSONITE

IDENTIFICATION STICKERS AND

CARSONITE POSTS SHALL BE OWNER

FURNISHED AND CONTRACTOR INSTALLED

N.T.S.

3 ASPHALT TAPER DETAIL

D4

EXISTING AC

EXISTING BASE ROCK

1/2" LEVEL 2 HMAC WEARING

SURFACE SAND SEAL EXCESSIVE

VOIDS

AC OVERLAY, SEE OVERLAY CONSTRUCTION

DETAIL

20'-0"

NOT TO SCALE

AutoCAD SHX Text

DESIGNED BY

AutoCAD SHX Text

APPROVED BY

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

BY

AutoCAD SHX Text

OREGON PARKS AND RECREATION DEPARTMENT

AutoCAD SHX Text

SHEET:

AutoCAD SHX Text

OPRIS#:

AutoCAD SHX Text

OF

AutoCAD SHX Text

CONTRACT #:

AutoCAD SHX Text

AutoCAD SHX Text 73402

AutoCAD SHX Text D4

AutoCAD SHX Text

SADDLE MOUNTAIN STATE NATURAL AREA

AutoCAD SHX Text

SADDLE MOUNTAIN ROADWAY IMPROVEMENTS

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text 03/11/2025

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MR

AutoCAD SHX Text

MR

C1 TITLE SHEET
G1 GENERAL NOTES
C2 TRAFFIC CONTROL PLAN
C3 ROADWAY IMPROVEMENT PLAN
C4 ROADWAY IMPROVEMENT PLAN
C5 ROADWAY IMPROVEMENT PLAN
C6 ROADWAY IMPROVEMENT PLAN
ESC1 EROSION AND SEDIMENT CONTROL PLANS
ESC2 EROSION AND SEDIMENT CONTROL DETAILS
D1 DETAILS
D2 DETAILS
D3 DETAILS
D4 DETAILS

File details come from the government source that posted it. Updated .